Combined Notice of Filings #1, 17823-17824 [2019-08425]
Download as PDF
Federal Register / Vol. 84, No. 81 / Friday, April 26, 2019 / Notices
Dated: April 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2019–08423 Filed 4–25–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: April 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[Docket No. ER19–1621–000]
amozie on DSK9F9SC42PROD with NOTICES
Great American Gas & Electric, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2019–08427 Filed 4–25–19; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding of Great
American Gas & Electric, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 9, 2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link above.
They are also available for electronic
VerDate Sep<11>2014
17:28 Apr 25, 2019
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–2344–003.
Applicants: Headwaters Wind Farm
LLC.
Description: Compliance filing:
Headwaters Wind Farm LLC, Docket No.
ER18–2344–003 to be effective
10/29/2018.
Filed Date: 4/22/19.
Accession Number: 20190422–5025.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER18–2397–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2019–
04–22_Compliance filing to Order 844
to be effective 7/1/2019.
Filed Date: 4/22/19.
Accession Number: 20190422–5112.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19–875–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2019–04–22_Deficiency Response to
Cyber Security Coordination to be
effective 3/30/2019.
Filed Date: 4/22/19.
Accession Number: 20190422–5142.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19–1343–000;
ER19–1342–000.
Applicants: NMRD Data Center III,
LLC, NMRD Data Center II, LLC.
Description: Supplement to March 18,
2019 NMRD Data Center III, LLC, et al.
tariff filings.
Filed Date: 4/19/19.
Accession Number: 20190419–5127.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19–1629–000.
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
17823
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3357
Monument Road Wind GIA Cancellation
to be effective 3/21/2019.
Filed Date: 4/22/19.
Accession Number: 20190422–5005.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19–1630–000.
Applicants: Entergy Louisiana, LLC.
Description: Tariff Cancellation:
Entergy Louisiana, LLC to be effective
1/1/2019.
Filed Date: 4/22/19.
Accession Number: 20190422–5020.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19–1631–000.
Applicants: Entergy Mississippi, LLC.
Description: Tariff Cancellation:
Entergy Mississippi, LLC to be effective
1/1/2019.
Filed Date: 4/22/19.
Accession Number: 20190422–5024.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19–1632–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ICSA, SA No.
3399, Queue Position V3–045 to be
effective 3/7/2017.
Filed Date: 4/22/19.
Accession Number: 20190422–5057.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19–1633–000.
Applicants: Rumford Power LLC.
Description: Compliance filing: Notice
of Succession, Revised MBR Tariff, &
New eTariff Baseline to be effective
4/23/2019.
Filed Date: 4/22/19.
Accession Number: 20190422–5101.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19–1634–000.
Applicants: Bridgeport Energy LLC.
Description: Compliance filing:
Revised MBR Tariff & New eTariff
Baseline to be effective 4/23/2019.
Filed Date: 4/22/19.
Accession Number: 20190422–5111.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19–1635–000.
Applicants: Glaciers Edge Wind
Project, LLC.
Description: Baseline eTariff Filing:
Glaciers Edge Initial Market-Based Rate
Application Filing to be effective
6/22/2019.
Filed Date: 4/22/19.
Accession Number: 20190422–5113.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19–1636–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–04–22_Termination of SA 6510
MISO-Cleco SSR Agreement for Teche
Unit No. 3 to be effective 4/30/2019.
E:\FR\FM\26APN1.SGM
26APN1
17824
Federal Register / Vol. 84, No. 81 / Friday, April 26, 2019 / Notices
Filed Date: 4/22/19.
Accession Number: 20190422–5123.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19–1637–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Attachment AE to Allow
DVERs to Utilize Control Status 3 to be
effective 12/31/9998.
Filed Date: 4/22/19.
Accession Number: 20190422–5128.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19–1638–000.
Applicants: Tiverton Power LLC.
Description: Compliance filing:
Revised MBR Tariff & New eTariff
Baseline to be effective 4/23/2019.
Filed Date: 4/22/19.
Accession Number: 20190422–5133.
Comments Due: 5 p.m. ET 5/13/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–08425 Filed 4–25–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
amozie on DSK9F9SC42PROD with NOTICES
[Docket No. CP16–480–000]
Annova LNG Common Infrastructure,
LLC, Annova LNG Brownsville A, LLC,
Annova LNG Brownsville B, LLC,
Annova LNG Brownsville C, LLC;
Notice of Availability of the Final
Environmental Impact Statement for
the Proposed Annova LNG Brownsville
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
VerDate Sep<11>2014
17:28 Apr 25, 2019
Jkt 247001
environmental impact statement (EIS)
for the Annova LNG Brownsville Project
(referred to as the Annova LNG Project,
or Project). Annova LNG Common
Infrastructure LLC, Annova LNG
Brownsville A LLC, Annova LNG
Brownsville B LLC, and Annova LNG
Brownsville C, LLC (collectively
referred to as Annova LNG) request
authorization to site, construct, and
operate liquefied natural gas (LNG)
export facilities on the Brownsville Ship
Channel in Cameron County, Texas. The
Project would include a new LNG
export terminal capable of producing up
to 6.95 million metric tons per year of
LNG for export. The LNG terminal
would receive natural gas to the export
facilities from a third party intrastate
pipeline.
