DEPARTMENT OF TRANSPORTATION
Office of the Secretary of
Transportation
Notice of Funding Opportunity for the
Department of Transportation’s
National Infrastructure Investments
Under the Consolidated
Appropriations Act, 2019
Office of the Secretary of
Transportation, DOT.
ACTION: Notice of funding opportunity.
AGENCY:
The Consolidated
Appropriations Act, 2019 (‘‘FY 2019
Appropriations Act’’) appropriated $900
million to be awarded by the
Department of Transportation (‘‘DOT’’)
for National Infrastructure Investments.
This appropriation stems from the
program funded and implemented
pursuant to the American Recovery and
Reinvestment Act of 2009 (the
‘‘Recovery Act’’) and is known as the
Better Utilizing Investments to Leverage
Development, or ‘‘BUILD Transportation
grants,’’ program. Funds for the FY 2019
BUILD Transportation grants program
are to be awarded on a competitive basis
for surface transportation infrastructure
projects that will have a significant local
or regional impact. The purpose of this
notice is to solicit applications for
BUILD Transportation grants.
DATES: Applications must be submitted
by 8:00 p.m. E.D.T. on July 15, 2019.
ADDRESSES: Applications must be
submitted through Grants.gov.
FOR FURTHER INFORMATION CONTACT: For
further information concerning this
notice, please contact the BUILD
Transportation grants program staff via
email at BUILDgrants@dot.gov, or call
Howard Hill at 202–366–0301. A TDD is
available for individuals who are deaf or
hard of hearing at 202–366–3993. In
addition, DOT will regularly post
answers to questions and requests for
clarifications as well as information
about webinars for further guidance on
DOT’s website at
www.transportation.gov/BUILDgrants.
SUPPLEMENTARY INFORMATION: The FY
2019 BUILD Transportation grant
program will make awards to surface
transportation infrastructure projects
that will have a significant impact
throughout the country. Each section of
jbell on DSK3GLQ082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:49 Apr 22, 2019
Jkt 247001
this notice contains information and
instructions relevant to the application
process for these BUILD Transportation
grants, and all applicants should read
this notice in its entirety so that they
have the information they need to
submit eligible and competitive
applications. For this round of BUILD
Transportation grants, the maximum
grant award is $25 million, and no more
than $90 million can be awarded to a
single State, as specified in the FY 2019
Appropriations Act. Per statute, the FY
2019 selection criteria are the same as
under the FY 2017 TIGER program,
although the description for each
criterion has been updated. For FY 2019
BUILD Transportation grants, the
definitions of urban and rural areas
differ from previous rounds.
Additionally, not more than 50 percent
of funds will be awarded to projects
located in urban and rural areas,
respectively.
Table of Contents
A. Program Description
B. Federal Award Information
C. Eligibility Information
D. Application and Submission Information
E. Application Review Information
F. Federal Award Administration
Information
G. Federal Awarding Agency Contacts
H. Other Information
A. Program Description
The Consolidated Appropriations Act,
2019 (Pub. L. 116–6, February 15, 2019)
(‘‘FY 2019 Appropriations Act’’)
appropriated $900 million to be
awarded by the Department of
Transportation (‘‘DOT’’) for National
Infrastructure Investments. Since this
program was created, $7.1 billion has
been awarded for capital investments in
surface transportation infrastructure
over ten rounds of competitive grants.
Throughout the program, these
discretionary grant awards have
supported projects that have a
significant local or regional impact.
Like the FY 2017 TIGER program, the
FY 2019 BUILD program will also give
special consideration to projects which
emphasize improved access to reliable,
safe, and affordable transportation for
communities in rural areas, such as
projects that improve infrastructure
condition, address public health and
safety, promote regional connectivity or
facilitate economic growth or
competitiveness. Such projects may
concurrently invest in broadband to
better facilitate productivity, including
through the U.S. Department of
Agriculture’s ReConnect Loan and Grant
program, and help rural citizens access
opportunities, or promote energy
PO 00000
Frm 00098
Fmt 4703
Sfmt 4703
16933
independence to help deliver significant
local or regional economic benefit.
B. Federal Award Information
1. Amount Available
The FY 2019 Appropriations Act
appropriated $900 million to be
awarded by DOT for the BUILD
Transportation grants program. The FY
2019 BUILD Transportation grants are
for capital investments in surface
transportation infrastructure and are to
be awarded on a competitive basis for
projects that will have a significant local
or regional impact. Additionally, the
Act allows for up to $15 million (of the
$900 million) to be awarded for the
planning, preparation or design of
eligible projects. DOT is referring to any
such awards as BUILD Transportation
planning grants. The FY 2019
Appropriations Act also allows DOT to
retain up to $27 million of the $900
million for award, oversight and
administration of grants and credit
assistance made under the program. If
this solicitation does not result in the
award and obligation of all available
funds, DOT may publish additional
solicitations.
The FY 2019 Appropriations Act
allows up to 20 percent of available
funds (or $180 million) to be used by
the Department to pay the subsidy and
administrative costs of a project
receiving credit assistance under the
Transportation Infrastructure Finance
and Innovation Act of 1998 (‘‘TIFIA’’) or
Railroad Rehabilitation and
Improvement Financing (RRIF)
programs, if that use of the FY 2019
BUILD funds would further the
purposes of the BUILD Transportation
grants program.
2. Award Size
The FY 2019 Appropriations Act
specifies that BUILD Transportation
grants may not be less than $5 million
and not greater than $25 million, except
that for projects located in rural areas
(as defined in Section C.3.ii.) the award
size is $1 million. There is no minimum
award size, regardless of location, for
BUILD Transportation planning grants.
3. Restrictions on Funding
Pursuant to the FY 2019
Appropriations Act, no more than 10
percent of the funds made available for
BUILD Transportation grants (or $90
million) may be awarded to projects in
a single State. The Act also directs that
not more than 50 percent of the funds
provided for BUILD Transportation
grants (or $450 million) shall be used for
projects located in rural areas with
population equal to or less than
E:\FR\FM\23APN1.SGM
23APN1
16934
Federal Register / Vol. 84, No. 78 / Tuesday, April 23, 2019 / Notices
200,000, and directs that not more than
50 percent of the funds provided for
BUILD Transportation grants (or $450
million) shall be used for projects
located in urbanized areas with a
population of more than 200,000.
Further, DOT must take measures to
ensure an equitable geographic
distribution of grant funds, an
appropriate balance in addressing the
needs of urban and rural areas, and
investment in a variety of transportation
modes.
4. Availability of Funds
The FY 2019 Appropriations Act
requires that FY 2019 BUILD
Transportation grants funds are
available for obligation only through
September 30, 2021. Obligation occurs
when a selected applicant and DOT
enter into a written grant agreement
after the applicant has satisfied
applicable administrative requirements,
including transportation planning and
environmental review requirements.
Unless authorized by the Department in
writing after the Department’s
announcement of FY 2019 BUILD
awards, any costs incurred prior to the
Department’s obligation of funds for a
project are ineligible for
reimbursement.1 All FY 2019 BUILD
funds must be expended (the grant
obligation must be liquidated or actually
paid out to the grantee) by September
30, 2026. After this date, unliquidated
funds are no longer available to the
project. As part of the review and
selection process described in Section
E.2., DOT will consider a project’s
likelihood of being ready to proceed
with an obligation of BUILD
Transportation grant funds and
complete liquidation of these
obligations, within the statutory
timelines. No waiver is possible for
these deadlines.
5. Previous BUILD/TIGER Awards
jbell on DSK3GLQ082PROD with NOTICES
Recipients of BUILD/TIGER grants
may apply for funding to support
additional phases of a project previously
awarded funds in the BUILD/TIGER
program. However, to be competitive,
the applicant should demonstrate the
1 Pre-award costs are only costs incurred directly
pursuant to the negotiation and anticipation of the
BUILD award where such costs are necessary for
efficient and timely performance of the scope of
work, as determined by DOT. Costs incurred under
an advance construction (23 U.S.C. 115)
authorization before the DOT announces that a
project is selected for a FY 2019 BUILD award
cannot be charged to FY 2019 BUILD funds.
Likewise, costs incurred under an FTA Letter of
No Prejudice under Chapter 53 of title 49 U.S.C.
before the DOT announces that a project is selected
for a FY 2019 BUILD award cannot be charged to
FY 2019 BUILD funds.
VerDate Sep<11>2014
17:49 Apr 22, 2019
Jkt 247001
extent to which the previously funded
project phase has met estimated project
schedules and budget, as well as the
ability to realize the benefits expected
for the project.
C. Eligibility Information
1. Eligible Applicants
Eligible Applicants for BUILD
Transportation grants are State, local,
and tribal governments, including U.S.
territories, transit agencies, port
authorities, metropolitan planning
organizations (MPOs), and other
political subdivisions of State or local
governments.
Multiple States or jurisdictions may
submit a joint application and must
identify a lead applicant as the primary
point of contact and also identify the
primary recipient of the award. Each
applicant in a joint application must be
an Eligible Applicant. Joint applications
must include a description of the roles
and responsibilities of each applicant
and must be signed by each applicant.
