Critical Infrastructure Protection Reliability Standard CIP-012-1-Cyber Security-Communications Between Control Centers, 17105-17112 [2019-08236]
Download as PDF
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Proposed Rules
Section, Transport Standards Branch, FAA,
has the authority to approve AMOCs for this
AD, if requested using the procedures found
in 14 CFR 39.19. In accordance with 14 CFR
39.19, send your request to your principal
inspector or local Flight Standards District
Office, as appropriate. If sending information
directly to the International Section, send it
to the attention of the person identified in
paragraph (j)(2) of this AD. Information may
be emailed to: 9-ANM-116-AMOCREQUESTS@faa.gov.
(i) Before using any approved AMOC,
notify your appropriate principal inspector,
or lacking a principal inspector, the manager
of the local flight standards district office/
certificate holding district office.
(ii) AMOCs approved previously for AD
2015–17–14 are approved as AMOCs for the
corresponding provisions of EASA AD 2018–
0233R1 that are required by paragraph (g) of
this AD.
(2) Contacting the Manufacturer: For any
requirement in this AD to obtain instructions
from a manufacturer, the instructions must
be accomplished using a method approved
by the Manager, International Section,
Transport Standards Branch, FAA; or EASA;
or Airbus SAS’s EASA DOA. If approved by
the DOA, the approval must include the
DOA-authorized signature.
(3) Required for Compliance (RC): For any
service information referenced in EASA AD
2018–0233R1 that contains RC procedures
and tests: Except as required by paragraph
(i)(2) of this AD, RC procedures and tests
must be done to comply with this AD; any
procedures or tests that are not identified as
RC are recommended. Those procedures and
tests that are not identified as RC may be
deviated from using accepted methods in
accordance with the operator’s maintenance
or inspection program without obtaining
approval of an AMOC, provided the
procedures and tests identified as RC can be
done and the airplane can be put back in an
airworthy condition. Any substitutions or
changes to procedures or tests identified as
RC require approval of an AMOC.
jbell on DSK30RV082PROD with PROPOSALS
(j) Related Information
(1) For information about EASA AD 2018–
0233R1, contact EASA, Konrad-AdenauerUfer 3, 50668 Cologne, Germany; telephone
+49 221 89990 6017; email ADs@
easa.europa.eu; internet
www.easa.europa.eu. You may find this
EASA AD on the EASA website at https://
ad.easa.europa.eu. You may view this EASA
AD at the FAA, Transport Standards Branch,
2200 South 216th St., Des Moines, WA. For
information on the availability of this
material at the FAA, call 206–231–3195.
EASA AD 2018–0233R1 may be found in the
AD docket on the internet at https://
www.regulations.gov by searching for and
locating Docket No. FAA–2019–0250.
(2) For more information about this AD,
contact Sanjay Ralhan, Aerospace Engineer,
International Section, Transport Standards
Branch, FAA, 2200 South 216th St., Des
Moines, WA 98198; telephone and fax 206–
231–3223.
VerDate Sep<11>2014
16:04 Apr 23, 2019
Jkt 247001
Issued in Des Moines, Washington, on
April 10, 2019.
Michael Kaszycki,
Acting Director, System Oversight Division,
Aircraft Certification Service.
[FR Doc. 2019–08172 Filed 4–23–19; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM18–20–000]
Critical Infrastructure Protection
Reliability Standard CIP–012–1—Cyber
Security—Communications Between
Control Centers
Federal Energy Regulatory
Commission, DOE.
ACTION: Notice of proposed rulemaking.
AGENCY:
The Federal Energy
Regulatory Commission (Commission)
proposes to approve Reliability
Standard CIP–012–1 (Cyber Security—
Communications between Control
Centers). The North American Electric
Reliability Corporation (NERC), the
Commission-certified Electric
Reliability Organization, submitted the
proposed Reliability Standard for
Commission approval in response to a
Commission directive. In addition, the
Commission proposes to direct that
NERC develop certain modifications to
Reliability Standard CIP–012–1 to
require protections regarding the
availability of communication links and
data communicated between bulk
electric system control centers and,
further, to clarify the types of data that
must be protected.
DATES: Comments are due June 24, 2019.
ADDRESSES: Comments, identified by
docket number, may be filed in the
following ways:
• Electronic Filing through https://
www.ferc.gov. Documents created
electronically using word processing
software should be filed in native
applications or print-to-PDF format and
not in a scanned format.
• Mail/Hand Delivery: Those unable
to file electronically may mail or handdeliver comments to: Federal Energy
Regulatory Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Instructions: For detailed instructions
on submitting comments and additional
information on the rulemaking process,
see the Comment Procedures Section of
this document.
PO 00000
Frm 00017
Fmt 4702
Sfmt 4702
FOR FURTHER INFORMATION CONTACT:
Vincent Le (Technical Information),
Office of Electric Reliability, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
(202) 502–6204, vincent.le@ferc.gov.
Kevin Ryan (Legal Information),
Office of the General Counsel, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
(202) 502–6840, kevin.ryan@ferc.gov.
SUPPLEMENTARY INFORMATION:
18 CFR Part 40
SUMMARY:
17105
1. Pursuant to section 215(d)(2) of the
Federal Power Act (FPA),1 the
Commission proposes to approve
Reliability Standard CIP–012–1 (Cyber
Security—Communications between
Control Centers). The North American
Electric Reliability Corporation (NERC),
the Commission-certified Electric
Reliability Organization (ERO),
submitted the proposed Reliability
Standard for Commission approval in
response to a Commission directive in
Order No. 822.2 Specifically, pursuant
to section 215(d)(5) of the FPA, the
Commission directed that NERC
develop modifications to require
responsible entities to implement
controls to protect, at a minimum,
communications links and sensitive
bulk electric system data communicated
between bulk electric system Control
Centers ‘‘in a manner that is
appropriately tailored to address the
risks posed to the bulk electric system
by the assets being protected (i.e., high,
medium, or low impact).’’ 3
2. Proposed Reliability Standard CIP–
012–1 is intended to augment the
currently-effective Critical Infrastructure
Protection (CIP) Reliability Standards to
mitigate cybersecurity risks associated
with communications between bulk
electric system Control Centers.4
Specifically, proposed Reliability
Standard CIP–012–1 supports
situational awareness and reliable bulk
electric system operations by requiring
responsible entities to protect the
confidentiality and integrity of Realtime Assessment and Real-time
monitoring data transmitted between
1 16
U.S.C. 824o(d)(2) (2012).
Critical Infrastructure Protection
Reliability Standards, Order No. 822, 154 FERC
¶ 61,037, at P 53, order denying reh’g, Order No.
822–A, 156 FERC ¶ 61,052 (2016).
3 16 U.S.C. 824o(d)(5); Order No. 822, 154 FERC
¶ 61,037 at P 53.
4 BES Cyber System is defined as ‘‘[o]ne or more
BES Cyber Assets logically grouped by a
responsible entity to perform one or more reliability
tasks for a functional entity.’’ Glossary of Terms
Used in NERC Reliability Standards (NERC
Glossary), https://www.nerc.com/files/glossary_of_
terms.pdf. The acronym BES refers to the bulk
electric system.
2 Revised
E:\FR\FM\24APP1.SGM
24APP1
17106
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Proposed Rules
bulk electric system Control Centers.5
Accordingly, the Commission proposes
to approve proposed Reliability
Standard CIP–012–1 based on a
determination that the standard is
largely responsive to the Commission’s
directive in Order No. 822 and improves
the cybersecurity posture of applicable
entities.
3. However, we are concerned that
there still may be certain cyber security
risks associated with the protection of
communications links and sensitive
bulk electric system data communicated
between bulk electric system Control
Centers that are not adequately
addressed in NERC’s proposal. First,
proposed Reliability Standard CIP–012–
1 does not require protections regarding
the availability of communication links
and data communicated between bulk
electric system Control Centers as
directed in Order No. 822.6 As
discussed below, at this time, we are not
persuaded by NERC’s explanation that
certain currently-effective CIP
Reliability Standards address the issue
of availability. Second, proposed
Reliability Standard CIP–012–1 does not
adequately identify the types of data
covered by its requirements, due to,
among other things, the fact that the
term ‘‘Real-time monitoring’’ is not
defined in the proposed Reliability
Standard or the NERC Glossary.
Clarification of the types of covered data
is warranted.
4. To address these issues, pursuant to
section 215(d)(5) of the FPA, the
Commission proposes to direct that
NERC develop modifications to the CIP
Reliability Standards to: (1) Require
protections regarding the availability of
communication links and data
communicated between bulk electric
system Control Centers; and (2) clearly
identify the types of data that must be
protected.
I. Background
jbell on DSK30RV082PROD with PROPOSALS
A. Section 215 and Mandatory
Reliability Standards
5. Section 215 of the FPA requires a
Commission-certified ERO to develop
5 The NERC Glossary defines Real-time
Assessment as ‘‘An evaluation of system conditions
using Real-time data to assess existing (preContingency) and potential (post-Contingency)
operating conditions. The assessment shall reflect
applicable inputs including, but not limited to:
Load, generation output levels, known Protection
System and Special Protection System status or
degradation, Transmission outages, generator
outages, Interchange, Facility Ratings, and
identified phase angle and equipment limitations.
(Real-time Assessment may be provided through
internal systems or through third-party services.)’’
NERC Glossary of Terms Used in NERC Reliability
Standards (July 3, 2018).
6 Order No. 822, 154 FERC ¶ 61,037 at P 54.
VerDate Sep<11>2014
16:04 Apr 23, 2019
Jkt 247001
mandatory and enforceable Reliability
Standards, subject to Commission
review and approval. Reliability
Standards may be enforced by the ERO,
subject to Commission oversight, or by
the Commission independently.7
Pursuant to section 215 of the FPA, the
Commission established a process to
select and certify an ERO,8 and
subsequently certified NERC.9
B. Order No. 822
6. In Order No. 822, the Commission
approved seven modified CIP Reliability
Standards and directed NERC to
develop additional modifications to the
CIP Reliability Standards.10
Specifically, the Commission directed
NERC to, among other things, develop
modifications to the CIP Reliability
Standards to require responsible entities
to implement controls to protect, at a
minimum, communications links and
sensitive bulk electric system data
communicated between bulk electric
system Control Centers ‘‘in a manner
that is appropriately tailored to address
the risks posed to the bulk electric
system by the assets being protected
(i.e., high, medium, or low impact).’’ 11
The Commission observed that NERC,
as well as other commenters in that
proceeding, ‘‘recognize that interControl Center communications play a
critical role in maintaining bulk electric
system reliability by . . . helping to
maintain situational awareness and
support reliable operations through
timely and accurate communication
between Control Centers.’’ 12
7. The Commission explained that
Control Centers associated with
responsible entities, including
reliability coordinators, balancing
authorities, and transmission operators,
must be capable of receiving and storing
a variety of bulk electric system data
from their interconnected entities in
order to adequately perform their
reliability functions. The Commission,
therefore, determined that ‘‘additional
measures to protect both the integrity
and availability of sensitive bulk electric
system data are warranted.’’ 13 The
Commission also recognized that the
7 16
U.S.C. 824o(e).
Concerning Certification of the Electric
Reliability Organization; and Procedures for the
Establishment, Approval, and Enforcement of
Electric Reliability Standards, Order No. 672, 114
FERC ¶ 61,104, order on reh’g, Order No. 672–A,
114 FERC ¶ 61,328 (2006).
9 North American Electric Reliability Corp., 116
FERC ¶ 61,062, order on reh’g and compliance, 117
FERC ¶ 61,126 (2006), aff’d sub nom. Alcoa, Inc. v.
FERC, 564 F.3d 1342 (D.C. Cir. 2009).
