Equitrans Midstream Corporation; Amended Notice of Intent To Prepare an Environmental Assessment for the Planned Tri-State Corridor Pipeline Project and Request for Comments on Environmental Issues, 17150-17152 [2019-08216]
Download as PDF
17150
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Notices
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and seven copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: April 17, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–08214 Filed 4–23–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF18–2–000]
jbell on DSK30RV082PROD with NOTICES
Equitrans Midstream Corporation;
Amended Notice of Intent To Prepare
an Environmental Assessment for the
Planned Tri-State Corridor Pipeline
Project and Request for Comments on
Environmental Issues
As previously noticed on February 20,
2018, and amended herein, the staff of
the Federal Energy Regulatory
Commission (FERC or Commission) will
prepare an environmental assessment
(EA) that will discuss the environmental
impacts of the Tri-State Corridor
Pipeline Project involving construction
and operation of facilities by Equitrans
Midstream Corporation (Equitrans) in
Washington County, Pennsylvania and
Brooke County, West Virginia. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
a second scoping period (due to
pipeline route changes in the project
design) the Commission will use to
gather input from the public and
interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
discover concerns the public may have
VerDate Sep<11>2014
17:20 Apr 23, 2019
Jkt 247001
about proposals. This process is referred
to as scoping. The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. By this notice, the
Commission requests public comments
on the scope of issues to address in the
EA. To ensure that your comments are
timely and properly recorded, please
submit your comments so that the
Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on May 20, 2019.
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider all filed comments during
the preparation of the EA.
If you sent comments on this project
to the Commission before the opening of
this docket on October 17, 2017, you
will need to file those comments in
Docket No. PF18–2–000 to ensure they
are considered as part of this
proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project, which
includes newly identified affected
landowners along the revised pipeline
route and landowners who would no
longer be affected by the previous
pipeline route. State and local
government representatives should
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, that approval conveys with
it the right of eminent domain.
Therefore, if you and the company do
not reach an easement agreement, the
pipeline company could initiate
condemnation proceedings in court. In
such instances, compensation would be
determined by a judge in accordance
with state law.
A fact sheet prepared by the FERC
entitled An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know? is available for viewing on
the FERC website (www.ferc.gov) at
https://www.ferc.gov/resources/guides/
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
gas/gas.pdf. This fact sheet addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings.
Public Participation
The Commission offers a free service
called eSubscription which makes it
easy to stay informed of all issuances
and submittals regarding the dockets/
projects to which you subscribe. These
instant email notifications are the fastest
way to receive notification and provide
a link to the document files which can
reduce the amount of time you spend
researching proceedings. To sign up go
to www.ferc.gov/docs-filing/
esubscription.asp.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. Using eComment is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
eRegister. You will be asked to select the
type of filing you are making; a
comment on a particular project is
considered a Comment on a Filing; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (PF18–2–000)
with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426
Summary of the Planned Project
Since issuance of our February 20,
2018 notice, Equitrans has taken over
the planned project from Brooke County
Access I, LLC. Additionally Equitrans
has modified approximately 60 percent
of the original pipeline route and added
or modified workspaces, access roads,
and other project components.
E:\FR\FM\24APN1.SGM
24APN1
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Notices
Equitrans plans to construct and
operate approximately 17 miles of new
natural gas transmission line and new
facilities in Washington County,
Pennsylvania and Brooke County, West
Virginia. The purpose of the project is
to provide 140 million cubic feet of firm
natural gas transportation service per
day to a proposed Power Facility being
constructed by ESC Brooke County
Power I, LLC in Brooke County, West
Virginia.
The Tri-State Corridor Pipeline
Project would consist of constructing
the following facilities:
• Approximately 16.7 miles of 16inch-diameter pipeline in Washington
County;
• approximately 0.3 mile of 16-inchdiameter pipeline in Brooke County;
• three interconnect/metering and
regulating stations and mainline valves
in Washington County;
• one metering and regulating station
at the Power Facility in Brooke County;
and
• new and existing temporary and
permanent access roads and contractor/
laydown yards.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the planned facilities
would disturb about 260 acres of land
for the aboveground facilities and the
pipeline. Following construction,
Equitrans would maintain about 104
acres for permanent operation of the
project’s facilities; the remaining
acreage would be restored and revert to
former uses. About 7 percent of the
planned pipeline route parallels existing
pipeline, utility, or road rights-of-way.
jbell on DSK30RV082PROD with NOTICES
The EA Process
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
planned project under these general
headings:
• Geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• air quality and noise;
• public safety; and
• cumulative impacts.