2. Cost Sharing or Matching
Per the FY 2019 Appropriations Act,
the Federal share of project costs for
which an expenditure is made under the
BUILD Transportation grant program
may not exceed 80 percent for a project
located in an urban area.2 The Secretary
may increase the Federal share of costs
above 80 percent for a project located in
a rural area. Urban area and rural area
are defined in Section C.3.ii of this
notice.
Non-Federal sources include State
funds originating from programs funded
by State revenue, local funds originating
from State or local revenue-funded
programs, or private funds. Toll credits
under 23 U.S.C. 120(i) are considered a
Federal source under the BUILD
program and, therefore, cannot be used
to satisfy the statutory cost sharing
requirement of a BUILD award. Unless
otherwise authorized by statute, nonFederal cost-share may not be counted
as the non-Federal share for both the
BUILD Transportation grant and another
Federal grant program. The Department
will not consider previously incurred
costs or previously expended or
encumbered funds towards the
matching requirement for any project.
Matching funds are subject to the same
Federal requirements described in
2 To meet match requirements, the minimum total
project cost for a project located in an urban area
must be $6.25 million.
Frm 00099
Fmt 4703
Sfmt 4703
3. Other
i. Eligible Projects
To be selected for a BUILD
Transportation grant, an applicant must
be an Eligible Applicant and the project
must be an Eligible Project.
PO 00000
Section F.2. as awarded funds. If repaid
from non-Federal sources, Federal credit
assistance is considered non-Federal
share.
Eligible projects for BUILD
Transportation grants are surface
transportation capital projects that
include, but are not limited to: (1)
Highway, bridge, or other road projects
eligible under title 23, United States
Code; (2) public transportation projects
eligible under chapter 53 of title 49,
United States Code; (3) passenger and
freight rail transportation projects; (4)
port infrastructure investments
(including inland port infrastructure
and land ports of entry); and (5)
intermodal projects.3
Improvements to Federally owned
facilities are ineligible under the FY
2019 BUILD program. Research,
demonstration, or pilot projects are
eligible only if they will result in longterm, permanent surface transportation
infrastructure that has independent
utility as defined in Section C.3.iii.
The FY 2019 Appropriations Act
allows up to $15 million for the
planning, preparation or design of
eligible projects. Activities eligible for
funding under BUILD Transportation
planning grants are related to the
planning, preparation, or design—
including environmental analysis,
feasibility studies, and other preconstruction activities—of surface
transportation capital projects.
Applicants are strongly encouraged to
submit applications only for eligible
award amounts.
ii. Rural/Urban Definition
For purposes of this notice, a project
is designated as urban if it is located
within (or on the boundary of) a Censusdesignated urbanized area 4 that had a
population greater than 200,000 in the
2010 Census. 5 If a project is located
outside a Census-designated urbanized
area with a population greater than
200,000, it is designated as a rural
project.
3 Please note that the Department may use a
BUILD Transportation grant to pay for the surface
transportation components of a broader project that
has non-surface transportation components, and
applicants are encouraged to apply for BUILD
Transportation grants to pay for the surface
transportation components of these projects.
4 Updated lists of UAs as defined by the Census
Bureau are available on the Census Bureau website
at https://www2.census.gov/geo/maps/dc10map/
UAUC_RefMap/ua/.
5 See www.transportation.gov/BUILDgrants for a
list of UAs.
E:\FR\FM\23APN1.SGM
23APN1
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 78 / Tuesday, April 23, 2019 / Notices
Rural and urban definitions differ in
some other DOT programs, including
TIFIA.
A project located in both an urban
and a rural area will be designated as
urban if the majority of the project’s
costs will be spent in urban areas.
Conversely, a project located in both an
urban area and a rural area will be
designated as rural if the majority of the
project’s costs will be spent in rural
areas.
This definition affects four aspects of
the program: (1) Not more than $450
million of the funds provided for BUILD
Transportation grants are to be used for
projects in rural areas; (2) not more than
$450 million of the funds provided for
BUILD Transportation grants are to be
used for projects in urban areas; (3) for
a project in a rural area the minimum
award is $1 million; and (4) the
Secretary may increase the Federal
share above 80 percent to pay for the
costs of a project in a rural area.
Transportation grant funding for those
components. If the application identifies
one or more independent project
components, the application should
clearly identify how each independent
component addresses selection criteria
and produces benefits on its own, in
addition to describing how the full
proposal of which the independent
component is a part addresses selection
criteria.
iii. Project Components
An application may describe a project
that contains more than one component,
and may describe components that may
be carried out by parties other than the
applicant. DOT may award funds for a
component, instead of the larger project,
if that component (1) independently
meets minimum award amounts
described in Section B and all eligibility
requirements described in Section C; (2)
independently aligns well with the
selection criteria specified in Section E;
and (3) meets National Environmental
Policy Act (NEPA) requirements with
respect to independent utility.
Independent utility means that the
component will represent a
transportation improvement that is
usable and represents a reasonable
expenditure of DOT funds even if no
other improvements are made in the
area, and will be ready for intended use
upon completion of that component’s
construction. All project components
that are presented together in a single
application must demonstrate a
relationship or connection between
them. (See Section D.2.iv. for Required
Approvals).
Applicants should be aware that,
depending upon the relationship
between project components and
applicable Federal law, DOT funding of
only some project components may
make other project components subject
to Federal requirements as described in
Section F.2.
DOT strongly encourages applicants
to identify in their applications the
project components that have
independent utility and separately
detail costs and requested BUILD
1. Address
Applications must be submitted to
Grants.gov. Instructions for submitting
applications can be found at
www.transportation.gov/BUILDgrants
along with specific instructions for the
forms and attachments required for
submission.
VerDate Sep<11>2014
17:49 Apr 22, 2019
Jkt 247001
iv. Application Limit
Each lead applicant may submit no
more than three applications. Unrelated
project components should not be
bundled in a single application for the
purpose of adhering to the limit. If a
lead applicant submits more than three
applications as the lead applicant, only
the first three received will be
considered.
D. Application and Submission
Information
2. Content and Form of Application
Submission
The application must include the
Standard Form 424 (Application for
Federal Assistance), cover page, and the
Project Narrative. More detailed
information about the Project Narrative
follows. Applicants should also
complete and attach to their application
the ‘‘BUILD 2019 Project Information’’
form available at
www.transportation.gov/BUILDgrants.
The Department recommends that the
project narrative follow the basic outline
below to address the program
requirements and assist evaluators in
locating relevant information.
I. Project Description ......
II. Project Location .........
III. Grant Funds, Sources
and Uses of all Project
Funding.
IV. Selection Criteria ......
V. Project Readiness ......
VI. Benefit Cost Analysis
See D.2.i.
See D.2.ii.
See D.2.iii.
See D.2.iv. and E.1.i.
See D.2.v. and E.1.ii.
See D.2.vi. and E.1.iii.
The project narrative should include
the information necessary for the
Department to determine that the
project satisfies project requirements
described in Sections B and C and to
assess the selection criteria specified in
Section E.1. To the extent practicable,
applicants should provide supporting
data and documentation in a form that
PO 00000
Frm 00100
Fmt 4703
Sfmt 4703
16935
is directly verifiable by the Department.
The Department may ask any applicant
to supplement data in its application
but expects applications to be complete
upon submission.
In addition to a detailed statement of
work, detailed project schedule, and
detailed project budget, the project
narrative should include a table of
contents, maps and graphics, as
appropriate, to make the information
easier to review. The Department
recommends that the project narrative
be prepared with standard formatting
preferences (a single-spaced document,
using a standard 12-point font such as
Times New Roman, with 1-inch
margins). The project narrative may not
exceed 30 pages in length, excluding
cover pages and table of contents. The
only substantive portions that may
exceed the 30-page limit are documents
supporting assertions or conclusions
made in the 30-page project narrative. If
possible, website links to supporting
documentation should be provided
rather than copies of these supporting
materials. If supporting documents are
submitted, applicants should clearly
identify within the project narrative the
relevant portion of the project narrative
that each supporting document
supports. The Department recommends
using appropriately descriptive file
names (e.g., ‘‘Project Narrative,’’
‘‘Maps,’’ ‘‘Memoranda of Understanding
and Letters of Support,’’ etc.) for all
attachments. DOT recommends
applications include the following
sections:
i. Project Description
The first section of the application
should provide a concise description of
the project, the transportation
challenges that it is intended to address,
and how it will address those
challenges. This section should discuss
the project’s history, including a
description of any previously completed
components. The applicant may use this
section to place the project into a
broader context of other transportation
infrastructure investments being
pursued by the project sponsor, and, if
applicable, how it will benefit
communities in rural areas.
ii. Project Location
This section of the application should
describe the project location, including
a detailed geographical description of
the proposed project, a map of the
project’s location and connections to
existing transportation infrastructure,
and geospatial data describing the
project location. If the project is located
within the boundary of a Censusdesignated urbanized area, the
E:\FR\FM\23APN1.SGM
23APN1
16936
Federal Register / Vol. 84, No. 78 / Tuesday, April 23, 2019 / Notices
application should identify that
urbanized area.
jbell on DSK3GLQ082PROD with NOTICES
iii. Grant Funds, Sources and Uses of
Project Funds
This section of the application should
describe the project’s budget. This
budget should not include any
previously incurred expenses. At a
minimum, it should include:
(A) Project costs;
(B) For all funds to be used for eligible
project costs, the source and amount of
those funds;
(C) For non-Federal funds to be used
for eligible project costs, documentation
of funding commitments should be
referenced here and included as an
appendix to the application;
(D) For Federal funds to be used for
eligible project costs, the amount,
nature, and source of any required nonFederal match for those funds; and
(E) A budget showing how each
source of funds will be spent. The
budget should show how each funding
source will share in each major
construction activity, and present that
data in dollars and percentages.