10 Order No. 822, 154 FERC ¶ 61,037 at PP 1, 3.
11 Id. P 53.
12 Id. P 54 (citing NERC Comments at 20).
13 Id. P 54.
8 Rules
PO 00000
Frm 00018
Fmt 4702
Sfmt 4702
data managed by responsible entities
has different attributes that may require
different information protection
controls, and the Commission stated
that NERC should consider the different
attributes of bulk electric system data as
it assesses appropriate information
protection controls. The Commission
concluded that NERC ‘‘should have
flexibility in the manner in which it
addresses the Commission’s
directive.’’ 14
8. In Order No. 822, the Commission
found to be reasonable the following
principles outlined in NERC’s
comments in that Commission
proceeding regarding protections for
communication links and sensitive bulk
electric system data communicated
between bulk electric system Control
Centers:
(1) should not have an adverse effect on
reliability, including the recognition of
instances where the introduction of latency
could have negative results; (2) should
account for the risk levels of assets and
information being protected, and require
protections that are commensurate with the
risks presented; and (3) should be resultsbased in order to provide flexibility to
account for the range of technologies and
entities involved in bulk electric system
communications.15
In addition, the Commission cautioned
that ‘‘not all communication network
components and data pose the same risk
to bulk electric system reliability and
may not require the same level of
protection.’’ 16 Therefore, the
Commission determined that NERC
should develop controls that reflect the
risk being addressed in a reasonable
manner.
C. NERC Petition and Proposed
Reliability Standard CIP–012–1
9. On September 18, 2018, NERC
submitted for Commission approval
proposed Reliability Standard CIP–012–
1 and the associated violation risk
factors and violation severity levels,
implementation plan, and effective
date.17 NERC states that the purpose of
the proposed Reliability Standard is to
help maintain situational awareness and
reliable bulk electric system operations
by protecting the confidentiality and
integrity of Real-time Assessment and
Real-time monitoring data transmitted
between Control Centers.
14 Id.
P 55.
15 Id.
16 Id.
P 56.
17 Proposed
Reliability Standard CIP–012–1 is not
attached to this notice of proposed rulemaking
(NOPR). The proposed Reliability Standards are
available on the Commission’s eLibrary document
retrieval system in Docket No. RM18–20–000 and
on the NERC website, www.nerc.com.
E:\FR\FM\24APP1.SGM
24APP1
jbell on DSK30RV082PROD with PROPOSALS
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Proposed Rules
10. NERC explains that, although the
Commission directed modifications to
Reliability Standard CIP–006–6, the
standard drafting team determined to
address the Commission’s
communications directive by
developing a new Reliability Standard.
According to NERC, the differences in
the scope and applicability between the
existing requirements of Reliability
Standard CIP–006–1 and the
Commission’s directive necessitated the
development of a new Reliability
Standard. Specifically, NERC notes that
while Reliability Standard CIP–006–6,
Requirement R1, Part 1.10 mandates
protections for nonprogrammable
communication components outside a
Physical Security Perimeter (PSP) but
inside the same Electronic Security
Perimeter (ESP) for certain Cyber Assets,
proposed Reliability Standard CIP–012–
1 ‘‘requires protections for
communications between Control
Centers that transmit certain data
regardless of the location of Cyber
Assets inside or outside a PSP or
ESP.’’ 18 In addition, NERC explains that
unlike Reliability Standard CIP–006–6,
which applies to high and medium
impact BES Cyber Assets at Control
Centers, proposed Reliability Standard
CIP–012–1 applies to assets associated
with communications between certain
Control Centers.
11. NERC states that proposed
Reliability Standard CIP–012–1
‘‘requires Responsible Entities to
develop and implement a plan to
address the risks posed by unauthorized
disclosure (confidentiality) and
unauthorized modification (integrity) of
Real-time Assessment and Real-time
monitoring data while being transmitted
between applicable Control Centers.’’ 19
According to NERC, the required plan
must include the following: (1)
Identification of security protections; (2)
identification of where the protections
are applied; and (3) identification of the
responsibilities of each entity in case a
Control Center is owned or operated by
different responsible entities.20
12. NERC posits that, consistent with
the Commission’s directive in Order No.
822, the risks posed by different types
of BES Control Centers and the
associated data communicated between
the Control Centers were considered by
the standard drafting team to determine
its appropriate scope and
applicability.21 With regard to
functional entities and facilities, NERC
states that proposed Reliability Standard
CIP–012–1 applies to balancing
authorities, generator operators,
reliability coordinators, transmission
operators and transmission owners that
own or operate a Control Center. NERC
explains that proposed Reliability
Standard CIP–012–1 applies to all
Control Centers, with one exemption
discussed below, ‘‘regardless of the
impact level of BES Cyber Systems
located at or associated with those
control centers.’’ 22 In that regard, NERC
explains that the standard drafting team
determined that the sensitivity of data
communicated between Control Centers
‘‘is not necessarily dependent on the
impact level of the BES Cyber Systems
located at or associated with the Control
Centers.’’ 23 NERC states that the
standard drafting team, instead, focused
on the types of Real-time data a Control
Center will communicate and whether
the compromise of that data would pose
a high risk to bulk electric system
reliability.
13. As noted above, the types of data
within the scope of proposed Reliability
Standard CIP–012–1 consists of Realtime Assessment and Real-time
monitoring data exchanged between
Control Centers. NERC states that it is
critical that this information is accurate
since responsible entities operate and
monitor the bulk electric system based
on this Real-time information. However,
NERC points out that proposed
Reliability Standard CIP–012–1 exempts
Control Centers ‘‘that transmit[ ] to
another Control Center Real-time
Assessment or Real-time monitoring
data pertaining only to the generation
resource of transmission station or
substation co-located with the
transmitting Control Center.’’ 24 NERC
explains that proposed Reliability
Standard CIP–012–1 ‘‘excludes other
data typically transferred between
Control Centers, such as Operational
Planning Analysis data, that is not used
by the Reliability Coordinator,
Balancing Authority, and Transmission
Operator in Real-time.’’ 25 According to
NERC, while Operational Planning
Analysis data provides information for
next-day operations, ‘‘entities adjust
their operating actions during the
current day based on the data from Realtime Assessments and Real-time
monitoring.’’ 26 NERC contends that if
there is a risk that Operational Planning
Analysis data has been compromised,
the responsible entity has the
opportunity to verify the data prior to
22 Id.
18 NERC
Petition at 9.
19 Id. at 10.
20 Id. at 3.
21 Id.
VerDate Sep<11>2014
16:04 Apr 23, 2019
at 10.
23 Id.
24 Id.
25 Id.
at 11.
at 12.
Jkt 247001
PO 00000
Frm 00019
any impact on Real-time operations.
Therefore, NERC concludes that while
‘‘an Operational Planning Analysis
factors into how an entity operates,
there is less of a risk that an entity
would act on compromised data from an
Operational Planning Analysis given it
will base its operating actions on Realtime inputs.’’ 27
14. NERC also indicates that data at
rest and oral communications fall
outside the scope of proposed
Reliability Standard CIP–012–1.
Regarding data at rest, NERC states that
the standard drafting team determined
that since data at rest resides within
BES Cyber Systems, it is already
protected by the controls mandated by
Reliability Standards CIP–003–6
through CIP–011–2. According to NERC,
oral communications are out of scope of
proposed Reliability Standard CIP–012–
1 ‘‘because operators have the ability to
terminate the call and initiate a new one
via trusted means if they suspect a
problem with, or compromise of, the
communication channel.’’ 28 NERC
notes that Reliability Standard COM–
001–3 requires reliability coordinators,
balancing authorities, and transmission
operators to have alternative
interpersonal communication
capability, which could be used if there
is a suspected compromise of oral
communication on one channel.
II. Discussion
15. Pursuant to section 215(d)(2) of
the FPA, the Commission proposes to
approve proposed Reliability Standard
CIP–012–1 as just, reasonable, not
unduly discriminatory or preferential,
and in the public interest. The proposed
Reliability Standard will enhance
existing protections for bulk electric
system reliability by augmenting the
currently-effective CIP Reliability
Standards to mitigate cybersecurity risks
associated with communications
between bulk electric system Control
Centers. Specifically, consistent with
the Commission’s directive in Order No.
822, proposed Reliability Standard CIP–
012–1 supports situational awareness
and reliable bulk electric system
operations by requiring responsible
entities to protect the confidentiality
and integrity of Real-time Assessment
and Real-time monitoring data
transmitted between bulk electric
system Control Centers.
16. While the Commission proposes
to approve Reliability Standard CIP–
012–1, certain cyber security risks
associated with communications
between bulk electric system Control
27 Id.
26 Id.
28 Id.
Fmt 4702
Sfmt 4702
17107
E:\FR\FM\24APP1.SGM
at 13.
at 14.
24APP1
17108
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Proposed Rules
jbell on DSK30RV082PROD with PROPOSALS
Centers may not be fully addressed even
with the implementation of the
proposed Reliability Standard. As
discussed below, the Commission is
concerned that a significant cyber
security risk associated with the
protection of communications links and
sensitive bulk electric system data
communicated between bulk electric
system Control Centers may persist
because: (1) The CIP Reliability
Standards do not address the
availability of communication links and
data communicated between bulk
electric system Control Centers; and (2)
proposed Reliability Standard CIP–012–
1 does not adequately identify the types
of data covered by its Requirements, due
to, among other things, the fact that the
term ‘‘Real-time monitoring’’ is not
defined.
17. To address these gaps, the
Commission seeks comment on
proposals to direct NERC, pursuant to
section 215(d)(5) of the FPA, to develop
modifications to the CIP Reliability
Standards to: (1) Require protections
regarding the availability of
communication links and data
communicated between bulk electric
system Control Centers; and (2) clearly
identify the types of data that must be
protected.
18. Below, we discuss the following
issues: (A) Availability of bulk electric
system communication links and data;
and (B) scope of bulk electric system
data that must be protected.
A. Availability of Bulk Electric System
Communication Links and Data Order
No. 822
19. In Order No. 822, the Commission
directed that NERC ‘‘should identify the
scope of sensitive bulk electric system
data that must be protected and specify
how the confidentiality, integrity, and
availability of each type of bulk electric
system data should be protected while
it is being transmitted or at rest.’’ 29 In
addition, the Commission clarified that
‘‘the directed modification should
encompass communication links and
data for intra-Control Center and interControl Center communications.’’ 30
20. Specifically, the Commission
explained that bulk electric system
Control Centers must be capable of
exchanging and storing sensitive bulk
electric system data from interconnected
entities in order for responsible entities
to adequately perform their reliability
functions. The Commission determined
‘‘that additional measures to protect
both the integrity and availability of
sensitive bulk electric system data are
29 Order
No. 822, 154 FERC ¶ 61,037 at P 56.
30 Id. P 58.
VerDate Sep<11>2014
16:04 Apr 23, 2019
Jkt 247001
warranted.’’ 31 The Commission
explained that protecting the
availability of sensitive bulk electric
system data involves ensuring that the
data required for bulk electric system
operations is available when needed.
The Commission responded to concerns
that the risks posed by bulk electric
system communication networks do not
justify the cost of implementing controls
by explaining that communications
between Control Centers are
fundamental to reliable bulk electric
system operations. The Commission,
however, also recognized that ‘‘not all
communication network components
and data pose the same risk to bulk
electric system reliability and may not
require the same level of protection.’’ 32
The Commission therefore determined
that it expected NERC to develop
controls that reflect the associated risk
and that can be implemented in a
reasonable manner.
NERC Petition
21. NERC states that proposed
Reliability Standard CIP–012–1,
Requirement R1 mandates that:
each Responsible Entity develop a plan to
mitigate the risks posed by unauthorized
disclosure and unauthorized modification of
Real-time Assessment and Real-time
monitoring data while being transmitted
between and applicable Control Centers.33
NERC acknowledges that Order No. 822
directed that ‘‘NERC should develop
measures to protect the confidentiality,
integrity, and availability of sensitive
[bulk electric system] data.’’ 34 NERC
states, however, that while proposed
Reliability Standard CIP–012–1 requires
protections for the confidentiality (i.e.,
unauthorized disclosure) and integrity
(i.e., unauthorized modification) of
Real-time Assessment and Real-time
monitoring data, the availability of that
data is addressed in currently-effective
Reliability Standards.
