Download as PDF khammond on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 84, No. 82 / Monday, April 29, 2019 / Notices watercraft, and have a pier with a platform, and a gas pump; a delineated swim area; riprap; a drainage ditch; and a concrete walkway. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list VerDate Sep<11>2014 16:56 Apr 26, 2019 Jkt 247001 prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: April 23, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–08561 Filed 4–26–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL19–67–000, Docket No. QF19–1082–001, Docket No. QF19–1083– 001, Docket No. QF19–1084–001] Michael Eisenfeld, James Neidhart, Jeffrey Neidhart, Steven Bair, Neil Tribbett, Jerry Knutson, Victoria Slikkerveer, Crystal Williams, The Coliseum, Inc., David Fosdeck, Stephen Ellison, Erin Hourihan, and Vote Solar; Notice of Petition for Enforcement Take notice that on April 19, 2019, pursuant to section 210(h)(2)(B) of the Public Utility Regulatory Policies Act of 1978 (PURPA), Michael Eisenfeld, James Neidhart, Jeffrey Neidhart, Steven Bair, Neil Tribbett, Jerry Knutson, Victoria Slikkerveer, Crystal Williams, The Coliseum, Inc., David Fosdeck, Stephen Ellison, Erin Hourihan, and Vote Solar (together, Petitioners) filed a Petition for Enforcement (petition), requesting that the Federal Energy Regulatory Commission (Commission) initiate an enforcement action against the City of Farmington, New Mexico, d/b/a Farmington Electric Utility System to remedy their alleged improper implementation of PURPA, all as more fully explained in their petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Petitioners. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 18015 should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on May 10, 2019. Dated: April 23, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–08554 Filed 4–26–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC19–21–000] Commission Information Collection Activities (FERC–729); Comment Request; Extension Federal Energy Regulatory Commission, DOE. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC– 729 (Electric Transmission Facilities). DATES: Comments on the collection of information are due June 28, 2019. ADDRESSES: You may submit comments (identified by Docket No. IC19–21–000) by either of the following methods: • eFiling at Commission’s Website: https://www.ferc.gov/docs-filing/ efiling.asp • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance, contact SUMMARY: E:\FR\FM\29APN1.SGM 29APN1 18016 Federal Register / Vol. 84, No. 82 / Monday, April 29, 2019 / Notices FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663, and fax at (202) 273– 0873. SUPPLEMENTARY INFORMATION: Title: FERC–729, Electric Transmission Facilities. OMB Control No.: 1902–0238. Abstract: This information collection implements the Commission’s mandates under EPAct 2005 Section 1221 which authorizes the Commission to issue permits under FPA Section 216(b) for electric transmission facilities and the Commission’s delegated responsibility to coordinate all other federal authorizations under FPA Section 216(h). The related FERC regulations seek to develop a timely review process for siting of proposed electric transmission facilities. The regulations provide for (among other things) an extensive pre-application process that will facilitate maximum participation from all interested entities and individuals to provide them with a reasonable opportunity to present their views and recommendations, with respect to the need for and impact of the facilities, early in the planning stages of the proposed facilities as required under FPA Section 216(d). Additionally, FERC has the authority to issue a permit to construct electric transmission facilities if a state has withheld approval for more than a year or has conditioned its approval in such a manner that it will not significantly reduce transmission congestion or is not economically feasible.1 FERC envisions that, under certain circumstances, the Commission’s review of the proposed facilities may take place after one year of the state’s review. Under Section 50.6(e)(3) the Commission will not accept applications until one year after the state’s review and then from applicants who can demonstrate that a state may withhold or condition approval of proposed facilities to such an extent that the facilities will not be constructed.2 In cases where FERC’s jurisdiction rests on FPA section 216(b)(1)(C),3 the pre-filing process should not commence until one year after the relevant State applications have been filed. This will give states one full year to process an application without any intervening Federal proceedings, including both the prefiling and application processes. Once that year is complete, an applicant may seek to commence FERC’s pre-filing process. Thereafter, once the pre-filing process is complete, the applicant may submit its application for a construction permit. Type of Respondent: Electric transmission facilities. Estimate of Annual Burden: 4 The Commission estimates the annual public reporting burden for the information collection as: FERC–729: ELECTRIC TRANSMISSION FACILITIES Number of respondents Annual number of responses per respondent Total number of responses Average burden & cost per response 5 Total annual burden hours & total annual cost (1) (2) (1) * (2) = (3) (4) (3) * (4) = (5) Electric Transmission Facilities ............................................ khammond on DSKBBV9HB2PROD with NOTICES Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. 1 FPA section 216(b)(1)(C). Commission will not issue a permit authorizing construction of the proposed facilities until, among other things, it finds that the state has, in fact, withheld approval for more than a year or had so conditioned its approval. 3 In all other instances (i.e. where the state does not have jurisdiction to act or otherwise to consider 2 The VerDate Sep<11>2014 16:56 Apr 26, 2019 Jkt 247001 1 1 Dated: April 23, 2019. Kimberly D. Bose, Secretary. 1 9,600 $758,400 9,600 $758,400 DEPARTMENT OF ENERGY [FR Doc. 2019–08560 Filed 4–26–19; 8:45 am] Federal Energy Regulatory Commission [Docket No. ER19–1646–000] BILLING CODE 6717–01–P Performance Materials NA, Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Performance Materials NA, Inc.’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of interstate benefits, or the applicant does not qualify to apply for a permit with the State because it does not serve end use customers in the State), the prefiling process may be commenced at any time. 4 ‘‘Burden’’ is the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 of what is included in the information collection burden, refer to Title 5 Code of Federal Regulations 1320.3. 5 FERC staff estimates that industry costs for salary plus benefits are similar to Commission costs. The cost figure is the FY2018 FERC average annual salary plus benefits ($164,820/year or $79/ hour). E:\FR\FM\29APN1.SGM 29APN1