Funding sources should be grouped into
three categories: Non-Federal; BUILD;
and other Federal. If the project contains
individual components, the budget
should separate the costs of each project
component. If the project will be
completed in phases, the budget should
separate the costs of each phase. The
budget detail should sufficiently
demonstrate that the project satisfies the
statutory cost-sharing requirements
described in Section C.2.
In addition to the information
enumerated above, this section should
provide complete information on how
all project funds may be used. For
example, if a particular source of funds
is available only after a condition is
satisfied, the application should identify
that condition and describe the
applicant’s control over whether it is
satisfied. Similarly, if a particular
source of funds is available for
expenditure only during a fixed time
period, the application should describe
that restriction. Complete information
about project funds will ensure that the
Department’s expectations for award
execution align with any funding
restrictions unrelated to the Department,
even if an award differs from the
applicant’s request.
iv. Selection Criteria
This section of the application should
demonstrate how the project aligns with
the Criteria described in Section E.1 of
this notice. The Department encourages
applicants to either address each
criterion or expressly state that the
VerDate Sep<11>2014
17:49 Apr 22, 2019
Jkt 247001
project does not address the criterion.
Applicants are not required to follow a
specific format, but the outline
suggested below, which addresses each
criterion separately, promotes a clear
discussion that assists project
evaluators. To minimize redundant
information in the application, the
Department encourages applicants to
cross-reference from this section of their
application to relevant substantive
information in other sections of the
application. The guidance in this
section is about how the applicant
should organize their application.
Guidance describing how the
Department will evaluate projects
against the Selection Criteria is in
Section E.1 of this notice. Applicants
also should review that section before
considering how to organize their
application.
(1) Primary Selection Criteria
(a) Safety
This section of the application should
describe the anticipated outcomes of the
project that support the Safety criterion
(described in Section E.1.i.(a) of this
notice). The applicant should include
information on, and to the extent
possible, quantify, how the project
would improve safety outcomes within
the project area or wider transportation
network, to include how the project will
reduce the number, rate, and
consequences of transportation-related
accidents, serious injuries, and
fatalities. If applicable, the applicant
should also include information on how
the project will eliminate unsafe grade
crossings or contribute to preventing
unintended releases of hazardous
materials.
(b) State of Good Repair
This section of the application should
describe how the project will contribute
to a state of good repair by improving
the condition or resilience of existing
transportation facilities and systems
(described in Section E.1.i.(b) of this
notice), including the project’s current
condition and how the proposed project
will improve it, and any estimates of
impacts on long-term cost structures or
overall life-cycle costs. If the project
will contribute to a state of good repair
of transportation infrastructure that
supports border security, the applicant
should describe how.
(c) Economic Competitiveness
This section of the application should
describe how the project will support
the Economic Competitiveness criterion
(described in Section E.1.i.(c) of this
notice). The applicant should include
information about expected impacts of
PO 00000
Frm 00101
Fmt 4703
Sfmt 4703
the project on the movement of goods
and people, including how the project
increases the efficiency of movement
and thereby reduces costs of doing
business, improves local and regional
freight connectivity to the national and
global economy, reduces burdens of
commuting, and improves overall wellbeing. The applicant should describe
the extent to which the project
contributes to the functioning and
growth of the economy, including the
extent to which the project addresses
congestion or freight connectivity,
bridges service gaps in rural areas, or
promotes the expansion of private
economic development including in
Opportunity Zones.
(d) Environmental Sustainability
This section of the application should
describe how the project addresses the
environmental sustainability criterion
(described in Section E.1.i.(d) of this
notice). Applicants are encouraged to
provide quantitative information,
including baseline information that
demonstrates how the project will
reduce energy consumption, reduce
stormwater runoff, or achieve other
benefits for the environment such as
brownfield redevelopment.
(e) Quality of Life
This section should describe how the
project increases transportation choices
for individuals, expands access to
essential services for people in
communities across the United States,
improves connectivity for citizens to
jobs, health care, and other critical
destinations, particularly for rural
communities, or otherwise addresses
the quality of life criterion (described in
Section E.1.i.(e) of this notice). If
construction of the transportation
project will allow concurrent
installation of fiber or other broadband
deployment as an essential service, the
applicant should describe those
activities and how they support quality
of life. Unless the concurrent activities
support transportation, they will not be
eligible for reimbursement.
(2) Secondary Selection Criteria
(a) Innovation
This section of the application should
describe innovative strategies used and
the anticipated benefits of using those
strategies, including those
corresponding to three categories
(described in Section E.1.i.(f) of this
notice): (i) Innovative Technologies, (ii)
Innovative Project Delivery, or (iii)
Innovative Financing.
E:\FR\FM\23APN1.SGM
23APN1
Federal Register / Vol. 84, No. 78 / Tuesday, April 23, 2019 / Notices
(i) Innovative Technologies
If an applicant is proposing to adopt
innovative safety approaches or
technology, the application should
demonstrate the applicant’s capacity to
implement those innovations, the
applicant’s understanding of applicable
Federal requirements and whether the
innovations may require extraordinary
permitting, approvals, exemptions,
waivers, or other procedural actions,
and the effects of those innovations on
the project delivery timeline.
If an applicant is proposing to deploy
innovative traveler information systems
or technologies as part of the surface
transportation capital project, including
work zone data exchanges or related
data exchanges, the application should
demonstrate the applicant’s capacity to
implement these innovations, the
applicant’s understanding of applicable
data standards, and whether the
proposed innovations will advance
safety or other benefits during and after
project completion.
If an applicant is proposing to deploy
autonomous vehicles or other
innovative motor vehicle technology,
the application should demonstrate that
all vehicles will comply with applicable
safety requirements, including those
administered by the National Highway
Traffic Safety Administration (NHTSA)
and Federal Motor Carrier Safety
Administration (FMCSA). Specifically,
the application should show that
vehicles acquired for the proposed
project will comply with applicable
Federal Motor Vehicle Safety Standards
(FMVSS) and Federal Motor Carrier
Safety Regulations (FMCSR). If the
vehicles may not comply, the
application should either (1) show that
the vehicles and their proposed
operations are within the scope of an
exemption or wavier that has already
been granted by NHTSA, FMCSA, or
both agencies or (2) directly address
whether the project will require
exemptions or waivers from the FMVSS,
FMCSR, or any other regulation and, if
the project will require exemptions or
waivers, present a plan for obtaining
them.
jbell on DSK3GLQ082PROD with NOTICES
(ii) Innovative Project Delivery
If an applicant plans to use innovative
approaches to project delivery or is
located in a State with NEPA delegation
authority, applicants should describe
those project delivery methods and how
they are expected to improve the
efficiency of the project development or
expedite project delivery.
If an applicant is proposing to use
SEP–14 or SEP–15 (as described in
section E.1.i.(f) of this notice) the
VerDate Sep<11>2014
17:49 Apr 22, 2019
Jkt 247001
applicant should describe that proposal.
The applicant should also provide
sufficient information for evaluators to
confirm that the applicant’s proposal
would meet the requirements of the
specific experimental authority
program.6
(iii) Innovative Financing
If an applicant plans to incorporate
innovative funding or financing, the
applicant should describe the funding
or financing approach, including a
description of all activities undertaken
to pursue private funding or financing
for the project and the outcomes of
those activities.
(b) Partnership
This section of the application should
include information to assess the
partnership criterion (described in
Section E.1.i.(g) of this notice) including
a list of all project parties and details
about the proposed grant recipient and
other public and private parties who are
involved in delivering the project. This
section should also describe efforts to
collaborate among stakeholders,
including with the private sector.
Applications for projects involving
other Federal agencies, or requiring
action from other Federal agencies,
should demonstrate commitment and
involvement of those agencies. For
example, projects involving border
infrastructure should demonstrate
evidence of concurrent investment from
U.S. Customs and Border Patrol, U.S.
Department of State, and other relevant
Federal agencies; relevant port projects
should demonstrate alignment with U.S.
Army Corps of Engineers investment
strategies.
v. Project Readiness
This section of the application should
include information that, when
considered with the project budget
information presented elsewhere in the
application, is sufficient for the
Department to evaluate whether the
project is reasonably expected to begin
construction in a timely manner. To
assist the Department’s project readiness
assessment, the applicant should
provide the information requested on
technical feasibility, project schedule,
project approvals, and project risks,
each of which is described in greater
detail in the following sections.