22. Specifically, NERC maintains that
Reliability Standard IRO–002–5
‘‘requires redundant and diversely
routed data exchange infrastructure
within the Reliability Coordinator’s
primary Control Center in order to
exchange Real-time data used in Realtime monitoring and Real-time
Assessments with Balancing
Authorities, Transmission Operators,
and other entities the Reliability
Coordinator deems necessary.’’ 35
Similarly, NERC states that Reliability
Standard TOP–001–4 ‘‘requires
P 54 (emphasis added).
P 56.
33 Petition at 15–16.
34 Id. at 17.
35 Id. at 18.
Balancing Authorities and Transmission
Operators to have redundant and
diversely routed data exchange
infrastructure to exchange Real-time
data.’’ 36 According to NERC, the
‘‘redundancy of data exchange
infrastructure helps to ensure the
availability of critical Real-time data for
Control Centers.’’ 37 Further, NERC
notes that Reliability Standards IRO–
010–2 and TOP–003–3 require
reliability coordinators, transmission
operators, and balancing authorities to
use a mutually agreeable security
protocol for exchange of Real-time data.
NERC contends that, by agreeing on
security protocols, entities communicate
directly with the appropriate entities
rather than having to translate different
protocols, which helps to ensure the
availability of Real-time data.
Discussion
23. We are not persuaded by the
explanation in NERC’s petition that
currently-effective CIP Reliability
Standard requirements address the
availability directive in Order No. 822.
Sensitive bulk electric system data
generally includes monitoring,
operational, and system planning data.
Ensuring timely and reliable access to
and use of this information is essential
to the reliable operation of the bulk
electric system. As the Commission
noted in Order No. 822, bulk electric
system Control Centers ‘‘must be
capable of receiving and storing a
variety of sensitive bulk electric system
data from interconnected entities.’’ 38 In
particular, the Commission stated that
additional protections to address the
availability of sensitive bulk electric
system data are warranted.39
24. We are not persuaded that the
currently-effective Reliability Standards
cited in NERC’s petition require
responsible entities to protect the
availability of sensitive bulk electric
system data in a manner consistent with
the directives in Order No. 822. For
instance, Reliability Standards IRO–
002–5 and TOP–001–4 require
responsible entities to have redundant
and diversely routed data exchange
infrastructure within the Control Center
environment, but do not pertain to
communications between individual
Control Centers, which was the subject
of the Commission’s directive in Order
No. 822. Similarly, Reliability Standards
IRO–010–2 and TOP–003–3 require
responsible entities to have mutually
agreeable security protocols for
31 Id.
32 Id.
PO 00000
Frm 00020
Fmt 4702
Sfmt 4702
36 Id.
37 Id.
38 Order
No. 822, 154 FERC ¶ 61,037 at P 54.
39 Id.
E:\FR\FM\24APP1.SGM
24APP1
jbell on DSK30RV082PROD with PROPOSALS
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Proposed Rules
exchange of Real-time data, which may
have the effect of contributing to greater
availability; however, these
requirements do not create an
obligation, as directed in Order No. 822,
to protect the availability of those
communication capabilities and
associated data by applying appropriate
security controls. Creating an obligation
to protect availability, while affording
flexibility in terms of what data is
protected and how, is distinct from
relying on currently-effective Reliability
Standards whose effect may be to
improve availability.
25. Bonneville Power Administration
(BPA) and CenterPoint Energy Houston
Electric addressed this distinction
during the standards development
process when they responded to the
standard drafting team’s assertion that
the availability directive is adequately
addressed by currently-effective CIP
Reliability Standards. BPA explained
that ‘‘[w]hile the requirements of TOP–
001–4 and IRO–002–5 (redundant and
diverse routing of data) can be used to
achieve increased Availability, it can
also be achieved through other equally
effective methods . . . [and] [t]herefore,
‘availability’ is not adequately
addressed by TOP–001–4 and IRO–002–
5 and limits entities’ options to address
availability by other methods more
appropriate to their systems.’’ 40
CenterPoint stated that, ‘‘TOP–001–4
and IRO–002–5 do not ensure
availability or communication of data
between inter-entity and intra-entity
Control Centers, but only the
redundancy of infrastructure internal to
the requesting entity’s primary Control
Center.’’ 41
26. Not addressing the availability of
covered communication links and data
could lead to unreliable operations
resulting from the inability to
communicate data between Control
Centers. While NERC contends that
currently-effective CIP Reliability
Standards adequately protect the
availability of sensitive bulk electric
system data, there is no obligation on
responsible entities to affirmatively
protect the availability of such data.
Moreover, while the Commission in
Order No. 822 allowed NERC flexibility
in what data is protected and how,
NERC has not addressed the directive to
protect the availability of sensitive bulk
electric system data.
27. Accordingly, pursuant to section
215(d)(5) of the FPA, the Commission
proposes to direct that NERC develop
modifications to the CIP Reliability
Standards to require protections
regarding the availability of
communication links and data
communicated between bulk electric
system Control Centers. We seek
comment on this proposal.
B. Scope of Bulk Electric System Data
That Must Be Protected Order No. 822
28. In Order No. 822, the Commission
stated that NERC ‘‘should identify the
scope of sensitive bulk electric system
data that must be protected and specify
how the confidentiality, integrity, and
availability of each type of bulk electric
system data should be protected while
it is being transmitted or at rest.’’ 42 In
addition, the Commission clarified that
‘‘the directed modification should
encompass communication links and
data for intra-Control Center and interControl Center communications.’’ 43
NERC Petition
29. NERC states that proposed
Reliability Standard CIP–012–1 applies
to Real-time Assessment and Real-time
monitoring data due to the critical
nature of the information. NERC
explains that:
Reliability Coordinators and Transmission
Operators must perform Real-time
Assessments every 30 minutes to assess the
conditions on the system and determine
whether there are any actual or potential
exceedances of System Operating Limits or
Interconnection Reliability Operating
Limits.44
In addition, NERC states that reliability
coordinators, balancing authorities, and
transmission operators must perform
Real-time monitoring. NERC contends
that since responsible entities ‘‘operate
and monitor the [bulk electric system]
according to this Real-time information,
it is of critical importance that it is
accurate.’’ 45
Discussion
30. Proposed Reliability Standard
CIP–012–1 requires the protection of
Real-time Assessment and Real-time
monitoring data. While Real-time
Assessment is broadly defined by NERC,
Real-time monitoring data is not
defined. Moreover, the proposed
Reliability Standard does not
specifically indicate the types of data to
be protected. We are concerned that
without further clarity, Reliability
Standard CIP–012–1 may be
implemented and enforced in an
inconsistent manner.
31. In the Technical Rationale
document appended to NERC’s petition,
42 Order
No. 822, 154 FERC ¶ 61,037 at P 56.
P 58.
44 NERC Petition at 12.
45 Id.
43 Id.
40 NERC
41 Id.
Petition at page 273 of pdf.
at page 274 of pdf.
VerDate Sep<11>2014
16:04 Apr 23, 2019
Jkt 247001
PO 00000
Frm 00021
Fmt 4702
Sfmt 4702
17109
NERC explained in more detail (relative
to the language of the proposed
Reliability Standard’s requirements)
what data should be protected under
proposed Reliability Standard CIP–012–
1:
The SDT recognized the FERC reference to
additional Reliability Standards and the
responsibilities to protect the applicable data
in accordance with NERC Reliability
Standards TOP–003 and IRO–010. The SDT
used these references to drive the
identification of sensitive BES data and chose
to base the CIP–012–1 requirements on the
Real-time data specification elements in
these standards. This approach provides
consistent scoping of identified data, and
does not require each entity to devise its own
list or inventory of this data. Many entities
are required to provide this data under
agreements executed with their [reliability
coordinator (RC)], [balancing authority (BA)]
or [transmission operator (TOP)]. Data
requiring protection in CIP–012–1 consists of
a subset of data that is identified by the RC,
BA, and TOP in the TOP–003 and IRO–010
data specification standards, limited to Realtime Assessment data and Real-time
monitoring data.46
The references to Reliability Standards
TOP–003 and IRO–010 in the Technical
Rationale document are not found in
proposed Reliability Standard CIP–012–
1. Instead Requirement R1 of proposed
Reliability Standard CIP–012–1 only
uses the terms ‘‘Real-time Assessment
and Real-time monitoring data.’’ In
addition, as the Technical Rational
indicates at the outset: ‘‘This Technical
Rationale and Justification for CIP–012–
1 is not a Reliability Standard and
should not be considered mandatory
and enforceable.’’ 47
32. Not clearly defining the types of
data that must be protected under the
proposed Reliability Standard could
result in uneven compliance and
enforcement. The term ‘‘Real-time
Assessment’’ is broadly defined in the
NERC Glossary of Terms, and the term
‘‘Real-time monitoring’’ is not defined at
all. These terms, alone, may not be
understood or enforced in a consistent
manner. This concern arose during the
standard drafting process in comments
regarding an earlier version of the
proposed Reliability Standard, which
was later modified.48 Still relevant,
46 NERC Petition, Exhibit F (Technical Rationale)
at 1–2; see also Exhibit E (Draft Implementation
Guidance) at 5 (providing similar context as to what
data should be protected).
47 NERC Petition, Exhibit F at iv; see also Exhibit
E at 3 (indicating that the draft Implementation
Guidance document only provides examples in
achieving compliance).
48 An early version of Requirement R1 of
proposed Reliability Standard CIP–012–1 identified
the scope of the data to be protected as ‘‘data used
for Operational Planning Analysis, Real-time
Assessments, and Real-time monitoring.’’
E:\FR\FM\24APP1.SGM
24APP1
17110
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Proposed Rules
however, are concerns raised regarding
the potential ambiguities associated
with enforcement of the scope of data
that must be protected. In particular,
while NERC identifies Reliability
Standards IRO–002–5, Requirements R5
and R6, and TOP–001–4, Requirements
R10 and R11 in discussing the
parameters of Real-time monitoring
data, the information outlined in the
identified requirements is not included
in the language of proposed Reliability
Standard CIP–012–1 itself and,
therefore, implementation and
compliance concerns may arise.49
33. The compliance obligations
imposed under proposed Reliability
Standard CIP–012–1 should be clear in
order for responsible entities to
effectively and reasonably implement
the required protections. The lack of
clarity regarding the scope of Real-time
monitoring data is inconsistent with
principles outlined by the Commission
in Order No. 672.50 In particular, the
lack of clarity may result in: (1) A
failure to establish a clear and
unambiguous requirement regarding the
protection of Real-time monitoring
data; 51 and (2) a failure to identify clear
and objective criterion to facilitate
consistent and non-preferential
enforcement since responsible entities
will not have a clear understanding of
the Real-time monitoring data to be
protected.52 Since the controls required
under Reliability Standard CIP–012–1
are plan-based, the scope of data to be
protected should be clear and
unambiguous so that responsible
entities will accurately identify
vulnerabilities or risks requiring
mitigation.
34. Therefore, pursuant to section
215(d)(5) of the FPA, the Commission
proposes to direct that NERC develop
modifications to the CIP Reliability
Standards to clearly identify the types of
data that must be protected. We seek
comment on this proposal. In particular,
we seek comment on the specific
information covered by the term ‘‘Realtime monitoring’’ and whether a NERC
Glossary definition would assist with
implementation and compliance.