Commission staff will also evaluate
possible alternatives to the planned
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called eLibrary or from the
Commission’s Public Reference Room, 888 First
Street NE, Washington, DC 20426, or call (202) 502–
8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
VerDate Sep<11>2014
17:20 Apr 23, 2019
Jkt 247001
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
Although no formal application has
been filed, Commission staff have
already initiated a NEPA review under
the Commission’s pre-filing process.
The purpose of the pre-filing process is
to encourage early involvement of
interested stakeholders and to identify
and resolve issues before the
Commission receives an application. As
part of the pre-filing review,
Commission staff will contact federal
and state agencies to discuss their
involvement in the scoping process and
the preparation of the EA.
The EA will present Commission
staffs’ independent analysis of the
issues. The EA will be available in
electronic format in the public record
through eLibrary 2 and the
Commission’s website (https://
www.ferc.gov/industries/gas/enviro/
eis.asp). If eSubscribed, you will receive
instant email notification when the EA
is issued. The EA may be issued for an
allotted public comment period.
Commission staff will consider all
comments on the EA before making
recommendations to the Commission.
To ensure Commission staff have the
opportunity to consider and address
your comments, please carefully follow
the instructions in the Public
Participation section, beginning on page
2.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues related to this
project to formally cooperate in the
preparation of the EA.3 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice. Currently, the
West Virginia Division of Natural
Resources has expressed its intention to
participate as a cooperating agency in
the preparation of the EA.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
2 For
instructions on connecting to eLibrary, refer
to the last page of this notice.
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
17151
Preservation Office(s), and to solicit
their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.4
The EA for this project will document
our findings on the impacts on historic
properties and summarize the status of
consultations under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials; Native
American Tribes; other interested
parties; and local libraries and
newspapers. This list also includes all
affected landowners (as defined in the
Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. Commission
staff will update the environmental
mailing list as the analysis proceeds to
ensure that Commission notices related
to this environmental review are sent to
all individuals, organizations, and
government entities interested in and/or
potentially affected by the planned
project.
If the Commission issues the EA for
an allotted public comment period, a
Notice of Availability of the EA will be
sent to the environmental mailing list
and will provide instructions to access
the electronic document on the FERC’s
website (www.ferc.gov). If you need to
make changes to your name/address, or
if you would like to remove your name
from the mailing list, please return the
attached ‘‘Mailing List Update Form’’
(appendix 2).
Becoming an Intervenor
Once Equitrans files its application
with the Commission, you may want to
become an intervenor which is an
official party to the Commission’s
proceeding. Only intervenors have the
right to seek rehearing of the
Commission’s decision and be heard by
the courts if they choose to appeal the
Commission’s final ruling. An
intervenor formally participates in the
proceeding by filing a request to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214). Motions
4 The Advisory Council on Historic Preservation
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\24APN1.SGM
24APN1
17152
Federal Register / Vol. 84, No. 79 / Wednesday, April 24, 2019 / Notices
to intervene are more fully described at
https://www.ferc.gov/resources/guides/
how-to/intervene.asp. Please note that
the Commission will not accept requests
for intervenor status at this time. You
must wait until the Commission
receives a formal application for the
project, after which the Commission
will issue a public notice that
establishes an intervention deadline.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on General Search and enter the
docket number in the Docket Number
field, excluding the last three digits (i.e.,
PF18–2). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Dated: April 18, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–08216 Filed 4–23–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL19–64–000, QF19–907–002,
QF19–908–002]
jbell on DSK30RV082PROD with NOTICES
Rockville Solar I LLC, Rockville Solar
II LLC, Rockville Solar I LLC, Rockville
Solar II LLC; Notice of Petition for
Declaratory Order
Take notice that on April 15, 2019,
pursuant to Rule 207(a)(2) of the
Commission’s (Commission) Rules of
Practice and Procedure,1 Rockville Solar
I LLC and Rockville Solar II LLC
(collectively, the Applicants or
Petitioners) filed a joint petition for
declaratory order (petition) requesting
that the Commission grant partial
waivers of the filing requirement in
section 292.203(a)(3) of the
Commission’s regulations (QF Filing
Requirement) 2 for the time-period
beginning April 9, 2014 for the
Rockville Solar I solar project and
beginning on August 19, 2014 for the
Rockville Solar II solar project and
ending on March 6, 2019, when each of
the Applicants filed the required Form
556 self-certifications for each of the
Projects to become a qualifying facility
(the requested waiver period),3 all as
more fully explained in the petition.
Any person desiring to intervene or to
protest in this proceeding must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioners.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above proceeding
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
CFR 292.203(a)(3) (2018).