Applicants are not required to follow
the specific format described here, but
this organization, which addresses each
6 SEP–14 information is available at https://
www.fhwa.dot.gov/programadmin/contracts/
sep_a.cfm. SEP–15 information is available at
https://www.fhwa.dot.gov/ipd/p3/toolkit/usdot/
sep15/implementation_procedure/.
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
16937
relevant aspect of project readiness,
promotes a clear discussion that assists
project evaluators. To minimize
redundant information in the
application, the Department encourages
applicants to cross-reference from this
section of their application to relevant
substantive information in other
sections of the application.
The guidance here is about what
information applicants should provide
and how the applicant should organize
their application. Guidance describing
how the Department will evaluate a
project’s readiness is described in
Section E.1.ii of this notice. Applicants
should review that section when
considering how to organize their
application.
(a) Technical Feasibility
The applicant should demonstrate the
technical feasibility of the project with
engineering and design studies and
activities; the development of design
criteria and/or a basis of design; the
basis for the cost estimate presented in
the BUILD application, including the
identification of contingency levels
appropriate to its level of design; and
any scope, schedule, and budget riskmitigation measures. Applicants should
include a detailed statement of work
that focuses on the technical and
engineering aspects of the project and
describes in detail the project to be
constructed.
(b) Project Schedule
The applicant should include a
detailed project schedule that identifies
all major project milestones. Examples
of such milestones include State and
local planning approvals (e.g.,
programming on the Statewide
Transportation Improvement Program);
start and completion of NEPA and other
Federal environmental reviews and
approvals including permitting; design
completion; right of way acquisition;
approval of plans, specifications and
estimates; procurement; State and local
approvals; project partnership and
implementation agreements, including
agreements with railroads; and
construction. The project schedule
should be sufficiently detailed to
demonstrate that:
(1) All necessary activities will be
complete to allow BUILD
Transportation grant funds to be
obligated sufficiently in advance of the
statutory deadline (September 30, 2021
for FY 2019 funds), and that any
unexpected delays will not put the
funds at risk of expiring before they are
obligated;
(2) the project can begin construction
quickly upon obligation of grant funds
E:\FR\FM\23APN1.SGM
23APN1
16938
Federal Register / Vol. 84, No. 78 / Tuesday, April 23, 2019 / Notices
and that those funds will be spent
expeditiously once construction starts,
with all funds expended by September
30, 2026; and
(3) all real property and right-of-way
acquisition will be completed in a
timely manner in accordance with 49
CFR part 24, 23 CFR part 710, and other
applicable legal requirements or a
statement that no acquisition is
necessary.
jbell on DSK3GLQ082PROD with NOTICES
(c) Required Approvals
(1) Environmental Permits and
Reviews. The application should
demonstrate receipt (or reasonably
anticipated receipt) of all environmental
approvals and permits necessary for the
project to proceed to construction on the
timeline specified in the project
schedule and necessary to meet the
statutory obligation deadline, including
satisfaction of all Federal, State and
local requirements and completion of
the NEPA process. Specifically, the
application should include:
(a) Information about the NEPA status
of the project. If the NEPA process is
complete, an applicant should indicate
the date of completion, and provide a
website link or other reference to the
final Categorical Exclusion, Finding of
No Significant Impact, Record of
Decision, and any other NEPA
documents prepared. If the NEPA
process is underway, but not complete,
the application should detail the type of
NEPA review underway, where the
project is in the process, and indicate
the anticipated date of completion of all
milestones and of the final NEPA
determination. If the last agency action
with respect to NEPA documents
occurred more than three years before
the application date, the applicant
should describe why the project has
been delayed and include a proposed
approach for verifying and, if necessary,
updating this material in accordance
with applicable NEPA requirements.
(b) Information on reviews, approvals,
and permits by other agencies. An
application should indicate whether the
proposed project requires reviews or
approval actions by other agencies,7
indicate the status of such actions, and
provide detailed information about the
status of those reviews or approvals and
should demonstrate compliance with
any other applicable Federal, State or
local requirements, and when such
approvals are expected. Applicants
should provide a website link or other
7 Projects that may impact protected resources
such as wetlands, species habitat, cultural or
historic resources require review and approval by
Federal and State agencies with jurisdiction over
those resources.
VerDate Sep<11>2014
17:49 Apr 22, 2019
Jkt 247001
reference to copies of any reviews,
approvals, and permits prepared.
(c) Environmental studies or other
documents, preferably through a
website link, that describe in detail
known project impacts, and possible
mitigation for those impacts.
(d) A description of discussions with
the appropriate DOT operating
administration field or headquarters
office regarding the project’s compliance
with NEPA and other applicable Federal
environmental reviews and approvals.
(e) A description of public
engagement about the project that has
occurred, including details on the
degree to which public comments and
commitments have been integrated into
project development and design.
(2) State and Local Approvals. The
applicant should demonstrate receipt of
State and local approvals on which the
project depends, such as State and local
environmental and planning approvals
and Statewide Transportation
Improvement Program (STIP) or
(Transportation Improvement Program)
TIP funding. Additional support from
relevant State and local officials is not
required; however, an applicant should
demonstrate that the project has broad
public support.
(3) Federal Transportation
Requirements Affecting State and Local
Planning. The planning requirements
applicable to the relevant operating
administration apply to all BUILD
Transportation grant projects,8
including intermodal projects located at
8 Under 23 U.S.C. 134 and 135, all projects
requiring an action by FHWA must be in the
applicable plan and programming documents (e.g.,
metropolitan transportation plan, transportation
improvement program (TIP) and statewide
transportation improvement program (STIP)).
Further, in air quality non-attainment and
maintenance areas, all regionally significant
projects, regardless of the funding source, must be
included in the conforming metropolitan
transportation plan and TIP. Inclusion in the STIP
is required under certain circumstances. To the
extent a project is required to be on a metropolitan
transportation plan, TIP, and/or STIP, it will not
receive a BUILD Transportation grant until it is
included in such plans. Plans that do not currently
include the awarded BUILD project can be amended
by the State and MPO. Projects that are not required
to be in long range transportation plans, STIPs, and
TIPs will not need to be included in such plans in
order to receive a BUILD Transportation grant. Port,
freight rail, and intermodal projects are not required
to be on the State Rail Plans called for in the
Passenger Rail Investment and Improvement Act of
2008, or in a State Freight Plan as described in the
FAST Act. However, applicants seeking funding for
freight projects are encouraged to demonstrate that
they have done sufficient planning to ensure that
projects fit into a prioritized list of capital needs
and are consistent with long-range goals. Means of
demonstrating this consistency would include
whether the project is in a TIP or a State Freight
Plan that conforms to the requirements 49 U.S.C.
70202 prior to the start of construction. Port
planning guidelines are available at
StrongPorts.gov.
PO 00000
Frm 00103
Fmt 4703
Sfmt 4703
airport facilities.9 Applicants should
demonstrate that a project that is
required to be included in the relevant
State, metropolitan, and local planning
documents has been or will be included
in such documents. If the project is not
included in a relevant planning
document at the time the application is
submitted, the applicant should submit
a statement from the appropriate
planning agency that actions are
underway to include the project in the
relevant planning document.
To the extent possible, freight projects
should be included in a State Freight
Plan and supported by a State Freight
Advisory Committee (49 U.S.C. 70201,
70202), if these exist. Applicants should
provide links or other documentation
supporting this consideration.
Because projects have different
schedules, the construction start date for
each BUILD Transportation grant must
be specified in the project-specific
agreements signed by relevant operating
administration and the grant recipients,
based on critical path items that
applicants identify in the application
and will be consistent with relevant
State and local plans.
(d) Assessment of Project Risks and
Mitigation Strategies
Project risks, such as procurement
delays, environmental uncertainties,
increases in real estate acquisition costs,
uncommitted local match,
unavailability of vehicles that either
comply with Federal Motor Vehicle
Safety Standards or are exempt from
Federal Motor Vehicle Safety Standards
in a manner that allows for their legal
acquisition and deployment,
unavailability of domestically
manufactured equipment, or lack of
legislative approval, affect the
likelihood of successful project start and
completion. The applicant should
identify all material risks to the project
and the strategies that the lead applicant
and any project partners have
undertaken or will undertake in order to
mitigate those risks. The applicant
should assess the greatest risks to the
project and identify how the project
parties will mitigate those risks.
9 Projects at grant obligated airports must be
compatible with the FAA-approved Airport Layout
Plan, as well as aeronautical surfaces associated
with the landing and takeoff of aircraft at the
airport. Additionally, projects at an airport: Must
comply with established Sponsor Grant Assurances,
including (but not limited to) requirements for nonexclusive use facilities, consultation with users,
consistency with local plans including
development of the area surrounding the airport,
and consideration of the interest of nearby
communities, among others; and must not adversely
affect the continued and unhindered access of
passengers to the terminal.