III. Information Collection Statement
35. The FERC–725B information
collection requirements contained in
this notice of proposed rulemaking are
subject to review by the Office of
Management and Budget (OMB) under
section 3507(d) of the Paperwork
Reduction Act of 1995.53 OMB’s
regulations require approval of certain
information collection requirements
imposed by agency rules.54 Upon
approval of a collection of information,
OMB will assign an OMB control
number and expiration date.
Respondents subject to the filing
requirements of this rule will not be
penalized for failing to respond to these
collections of information unless the
collections of information display a
valid OMB control number. The
Commission solicits comments on the
Commission’s need for this information,
whether the information will have
practical utility, the accuracy of the
burden estimates, ways to enhance the
quality, utility, and clarity of the
information to be collected or retained,
and any suggested methods for
minimizing respondents’ burden,
including the use of automated
information techniques.
36. The Commission bases its
paperwork burden estimates on the
changes in paperwork burden presented
by the newly proposed Reliability
Standard CIP–012–1.
37. The NERC Compliance Registry,
as of December 2017, identifies
approximately 1,250 unique U.S.
entities that are subject to mandatory
compliance with Reliability Standards.
Of this total, we estimate that 714
entities will face an increased
paperwork burden under proposed
Reliability Standard CIP–012–1. Based
on these assumptions, we estimate the
following reporting burden:
ANNUAL CHANGES PROPOSED BY THE NOPR IN DOCKET NO. RM18–20–000
Implementation of Documented Plan(s) (Requirement
R1) 57.
Document Identification of Security Protection (Requirement R1.1) 57.
Identification of Security Protection Application (if
owned by same Responsible Entity) (Requirement
R1.2) 57.
Identification of Security Protection Application (if not
owned by same Responsible Entity) (Requirement
R1.3) 57.
Maintaining Compliance (ongoing) ................................
Total (one-time) ......................................................
Total (ongoing) .......................................................
TOTAL .............................................................
jbell on DSK30RV082PROD with PROPOSALS
49 See
NERC Petition at page 505 of pdf.
No. 672, 114 FERC ¶ 61,104, order on
reh’g, Order No. 672–A, 114 FERC ¶ 61,328.
51 Id. PP 322, 325.
52 Id. P 327.
53 44 U.S.C. 3507(d) (2012).
54 5 CFR 1320.11.
55 We consider the filing of an application to be
a ‘‘response.’’
50 Order
VerDate Sep<11>2014
18:03 Apr 23, 2019
Jkt 247001
Number of
respondents
Number of
responses 55
per respondent
Total number
of responses
Average burden hrs. &
cost per
response 56
Total annual burden hours
& total annual cost
(1)
(2)
(1) × (2) = (3)
(4)
(3) × (4) = 5
714
1
714
128 hrs.; $10,496 ..............
91,392 hrs.;$7,494,144.
714
1
714
40 hrs.; $3,280 ..................
28,560 hrs.; $2,341,920.
714
1
714
20 hrs.; $1,640 ..................
14,280 hrs.; $1,170,960.
714
1
714
160 hrs.; $13,120 ..............
14,240 hrs.; $9,367,680.
714
........................
........................
1
........................
........................
714
2,856
714
83 hrs.; $6,806 ..................
...........................................
...........................................
59,262 hrs.; $4,859,484.
148,472 hrs.; $12,174,704.
59,262 hrs.; $4,859,484.
........................
........................
3,570
...........................................
207,734 hrs.; $17,034,188.
56 The loaded hourly wage figure (includes
benefits) is based on the average of the occupational
categories for 2017 found on the Bureau of Labor
Statistics website (https://www.bls.gov/oes/current/
naics2_22.htm):
Information Security Analysts (Occupation Code:
15–1122): $42.84.
Computer and Mathematical (Occupation Code:
15–0000): $44.02.
Legal (Occupation Code: 23–0000): $143.68.
PO 00000
Frm 00022
Fmt 4702
Sfmt 4702
Computer and Information Systems Managers
(Occupation Code: 11–3021): $96.51.
These various occupational categories’ wage
figures are averaged and weighted equally as
follows: ($42.84/hour + $44.02/hour + $143.68/hour
+ $96.51/hour) ÷ 4 = $81.76/hour. The resulting
wage figure is rounded to $82.00/hour for use in
calculating wage figures in the NOPR in Docket No.
RM18–20–000.
57 This is a one-time reporting requirement.
E:\FR\FM\24APP1.SGM
24APP1
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Proposed Rules
jbell on DSK30RV082PROD with PROPOSALS
38. The one-time burden for the
FERC–725B information collection will
be averaged over three years:
• 148,472 hours ÷ 3 = 49,491 hours/year
over three years
• The number of one-time responses for
the FERC–725B information
collection is also averaged over three
years: 2,856 responses ÷ 3 = 952
responses/year
39. The responses and burden for onetime and ongoing burden for Years 1–3
will total respectively as follows:
• Year 1: 1,666 responses [952
responses (one-time) + 714 responses
(ongoing)]; 108,753 hours [49,491
hours (one-time) + 59,262 hours
(ongoing)]
• Year 2: 1,666 responses [952
responses (one-time) + 714 responses
(ongoing)]; 108,753 hours [49,491
hours (one-time) + 59,262 hours
(ongoing)]
• Year 3: 1,666 responses [952
responses (one-time) + 714 responses
(ongoing)]; 108,753 hours [49,491
hours (one-time) + 59,262 hours
(ongoing)]
40. Title: Mandatory Reliability
Standards for Critical Infrastructure
Protection [CIP] Reliability Standards.
Action: Proposed revision to FERC–
725B information collection.
OMB Control No.: 1902–0248.
Respondents: Businesses or other forprofit institutions; not-for-profit
institutions.
Frequency of Responses: On occasion.
Necessity of the Information: This
notice of proposed rulemaking proposes
to approve the requested modifications
to Reliability Standards pertaining to
critical infrastructure protection. As
discussed above, the Commission
proposes to approve NERC’s proposed
Reliability Standard CIP–012–1
pursuant to section 215(d)(2) of the FPA
because they improve upon the
currently-effective suite of cyber
security Reliability Standards.
Internal Review: The Commission has
reviewed the proposed Reliability
Standard and made a determination that
its action is necessary to implement
section 215 of the FPA.
41. Interested persons may obtain
information on the reporting
requirements by contacting the
following: Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426 [Attention: Ellen
Brown, Office of the Executive Director,
VerDate Sep<11>2014
18:03 Apr 23, 2019
Jkt 247001
email: DataClearance@ferc.gov, phone:
(202) 502–8663, fax: (202) 273–0873].
42. For submitting comments
concerning the collection(s) of
information and the associated burden
estimate(s), please send your comments
to the Commission, and to the Office of
Management and Budget, Office of
Information and Regulatory Affairs, 725
17th Street NW, Washington, DC 20503,
[Attention: Desk Officer for the Federal
Energy Regulatory Commission, phone:
(202) 395–4638, fax: (202) 395–7285].
For security reasons, comments to OMB
should be submitted by email to: oira_
submission@omb.eop.gov. Comments
submitted to OMB should include
Docket Number RM18–20–000 and
FERC–725B (OMB Control No. 1902–
0248).
IV. Environmental Analysis
43. The Commission is required to
prepare an Environmental Assessment
or an Environmental Impact Statement
for any action that may have a
significant adverse effect on the human
environment.58 The Commission has
categorically excluded certain actions
from this requirement as not having a
significant effect on the human
environment. Included in the exclusion
are rules that are clarifying, corrective,
or procedural or that do not
substantially change the effect of the
regulations being amended.59 The
actions proposed herein fall within this
categorical exclusion in the
Commission’s regulations.
V. Regulatory Flexibility Act Analysis
44. The Regulatory Flexibility Act of
1980 (RFA) generally requires a
description and analysis of proposed
rules that will have significant
economic impact on a substantial
number of small entities.60 The Small
Business Administration’s (SBA) Office
of Size Standards develops the
numerical definition of a small
business.61 The SBA revised its size
standard for electric utilities (effective
January 22, 2014) to a standard based on
the number of employees, including
affiliates (from the prior standard based
on megawatt hour sales).62
58 Regulations
Implementing the National
Environmental Policy Act of 1969, Order No. 486,
FERC Stats. & Regs. ¶ 30,783 (1987) (crossreferenced at 41 FERC ¶ 61,284).
59 18 CFR 380.4(a)(2)(ii).
60 5 U.S.C. 601–12 (2012).
61 13 CFR 121.101.
62 13 CFR 121.201, Subsection 221.
PO 00000
Frm 00023
Fmt 4702
Sfmt 4702
17111
45. Proposed Reliability Standard
CIP–012–1 is expected to impose an
additional burden on 714 entities 63
(reliability coordinators, generator
operators, generator owners, interchange
coordinators or authorities, transmission
operators, balancing authorities, and
transmission owners).
46. Of the 714 affected entities
discussed above, we estimate that
approximately 82% percent of the
affected entities are small entities. We
estimate that each of the 585 small
entities to whom the proposed
modifications to Reliability Standard
CIP–012–1 apply will incur one-time
costs of approximately $17,051 per
entity to implement the proposed
Reliability Standards, as well as the
ongoing paperwork burden reflected in
the Information Collection Statement
(approximately $6,806 per year per
entity). We do not consider the
estimated costs for these 585 small
entities to be a significant economic
impact. Accordingly, we propose to
certify that proposed Reliability
Standard CIP–012–1 will not have a
significant economic impact on a
substantial number of small entities.
VI. Comment Procedures
47. The Commission invites interested
persons to submit comments on the
matters and issues proposed in this
notice to be adopted, including any
related matters or alternative proposals
that commenters may wish to discuss.
Comments are due June 24, 2019.
Comments must refer to Docket No.
RM18–20–000, and must include the
commenter’s name, the organization
they represent, if applicable, and
address.
48. The Commission encourages
comments to be filed electronically via
the eFiling link on the Commission’s
website at https://www.ferc.gov. The
Commission accepts most standard
word processing formats. Documents
created electronically using word
processing software should be filed in
63 Public utilities may fall under one of several
different categories, each with a size threshold
based on the company’s number of employees,
including affiliates, the parent company, and
subsidiaries. For the analysis in this NOPR, we are
using a 500 employee threshold due to each
affected entity falling within the role of Electric
Bulk Power Transmission and Control (NAISC
Code: 221121).
E:\FR\FM\24APP1.SGM
24APP1
17112
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Proposed Rules
native applications or print-to-PDF
format and not in a scanned format.
Commenters filing electronically do not
need to make a paper filing.
49. Commenters that are not able to
file comments electronically must send
an original of their comments to:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
50. All comments will be placed in
the Commission’s public files and may
be viewed, printed, or downloaded
remotely as described in the Document
Availability section below. Commenters
on this proposal are not required to
serve copies of their comments on other
commenters.
VII. Document Availability
51. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) and in the Commission’s
Public Reference Room during normal
business hours (8:30 a.m. to 5:00 p.m.
Eastern time) at 888 First Street NE,
Room 2A, Washington, DC 20426.
52. From the Commission’s Home
Page on the internet, this information is
available on eLibrary. The full text of
this document is available on eLibrary
in PDF and Microsoft Word format for
viewing, printing, and/or downloading.
To access this document in eLibrary,
type the docket number of this
document, excluding the last three
digits, in the docket number field.
53. User assistance is available for
eLibrary and the Commission’s website
during normal business hours from the
Commission’s Online Support at (202)
502–6652 (toll free at 1–866–208–3676)
or email at ferconlinesupport@ferc.gov,
or the Public Reference Room at (202)
502–8371, TTY (202) 502–8659. Email
the Public Reference Room at
public.referenceroom@ferc.gov.
jbell on DSK30RV082PROD with PROPOSALS
By direction of the Commission.