Rockville Solar I, Docket No. QF19–907–000
and Rockville Solar II, Docket No. QF19–908–000.
CFR 385.207 (2018).
VerDate Sep<11>2014
17:20 Apr 23, 2019
Jkt 247001
Dated: April 17, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–08218 Filed 4–23–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–203–000]
Owensboro Municipal Utilities v.
Louisville Gas and Electric Company
and Kentucky Utilities Company;
Notice of Filing
Take notice that on April 18, 2019,
Louisville Gas and Electric Company
and Kentucky Utilities Company
submitted a Compliance Refund Report
[OMU RS No. 402], pursuant to the
Federal Energy Regulatory
Commission’s February 21, 2019 Order.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
2 18
3 See
1 18
Comment Date: 5:00 p.m. Eastern time
on May 15, 2019.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
1 Owensboro Mun. Utilities v. Louisville Gas and
Elec. Co., et al., 166 FERC ¶ 61,131 (2019).
E:\FR\FM\24APN1.SGM
24APN1
Agencies
[Federal Register Volume 84, Number 79 (Wednesday, April 24, 2019)]
[Notices]
[Pages 17150-17152]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-08216]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF18-2-000]
Equitrans Midstream Corporation; Amended Notice of Intent To
Prepare an Environmental Assessment for the Planned Tri-State Corridor
Pipeline Project and Request for Comments on Environmental Issues
As previously noticed on February 20, 2018, and amended herein, the
staff of the Federal Energy Regulatory Commission (FERC or Commission)
will prepare an environmental assessment (EA) that will discuss the
environmental impacts of the Tri-State Corridor Pipeline Project
involving construction and operation of facilities by Equitrans
Midstream Corporation (Equitrans) in Washington County, Pennsylvania
and Brooke County, West Virginia. The Commission will use this EA in
its decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of a second scoping period (due
to pipeline route changes in the project design) the Commission will
use to gather input from the public and interested agencies about
issues regarding the project. The National Environmental Policy Act
(NEPA) requires the Commission to take into account the environmental
impacts that could result from its action whenever it considers the
issuance of a Certificate of Public Convenience and Necessity. NEPA
also requires the Commission to discover concerns the public may have
about proposals. This process is referred to as scoping. The main goal
of the scoping process is to focus the analysis in the EA on the
important environmental issues. By this notice, the Commission requests
public comments on the scope of issues to address in the EA. To ensure
that your comments are timely and properly recorded, please submit your
comments so that the Commission receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on May 20, 2019.
You can make a difference by submitting your specific comments or
concerns about the project. Your comments should focus on the potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. Your input will help the Commission
staff determine what issues they need to evaluate in the EA. Commission
staff will consider all filed comments during the preparation of the
EA.
If you sent comments on this project to the Commission before the
opening of this docket on October 17, 2017, you will need to file those
comments in Docket No. PF18-2-000 to ensure they are considered as part
of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project, which includes newly identified affected
landowners along the revised pipeline route and landowners who would no
longer be affected by the previous pipeline route. State and local
government representatives should notify their constituents of this
planned project and encourage them to comment on their areas of
concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the planned facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, that approval conveys with it the right of
eminent domain. Therefore, if you and the company do not reach an
easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law.
A fact sheet prepared by the FERC entitled An Interstate Natural
Gas Facility On My Land? What Do I Need To Know? is available for
viewing on the FERC website (www.ferc.gov) at https://www.ferc.gov/resources/guides/gas/gas.pdf. This fact sheet addresses a number of
typically asked questions, including the use of eminent domain and how
to participate in the Commission's proceedings.
Public Participation
The Commission offers a free service called eSubscription which
makes it easy to stay informed of all issuances and submittals
regarding the dockets/projects to which you subscribe. These instant
email notifications are the fastest way to receive notification and
provide a link to the document files which can reduce the amount of
time you spend researching proceedings. To sign up go to www.ferc.gov/docs-filing/esubscription.asp.
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. Using eComment is an easy
method for submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on eRegister. You will be asked to select the type of filing you are
making; a comment on a particular project is considered a Comment on a
Filing; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(PF18-2-000) with your submission: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington,
DC 20426
Summary of the Planned Project
Since issuance of our February 20, 2018 notice, Equitrans has taken
over the planned project from Brooke County Access I, LLC. Additionally
Equitrans has modified approximately 60 percent of the original
pipeline route and added or modified workspaces, access roads, and
other project components.