E:\FR\FM\23APN1.SGM
23APN1
Federal Register / Vol. 84, No. 78 / Tuesday, April 23, 2019 / Notices
jbell on DSK3GLQ082PROD with NOTICES
If an applicant anticipates pursuing a
waiver for relevant domestic preference
laws, the applicant should describe
steps that have been or will be taken to
maximize the use of domestic goods,
products, and materials in constructing
their project.
To the extent the applicant is
unfamiliar with the Federal program,
the applicant should contact the
appropriate DOT operating
administration field or headquarters
offices, as found in contact information
at www.transportation.gov/BUILDgrants,
for information on the pre-requisite
steps to obligate Federal funds in order
to ensure that their project schedule is
reasonable and that there are no risks of
delays in satisfying Federal
requirements.
BUILD Transportation planning grant
applicants should describe their
capacity to successfully implement the
proposed activities in a timely manner.
vi. Benefit Cost Analysis
This section describes the
recommended approach for the
completion and submission of a benefitcost analysis (BCA) as an appendix to
the Project Narrative. The results of the
analysis should be summarized in the
Project Narrative directly, as described
in Section D.2.
The appendix should provide present
value estimates of a project’s benefits
and costs relative to a no-build baseline.
To calculate present values, applicants
should apply a real discount rate (i.e.,
the discount rate net of the inflation
rate) of 7 percent per year to the
project’s streams of benefits and costs.
The purpose of the BCA is to enable the
Department to evaluate the project’s
cost-effectiveness by estimating a
benefit-cost ratio and calculating the
magnitude of net benefits for the project.
The primary economic benefits from
projects eligible for BUILD
Transportation grants are likely to
include savings in travel time costs,
vehicle or terminal operating costs, and
safety costs for both existing users of the
improved facility and new users who
may be attracted to it as a result of the
project. Reduced damages from vehicle
emissions and savings in maintenance
costs to public agencies may also be
quantified. Applicants may describe
other categories of benefits in the BCA
that are more difficult to quantify and
value in economic terms, such as
improving the reliability of travel times
or improvements to the existing human
and natural environments (such as
increased connectivity, improved public
health, storm water runoff mitigation,
and noise reduction), while also
providing numerical estimates of the
VerDate Sep<11>2014
17:49 Apr 22, 2019
Jkt 247001
16939
magnitude and timing of each of these
additional impacts wherever possible.
Any benefits claimed for the project,
both quantified and unquantified,
should be clearly tied to the expected
outcomes of the project.
The BCA should include the full costs
of developing, constructing, operating,
and maintaining the proposed project,
as well as the expected timing or
schedule for costs in each of these
categories. The BCA may also consider
the present discounted value of any
remaining service life of the asset at the
end of the analysis period. The costs
and benefits that are compared in the
BCA should also cover the same project
scope.
The BCA should carefully document
the assumptions and methodology used
to produce the analysis, including a
description of the baseline, the sources
of data used to project the outcomes of
the project, and the values of key input
parameters. Applicants should provide
all relevant files used for their BCA,
including any spreadsheet files and
technical memos describing the analysis
(whether created in-house or by a
contractor). The spreadsheets and
technical memos should present the
calculations in sufficient detail and
transparency to allow the analysis to be
reproduced by DOT evaluators. Detailed
guidance for estimating some types of
quantitative benefits and costs, together
with recommended economic values for
converting them to dollar terms and
discounting to their present values, are
available in the Department’s guidance
for conducting BCAs for projects
seeking funding under the BUILD
Transportation grant program (see
www.transportation.gov/BUILDgrants/
additional-guidance).
that determination as a basis for making
a BUILD Transportation grant to another
applicant.
3. Unique Entity Identifier and System
for Award Management (SAM)
Each applicant must: (1) Be registered
in SAM before submitting its
application; (2) provide a valid unique
entity identifier in its application; and
(3) continue to maintain an active SAM
registration with current information at
all times during which it has an active
Federal award or an application or plan
under consideration by a Federal
awarding agency. The Department may
not make a BUILD Transportation grant
to an applicant until the applicant has
complied with all applicable unique
entity identifier and SAM requirements
and, if an applicant has not fully
complied with the requirements by the
time the Department is ready to make a
BUILD Transportation grant, the
Department may determine that the
applicant is not qualified to receive a
BUILD Transportation grant and use
Only applicants who comply with all
submission deadlines described in this
notice and electronically submit valid
applications through Grants.gov will be
eligible for award. Applicants are
strongly encouraged to make
submissions in advance of the deadline.
PO 00000
Frm 00104
Fmt 4703
Sfmt 4703
4. Submission Dates and Times
i. Deadline
Applications must be submitted by
8:00 p.m. E.D.T. on July 15, 2019.
To submit an application through
Grants.gov, applicants must:
(1) Obtain a Data Universal
Numbering System (DUNS) number;
(2) Register with the System for
Award Management (SAM) at
www.SAM.gov;
(3) Create a Grants.gov username and
password; and
(4) The E-Business Point of Contact
(POC) at the applicant’s organization
must respond to the registration email
from Grants.gov and login at Grants.gov
to authorize the applicant as the
Authorized Organization Representative
(AOR). Please note that there can be
more than one AOR for an organization.
Please note that the Grants.gov
registration process usually takes 2–4
weeks to complete and that the
Department will not consider late
applications that are the result of failure
to register or comply with Grants.gov
applicant requirements in a timely
manner. For information and instruction
on each of these processes, please see
instructions at https://www.grants.gov/
web/grants/applicants/applicantfaqs.html. If applicants experience
difficulties at any point during the
registration or application process,
please call the Grants.gov Customer
Service Support Hotline at 1(800) 518–
4726, Monday-Friday from 7:00 a.m. to
9:00 p.m. EST.
ii. Consideration of Applications:
iii. Late Applications
Applicants experiencing technical
issues with Grants.gov that are beyond
the applicant’s control must contact
BUILDgrants@dot.gov prior to the
application deadline with the user name
of the registrant and details of the
technical issue experienced. The
applicant must provide:
(1) Details of the technical issue
experienced;
(2) Screen capture(s) of the technical
issues experienced along with
corresponding Grants.gov ‘‘Grant
tracking number;’’
E:\FR\FM\23APN1.SGM
23APN1
16940
Federal Register / Vol. 84, No. 78 / Tuesday, April 23, 2019 / Notices
(3) The ‘‘Legal Business Name’’ for the
applicant that was provided in the SF–
424;
(4) The AOR name submitted in the
SF–424;
(5) The DUNS number associated with
the application; and
(6) The Grants.gov Help Desk Tracking
Number
To ensure a fair competition of
limited discretionary funds, the
following conditions are not valid
reasons to permit late submissions: (1)
Failure to complete the registration
process before the deadline; (2) failure
to follow Grants.gov instructions on
how to register and apply as posted on
its website; (3) failure to follow all
instructions in this notice of funding
opportunity; and (4) technical issues
experienced with the applicant’s
computer or information technology
environment. After the Department
reviews all information submitted and
contact the Grants.gov Help Desk to
validate reported technical issues, DOT
staff will contact late applicants to
approve or deny a request to submit a
late application through Grants.gov. If
the reported technical issues cannot be
validated, late applications will be
rejected as untimely.
E. Application Review Information
jbell on DSK3GLQ082PROD with NOTICES
1. Criteria
This section specifies the criteria that
DOT will use to evaluate and award
applications for BUILD Transportation
grants. The criteria incorporate the
statutory eligibility requirements for this
program, which are specified in this
notice as relevant. Projects will also be
evaluated for demonstrated project
readiness and benefits and costs.
i. Primary Selection Criteria
Applications that do not demonstrate
a potential for moderate long-term
benefits based on these criteria will not
proceed in the evaluation process. DOT
does not consider any selection criterion
more important than the others. BUILD
Transportation planning grant
applications will be evaluated against
the same criteria as capital grant
applications. While the FY 2019
Appropriations Act allows funding
solely for pre-construction activities, the
Department will prioritize FY 2019
BUILD Transportation grant program
funding for projects that propose to
move into the construction phase within
the period of obligation. Accordingly,
applications for BUILD Transportation
planning grants will be less competitive
than capital grants.
The selection criteria, which will
receive equal consideration, are:
VerDate Sep<11>2014
17:49 Apr 22, 2019
Jkt 247001
(a) Safety
The Department will assess the
project’s ability to foster a safe
transportation system for the movement
of goods and people. The Department
will consider the projected impacts on
the number, rate, and consequences of
crashes, fatalities and injuries among
transportation users; the project’s
contribution to the elimination of
highway/rail grade crossings, or the
project’s contribution to preventing
unintended releases of hazardous
materials.
(b) State of Good Repair
The Department will assess whether
and to what extent: (1) The project is
consistent with relevant plans to
maintain transportation facilities or
systems in a state of good repair and
address current and projected
vulnerabilities; (2) if left unimproved,
the poor condition of the asset will
threaten future transportation network
efficiency, mobility of goods or
accessibility and mobility of people, or
economic growth; (3) the project is
appropriately capitalized up front and
uses asset management approaches that
optimize its long-term cost structure; (4)
a sustainable source of revenue is
available for operations and
maintenance of the project and the
project will reduce overall life-cycle
costs; (5) the project will maintain or
improve transportation infrastructure
that supports border security functions;
and (6) the project includes a plan to
maintain the transportation
infrastructure in a state of good repair.
