Performance Materials NA, Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 18016-18017 [2019-08557]

Download as PDF 18016 Federal Register / Vol. 84, No. 82 / Monday, April 29, 2019 / Notices FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663, and fax at (202) 273– 0873. SUPPLEMENTARY INFORMATION: Title: FERC–729, Electric Transmission Facilities. OMB Control No.: 1902–0238. Abstract: This information collection implements the Commission’s mandates under EPAct 2005 Section 1221 which authorizes the Commission to issue permits under FPA Section 216(b) for electric transmission facilities and the Commission’s delegated responsibility to coordinate all other federal authorizations under FPA Section 216(h). The related FERC regulations seek to develop a timely review process for siting of proposed electric transmission facilities. The regulations provide for (among other things) an extensive pre-application process that will facilitate maximum participation from all interested entities and individuals to provide them with a reasonable opportunity to present their views and recommendations, with respect to the need for and impact of the facilities, early in the planning stages of the proposed facilities as required under FPA Section 216(d). Additionally, FERC has the authority to issue a permit to construct electric transmission facilities if a state has withheld approval for more than a year or has conditioned its approval in such a manner that it will not significantly reduce transmission congestion or is not economically feasible.1 FERC envisions that, under certain circumstances, the Commission’s review of the proposed facilities may take place after one year of the state’s review. Under Section 50.6(e)(3) the Commission will not accept applications until one year after the state’s review and then from applicants who can demonstrate that a state may withhold or condition approval of proposed facilities to such an extent that the facilities will not be constructed.2 In cases where FERC’s jurisdiction rests on FPA section 216(b)(1)(C),3 the pre-filing process should not commence until one year after the relevant State applications have been filed. This will give states one full year to process an application without any intervening Federal proceedings, including both the prefiling and application processes. Once that year is complete, an applicant may seek to commence FERC’s pre-filing process. Thereafter, once the pre-filing process is complete, the applicant may submit its application for a construction permit. Type of Respondent: Electric transmission facilities. Estimate of Annual Burden: 4 The Commission estimates the annual public reporting burden for the information collection as: FERC–729: ELECTRIC TRANSMISSION FACILITIES Number of respondents Annual number of responses per respondent Total number of responses Average burden & cost per response 5 Total annual burden hours & total annual cost (1) (2) (1) * (2) = (3) (4) (3) * (4) = (5) Electric Transmission Facilities ............................................ khammond on DSKBBV9HB2PROD with NOTICES Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. 1 FPA section 216(b)(1)(C). Commission will not issue a permit authorizing construction of the proposed facilities until, among other things, it finds that the state has, in fact, withheld approval for more than a year or had so conditioned its approval. 3 In all other instances (i.e. where the state does not have jurisdiction to act or otherwise to consider 2 The VerDate Sep<11>2014 16:56 Apr 26, 2019 Jkt 247001 1 1 Dated: April 23, 2019. Kimberly D. Bose, Secretary. 1 9,600 $758,400 9,600 $758,400 DEPARTMENT OF ENERGY [FR Doc. 2019–08560 Filed 4–26–19; 8:45 am] Federal Energy Regulatory Commission [Docket No. ER19–1646–000] BILLING CODE 6717–01–P Performance Materials NA, Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Performance Materials NA, Inc.’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of interstate benefits, or the applicant does not qualify to apply for a permit with the State because it does not serve end use customers in the State), the prefiling process may be commenced at any time. 4 ‘‘Burden’’ is the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 of what is included in the information collection burden, refer to Title 5 Code of Federal Regulations 1320.3. 5 FERC staff estimates that industry costs for salary plus benefits are similar to Commission costs. The cost figure is the FY2018 FERC average annual salary plus benefits ($164,820/year or $79/ hour). E:\FR\FM\29APN1.SGM 29APN1 Federal Register / Vol. 84, No. 82 / Monday, April 29, 2019 / Notices khammond on DSKBBV9HB2PROD with NOTICES future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is May 13, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link above. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 23, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–08557 Filed 4–26–19; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 16:56 Apr 26, 2019 Jkt 247001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–1933–010. Applicants: Interstate Power and Light Company. Description: Notification of Change in Status of Interstate Power and Light Company. Filed Date: 4/19/19. Accession Number: 20190419–5188. Comments Due: 5 p.m. ET 5/10/19. Docket Numbers: ER18–2054–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Compliance filing: 2019– 04–23_Attachment X Compliance relative to EL18–17–000 to be effective 7/24/2018. Filed Date: 4/23/19. Accession Number: 20190423–5115. Comments Due: 5 p.m. ET 5/14/19. Docket Numbers: ER18–2318–002. Applicants: Southwest Power Pool, Inc. Description: Compliance filing: Compliance Filing in ER18–2318— Order No. 844 Compliance to be effective 1/1/2019. Filed Date: 4/22/19. Accession Number: 20190422–5158. Comments Due: 5 p.m. ET 5/13/19. Docket Numbers: ER19–1639–000. Applicants: South Peak Wind LLC. Description: Baseline eTariff Filing: Market-based rate application to be effective 6/21/2019. Filed Date: 4/22/19. Accession Number: 20190422–5155. Comments Due: 5 p.m. ET 5/13/19. Docket Numbers: ER19–1641–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2019–04–22 RMR CPM Enhancements Amendment to be effective 7/22/2019. Filed Date: 4/23/19. Accession Number: 20190423–5000. Comments Due: 5 p.m. ET 5/14/19. Docket Numbers: ER19–1642–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Letter Agreement with Quarantina Energy Storage, LLC to be effective 4/12/2019. Filed Date: 4/23/19. Accession Number: 20190423–5001. Comments Due: 5 p.m. ET 5/14/19. Docket Numbers: ER19–1643–000. Applicants: Hopewell Power Generation, LLC. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 18017 Description: Baseline eTariff Filing: Baseline New Reactive Service Tariff to be effective 4/24/2019. Filed Date: 4/23/19. Accession Number: 20190423–5002. Comments Due: 5 p.m. ET 5/14/19. Docket Numbers: ER19–1644–000. Applicants: Richland-Stryker Generation LLC. Description: Baseline eTariff Filing: Baseline New Reactive Service Tariff to be effective 4/24/2019. Filed Date: 4/23/19. Accession Number: 20190423–5004. Comments Due: 5 p.m. ET 5/14/19. Docket Numbers: ER19–1645–000. Applicants: DTE Electric Company. Description: Notice of Cancellation of Distribution Interconnection Agreement (Rate Schedule No. 38) of DTE Electric Company. Filed Date: 4/19/19. Accession Number: 20190419–5185. Comments Due: 5 p.m. ET 5/10/19. Docket Numbers: ER19–1646–000. Applicants: Performance Materials NA, Inc. Description: Baseline eTariff Filing: Petition for Approval of Initial MarketBased Rate Tariff to be effective 6/23/2019. Filed Date: 4/23/19. Accession Number: 20190423–5044. Comments Due: 5 p.m. ET 5/14/19. Docket Numbers: ER19–1647–000. Applicants: AM Commodities Corporation. Description: Tariff Cancellation: Notice of Cancellation of Market-Based Rate Tariff to be effective 6/23/2019. Filed Date: 4/23/19. Accession Number: 20190423–5065. Comments Due: 5 p.m. ET 5/14/19. Docket Numbers: ER19–1648–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Empire District Electric Company Formula Rate Revisions to be effective 1/1/2019. Filed Date: 4/23/19. Accession Number: 20190423–5097. Comments Due: 5 p.m. ET 5/14/19. Docket Numbers: ER19–1649–000. Applicants: California Power Exchange Corporation. Description: Petition to Extend Existing Wind-Up Charge Settlement of California Power Exchange Corporation. Filed Date: 4/22/19. Accession Number: 20190422–5226. Comments Due: 5 p.m. ET 5/13/19. Docket Numbers: ER19–1650–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, SA No. 4512; E:\FR\FM\29APN1.SGM 29APN1

Agencies

[Federal Register Volume 84, Number 82 (Monday, April 29, 2019)]
[Notices]
[Pages 18016-18017]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-08557]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER19-1646-000]


Performance Materials NA, Inc.; Supplemental Notice That Initial 
Market-Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Performance Materials NA, Inc.'s application for market-based rate 
authority, with an accompanying rate tariff, noting that such 
application includes a request for blanket authorization, under 18 CFR 
part 34, of

[[Page 18017]]

future issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is May 13, 2019.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link 
above. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected]. or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: April 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-08557 Filed 4-26-19; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.