Combined Notice of Filings, 17148-17149 [2019-08238]
Download as PDF
17148
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Notices
obligation concerning its
confidentiality; (5) an explanation of the
competitive injury to the submitting
person that would result from public
disclosure; (6) when such information
might lose its confidential character due
to the passage of time; and (7) why
disclosure of the information would be
contrary to the public interest.
Signed in Washington, DC on April 16,
2019.
David Nemtzow,
Director, Building Technologies Office.
[FR Doc. 2019–08266 Filed 4–23–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Notice of Request for Information (RFI)
on Research and Development
Opportunities for Innovations in
Sensors and Controls for Building
Energy Management
Office of Energy Efficiency and
Renewable Energy, Department of
Energy (DOE).
ACTION: Request for information (RFI).
AGENCY:
The U.S. Department of
Energy (DOE) invites public comment
on its Request for Information (RFI) on
research and development opportunities
for innovations in sensors and controls
for building energy management.
Through this RFI, the Office of Energy
Efficiency and Renewable Energy
(EERE) Building Technologies Office
(BTO) seeks input on research and
development opportunities for the
integration and optimization of systems
at the whole-building level through
connected and controllable loads for
increased energy affordability, improved
occupant comfort, and enhanced
provision of grid services that will
strengthen the integration between
buildings, other distributed energy
resources, and the electric grid. This RFI
will inform BTO’s strategic planning
moving forward in identifying earlystage and innovative technology
solutions to meet these goals. Successful
solutions will strengthen the
affordability, reliability, and resiliency
of the energy consumed by the buildings
sector, contributing to DOE’s priorities
for the energy sector as a whole.
DATES: Responses to the RFI must be
received by 5:00 p.m. (ET) on June 3rd,
2019.
ADDRESSES: Interested parties are to
submit comments electronically to
BTO_SensorsControls_RDO@ee.doe.gov.
Include ‘‘Research and Development
Opportunities for Innovations in
Sensors and Controls for Building
Energy Management’’ in the subject of
jbell on DSK30RV082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:20 Apr 23, 2019
Jkt 247001
the title. Responses must be provided as
attachments to an email. It is
recommended that attachments with file
sizes exceeding 25MB be compressed
(i.e., zipped) to ensure message delivery.
Responses must be provided as a
Microsoft Word (.docx) attachment to
the email, and no more than 10 pages in
length, 12 point font, 1 inch margins.
Only electronic responses will be
accepted.
Please identify your answers by
responding to a specific question or
topic if applicable. Respondents may
answer as many or as few questions as
they wish.
EERE will not respond to individual
submissions or publish publicly a
compendium of responses. A response
to this RFI will not be viewed as a
binding commitment to develop or
pursue the project or ideas discussed.
Respondents are requested to provide
the following information at the start of
their response to this RFI:
• Company/institution name;
• Company/institution contact;
• Contact’s address, phone number,
and email address.
The complete RFI document is
located at https://eereexchange.energy.gov/.
FOR FURTHER INFORMATION CONTACT:
Question may be addressed to BTO_
SensorsControls_RDO@ee.doe.gov or
Marina Sofos, (202) 586–3492,
marina.sofos@hq.doe.gov. or Erika
Gupta, (202) 586–3152, erika.gupta@
ee.doe.gov. Further instruction can be
found in the RFI document posted on
EERE Exchange.
SUPPLEMENTARY INFORMATION: The
purpose of this RFI is to solicit feedback
from industry, academia, research
laboratories, government agencies, and
other stakeholders on issues related to
sensor and control technologies for
optimizing building energy
management. This information will be
used by BTO to update its Sensors and
Controls R&D strategy and supporting
energy savings and cost reduction goals,
as well as to inform future strategic
planning and adjustments to its R&D
portfolio. This is solely a request for
information and not a Funding
Opportunity Announcement (FOA).
EERE is not accepting FOA applications.