The Department will prioritize projects
that ensure the good condition of
transportation infrastructure, including
rural transportation infrastructure, that
support commerce and economic
growth.
(c) Economic Competitiveness
The Department will assess whether
the project will (1) decrease
transportation costs and improve access,
especially for rural communities or
communities in Opportunity Zones,10
through reliable and timely access to
employment centers and job
opportunities; (2) improve long-term
efficiency, reliability or costs in the
movement of workers or goods; (3)
increase the economic productivity of
land, capital, or labor, including assets
in Opportunity Zones; (4) result in longterm job creation and other economic
opportunities; or (5) help the United
States compete in a global economy by
10 See https://www.cdfifund.gov/Pages/
Opportunity-Zones.aspx for more information on
Opportunity Zones.
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
facilitating efficient and reliable freight
movement.
Projects that address congestion in
major urban areas, particularly those
that do so through the use of congestion
pricing or the deployment of advanced
technology, projects that bridge gaps in
service in rural areas, and projects that
attract private economic development,
all support local or regional economic
competitiveness.
(d) Environmental Sustainability
The Department will consider the
extent to which the project improves
energy efficiency, reduces dependence
on oil, reduces congestion-related
emissions, improves water quality,
avoids and mitigates environmental
impacts and otherwise benefits the
environment, including through
alternative right of way uses
demonstrating innovative ways to
improve or streamline environmental
reviews while maintaining the same
outcomes. The Department will assess
the project’s ability to: (i) reduce energy
use and air or water pollution through
congestion mitigation strategies; (ii)
avoid adverse environmental impacts to
air or water quality, wetlands, and
endangered species; or (iii) provide
environmental benefits, such as
brownfield redevelopment, ground
water recharge in areas of water scarcity,
wetlands creation or improved habitat
connectivity, and stormwater
mitigation.
(e) Quality of Life
The Department will consider the
extent to which the project: (i) Increases
transportation choices for individuals to
provide more freedom on transportation
decisions; (ii) expands access to
essential services for communities
across the United States, particularly for
rural communities; or (iii) improves
connectivity for citizens to jobs, health
care, and other critical destinations,
particularly for rural communities.
Americans living in rural areas and on
Tribal lands continue to
disproportionately lack access and
connectivity, and the Department will
consider whether and the extent to
which the construction of the
transportation project will allow
concurrent installation of fiber or other
broadband deployment as an essential
service.
ii. Secondary Selection Criteria
(a) Innovation
The Department will assess the extent
to which the applicant uses innovative
strategies, including: (i) Innovative
technologies, (ii) innovative project
delivery, or (iii) innovative financing.
E:\FR\FM\23APN1.SGM
23APN1
Federal Register / Vol. 84, No. 78 / Tuesday, April 23, 2019 / Notices
jbell on DSK3GLQ082PROD with NOTICES
(i) Innovative Technologies
DOT will assess innovative
approaches to transportation safety,
particularly in relation to automated
vehicles and the detection, mitigation,
and documentation of safety risks.
When making BUILD Transportation
grant award decisions, the Department
will consider any innovative safety
approaches proposed by the applicant,
particularly projects which incorporate
innovative design solutions, enhance
the environment for automated vehicles,
or use technology to improve the
detection, mitigation, and
documentation of safety risks.
Innovative safety approaches may
include, but are not limited to:
• Conflict detection and mitigation
technologies (e.g., intersection alerts
and signal prioritization);
• Dynamic signaling, smart traffic
signals, or pricing systems to reduce
congestion;
• Traveler information systems, to
include work zone data exchanges;
• Signage and design features that
facilitate autonomous or semiautonomous vehicle technologies;
• Applications to automatically
capture and report safety-related issues
(e.g., identifying and documenting nearmiss incidents); and
• Cybersecurity elements to protect
safety-critical systems.
For innovative safety proposals, the
Department will evaluate safety benefits
that those approaches could produce
and the broader applicability of the
potential results. DOT will also assess
the extent to which the project uses
innovative technology that supports
surface transportation to significantly
enhance the operational performance of
the transportation system.
Innovative technologies include:
Broadband deployment and the
installation of high-speed networks
concurrent with the project
construction; connecting Intelligent
Transportation System (ITS)
infrastructure; and providing direct fiber
connections that support surface
transportation to public and private
entities, which can provide a platform
and catalyst for growth of rural
communities. The Department will
consider whether and the extent to
which the construction of the
transportation project will allow
concurrent broadband deployment and
the installation of high-speed networks.
(ii) Innovative Project Delivery
DOT will consider the extent to which
the project utilizes innovative practices
in contracting (such as public-private
partnerships), congestion management,
VerDate Sep<11>2014
17:49 Apr 22, 2019
Jkt 247001
asset management, or long-term
operations and maintenance.
The Department also seeks projects
that employ innovative approaches to
improve the efficiency and effectiveness
of the environmental permitting and
review to accelerate project delivery and
achieve improved outcomes for
communities and the environment. The
Department’s objective is to achieve
timely and consistent environmental
review and permit decisions.
Accordingly, projects from States with
NEPA assignment authority under 23
U.S.C. 327 are considered to use an
innovative approach to project delivery.
Participation in innovative project
delivery approaches will not remove
any statutory requirements affecting
project delivery.
While BUILD Transportation grant
award recipients are not required to
employ innovative approaches, the
Department encourages BUILD
Transportation grant applicants to
describe innovative project delivery
methods for proposed projects.
Additionally, DOT is interested in
projects that apply innovative strategies
to improve the efficiency of project
development or expedite project
delivery by using FHWA’s Special
Experimental Project No. 14 (SEP–14)
and Special Experimental Project No. 15
(SEP–15). Under SEP–14 and SEP–15,
FHWA may waive statutory and
regulatory requirements under title 23
on a project-by-project basis to explore
innovative processes that could be
adopted through legislation. This
experimental authority is available to
test changes that would improve the
efficiency of project delivery in a
manner that is consistent with the
purposes underlying existing
requirements; it is not available to
frustrate the purposes of existing
requirements.
When making BUILD Transportation
grant award decisions, the Department
will consider the applicant’s proposals
to use SEP–14 or SEP–15, whether the
proposals are consistent with the
objectives and requirements of those
programs, the potential benefits that
experimental authorities or waivers
might provide to the project, and the
broader applicability of potential
results. The Department is not replacing
the application processes for SEP–14 or
SEP–15 with this notice or the BUILD
Transportation grant program
application. Instead, it seeks detailed
expressions of interest in those
programs. If selected for an BUILD
Transportation grant award, the
applicant would need to satisfy the
relevant programs’ requirements and
complete the appropriate application
PO 00000
Frm 00106
Fmt 4703
Sfmt 4703
16941
processes. Selection for a BUILD
Transportation grant award does not
mean a project’s SEP–14 or SEP–15
proposal has been approved. The
Department will make a separate
determination in accordance with those
programs’ processes on the
appropriateness of a waiver.
(iii) Innovative Financing
DOT will assess the extent to which
the project incorporates innovations in
transportation funding and finance
through both traditional and innovative
means, including by using private sector
funding or financing and recycled
revenue from the competitive sale or
lease of publicly owned or operated
assets.
(b) Partnership
The Department will consider the
extent to which projects demonstrate
strong collaboration among a broad
range of stakeholders. Projects with
strong partnership typically involve
multiple partners in project
development and funding, such as State
and local governments, other public
entities, and private or nonprofit
entities. DOT will consider applicants
that partner with State, local, or private
entities for the completion and
operation of transportation
infrastructure to have strong
partnership. DOT will also assess the
extent to which the project application
demonstrates collaboration among
neighboring or regional jurisdictions to
achieve local or regional benefits. In the
context of public-private partnerships,
DOT will assess the extent to which
partners are encouraged to ensure longterm asset performance, such as through
pay-for-success approaches.