Issued: April 18, 2019
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–08236 Filed 4–23–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:04 Apr 23, 2019
Jkt 247001
DEPARTMENT OF HEALTH AND
HUMAN SERVICES
Food and Drug Administration
21 CFR Part 7
[Docket No. FDA–2018–D–2074]
Initiation of Voluntary Recalls Draft
Guidance for Industry and Food and
Drug Administration Staff; Availability
AGENCY:
Food and Drug Administration,
HHS.
ACTION:
Notice of availability.
The Food and Drug
Administration (FDA or Agency) is
announcing the availability of a draft
guidance for industry and FDA staff
entitled ‘‘Initiation of Voluntary Recalls
Under 21 CFR part 7, subpart C.’’ The
draft guidance, if finalized, would
establish guidance for industry and FDA
staff regarding timely initiation of
voluntary recalls of FDA-regulated
products. The draft guidance discusses
what preparations firms in a
distribution chain, including
manufacturers and distributors, should
consider making to establish recall
initiation procedures; to ensure timely
identification of, and response to,
product problems that might lead to a
recall; and to promptly issue recall
communications and press releases or
other public notices. It also discusses
preparations that firms in a distribution
chain should consider making to ensure
timely responses to a recall
communication. In addition, it
discusses how FDA assists firms with
carrying out their recall responsibilities
to protect the public health from
distributed products in violation of the
Federal Food, Drug, and Cosmetic Act
and other laws administered by FDA.
DATES: Submit either electronic or
written comments on the draft guidance
by June 24, 2019 to ensure that the
Agency considers your comment on this
draft guidance before it begins work on
the final version of the guidance.
ADDRESSES: You may submit either
electronic or written comments on
Agency guidances at any time as
follows:
SUMMARY:
Electronic Submissions
Submit electronic comments in the
following way:
• Federal eRulemaking Portal:
https://www.regulations.gov. Follow the
instructions for submitting comments.
Comments submitted electronically,
including attachments, to https://
www.regulations.gov will be posted to
the docket unchanged. Because your
comment will be made public, you are
PO 00000
Frm 00024
Fmt 4702
Sfmt 4702
solely responsible for ensuring that your
comment does not include any
confidential information that you or a
third party may not wish to be posted,
such as medical information, your or
anyone else’s Social Security number, or
confidential business information, such
as a manufacturing process. Please note
that if you include your name, contact
information, or other information that
identifies you in the body of your
comments, that information will be
posted on https://www.regulations.gov.
• If you want to submit a comment
with confidential information that you
do not wish to be made available to the
public, submit the comment as a
written/paper submission and in the
manner detailed (see ‘‘Written/Paper
Submissions’’ and ‘‘Instructions’’).
Written/Paper Submissions
Submit written/paper submissions as
follows:
• Mail/Hand delivery/Courier (for
written/paper submissions): Dockets
Management Staff (HFA–305), Food and
Drug Administration, 5630 Fishers
Lane, Rm. 1061, Rockville, MD 20852.
• For written/paper comments
submitted to the Dockets Management
Staff, FDA will post your comment, as
well as any attachments, except for
information submitted, marked and
identified, as confidential, if submitted
as detailed in ‘‘Instructions.’’
Instructions: All submissions received
must include the Docket No. FDA–
2018–D–2074 for ‘‘Initiation of
Voluntary Recalls Under 21 CFR part 7,
subpart C; Draft Guidance for Industry
and FDA Staff.’’ Received comments
will be placed in the docket and, except
for those submitted as ‘‘Confidential
Submissions,’’ publicly viewable at
https://www.regulations.gov or at the
Dockets Management Staff office
between 9 a.m. and 4 p.m., Monday
through Friday.
• Confidential Submissions—To
submit a comment with confidential
information that you do not wish to be
made publicly available, submit your
comments only as a written/paper
submission. You should submit two
copies total. One copy will include the
information you claim to be confidential
with a heading or cover note that states
‘‘THIS DOCUMENT CONTAINS
CONFIDENTIAL INFORMATION.’’ The
Agency will review this copy, including
the claimed confidential information, in
its consideration of comments. The
second copy, which will have the
claimed confidential information
redacted/blacked out, will be available
for public viewing and posted on
https://www.regulations.gov. Submit
both copies to the Dockets Management
E:\FR\FM\24APP1.SGM
24APP1
Agencies
[Federal Register Volume 84, Number 79 (Wednesday, April 24, 2019)]
[Proposed Rules]
[Pages 17105-17112]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-08236]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
18 CFR Part 40
[Docket No. RM18-20-000]
Critical Infrastructure Protection Reliability Standard CIP-012-
1--Cyber Security--Communications Between Control Centers
AGENCY: Federal Energy Regulatory Commission, DOE.
ACTION: Notice of proposed rulemaking.
-----------------------------------------------------------------------
SUMMARY: The Federal Energy Regulatory Commission (Commission) proposes
to approve Reliability Standard CIP-012-1 (Cyber Security--
Communications between Control Centers). The North American Electric
Reliability Corporation (NERC), the Commission-certified Electric
Reliability Organization, submitted the proposed Reliability Standard
for Commission approval in response to a Commission directive. In
addition, the Commission proposes to direct that NERC develop certain
modifications to Reliability Standard CIP-012-1 to require protections
regarding the availability of communication links and data communicated
between bulk electric system control centers and, further, to clarify
the types of data that must be protected.
DATES: Comments are due June 24, 2019.
ADDRESSES: Comments, identified by docket number, may be filed in the
following ways:
Electronic Filing through https://www.ferc.gov. Documents
created electronically using word processing software should be filed
in native applications or print-to-PDF format and not in a scanned
format.
Mail/Hand Delivery: Those unable to file electronically
may mail or hand-deliver comments to: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE,
Washington, DC 20426.
Instructions: For detailed instructions on submitting comments and
additional information on the rulemaking process, see the Comment
Procedures Section of this document.
FOR FURTHER INFORMATION CONTACT:
Vincent Le (Technical Information), Office of Electric Reliability,
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, (202) 502-6204, [email protected].
Kevin Ryan (Legal Information), Office of the General Counsel,
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, (202) 502-6840, [email protected].
SUPPLEMENTARY INFORMATION:
1. Pursuant to section 215(d)(2) of the Federal Power Act (FPA),\1\
the Commission proposes to approve Reliability Standard CIP-012-1
(Cyber Security--Communications between Control Centers). The North
American Electric Reliability Corporation (NERC), the Commission-
certified Electric Reliability Organization (ERO), submitted the
proposed Reliability Standard for Commission approval in response to a
Commission directive in Order No. 822.\2\ Specifically, pursuant to
section 215(d)(5) of the FPA, the Commission directed that NERC develop
modifications to require responsible entities to implement controls to
protect, at a minimum, communications links and sensitive bulk electric
system data communicated between bulk electric system Control Centers
``in a manner that is appropriately tailored to address the risks posed
to the bulk electric system by the assets being protected (i.e., high,
medium, or low impact).'' \3\
---------------------------------------------------------------------------
\1\ 16 U.S.C. 824o(d)(2) (2012).
\2\ Revised Critical Infrastructure Protection Reliability
Standards, Order No. 822, 154 FERC ] 61,037, at P 53, order denying
reh'g, Order No. 822-A, 156 FERC ] 61,052 (2016).
\3\ 16 U.S.C. 824o(d)(5); Order No. 822, 154 FERC ] 61,037 at P
53.
---------------------------------------------------------------------------
2. Proposed Reliability Standard CIP-012-1 is intended to augment
the currently-effective Critical Infrastructure Protection (CIP)
Reliability Standards to mitigate cybersecurity risks associated with
communications between bulk electric system Control Centers.\4\
Specifically, proposed Reliability Standard CIP-012-1 supports
situational awareness and reliable bulk electric system operations by
requiring responsible entities to protect the confidentiality and
integrity of Real-time Assessment and Real-time monitoring data
transmitted between
[[Page 17106]]
bulk electric system Control Centers.\5\ Accordingly, the Commission
proposes to approve proposed Reliability Standard CIP-012-1 based on a
determination that the standard is largely responsive to the
Commission's directive in Order No. 822 and improves the cybersecurity
posture of applicable entities.
---------------------------------------------------------------------------
\4\ BES Cyber System is defined as ``[o]ne or more BES Cyber
Assets logically grouped by a responsible entity to perform one or
more reliability tasks for a functional entity.'' Glossary of Terms
Used in NERC Reliability Standards (NERC Glossary), https://www.nerc.com/files/glossary_of_terms.pdf. The acronym BES refers to
the bulk electric system.
\5\ The NERC Glossary defines Real-time Assessment as ``An
evaluation of system conditions using Real-time data to assess
existing (pre-Contingency) and potential (post-Contingency)
operating conditions. The assessment shall reflect applicable inputs
including, but not limited to: Load, generation output levels, known
Protection System and Special Protection System status or
degradation, Transmission outages, generator outages, Interchange,
Facility Ratings, and identified phase angle and equipment
limitations. (Real-time Assessment may be provided through internal
systems or through third-party services.)'' NERC Glossary of Terms
Used in NERC Reliability Standards (July 3, 2018).
---------------------------------------------------------------------------
3. However, we are concerned that there still may be certain cyber
security risks associated with the protection of communications links
and sensitive bulk electric system data communicated between bulk
electric system Control Centers that are not adequately addressed in
NERC's proposal. First, proposed Reliability Standard CIP-012-1 does
not require protections regarding the availability of communication
links and data communicated between bulk electric system Control
Centers as directed in Order No. 822.\6\ As discussed below, at this
time, we are not persuaded by NERC's explanation that certain
currently-effective CIP Reliability Standards address the issue of
availability. Second, proposed Reliability Standard CIP-012-1 does not
adequately identify the types of data covered by its requirements, due
to, among other things, the fact that the term ``Real-time monitoring''
is not defined in the proposed Reliability Standard or the NERC
Glossary. Clarification of the types of covered data is warranted.
---------------------------------------------------------------------------
\6\ Order No. 822, 154 FERC ] 61,037 at P 54.
---------------------------------------------------------------------------
4. To address these issues, pursuant to section 215(d)(5) of the
FPA, the Commission proposes to direct that NERC develop modifications
to the CIP Reliability Standards to: (1) Require protections regarding
the availability of communication links and data communicated between
bulk electric system Control Centers; and (2) clearly identify the
types of data that must be protected.
I. Background
A. Section 215 and Mandatory Reliability Standards
5. Section 215 of the FPA requires a Commission-certified ERO to
develop mandatory and enforceable Reliability Standards, subject to
Commission review and approval. Reliability Standards may be enforced
by the ERO, subject to Commission oversight, or by the Commission
independently.\7\ Pursuant to section 215 of the FPA, the Commission
established a process to select and certify an ERO,\8\ and subsequently
certified NERC.\9\
---------------------------------------------------------------------------
\7\ 16 U.S.C. 824o(e).
\8\ Rules Concerning Certification of the Electric Reliability
Organization; and Procedures for the Establishment, Approval, and
Enforcement of Electric Reliability Standards, Order No. 672, 114
FERC ] 61,104, order on reh'g, Order No. 672-A, 114 FERC ] 61,328
(2006).
\9\ North American Electric Reliability Corp., 116 FERC ]
61,062, order on reh'g and compliance, 117 FERC ] 61,126 (2006),
aff'd sub nom. Alcoa, Inc. v. FERC, 564 F.3d 1342 (D.C. Cir. 2009).
---------------------------------------------------------------------------
B. Order No. 822
6. In Order No. 822, the Commission approved seven modified CIP
Reliability Standards and directed NERC to develop additional
modifications to the CIP Reliability Standards.\10\ Specifically, the
Commission directed NERC to, among other things, develop modifications
to the CIP Reliability Standards to require responsible entities to
implement controls to protect, at a minimum, communications links and
sensitive bulk electric system data communicated between bulk electric
system Control Centers ``in a manner that is appropriately tailored to
address the risks posed to the bulk electric system by the assets being
protected (i.e., high, medium, or low impact).'' \11\ The Commission
observed that NERC, as well as other commenters in that proceeding,
``recognize that inter-Control Center communications play a critical
role in maintaining bulk electric system reliability by . . . helping
to maintain situational awareness and support reliable operations
through timely and accurate communication between Control Centers.''