The RFI is available at: https://eereexchange.energy.gov/.
Confidential Business Information
Pursuant to 10 CFR 1004.11, any
person submitting information that he
or she believes to be confidential and
exempt by law from public disclosure
should submit via email two well
marked copies: One copy of the
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
document marked ‘‘confidential’’
including all the information believed to
be confidential, and one copy of the
document marked ‘‘non-confidential’’
with the information believed to be
confidential deleted. DOE will make its
own determination about the
confidential status of the information
and treat it according to its
determination. Factors of interest to
DOE when evaluating requests to treat
submitted information as confidential
include: (1) A description of the items;
(2) whether and why such items are
customarily treated as confidential
within the industry; (3) whether the
information is generally known by or
available from other sources; (4)
whether the information has previously
been made available to others without
obligation concerning its
confidentiality; (5) an explanation of the
competitive injury to the submitting
person that would result from public
disclosure; (6) when such information
might lose its confidential character due
to the passage of time; and (7) why
disclosure of the information would be
contrary to the public interest.
Signed in Washington, DC on April 16,
2019.
David Nemtzow,
Director, Building Technologies Office.
[FR Doc. 2019–08274 Filed 4–23–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR19–40–001.
Applicants: Cranberry Pipeline
Corporation.
Description: Tariff filing per
284.123(b), (e)+(g): Amended
Application for Rate Approval to be
effective 4/18/2019.
Filed Date: 4/17/19.
Accession Number: 201904175128.
Comments Due: 5 p.m. ET 5/8/19.
284.123(g) Protests Due: 5 p.m. ET
5/8/19.
Docket Numbers: RP19–1129–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: TCO
VPSE Negotiated Rate Amendments to
be effective 4/16/2019.
Filed Date: 4/16/19.
Accession Number: 20190416–5096.
E:\FR\FM\24APN1.SGM
24APN1
jbell on DSK30RV082PROD with NOTICES
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Notices
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: RP19–1130–000.
Applicants: MIGC LLC.
Description: § 4(d) Rate Filing: Gas
Quality Update—Hydrogen Sulphide
and Sulphur to be effective 5/17/2019.
Filed Date: 4/17/19.
Accession Number: 20190417–5000.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: RP19–1131–000.
Applicants: Trunkline Gas Company,
LLC.
Description: § 4(d) Rate Filing:
Administrative Revisions Filing to be
effective 5/18/2019.
Filed Date: 4/17/19.
Accession Number: 20190417–5069.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: RP19–1132–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: Penalty Crediting Report
of El Paso Natural Gas Company, L.L.C.
under RP19–1132.
Filed Date: 4/17/19.
Accession Number: 20190417–5096.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: RP19–1134–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing: Wells
Fargo Commodities SP347736 to be
effective 5/1/2019.
Filed Date: 4/17/19.
Accession Number: 20190417–5127.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: RP19–1135–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: § 4(d) Rate Filing: Fuel
Tracker Filing 4/18/19 to be effective
6/1/2019.
Filed Date: 4/18/19.
Accession Number: 20190418–5000.
Comments Due: 5 p.m. ET 4/30/19.
Docket Numbers: RP19–1136–000.
Applicants: Elba Express Company,
L.L.C.
Description: § 4(d) Rate Filing: Fuel
Tracker Filing—2019 to be effective
6/1/2019.
Filed Date: 4/18/19.
Accession Number: 20190418–5001.
Comments Due: 5 p.m. ET 4/30/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
VerDate Sep<11>2014
17:20 Apr 23, 2019
Jkt 247001
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 18, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–08238 Filed 4–23–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–151–000]
Enable Gas Transmission, LLC; Notice
of Request Under Blanket
Authorization
Take notice that on April 8, 2019,
Enable Gas Transmission, LLC (Enable),
910 Louisiana St., Ste. 48040, Houston,
Texas 77002, filed in Docket No. CP19–
151–000 a prior notice request pursuant
to sections 157.205 and 157.211 of the
Commission’s regulations under the
Natural Gas Act (NGA), and Enable’s
blanket certificate issued in Docket Nos.