DOT will also consider the extent to
which projects include partnerships that
bring together diverse transportation
agencies or are supported, financially or
otherwise, by other stakeholders that are
pursuing similar objectives. For
example, DOT will consider the extent
to which transportation projects are
coordinated with economic
development, housing, water and waste
infrastructure, power and electric
infrastructure, broadband and land use
plans and policies or other public
service efforts.
ii. Demonstrated Project Readiness
During application evaluation, the
Department may consider project
readiness to assess the likelihood of a
successful project. In that analysis, the
Department will consider significant
risks to successful completion of a
project, including risks associated with
environmental review, permitting,
E:\FR\FM\23APN1.SGM
23APN1
16942
Federal Register / Vol. 84, No. 78 / Tuesday, April 23, 2019 / Notices
technical feasibility, funding, and the
applicant’s capacity to manage project
delivery. Risks do not disqualify
projects from award, but competitive
applications clearly and directly
describe achievable risk mitigation
strategies. A project with mitigated risks
or with a risk mitigation plan is more
competitive than a comparable project
with unaddressed risks.
iii. Project Costs and Benefits
The Department may consider the
costs and benefits of projects seeking
BUILD Transportation grant funding. To
the extent possible, the Department will
rely on quantitative, data-supported
analysis to assess how well a project
addresses this criterion, including an
assessment of the project’s estimated
benefit-cost ratio and net quantifiable
benefits based on the applicant-supplied
BCA described in Section D.2.vi.
iv. Additional Considerations
The FY 2019 Appropriations Act
requires the Department to consider
contributions to geographic diversity
among recipients, including the need for
a balance between the needs of rural
and urban communities when selecting
BUILD Transportation grant awards.
jbell on DSK3GLQ082PROD with NOTICES
2. Review and Selection Process
DOT reviews all eligible applications
received by the deadline. The BUILD
Transportation grants review and
selection process consists of at least
Technical Review and Senior Review. In
the Technical Review, teams comprising
staff from the Office of the Secretary
(OST) and operating administrations
review all eligible applications and rate
projects based on how well the projects
align with the selection criteria. The
Senior Review Team, which includes
senior leadership from OST and the
operating administrations, determines
which projects to advance to the
Secretary as Highly Rated. The FY 2019
Appropriations Act mandated BUILD
Transportation grant awards by
November 12, 2019. The Secretary
selects from the Highly Rated projects
for final awards.
3. Additional Information
Prior to award, each selected
applicant will be subject to a risk
assessment as required by 2 CFR
200.205. The Department must review
and consider any information about the
applicant that is in the designated
integrity and performance system
accessible through SAM (currently the
Federal Awardee Performance and
Integrity Information System (FAPIIS).
An applicant may review information in
FAPIIS and comment on any
VerDate Sep<11>2014
17:49 Apr 22, 2019
Jkt 247001
information about itself. The
Department will consider comments by
the applicant, in addition to the other
information in FAPIIS, in making a
judgment about the applicant’s integrity,
business ethics, and record of
performance under Federal awards
when completing the review of risk
posed by applicants.
F. Federal Award Administration
Information
1. Federal Award Notice
Following the evaluation outlined in
Section E, the Secretary will announce
awarded projects by posting a list of
selected projects at
www.transportation.gov/BUILDgrants.
Notice of selection is not authorization
to begin performance. Following that
announcement, the relevant operating
administration will contact the point of
contact listed in the SF 424 to initiate
negotiation of the grant agreement for
authorization.
2. Administrative and National Policy
Requirements
All awards will be administered
pursuant to the Uniform Administrative
Requirements, Cost Principles and
Audit Requirements for Federal Awards
found in 2 CFR part 200, as adopted by
DOT at 2 CFR part 1201. Federal wage
rate requirements included in
subchapter IV of chapter 31 of title 40,
U.S.C., apply to all projects receiving
funds under this program, and apply to
all parts of the project, whether funded
with BUILD Transportation Grant funds,
other Federal funds, or non-Federal
funds.
In connection with any program or
activity conducted with or benefiting
from funds awarded under this notice,
recipients of funds must comply with
all applicable requirements of Federal
law, including, without limitation, the
Constitution of the United States; the
conditions of performance, nondiscrimination requirements, and other
assurances made applicable to the
award of funds in accordance with
regulations of the Department of
Transportation; and applicable Federal
financial assistance and contracting
principles promulgated by the Office of
Management and Budget. In complying
with these requirements, recipients, in
particular, must ensure that no
concession agreements are denied or
other contracting decisions made on the
basis of speech or other activities
protected by the First Amendment. If
the Department determines that a
recipient has failed to comply with
applicable Federal requirements, the
Department may terminate the award of
PO 00000
Frm 00107
Fmt 4703
Sfmt 4703
funds and disallow previously incurred
costs, requiring the recipient to
reimburse any expended award funds.
Additionally, applicable Federal laws,
rules and regulations of the relevant
operating administration administering
the project will apply to the projects
that receive BUILD Transportation grant
awards, including planning
requirements, Service Outcome
Agreements, Stakeholder Agreements,
Buy America compliance, and other
requirements under DOT’s other
highway, transit, rail, and port grant
programs. In particular, Executive Order
13858 directs the Executive Branch
Departments and agencies to maximize
the use of goods, products, and
materials produced in the United States
through the terms and conditions of
Federal financial assistance awards. If
selected for an award, grantees must be
prepared to demonstrate how they will
maximize the use of domestic goods,
products, and materials in constructing
their project BUILD Transportation
grant projects involving vehicle
acquisition must involve only vehicles
that comply with applicable Federal
Motor Vehicle Safety Standards and
Federal Motor Vehicle Safety
Regulations, or vehicles that are exempt
from Federal Motor Carrier Safety
Standards or Federal Motor Carrier
Safety Regulations in a manner that
allows for the legal acquisition and
deployment of the vehicle or vehicles.
For projects administered by FHWA,
applicable Federal laws, rules, and
regulations set forth in Title 23 U.S.C.
and Title 23 CFR apply, including the
23 U.S.C. 129 restrictions on the use of
toll revenues, and Section 4(f)
preservation of parklands and historic
properties requirements under 23 U.S.C.
138. .For an illustrative list of the other
applicable laws, rules, regulations,
executive orders, polices, guidelines,
and requirements as they relate to a
BUILD Transportation grant project
administered by the FHWA, please see
https://ops.fhwa.dot.gov/Freight/
infrastructure/tiger/fy2016_gr_exhbt/
index.htm.
For BUILD Transportation projects
administered by the Federal Transit
Administration and partially funded
with Federal transit assistance, all
relevant requirements under chapter 53
of title 49 U.S.C. apply. For transit
projects funded exclusively with BUILD
Transportation grant funds, some
requirements of chapter 53 of title 49
U.S.C. and chapter VI of title 49 CFR
apply.
For projects administered by the
Federal Railroad Administration, FRA
requirements described in 49 U.S.C.
Subtitle V, Part C apply.
E:\FR\FM\23APN1.SGM
23APN1
Federal Register / Vol. 84, No. 78 / Tuesday, April 23, 2019 / Notices
For each project that receives a BUILD
Transportation grant award, the terms of
the award will require the recipient to
complete the project using at least the
level of non-Federal funding that was
specified in the application. If the actual
costs of the project are greater than the
costs estimated in the application, the
recipient will be responsible for
increasing the non-Federal contribution.
If the actual costs of the project are less
than the costs estimated in the
application, DOT will generally reduce
the Federal contribution.
3. Reporting
i. Progress Reporting on Grant Activities
Each applicant selected for BUILD
Transportation grant funding must
submit quarterly progress reports and
Federal Financial Reports (SF–425) to
monitor project progress and ensure
accountability and financial
transparency in the BUILD
Transportation grant program.
ii. System Performance Reporting
Each applicant selected for BUILD
Transportation grant funding must
collect and report to the DOT
information on the project’s
performance. The specific performance
information and reporting time period
will be determined on a project-byproject basis. Performance indicators
will not include formal goals or targets,
but will include observed measures
under baseline (pre-project) as well as
post-implementation outcomes, and will
be used to evaluate and compare
projects and monitor the results that
grant funds achieve to the intended
long-term outcomes of the BUILD
Transportation grant program are
achieved. To the extent possible,
performance indicators used in the
reporting should align with the
measures included in the application
and should relate to at least one of the
selection criteria defined in Section E.
Performance reporting continues for
several years after project construction
is completed, and DOT does not provide
BUILD Transportation grant funding
specifically for performance reporting.
jbell on DSK3GLQ082PROD with NOTICES
iii. Reporting of Matters Related to
Recipient Integrity and Performance
If the total value of a selected
applicant’s currently active grants,
cooperative agreements, and
procurement contracts from all Federal
awarding agencies exceeds $10,000,000
for any period of time during the period
of performance of this Federal award,
then the applicant during that period of
time must maintain the currency of
information reported to the SAM that is
VerDate Sep<11>2014
17:49 Apr 22, 2019
Jkt 247001
made available in the designated
integrity and performance system
(currently FAPIIS) about civil, criminal,
or administrative proceedings described
in paragraph 2 of this award term and
condition. This is a statutory
requirement under section 872 of Public
Law 110–417, as amended (41 U.S.C.
2313). As required by section 3010 of
Public Law 111–212, all information
posted in the designated integrity and
performance system on or after April 15,
2011, except past performance reviews
required for Federal procurement
contracts, will be publicly available.
G. Federal Awarding Agency Contacts
For further information concerning
this notice please contact the BUILD
Transportation grant program staff via
email at BUILDgrants@dot.gov, or call
Howard Hill at 202–366–0301. A TDD is
available for individuals who are deaf or
hard of hearing at 202–366–3993. In
addition, DOT will post answers to
questions and requests for clarifications
on DOT’s website at
www.transportation.gov/BUILDgrants.
To ensure applicants receive accurate
information about eligibility or the
program, the applicant is encouraged to
contact DOT directly, rather than
through intermediaries or third parties,
with questions. DOT staff may also
conduct briefings on the BUILD
Transportation grant selection and
award process upon request.