\12\
---------------------------------------------------------------------------
\10\ Order No. 822, 154 FERC ] 61,037 at PP 1, 3.
\11\ Id. P 53.
\12\ Id. P 54 (citing NERC Comments at 20).
---------------------------------------------------------------------------
7. The Commission explained that Control Centers associated with
responsible entities, including reliability coordinators, balancing
authorities, and transmission operators, must be capable of receiving
and storing a variety of bulk electric system data from their
interconnected entities in order to adequately perform their
reliability functions. The Commission, therefore, determined that
``additional measures to protect both the integrity and availability of
sensitive bulk electric system data are warranted.'' \13\ The
Commission also recognized that the data managed by responsible
entities has different attributes that may require different
information protection controls, and the Commission stated that NERC
should consider the different attributes of bulk electric system data
as it assesses appropriate information protection controls. The
Commission concluded that NERC ``should have flexibility in the manner
in which it addresses the Commission's directive.'' \14\
---------------------------------------------------------------------------
\13\ Id. P 54.
\14\ Id. P 55.
---------------------------------------------------------------------------
8. In Order No. 822, the Commission found to be reasonable the
following principles outlined in NERC's comments in that Commission
proceeding regarding protections for communication links and sensitive
bulk electric system data communicated between bulk electric system
Control Centers:
(1) should not have an adverse effect on reliability, including
the recognition of instances where the introduction of latency could
have negative results; (2) should account for the risk levels of
assets and information being protected, and require protections that
are commensurate with the risks presented; and (3) should be
results-based in order to provide flexibility to account for the
range of technologies and entities involved in bulk electric system
communications.\15\
---------------------------------------------------------------------------
\15\ Id.
In addition, the Commission cautioned that ``not all communication
network components and data pose the same risk to bulk electric system
reliability and may not require the same level of protection.'' \16\
Therefore, the Commission determined that NERC should develop controls
that reflect the risk being addressed in a reasonable manner.
---------------------------------------------------------------------------
\16\ Id. P 56.
---------------------------------------------------------------------------
C. NERC Petition and Proposed Reliability Standard CIP-012-1
9. On September 18, 2018, NERC submitted for Commission approval
proposed Reliability Standard CIP-012-1 and the associated violation
risk factors and violation severity levels, implementation plan, and
effective date.\17\ NERC states that the purpose of the proposed
Reliability Standard is to help maintain situational awareness and
reliable bulk electric system operations by protecting the
confidentiality and integrity of Real-time Assessment and Real-time
monitoring data transmitted between Control Centers.
---------------------------------------------------------------------------
\17\ Proposed Reliability Standard CIP-012-1 is not attached to
this notice of proposed rulemaking (NOPR). The proposed Reliability
Standards are available on the Commission's eLibrary document
retrieval system in Docket No. RM18-20-000 and on the NERC website,
www.nerc.com.
---------------------------------------------------------------------------
[[Page 17107]]
10. NERC explains that, although the Commission directed
modifications to Reliability Standard CIP-006-6, the standard drafting
team determined to address the Commission's communications directive by
developing a new Reliability Standard. According to NERC, the
differences in the scope and applicability between the existing
requirements of Reliability Standard CIP-006-1 and the Commission's
directive necessitated the development of a new Reliability Standard.
Specifically, NERC notes that while Reliability Standard CIP-006-6,
Requirement R1, Part 1.10 mandates protections for nonprogrammable
communication components outside a Physical Security Perimeter (PSP)
but inside the same Electronic Security Perimeter (ESP) for certain
Cyber Assets, proposed Reliability Standard CIP-012-1 ``requires
protections for communications between Control Centers that transmit
certain data regardless of the location of Cyber Assets inside or
outside a PSP or ESP.'' \18\ In addition, NERC explains that unlike
Reliability Standard CIP-006-6, which applies to high and medium impact
BES Cyber Assets at Control Centers, proposed Reliability Standard CIP-
012-1 applies to assets associated with communications between certain
Control Centers.
---------------------------------------------------------------------------
\18\ NERC Petition at 9.
---------------------------------------------------------------------------
11. NERC states that proposed Reliability Standard CIP-012-1
``requires Responsible Entities to develop and implement a plan to
address the risks posed by unauthorized disclosure (confidentiality)
and unauthorized modification (integrity) of Real-time Assessment and
Real-time monitoring data while being transmitted between applicable
Control Centers.'' \19\ According to NERC, the required plan must
include the following: (1) Identification of security protections; (2)
identification of where the protections are applied; and (3)
identification of the responsibilities of each entity in case a Control
Center is owned or operated by different responsible entities.\20\
---------------------------------------------------------------------------
\19\ Id. at 10.
\20\ Id. at 3.
---------------------------------------------------------------------------
12. NERC posits that, consistent with the Commission's directive in
Order No. 822, the risks posed by different types of BES Control
Centers and the associated data communicated between the Control
Centers were considered by the standard drafting team to determine its
appropriate scope and applicability.\21\ With regard to functional
entities and facilities, NERC states that proposed Reliability Standard
CIP-012-1 applies to balancing authorities, generator operators,
reliability coordinators, transmission operators and transmission
owners that own or operate a Control Center. NERC explains that
proposed Reliability Standard CIP-012-1 applies to all Control Centers,
with one exemption discussed below, ``regardless of the impact level of
BES Cyber Systems located at or associated with those control
centers.'' \22\ In that regard, NERC explains that the standard
drafting team determined that the sensitivity of data communicated
between Control Centers ``is not necessarily dependent on the impact
level of the BES Cyber Systems located at or associated with the
Control Centers.'' \23\ NERC states that the standard drafting team,
instead, focused on the types of Real-time data a Control Center will
communicate and whether the compromise of that data would pose a high
risk to bulk electric system reliability.
---------------------------------------------------------------------------
\21\ Id.
\22\ Id. at 10.
\23\ Id.
---------------------------------------------------------------------------
13. As noted above, the types of data within the scope of proposed
Reliability Standard CIP-012-1 consists of Real-time Assessment and
Real-time monitoring data exchanged between Control Centers. NERC
states that it is critical that this information is accurate since
responsible entities operate and monitor the bulk electric system based
on this Real-time information. However, NERC points out that proposed
Reliability Standard CIP-012-1 exempts Control Centers ``that transmit[
] to another Control Center Real-time Assessment or Real-time
monitoring data pertaining only to the generation resource of
transmission station or substation co-located with the transmitting
Control Center.'' \24\ NERC explains that proposed Reliability Standard
CIP-012-1 ``excludes other data typically transferred between Control
Centers, such as Operational Planning Analysis data, that is not used
by the Reliability Coordinator, Balancing Authority, and Transmission
Operator in Real-time.'' \25\ According to NERC, while Operational
Planning Analysis data provides information for next-day operations,
``entities adjust their operating actions during the current day based
on the data from Real-time Assessments and Real-time monitoring.'' \26\
NERC contends that if there is a risk that Operational Planning
Analysis data has been compromised, the responsible entity has the
opportunity to verify the data prior to any impact on Real-time
operations. Therefore, NERC concludes that while ``an Operational
Planning Analysis factors into how an entity operates, there is less of
a risk that an entity would act on compromised data from an Operational
Planning Analysis given it will base its operating actions on Real-time
inputs.'' \27\
---------------------------------------------------------------------------
\24\ Id. at 11.
\25\ Id. at 12.
\26\ Id.
\27\ Id. at 13.
---------------------------------------------------------------------------
14. NERC also indicates that data at rest and oral communications
fall outside the scope of proposed Reliability Standard CIP-012-1.
Regarding data at rest, NERC states that the standard drafting team
determined that since data at rest resides within BES Cyber Systems, it
is already protected by the controls mandated by Reliability Standards
CIP-003-6 through CIP-011-2. According to NERC, oral communications are
out of scope of proposed Reliability Standard CIP-012-1 ``because
operators have the ability to terminate the call and initiate a new one
via trusted means if they suspect a problem with, or compromise of, the
communication channel.'' \28\ NERC notes that Reliability Standard COM-
001-3 requires reliability coordinators, balancing authorities, and
transmission operators to have alternative interpersonal communication
capability, which could be used if there is a suspected compromise of
oral communication on one channel.
---------------------------------------------------------------------------
\28\ Id. at 14.
---------------------------------------------------------------------------
II. Discussion
15. Pursuant to section 215(d)(2) of the FPA, the Commission
proposes to approve proposed Reliability Standard CIP-012-1 as just,
reasonable, not unduly discriminatory or preferential, and in the
public interest. The proposed Reliability Standard will enhance
existing protections for bulk electric system reliability by augmenting
the currently-effective CIP Reliability Standards to mitigate
cybersecurity risks associated with communications between bulk
electric system Control Centers. Specifically, consistent with the
Commission's directive in Order No. 822, proposed Reliability Standard
CIP-012-1 supports situational awareness and reliable bulk electric
system operations by requiring responsible entities to protect the
confidentiality and integrity of Real-time Assessment and Real-time
monitoring data transmitted between bulk electric system Control
Centers.
16. While the Commission proposes to approve Reliability Standard
CIP-012-1, certain cyber security risks associated with communications
between bulk electric system Control
[[Page 17108]]
Centers may not be fully addressed even with the implementation of the
proposed Reliability Standard. As discussed below, the Commission is
concerned that a significant cyber security risk associated with the
protection of communications links and sensitive bulk electric system
data communicated between bulk electric system Control Centers may
persist because: (1) The CIP Reliability Standards do not address the
availability of communication links and data communicated between bulk
electric system Control Centers; and (2) proposed Reliability Standard
CIP-012-1 does not adequately identify the types of data covered by its
Requirements, due to, among other things, the fact that the term
``Real-time monitoring'' is not defined.
17. To address these gaps, the Commission seeks comment on
proposals to direct NERC, pursuant to section 215(d)(5) of the FPA, to
develop modifications to the CIP Reliability Standards to: (1) Require
protections regarding the availability of communication links and data
communicated between bulk electric system Control Centers; and (2)
clearly identify the types of data that must be protected.
18. Below, we discuss the following issues: (A) Availability of
bulk electric system communication links and data; and (B) scope of
bulk electric system data that must be protected.
A. Availability of Bulk Electric System Communication Links and Data
Order No. 822
19. In Order No. 822, the Commission directed that NERC ``should
identify the scope of sensitive bulk electric system data that must be
protected and specify how the confidentiality, integrity, and
availability of each type of bulk electric system data should be
protected while it is being transmitted or at rest.'' \29\ In addition,
the Commission clarified that ``the directed modification should
encompass communication links and data for intra-Control Center and
inter-Control Center communications.'' \30\
---------------------------------------------------------------------------
\29\ Order No. 822, 154 FERC ] 61,037 at P 56.
\30\ Id. P 58.
---------------------------------------------------------------------------
20. Specifically, the Commission explained that bulk electric
system Control Centers must be capable of exchanging and storing
sensitive bulk electric system data from interconnected entities in
order for responsible entities to adequately perform their reliability
functions. The Commission determined ``that additional measures to
protect both the integrity and availability of sensitive bulk electric
system data are warranted.'' \31\ The Commission explained that
protecting the availability of sensitive bulk electric system data
involves ensuring that the data required for bulk electric system
operations is available when needed. The Commission responded to
concerns that the risks posed by bulk electric system communication
networks do not justify the cost of implementing controls by explaining
that communications between Control Centers are fundamental to reliable
bulk electric system operations. The Commission, however, also
recognized that ``not all communication network components and data
pose the same risk to bulk electric system reliability and may not
require the same level of protection.'' \32\ The Commission therefore
determined that it expected NERC to develop controls that reflect the
associated risk and that can be implemented in a reasonable manner.
