Constellation Power Source Generation, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 18014 [2019-08553]
Download as PDF
18014
Federal Register / Vol. 84, No. 82 / Monday, April 29, 2019 / Notices
FERC–915, PUBLIC UTILITY MARKET-BASED RATE AUTHORIZATION HOLDERS—RECORDS RETENTION REQUIREMENTS
FERC Requirement
Number of
respondents
Annual number
of responses
per respondent
Total number
of responses
Average burden
& cost per
response
Total annual
burden hours
& cost
Annual cost
per respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
FERC–915 ...............
2,510
1
2,510
1 hr.; $33.00 ..........
2,510 hrs.; $82,830
$33.00
Total: ................
............................
............................
2,510
................................
2,510 hrs.; 82, 830
............................
In addition, there are records storage
costs. For all respondents, we estimate
a total of 65,000 cu. ft. of records in offsite storage. Based on an approximate
storage cost of $0.24 per cubic foot, we
estimate total annual storage cost to be
$15,600.00 (or $6.22 annually per
respondent). The total annual cost for
all respondents (burden cost plus offsite storage) is $98,430.00 (or $82,830 +
$15,600); the average total annual cost
per respondent is $39.22 ($6.22 +
$33.00).
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: April 23, 2019.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL19–57–000]
Constellation Power Source
Generation, LLC; Notice of Institution
of Section 206 Proceeding and Refund
Effective Date
khammond on DSKBBV9HB2PROD with NOTICES
[FR Doc. 2019–08553 Filed 4–26–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests:
Alabama Power Company
BILLING CODE 6717–01–P
On April 19, 2019, the Commission
issued an order in Docket No. EL19–57–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into the continued justness and
reasonableness of Constellation Power
Source Generation, LLC’s rate for
16:56 Apr 26, 2019
Dated: April 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[Project No. 2146–252]
[FR Doc. 2019–08559 Filed 4–26–19; 8:45 am]
VerDate Sep<11>2014
providing Reactive Supply and Voltage
Control Service. Constellation Power
Source Generation, LLC, 167 FERC
¶ 61,062 (2019).
The refund effective date in Docket
No. EL19–57–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL19–57–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2018),
within 21 days of the date of issuance
of the order.
Jkt 247001
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2146–252.
c. Date Filed: March 14, 2019.
d. Applicant: Alabama Power
Company.
e. Name of Project: Coosa River
Hydroelectric Project.
f. Location: Coosa River, in Etowah
County, Alabama.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Justin Bearden,
Shoreline Management, Alabama Power
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Company, 600 North 18th Street,
Birmingham, Alabama 35203, (205)
257–6769, jbearden@southernco.com.
i. FERC Contact: Shana High, (202)
502–8674.
j. Deadline for filing comments,
motions to intervene, and protests: May
23, 2019.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2146–252.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Alabama
Power Company requests Commission
approval to permit The City of
Southside to construct shoreline-based
amenities associated with a riverfront
development project. The following
amenities are proposed within the
project boundary: a boat ramp and fixed
pier; four boat docks that would
accommodate 24 watercraft each; a
boardwalk that would accommodate 20
E:\FR\FM\29APN1.SGM
29APN1
Agencies
[Federal Register Volume 84, Number 82 (Monday, April 29, 2019)]
[Notices]
[Page 18014]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-08553]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL19-57-000]
Constellation Power Source Generation, LLC; Notice of Institution
of Section 206 Proceeding and Refund Effective Date
On April 19, 2019, the Commission issued an order in Docket No.
EL19-57-000, pursuant to section 206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an investigation into the continued
justness and reasonableness of Constellation Power Source Generation,
LLC's rate for providing Reactive Supply and Voltage Control Service.
Constellation Power Source Generation, LLC, 167 FERC ] 61,062 (2019).
The refund effective date in Docket No. EL19-57-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL19-57-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426, in accordance with Rule 214 of the
Commission's Rules of Practice and Procedure, 18 CFR 385.214 (2018),
within 21 days of the date of issuance of the order.
Dated: April 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-08553 Filed 4-26-19; 8:45 am]
BILLING CODE 6717-01-P