Agencies

[Federal Register Volume 84, Number 82 (Monday, April 29, 2019)]
[Notices]
[Pages 18015-18016]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-08560]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC19-21-000]


Commission Information Collection Activities (FERC-729); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission, DOE.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the currently approved 
information collection, FERC-729 (Electric Transmission Facilities).

DATES: Comments on the collection of information are due June 28, 2019.

ADDRESSES: You may submit comments (identified by Docket No. IC19-21-
000) by either of the following methods:
     eFiling at Commission's Website: https://www.ferc.gov/docs-filing/efiling.asp
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance, contact

[[Page 18016]]

FERC Online Support by email at [email protected], or by phone 
at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION:
    Title: FERC-729, Electric Transmission Facilities.
    OMB Control No.: 1902-0238.
    Abstract: This information collection implements the Commission's 
mandates under EPAct 2005 Section 1221 which authorizes the Commission 
to issue permits under FPA Section 216(b) for electric transmission 
facilities and the Commission's delegated responsibility to coordinate 
all other federal authorizations under FPA Section 216(h). The related 
FERC regulations seek to develop a timely review process for siting of 
proposed electric transmission facilities. The regulations provide for 
(among other things) an extensive pre-application process that will 
facilitate maximum participation from all interested entities and 
individuals to provide them with a reasonable opportunity to present 
their views and recommendations, with respect to the need for and 
impact of the facilities, early in the planning stages of the proposed 
facilities as required under FPA Section 216(d).
    Additionally, FERC has the authority to issue a permit to construct 
electric transmission facilities if a state has withheld approval for 
more than a year or has conditioned its approval in such a manner that 
it will not significantly reduce transmission congestion or is not 
economically feasible.\1\ FERC envisions that, under certain 
circumstances, the Commission's review of the proposed facilities may 
take place after one year of the state's review. Under Section 
50.6(e)(3) the Commission will not accept applications until one year 
after the state's review and then from applicants who can demonstrate 
that a state may withhold or condition approval of proposed facilities 
to such an extent that the facilities will not be constructed.\2\ In 
cases where FERC's jurisdiction rests on FPA section 216(b)(1)(C),\3\ 
the pre-filing process should not commence until one year after the 
relevant State applications have been filed. This will give states one 
full year to process an application without any intervening Federal 
proceedings, including both the pre-filing and application processes. 
Once that year is complete, an applicant may seek to commence FERC's 
pre-filing process. Thereafter, once the pre-filing process is 
complete, the applicant may submit its application for a construction 
permit.
---------------------------------------------------------------------------

    \1\ FPA section 216(b)(1)(C).
    \2\ The Commission will not issue a permit authorizing 
construction of the proposed facilities until, among other things, 
it finds that the state has, in fact, withheld approval for more 
than a year or had so conditioned its approval.
    \3\ In all other instances (i.e. where the state does not have 
jurisdiction to act or otherwise to consider interstate benefits, or 
the applicant does not qualify to apply for a permit with the State 
because it does not serve end use customers in the State), the pre-
filing process may be commenced at any time.
---------------------------------------------------------------------------

    Type of Respondent: Electric transmission facilities.
    Estimate of Annual Burden: \4\ The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \4\ ``Burden'' is the total time, effort, or financial resources 
expended by persons to generate, maintain, retain, or disclose or 
provide information to or for a Federal agency. For further 
explanation of what is included in the information collection 
burden, refer to Title 5 Code of Federal Regulations 1320.3.
    \5\ FERC staff estimates that industry costs for salary plus 
benefits are similar to Commission costs. The cost figure is the 
FY2018 FERC average annual salary plus benefits ($164,820/year or 
$79/hour).

                                   FERC-729: Electric Transmission Facilities
----------------------------------------------------------------------------------------------------------------
                                                                                                   Total annual
                                     Number of     Annual number   Total number   Average burden  burden hours &
                                    respondents    of responses    of responses     & cost per     total annual
                                                  per respondent                   response \5\        cost
                                             (1)             (2)     (1) * (2) =             (4)     (3) * (4) =
                                                                             (3)                             (5)
----------------------------------------------------------------------------------------------------------------
Electric Transmission Facilities               1               1               1           9,600           9,600
                                                                                        $758,400        $758,400
----------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: April 23, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-08560 Filed 4-26-19; 8:45 am]