---------------------------------------------------------------------------
\31\ Id. P 54 (emphasis added).
\32\ Id. P 56.
---------------------------------------------------------------------------
NERC Petition
21. NERC states that proposed Reliability Standard CIP-012-1,
Requirement R1 mandates that:
each Responsible Entity develop a plan to mitigate the risks posed
by unauthorized disclosure and unauthorized modification of Real-
time Assessment and Real-time monitoring data while being
transmitted between and applicable Control Centers.\33\
---------------------------------------------------------------------------
\33\ Petition at 15-16.
NERC acknowledges that Order No. 822 directed that ``NERC should
develop measures to protect the confidentiality, integrity, and
availability of sensitive [bulk electric system] data.'' \34\ NERC
states, however, that while proposed Reliability Standard CIP-012-1
requires protections for the confidentiality (i.e., unauthorized
disclosure) and integrity (i.e., unauthorized modification) of Real-
time Assessment and Real-time monitoring data, the availability of that
data is addressed in currently-effective Reliability Standards.
---------------------------------------------------------------------------
\34\ Id. at 17.
---------------------------------------------------------------------------
22. Specifically, NERC maintains that Reliability Standard IRO-002-
5 ``requires redundant and diversely routed data exchange
infrastructure within the Reliability Coordinator's primary Control
Center in order to exchange Real-time data used in Real-time monitoring
and Real-time Assessments with Balancing Authorities, Transmission
Operators, and other entities the Reliability Coordinator deems
necessary.'' \35\ Similarly, NERC states that Reliability Standard TOP-
001-4 ``requires Balancing Authorities and Transmission Operators to
have redundant and diversely routed data exchange infrastructure to
exchange Real-time data.'' \36\ According to NERC, the ``redundancy of
data exchange infrastructure helps to ensure the availability of
critical Real-time data for Control Centers.'' \37\ Further, NERC notes
that Reliability Standards IRO-010-2 and TOP-003-3 require reliability
coordinators, transmission operators, and balancing authorities to use
a mutually agreeable security protocol for exchange of Real-time data.
NERC contends that, by agreeing on security protocols, entities
communicate directly with the appropriate entities rather than having
to translate different protocols, which helps to ensure the
availability of Real-time data.
---------------------------------------------------------------------------
\35\ Id. at 18.
\36\ Id.
\37\ Id.
---------------------------------------------------------------------------
Discussion
23. We are not persuaded by the explanation in NERC's petition that
currently-effective CIP Reliability Standard requirements address the
availability directive in Order No. 822. Sensitive bulk electric system
data generally includes monitoring, operational, and system planning
data. Ensuring timely and reliable access to and use of this
information is essential to the reliable operation of the bulk electric
system. As the Commission noted in Order No. 822, bulk electric system
Control Centers ``must be capable of receiving and storing a variety of
sensitive bulk electric system data from interconnected entities.''
\38\ In particular, the Commission stated that additional protections
to address the availability of sensitive bulk electric system data are
warranted.\39\
---------------------------------------------------------------------------
\38\ Order No. 822, 154 FERC ] 61,037 at P 54.
\39\ Id.
---------------------------------------------------------------------------
24. We are not persuaded that the currently-effective Reliability
Standards cited in NERC's petition require responsible entities to
protect the availability of sensitive bulk electric system data in a
manner consistent with the directives in Order No. 822. For instance,
Reliability Standards IRO-002-5 and TOP-001-4 require responsible
entities to have redundant and diversely routed data exchange
infrastructure within the Control Center environment, but do not
pertain to communications between individual Control Centers, which was
the subject of the Commission's directive in Order No. 822. Similarly,
Reliability Standards IRO-010-2 and TOP-003-3 require responsible
entities to have mutually agreeable security protocols for
[[Page 17109]]
exchange of Real-time data, which may have the effect of contributing
to greater availability; however, these requirements do not create an
obligation, as directed in Order No. 822, to protect the availability
of those communication capabilities and associated data by applying
appropriate security controls. Creating an obligation to protect
availability, while affording flexibility in terms of what data is
protected and how, is distinct from relying on currently-effective
Reliability Standards whose effect may be to improve availability.
25. Bonneville Power Administration (BPA) and CenterPoint Energy
Houston Electric addressed this distinction during the standards
development process when they responded to the standard drafting team's
assertion that the availability directive is adequately addressed by
currently-effective CIP Reliability Standards. BPA explained that
``[w]hile the requirements of TOP-001-4 and IRO-002-5 (redundant and
diverse routing of data) can be used to achieve increased Availability,
it can also be achieved through other equally effective methods . . .
[and] [t]herefore, `availability' is not adequately addressed by TOP-
001-4 and IRO-002-5 and limits entities' options to address
availability by other methods more appropriate to their systems.'' \40\
CenterPoint stated that, ``TOP-001-4 and IRO-002-5 do not ensure
availability or communication of data between inter-entity and intra-
entity Control Centers, but only the redundancy of infrastructure
internal to the requesting entity's primary Control Center.'' \41\
---------------------------------------------------------------------------
\40\ NERC Petition at page 273 of pdf.
\41\ Id. at page 274 of pdf.
---------------------------------------------------------------------------
26. Not addressing the availability of covered communication links
and data could lead to unreliable operations resulting from the
inability to communicate data between Control Centers. While NERC
contends that currently-effective CIP Reliability Standards adequately
protect the availability of sensitive bulk electric system data, there
is no obligation on responsible entities to affirmatively protect the
availability of such data. Moreover, while the Commission in Order No.
822 allowed NERC flexibility in what data is protected and how, NERC
has not addressed the directive to protect the availability of
sensitive bulk electric system data.
27. Accordingly, pursuant to section 215(d)(5) of the FPA, the
Commission proposes to direct that NERC develop modifications to the
CIP Reliability Standards to require protections regarding the
availability of communication links and data communicated between bulk
electric system Control Centers. We seek comment on this proposal.
B. Scope of Bulk Electric System Data That Must Be Protected Order No.
822
28. In Order No. 822, the Commission stated that NERC ``should
identify the scope of sensitive bulk electric system data that must be
protected and specify how the confidentiality, integrity, and
availability of each type of bulk electric system data should be
protected while it is being transmitted or at rest.'' \42\ In addition,
the Commission clarified that ``the directed modification should
encompass communication links and data for intra-Control Center and
inter-Control Center communications.'' \43\
---------------------------------------------------------------------------
\42\ Order No. 822, 154 FERC ] 61,037 at P 56.
\43\ Id. P 58.
---------------------------------------------------------------------------
NERC Petition
29. NERC states that proposed Reliability Standard CIP-012-1
applies to Real-time Assessment and Real-time monitoring data due to
the critical nature of the information. NERC explains that:
Reliability Coordinators and Transmission Operators must perform
Real-time Assessments every 30 minutes to assess the conditions on
the system and determine whether there are any actual or potential
exceedances of System Operating Limits or Interconnection
Reliability Operating Limits.\44\
---------------------------------------------------------------------------
\44\ NERC Petition at 12.
In addition, NERC states that reliability coordinators, balancing
authorities, and transmission operators must perform Real-time
monitoring. NERC contends that since responsible entities ``operate and
monitor the [bulk electric system] according to this Real-time
information, it is of critical importance that it is accurate.'' \45\
---------------------------------------------------------------------------
\45\ Id.
---------------------------------------------------------------------------
Discussion
30. Proposed Reliability Standard CIP-012-1 requires the protection
of Real-time Assessment and Real-time monitoring data. While Real-time
Assessment is broadly defined by NERC, Real-time monitoring data is not
defined. Moreover, the proposed Reliability Standard does not
specifically indicate the types of data to be protected. We are
concerned that without further clarity, Reliability Standard CIP-012-1
may be implemented and enforced in an inconsistent manner.
31. In the Technical Rationale document appended to NERC's
petition, NERC explained in more detail (relative to the language of
the proposed Reliability Standard's requirements) what data should be
protected under proposed Reliability Standard CIP-012-1:
The SDT recognized the FERC reference to additional Reliability
Standards and the responsibilities to protect the applicable data in
accordance with NERC Reliability Standards TOP-003 and IRO-010. The
SDT used these references to drive the identification of sensitive
BES data and chose to base the CIP-012-1 requirements on the Real-
time data specification elements in these standards. This approach
provides consistent scoping of identified data, and does not require
each entity to devise its own list or inventory of this data. Many
entities are required to provide this data under agreements executed
with their [reliability coordinator (RC)], [balancing authority
(BA)] or [transmission operator (TOP)]. Data requiring protection in
CIP-012-1 consists of a subset of data that is identified by the RC,
BA, and TOP in the TOP-003 and IRO-010 data specification standards,
limited to Real-time Assessment data and Real-time monitoring
data.\46\
---------------------------------------------------------------------------
\46\ NERC Petition, Exhibit F (Technical Rationale) at 1-2; see
also Exhibit E (Draft Implementation Guidance) at 5 (providing
similar context as to what data should be protected).
The references to Reliability Standards TOP-003 and IRO-010 in the
Technical Rationale document are not found in proposed Reliability
Standard CIP-012-1. Instead Requirement R1 of proposed Reliability
Standard CIP-012-1 only uses the terms ``Real-time Assessment and Real-
time monitoring data.'' In addition, as the Technical Rational
indicates at the outset: ``This Technical Rationale and Justification
for CIP-012-1 is not a Reliability Standard and should not be
considered mandatory and enforceable.'' \47\
---------------------------------------------------------------------------
\47\ NERC Petition, Exhibit F at iv; see also Exhibit E at 3
(indicating that the draft Implementation Guidance document only
provides examples in achieving compliance).
---------------------------------------------------------------------------
32. Not clearly defining the types of data that must be protected
under the proposed Reliability Standard could result in uneven
compliance and enforcement. The term ``Real-time Assessment'' is
broadly defined in the NERC Glossary of Terms, and the term ``Real-time
monitoring'' is not defined at all. These terms, alone, may not be
understood or enforced in a consistent manner. This concern arose
during the standard drafting process in comments regarding an earlier
version of the proposed Reliability Standard, which was later
modified.\48\ Still relevant,
[[Page 17110]]
however, are concerns raised regarding the potential ambiguities
associated with enforcement of the scope of data that must be
protected. In particular, while NERC identifies Reliability Standards
IRO-002-5, Requirements R5 and R6, and TOP-001-4, Requirements R10 and
R11 in discussing the parameters of Real-time monitoring data, the
information outlined in the identified requirements is not included in
the language of proposed Reliability Standard CIP-012-1 itself and,
therefore, implementation and compliance concerns may arise.\49\
---------------------------------------------------------------------------
\48\ An early version of Requirement R1 of proposed Reliability
Standard CIP-012-1 identified the scope of the data to be protected
as ``data used for Operational Planning Analysis, Real-time
Assessments, and Real-time monitoring.''
\49\ See NERC Petition at page 505 of pdf.
---------------------------------------------------------------------------
33. The compliance obligations imposed under proposed Reliability
Standard CIP-012-1 should be clear in order for responsible entities to
effectively and reasonably implement the required protections. The lack
of clarity regarding the scope of Real-time monitoring data is
inconsistent with principles outlined by the Commission in Order No.
672.\50\ In particular, the lack of clarity may result in: (1) A
failure to establish a clear and unambiguous requirement regarding the
protection of Real-time monitoring data; \51\ and (2) a failure to
identify clear and objective criterion to facilitate consistent and
non-preferential enforcement since responsible entities will not have a
clear understanding of the Real-time monitoring data to be
protected.\52\ Since the controls required under Reliability Standard
CIP-012-1 are plan-based, the scope of data to be protected should be
clear and unambiguous so that responsible entities will accurately
identify vulnerabilities or risks requiring mitigation.