[[Page 17151]]
Equitrans plans to construct and operate approximately 17 miles of
new natural gas transmission line and new facilities in Washington
County, Pennsylvania and Brooke County, West Virginia. The purpose of
the project is to provide 140 million cubic feet of firm natural gas
transportation service per day to a proposed Power Facility being
constructed by ESC Brooke County Power I, LLC in Brooke County, West
Virginia.
The Tri-State Corridor Pipeline Project would consist of
constructing the following facilities:
Approximately 16.7 miles of 16-inch-diameter pipeline in
Washington County;
approximately 0.3 mile of 16-inch-diameter pipeline in
Brooke County;
three interconnect/metering and regulating stations and
mainline valves in Washington County;
one metering and regulating station at the Power Facility
in Brooke County; and
new and existing temporary and permanent access roads and
contractor/laydown yards.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called eLibrary or from the Commission's
Public Reference Room, 888 First Street NE, Washington, DC 20426, or
call (202) 502-8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the planned facilities would disturb about 260
acres of land for the aboveground facilities and the pipeline.
Following construction, Equitrans would maintain about 104 acres for
permanent operation of the project's facilities; the remaining acreage
would be restored and revert to former uses. About 7 percent of the
planned pipeline route parallels existing pipeline, utility, or road
rights-of-way.
The EA Process
The EA will discuss impacts that could occur as a result of the
construction and operation of the planned project under these general
headings:
Geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
air quality and noise;
public safety; and
cumulative impacts.
Commission staff will also evaluate possible alternatives to the
planned project or portions of the project, and make recommendations on
how to lessen or avoid impacts on the various resource areas.
Although no formal application has been filed, Commission staff
have already initiated a NEPA review under the Commission's pre-filing
process. The purpose of the pre-filing process is to encourage early
involvement of interested stakeholders and to identify and resolve
issues before the Commission receives an application. As part of the
pre-filing review, Commission staff will contact federal and state
agencies to discuss their involvement in the scoping process and the
preparation of the EA.
The EA will present Commission staffs' independent analysis of the
issues. The EA will be available in electronic format in the public
record through eLibrary \2\ and the Commission's website (https://www.ferc.gov/industries/gas/enviro/eis.asp). If eSubscribed, you will
receive instant email notification when the EA is issued. The EA may be
issued for an allotted public comment period. Commission staff will
consider all comments on the EA before making recommendations to the
Commission. To ensure Commission staff have the opportunity to consider
and address your comments, please carefully follow the instructions in
the Public Participation section, beginning on page 2.
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues related to this project to formally cooperate in
the preparation of the EA.\3\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice. Currently, the West Virginia Division of Natural Resources has
expressed its intention to participate as a cooperating agency in the
preparation of the EA.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office(s),
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\4\ The EA for this project will
document our findings on the impacts on historic properties and
summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials; Native
American Tribes; other interested parties; and local libraries and
newspapers. This list also includes all affected landowners (as defined
in the Commission's regulations) who are potential right-of-way
grantors, whose property may be used temporarily for project purposes,
or who own homes within certain distances of aboveground facilities,
and anyone who submits comments on the project. Commission staff will
update the environmental mailing list as the analysis proceeds to
ensure that Commission notices related to this environmental review are
sent to all individuals, organizations, and government entities
interested in and/or potentially affected by the planned project.
If the Commission issues the EA for an allotted public comment
period, a Notice of Availability of the EA will be sent to the
environmental mailing list and will provide instructions to access the
electronic document on the FERC's website (www.ferc.gov). If you need
to make changes to your name/address, or if you would like to remove
your name from the mailing list, please return the attached ``Mailing
List Update Form'' (appendix 2).
Becoming an Intervenor
Once Equitrans files its application with the Commission, you may
want to become an intervenor which is an official party to the
Commission's proceeding. Only intervenors have the right to seek
rehearing of the Commission's decision and be heard by the courts if
they choose to appeal the Commission's final ruling. An intervenor
formally participates in the proceeding by filing a request to
intervene pursuant to Rule 214 of the Commission's Rules of Practice
and Procedures (18 CFR 385.214). Motions
[[Page 17152]]
to intervene are more fully described at https://www.ferc.gov/resources/guides/how-to/intervene.asp. Please note that the Commission will not
accept requests for intervenor status at this time. You must wait until
the Commission receives a formal application for the project, after
which the Commission will issue a public notice that establishes an
intervention deadline.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on General Search and enter the docket number in
the Docket Number field, excluding the last three digits (i.e., PF18-
2). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along
with other related information.
Dated: April 18, 2019.
Kimberly D. Bose,
Secretary.