CP82–384–000 and CP82–384–001,
seeking authorization to modify its 4inch-diameter lateral line connected to
its 12-inch-diameter Line OT–27 in
Sequoyah County, Oklahoma. Enable
proposes to install a new delivery meter
and appurtenant facilities that are
designed to measure a maximum of
6,000 Dekatherms per day at 700-psig.
Enable states that the facilities will
constitute a bypass of Arkansas
Oklahoma Gas Corporation, a Local
Distribution Company, and that the
purpose of the new meter is to provide
natural gas service to Roland
Development Authority (Roland).
Enable avers that Roland will construct,
own, and operate a lateral line to receive
the gas delivery service to its facility
from Enable’s measurement facility.
Enable estimates the cost of the Project
to be $325,000, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
17149
Any questions concerning this
application may be directed to Lisa
Yoho, Senior Director, Regulatory and
FERC Compliance, Enable Gas
Transmission, LLC, 910 Louisiana
Street, Ste. 48040, Houston, Texas,
77002, by telephone at (346)701–2539,
or by email at lisa.yoho@
enablemidstream.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters,
E:\FR\FM\24APN1.SGM
24APN1
Agencies
[Federal Register Volume 84, Number 79 (Wednesday, April 24, 2019)]
[Notices]
[Pages 17148-17149]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-08238]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR19-40-001.
Applicants: Cranberry Pipeline Corporation.
Description: Tariff filing per 284.123(b), (e)+(g): Amended
Application for Rate Approval to be effective 4/18/2019.
Filed Date: 4/17/19.
Accession Number: 201904175128.
Comments Due: 5 p.m. ET 5/8/19.
284.123(g) Protests Due: 5 p.m. ET 5/8/19.
Docket Numbers: RP19-1129-000.
Applicants: Columbia Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: TCO VPSE Negotiated Rate
Amendments to be effective 4/16/2019.
Filed Date: 4/16/19.
Accession Number: 20190416-5096.
[[Page 17149]]
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: RP19-1130-000.
Applicants: MIGC LLC.
Description: Sec. 4(d) Rate Filing: Gas Quality Update--Hydrogen
Sulphide and Sulphur to be effective 5/17/2019.
Filed Date: 4/17/19.
Accession Number: 20190417-5000.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: RP19-1131-000.
Applicants: Trunkline Gas Company, LLC.
Description: Sec. 4(d) Rate Filing: Administrative Revisions
Filing to be effective 5/18/2019.
Filed Date: 4/17/19.
Accession Number: 20190417-5069.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: RP19-1132-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: Penalty Crediting Report of El Paso Natural Gas
Company, L.L.C. under RP19-1132.
Filed Date: 4/17/19.
Accession Number: 20190417-5096.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: RP19-1134-000.
Applicants: Tennessee Gas Pipeline Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Wells Fargo Commodities
SP347736 to be effective 5/1/2019.
Filed Date: 4/17/19.
Accession Number: 20190417-5127.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: RP19-1135-000.
Applicants: Midcontinent Express Pipeline LLC.
Description: Sec. 4(d) Rate Filing: Fuel Tracker Filing 4/18/19 to
be effective 6/1/2019.
Filed Date: 4/18/19.
Accession Number: 20190418-5000.
Comments Due: 5 p.m. ET 4/30/19.
Docket Numbers: RP19-1136-000.
Applicants: Elba Express Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Fuel Tracker Filing--2019 to
be effective 6/1/2019.
Filed Date: 4/18/19.
Accession Number: 20190418-5001.
Comments Due: 5 p.m. ET 4/30/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified date(s). Protests may be considered,
but intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 18, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-08238 Filed 4-23-19; 8:45 am]
BILLING CODE 6717-01-P