---------------------------------------------------------------------------
\50\ Order No. 672, 114 FERC ] 61,104, order on reh'g, Order No.
672-A, 114 FERC ] 61,328.
\51\ Id. PP 322, 325.
\52\ Id. P 327.
---------------------------------------------------------------------------
34. Therefore, pursuant to section 215(d)(5) of the FPA, the
Commission proposes to direct that NERC develop modifications to the
CIP Reliability Standards to clearly identify the types of data that
must be protected. We seek comment on this proposal. In particular, we
seek comment on the specific information covered by the term ``Real-
time monitoring'' and whether a NERC Glossary definition would assist
with implementation and compliance.
III. Information Collection Statement
35. The FERC-725B information collection requirements contained in
this notice of proposed rulemaking are subject to review by the Office
of Management and Budget (OMB) under section 3507(d) of the Paperwork
Reduction Act of 1995.\53\ OMB's regulations require approval of
certain information collection requirements imposed by agency
rules.\54\ Upon approval of a collection of information, OMB will
assign an OMB control number and expiration date. Respondents subject
to the filing requirements of this rule will not be penalized for
failing to respond to these collections of information unless the
collections of information display a valid OMB control number. The
Commission solicits comments on the Commission's need for this
information, whether the information will have practical utility, the
accuracy of the burden estimates, ways to enhance the quality, utility,
and clarity of the information to be collected or retained, and any
suggested methods for minimizing respondents' burden, including the use
of automated information techniques.
---------------------------------------------------------------------------
\53\ 44 U.S.C. 3507(d) (2012).
\54\ 5 CFR 1320.11.
---------------------------------------------------------------------------
36. The Commission bases its paperwork burden estimates on the
changes in paperwork burden presented by the newly proposed Reliability
Standard CIP-012-1.
37. The NERC Compliance Registry, as of December 2017, identifies
approximately 1,250 unique U.S. entities that are subject to mandatory
compliance with Reliability Standards. Of this total, we estimate that
714 entities will face an increased paperwork burden under proposed
Reliability Standard CIP-012-1. Based on these assumptions, we estimate
the following reporting burden:
---------------------------------------------------------------------------
\55\ We consider the filing of an application to be a
``response.''
\56\ The loaded hourly wage figure (includes benefits) is based
on the average of the occupational categories for 2017 found on the
Bureau of Labor Statistics website (https://www.bls.gov/oes/current/naics2_22.htm):
Information Security Analysts (Occupation Code: 15-1122):
$42.84.
Computer and Mathematical (Occupation Code: 15-0000): $44.02.
Legal (Occupation Code: 23-0000): $143.68.
Computer and Information Systems Managers (Occupation Code: 11-
3021): $96.51.
These various occupational categories' wage figures are averaged
and weighted equally as follows: ($42.84/hour + $44.02/hour +
$143.68/hour + $96.51/hour) / 4 = $81.76/hour. The resulting wage
figure is rounded to $82.00/hour for use in calculating wage figures
in the NOPR in Docket No. RM18-20-000.
\57\ This is a one-time reporting requirement.
Annual Changes Proposed by the NOPR in Docket No. RM18-20-000
----------------------------------------------------------------------------------------------------------------
Total annual
Number of Number of Total number Average burden burden hours &
respondents responses \55\ of responses hrs. & cost per total annual
per respondent response \56\ cost
(1) (2) (1) x (2) = (4)............. (3) x (4) = 5
(3)
----------------------------------------------------------------------------------------------------------------
Implementation of Documented 714 1 714 128 hrs.; 91,392
Plan(s) (Requirement R1) $10,496. hrs.;$7,494,14
\57\. 4.
Document Identification of 714 1 714 40 hrs.; $3,280. 28,560 hrs.;
Security Protection $2,341,920.
(Requirement R1.1) \57\.
Identification of Security 714 1 714 20 hrs.; $1,640. 14,280 hrs.;
Protection Application (if $1,170,960.
owned by same Responsible
Entity) (Requirement R1.2)
\57\.
Identification of Security 714 1 714 160 hrs.; 14,240 hrs.;
Protection Application (if $13,120. $9,367,680.
not owned by same
Responsible Entity)
(Requirement R1.3) \57\.
Maintaining Compliance 714 1 714 83 hrs.; $6,806. 59,262 hrs.;
(ongoing). $4,859,484.
Total (one-time)......... .............. .............. 2,856 ................ 148,472 hrs.;
$12,174,704.
Total (ongoing).......... .............. .............. 714 ................ 59,262 hrs.;
$4,859,484.
----------------------------------------------------------------------------------
TOTAL................ .............. .............. 3,570 ................ 207,734 hrs.;
$17,034,188.
----------------------------------------------------------------------------------------------------------------
[[Page 17111]]
38. The one-time burden for the FERC-725B information collection
will be averaged over three years:
148,472 hours / 3 = 49,491 hours/year over three years
The number of one-time responses for the FERC-725B information
collection is also averaged over three years: 2,856 responses / 3 = 952
responses/year
39. The responses and burden for one-time and ongoing burden for
Years 1-3 will total respectively as follows:
Year 1: 1,666 responses [952 responses (one-time) + 714
responses (ongoing)]; 108,753 hours [49,491 hours (one-time) + 59,262
hours (ongoing)]
Year 2: 1,666 responses [952 responses (one-time) + 714
responses (ongoing)]; 108,753 hours [49,491 hours (one-time) + 59,262
hours (ongoing)]
Year 3: 1,666 responses [952 responses (one-time) + 714
responses (ongoing)]; 108,753 hours [49,491 hours (one-time) + 59,262
hours (ongoing)]
40. Title: Mandatory Reliability Standards for Critical
Infrastructure Protection [CIP] Reliability Standards.
Action: Proposed revision to FERC-725B information collection.
OMB Control No.: 1902-0248.
Respondents: Businesses or other for-profit institutions; not-for-
profit institutions.
Frequency of Responses: On occasion.
Necessity of the Information: This notice of proposed rulemaking
proposes to approve the requested modifications to Reliability
Standards pertaining to critical infrastructure protection. As
discussed above, the Commission proposes to approve NERC's proposed
Reliability Standard CIP-012-1 pursuant to section 215(d)(2) of the FPA
because they improve upon the currently-effective suite of cyber
security Reliability Standards.
Internal Review: The Commission has reviewed the proposed
Reliability Standard and made a determination that its action is
necessary to implement section 215 of the FPA.
41. Interested persons may obtain information on the reporting
requirements by contacting the following: Federal Energy Regulatory
Commission, 888 First Street NE, Washington, DC 20426 [Attention: Ellen
Brown, Office of the Executive Director, email: [email protected],
phone: (202) 502-8663, fax: (202) 273-0873].
42. For submitting comments concerning the collection(s) of
information and the associated burden estimate(s), please send your
comments to the Commission, and to the Office of Management and Budget,
Office of Information and Regulatory Affairs, 725 17th Street NW,
Washington, DC 20503, [Attention: Desk Officer for the Federal Energy
Regulatory Commission, phone: (202) 395-4638, fax: (202) 395-7285]. For
security reasons, comments to OMB should be submitted by email to:
[email protected]. Comments submitted to OMB should include
Docket Number RM18-20-000 and FERC-725B (OMB Control No. 1902-0248).
IV. Environmental Analysis
43. The Commission is required to prepare an Environmental
Assessment or an Environmental Impact Statement for any action that may
have a significant adverse effect on the human environment.\58\ The
Commission has categorically excluded certain actions from this
requirement as not having a significant effect on the human
environment. Included in the exclusion are rules that are clarifying,
corrective, or procedural or that do not substantially change the
effect of the regulations being amended.\59\ The actions proposed
herein fall within this categorical exclusion in the Commission's
regulations.
---------------------------------------------------------------------------
\58\ Regulations Implementing the National Environmental Policy
Act of 1969, Order No. 486, FERC Stats. & Regs. ] 30,783 (1987)
(cross-referenced at 41 FERC ] 61,284).
\59\ 18 CFR 380.4(a)(2)(ii).
---------------------------------------------------------------------------
V. Regulatory Flexibility Act Analysis
44. The Regulatory Flexibility Act of 1980 (RFA) generally requires
a description and analysis of proposed rules that will have significant
economic impact on a substantial number of small entities.\60\ The
Small Business Administration's (SBA) Office of Size Standards develops
the numerical definition of a small business.\61\ The SBA revised its
size standard for electric utilities (effective January 22, 2014) to a
standard based on the number of employees, including affiliates (from
the prior standard based on megawatt hour sales).\62\
---------------------------------------------------------------------------
\60\ 5 U.S.C. 601-12 (2012).
\61\ 13 CFR 121.101.
\62\ 13 CFR 121.201, Subsection 221.
---------------------------------------------------------------------------
45. Proposed Reliability Standard CIP-012-1 is expected to impose
an additional burden on 714 entities \63\ (reliability coordinators,
generator operators, generator owners, interchange coordinators or
authorities, transmission operators, balancing authorities, and
transmission owners).
---------------------------------------------------------------------------
\63\ Public utilities may fall under one of several different
categories, each with a size threshold based on the company's number
of employees, including affiliates, the parent company, and
subsidiaries. For the analysis in this NOPR, we are using a 500
employee threshold due to each affected entity falling within the
role of Electric Bulk Power Transmission and Control (NAISC Code:
221121).
---------------------------------------------------------------------------
46. Of the 714 affected entities discussed above, we estimate that
approximately 82% percent of the affected entities are small entities.
We estimate that each of the 585 small entities to whom the proposed
modifications to Reliability Standard CIP-012-1 apply will incur one-
time costs of approximately $17,051 per entity to implement the
proposed Reliability Standards, as well as the ongoing paperwork burden
reflected in the Information Collection Statement (approximately $6,806
per year per entity). We do not consider the estimated costs for these
585 small entities to be a significant economic impact. Accordingly, we
propose to certify that proposed Reliability Standard CIP-012-1 will
not have a significant economic impact on a substantial number of small
entities.
VI. Comment Procedures
47. The Commission invites interested persons to submit comments on
the matters and issues proposed in this notice to be adopted, including
any related matters or alternative proposals that commenters may wish
to discuss. Comments are due June 24, 2019. Comments must refer to
Docket No. RM18-20-000, and must include the commenter's name, the
organization they represent, if applicable, and address.
48. The Commission encourages comments to be filed electronically
via the eFiling link on the Commission's website at https://www.ferc.gov. The Commission accepts most standard word processing
formats. Documents created electronically using word processing
software should be filed in
[[Page 17112]]
native applications or print-to-PDF format and not in a scanned format.
Commenters filing electronically do not need to make a paper filing.
49. Commenters that are not able to file comments electronically
must send an original of their comments to: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE,
Washington, DC 20426.
50. All comments will be placed in the Commission's public files
and may be viewed, printed, or downloaded remotely as described in the
Document Availability section below. Commenters on this proposal are
not required to serve copies of their comments on other commenters.
VII. Document Availability
51. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) and
in the Commission's Public Reference Room during normal business hours
(8:30 a.m. to 5:00 p.m. Eastern time) at 888 First Street NE, Room 2A,
Washington, DC 20426.
52. From the Commission's Home Page on the internet, this
information is available on eLibrary. The full text of this document is
available on eLibrary in PDF and Microsoft Word format for viewing,
printing, and/or downloading. To access this document in eLibrary, type
the docket number of this document, excluding the last three digits, in
the docket number field.
53. User assistance is available for eLibrary and the Commission's
website during normal business hours from the Commission's Online
Support at (202) 502-6652 (toll free at 1-866-208-3676) or email at
[email protected], or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the Public Reference Room at
[email protected].
By direction of the Commission.
Issued: April 18, 2019
Nathaniel J. Davis, Sr.,
Deputy Secretary.