The final EIS assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the Project would result in adverse
environmental impacts. With the
mitigation measures recommended in
the EIS and Annova’s proposed
mitigation measures, most impacts in
the Project area would be avoided or
minimized and would not be
significant. However, the Project would
have significant construction noise
impacts during the six months of
nighttime pile-driving. In addition, the
Annova LNG Project combined with
other projects within the geographic
scope, including the Texas LNG and Rio
Grande LNG Projects, would contribute
to potential significant cumulative
impacts from construction noise during
nighttime pile-driving, sediment/
turbidity and shoreline erosion within
the Brownsville Ship Channel during
operations from vessel transits; on the
federally listed ocelot and jaguarundi
from habitat loss in combination with
past actions and potential for increased
vehicular strikes during construction;
on the federally listed aplomado falcon
from habitat loss in combination with
past actions; and on visual resources
from the presence of aboveground
structures. Construction and operation
of the Project would result in mostly
temporary or short-term environmental
impacts; however, some long-term and
permanent environmental impacts
would occur.
The U.S. Army Corps of Engineers;
U.S. Coast Guard; U.S. Department of
Transportation; U.S. Environmental
Protection Agency; U.S. Fish and
Wildlife Service; National Parks Service;
the National Oceanic and Atmospheric
Administration, National Marine
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
Fisheries Service; Federal Aviation
Administration; and U.S. Department of
Energy participated as cooperating
agencies in the preparation of the EIS.
Cooperating agencies have jurisdiction
by law or special expertise with respect
to resources potentially affected by the
proposal and participate in the NEPA
analysis.
The final EIS addresses the potential
environmental effects of the
construction and operation of the
following Project facilities:
• Pipeline meter station;
• natural gas pretreatment and
liquefaction facilities;
• two LNG storage tanks;
• marine and LNG transfer facilities;
• control room, administration/
maintenance building;
• site access road; and
• utilities (power, water, and
communication systems).
The Commission mailed a copy of the
Notice of Availability to federal, state,
and local government representatives
and agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
Project area. The final EIS is only
available in electronic format. It may be
viewed and downloaded from the
FERC’s website (www.ferc.gov), on the
Environmental Documents page (https://
www.ferc.gov/industries/gas/enviro/
eis.asp). In addition, the final EIS may
be accessed by using the eLibrary link
on the FERC’s website. Click on the
eLibrary link (https://www.ferc.gov/
docs-filing/elibrary.asp), click on
General Search, and enter the docket
number in the Docket Number field,
excluding the last three digits (i.e.,
CP16–480). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
E:\FR\FM\26APN1.SGM
26APN1
Agencies
[Federal Register Volume 84, Number 81 (Friday, April 26, 2019)]
[Notices]
[Pages 17823-17824]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-08425]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-2344-003.
Applicants: Headwaters Wind Farm LLC.
Description: Compliance filing: Headwaters Wind Farm LLC, Docket
No. ER18-2344-003 to be effective 10/29/2018.
Filed Date: 4/22/19.
Accession Number: 20190422-5025.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER18-2397-002.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2019-04-22_Compliance filing to
Order 844 to be effective 7/1/2019.
Filed Date: 4/22/19.
Accession Number: 20190422-5112.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19-875-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2019-04-22_Deficiency Response to
Cyber Security Coordination to be effective 3/30/2019.
Filed Date: 4/22/19.
Accession Number: 20190422-5142.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19-1343-000; ER19-1342-000.
Applicants: NMRD Data Center III, LLC, NMRD Data Center II, LLC.
Description: Supplement to March 18, 2019 NMRD Data Center III,
LLC, et al. tariff filings.
Filed Date: 4/19/19.
Accession Number: 20190419-5127.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19-1629-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3357 Monument Road Wind GIA
Cancellation to be effective 3/21/2019.
Filed Date: 4/22/19.
Accession Number: 20190422-5005.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19-1630-000.
Applicants: Entergy Louisiana, LLC.
Description: Tariff Cancellation: Entergy Louisiana, LLC to be
effective 1/1/2019.
Filed Date: 4/22/19.
Accession Number: 20190422-5020.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19-1631-000.
Applicants: Entergy Mississippi, LLC.
Description: Tariff Cancellation: Entergy Mississippi, LLC to be
effective 1/1/2019.
Filed Date: 4/22/19.
Accession Number: 20190422-5024.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19-1632-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of ICSA,
SA No. 3399, Queue Position V3-045 to be effective 3/7/2017.
Filed Date: 4/22/19.
Accession Number: 20190422-5057.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19-1633-000.
Applicants: Rumford Power LLC.
Description: Compliance filing: Notice of Succession, Revised MBR
Tariff, & New eTariff Baseline to be effective 4/23/2019.
Filed Date: 4/22/19.
Accession Number: 20190422-5101.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19-1634-000.
Applicants: Bridgeport Energy LLC.
Description: Compliance filing: Revised MBR Tariff & New eTariff
Baseline to be effective 4/23/2019.
Filed Date: 4/22/19.
Accession Number: 20190422-5111.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19-1635-000.
Applicants: Glaciers Edge Wind Project, LLC.
Description: Baseline eTariff Filing: Glaciers Edge Initial Market-
Based Rate Application Filing to be effective 6/22/2019.
Filed Date: 4/22/19.
Accession Number: 20190422-5113.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19-1636-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-04-22_Termination of SA
6510 MISO-Cleco SSR Agreement for Teche Unit No. 3 to be effective 4/
30/2019.
[[Page 17824]]
Filed Date: 4/22/19.
Accession Number: 20190422-5123.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19-1637-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Attachment AE
to Allow DVERs to Utilize Control Status 3 to be effective 12/31/9998.
Filed Date: 4/22/19.
Accession Number: 20190422-5128.
Comments Due: 5 p.m. ET 5/13/19.
Docket Numbers: ER19-1638-000.
Applicants: Tiverton Power LLC.
Description: Compliance filing: Revised MBR Tariff & New eTariff
Baseline to be effective 4/23/2019.
Filed Date: 4/22/19.
Accession Number: 20190422-5133.
Comments Due: 5 p.m. ET 5/13/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-08425 Filed 4-25-19; 8:45 am]
BILLING CODE 6717-01-P