H. Other information
1. Protection of Confidential Business
Information
All information submitted as part of
or in support of any application shall
use publicly available data or data that
can be made public and methodologies
that are accepted by industry practice
and standards, to the extent possible. If
the applicant submits information that
the applicant considers to be a trade
secret or confidential commercial or
financial information, the applicant
must provide that information in a
separate document, which the applicant
may cross-reference from the
application narrative or other portions
of the application. For the separate
document containing confidential
information, the applicant must do the
following: (1) State on the cover of that
document that it ‘‘Contains Confidential
Business Information (CBI)’’; (2) mark
each page that contains confidential
information with ‘‘CBI’’; (3) highlight or
otherwise denote the confidential
content on each page; and (4) at the end
of the document, explain how
disclosure of the confidential
information would cause substantial
PO 00000
Frm 00108
Fmt 4703
Sfmt 9990
16943
competitive harm. DOT will protect
confidential information complying
with these requirements to the extent
required under applicable law. If DOT
receives a Freedom of Information Act
(FOIA) request for the information that
the applicant has marked in accordance
with this section, DOT will follow the
procedures described in its FOIA
regulations at 49 CFR 7.29. Only
information that is in the separate
document, marked in accordance with
this section, and ultimately determined
to be confidential under § 7.29 will be
exempt from disclosure under FOIA.
2. Publication/Sharing of Application
Information
Following the completion of the
selection process and announcement of
awards, the Department intends to
publish a list of all applications
received along with the names of the
applicant organizations and funding
amounts requested. Except for the
information properly marked as
described in Section H.1., the
Department may make application
narratives publicly available or share
application information within the
Department or with other Federal
agencies if the Department determines
that sharing is relevant to the respective
program’s objectives.
3. Department Feedback on
Applications
The Department strives to provide as
much information as possible to assist
applicants with the application process.
The Department will not review
applications in advance, but Department
staff are available for technical
questions and assistance. To efficiently
use Department resources, the
Department will prioritize interactions
with applicants who have not already
received a debrief on their FY 2018
BUILD Transportation grant application.
Program staff will address questions to
BUILDgrants@dot.gov throughout the
application period. Department staff
will make reasonable efforts to schedule
meetings on projects through May 31,
2019. After that date, Department staff
will schedule meetings only to the
extent possible and consistent with
timely completion of other activities.
Issued On: April 16, 2019.
Elaine L. Chao,
Secretary.
[FR Doc. 2019–08137 Filed 4–22–19; 8:45 am]
BILLING CODE 4910–9X–P
E:\FR\FM\23APN1.SGM
23APN1
Agencies
[Federal Register Volume 84, Number 78 (Tuesday, April 23, 2019)]
[Notices]
[Pages 16933-16943]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-08137]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Office of the Secretary of Transportation
Notice of Funding Opportunity for the Department of
Transportation's National Infrastructure Investments Under the
Consolidated Appropriations Act, 2019
AGENCY: Office of the Secretary of Transportation, DOT.
ACTION: Notice of funding opportunity.
-----------------------------------------------------------------------
SUMMARY: The Consolidated Appropriations Act, 2019 (``FY 2019
Appropriations Act'') appropriated $900 million to be awarded by the
Department of Transportation (``DOT'') for National Infrastructure
Investments. This appropriation stems from the program funded and
implemented pursuant to the American Recovery and Reinvestment Act of
2009 (the ``Recovery Act'') and is known as the Better Utilizing
Investments to Leverage Development, or ``BUILD Transportation
grants,'' program. Funds for the FY 2019 BUILD Transportation grants
program are to be awarded on a competitive basis for surface
transportation infrastructure projects that will have a significant
local or regional impact. The purpose of this notice is to solicit
applications for BUILD Transportation grants.
DATES: Applications must be submitted by 8:00 p.m. E.D.T. on July 15,
2019.
ADDRESSES: Applications must be submitted through Grants.gov.
FOR FURTHER INFORMATION CONTACT: For further information concerning
this notice, please contact the BUILD Transportation grants program
staff via email at [email protected], or call Howard Hill at 202-366-
0301. A TDD is available for individuals who are deaf or hard of
hearing at 202-366-3993. In addition, DOT will regularly post answers
to questions and requests for clarifications as well as information
about webinars for further guidance on DOT's website at
www.transportation.gov/BUILDgrants.
SUPPLEMENTARY INFORMATION: The FY 2019 BUILD Transportation grant
program will make awards to surface transportation infrastructure
projects that will have a significant impact throughout the country.
Each section of this notice contains information and instructions
relevant to the application process for these BUILD Transportation
grants, and all applicants should read this notice in its entirety so
that they have the information they need to submit eligible and
competitive applications. For this round of BUILD Transportation
grants, the maximum grant award is $25 million, and no more than $90
million can be awarded to a single State, as specified in the FY 2019
Appropriations Act. Per statute, the FY 2019 selection criteria are the
same as under the FY 2017 TIGER program, although the description for
each criterion has been updated. For FY 2019 BUILD Transportation
grants, the definitions of urban and rural areas differ from previous
rounds. Additionally, not more than 50 percent of funds will be awarded
to projects located in urban and rural areas, respectively.
Table of Contents
A. Program Description
B. Federal Award Information
C. Eligibility Information
D. Application and Submission Information
E. Application Review Information
F. Federal Award Administration Information
G. Federal Awarding Agency Contacts
H. Other Information
A. Program Description
The Consolidated Appropriations Act, 2019 (Pub. L. 116-6, February
15, 2019) (``FY 2019 Appropriations Act'') appropriated $900 million to
be awarded by the Department of Transportation (``DOT'') for National
Infrastructure Investments. Since this program was created, $7.1
billion has been awarded for capital investments in surface
transportation infrastructure over ten rounds of competitive grants.
Throughout the program, these discretionary grant awards have supported
projects that have a significant local or regional impact.
Like the FY 2017 TIGER program, the FY 2019 BUILD program will also
give special consideration to projects which emphasize improved access
to reliable, safe, and affordable transportation for communities in
rural areas, such as projects that improve infrastructure condition,
address public health and safety, promote regional connectivity or
facilitate economic growth or competitiveness. Such projects may
concurrently invest in broadband to better facilitate productivity,
including through the U.S. Department of Agriculture's ReConnect Loan
and Grant program, and help rural citizens access opportunities, or
promote energy independence to help deliver significant local or
regional economic benefit.
B. Federal Award Information
1. Amount Available
The FY 2019 Appropriations Act appropriated $900 million to be
awarded by DOT for the BUILD Transportation grants program. The FY 2019
BUILD Transportation grants are for capital investments in surface
transportation infrastructure and are to be awarded on a competitive
basis for projects that will have a significant local or regional
impact. Additionally, the Act allows for up to $15 million (of the $900
million) to be awarded for the planning, preparation or design of
eligible projects. DOT is referring to any such awards as BUILD
Transportation planning grants. The FY 2019 Appropriations Act also
allows DOT to retain up to $27 million of the $900 million for award,
oversight and administration of grants and credit assistance made under
the program. If this solicitation does not result in the award and
obligation of all available funds, DOT may publish additional
solicitations.
The FY 2019 Appropriations Act allows up to 20 percent of available
funds (or $180 million) to be used by the Department to pay the subsidy
and administrative costs of a project receiving credit assistance under
the Transportation Infrastructure Finance and Innovation Act of 1998
(``TIFIA'') or Railroad Rehabilitation and Improvement Financing (RRIF)
programs, if that use of the FY 2019 BUILD funds would further the
purposes of the BUILD Transportation grants program.
2. Award Size
The FY 2019 Appropriations Act specifies that BUILD Transportation
grants may not be less than $5 million and not greater than $25
million, except that for projects located in rural areas (as defined in
Section C.3.ii.) the award size is $1 million. There is no minimum
award size, regardless of location, for BUILD Transportation planning
grants.
3. Restrictions on Funding
Pursuant to the FY 2019 Appropriations Act, no more than 10 percent
of the funds made available for BUILD Transportation grants (or $90
million) may be awarded to projects in a single State. The Act also
directs that not more than 50 percent of the funds provided for BUILD
Transportation grants (or $450 million) shall be used for projects
located in rural areas with population equal to or less than
[[Page 16934]]
200,000, and directs that not more than 50 percent of the funds
provided for BUILD Transportation grants (or $450 million) shall be
used for projects located in urbanized areas with a population of more
than 200,000. Further, DOT must take measures to ensure an equitable
geographic distribution of grant funds, an appropriate balance in
addressing the needs of urban and rural areas, and investment in a
variety of transportation modes.
4. Availability of Funds
The FY 2019 Appropriations Act requires that FY 2019 BUILD
Transportation grants funds are available for obligation only through
September 30, 2021. Obligation occurs when a selected applicant and DOT
enter into a written grant agreement after the applicant has satisfied
applicable administrative requirements, including transportation
planning and environmental review requirements. Unless authorized by
the Department in writing after the Department's announcement of FY
2019 BUILD awards, any costs incurred prior to the Department's
obligation of funds for a project are ineligible for reimbursement.\1\
All FY 2019 BUILD funds must be expended (the grant obligation must be
liquidated or actually paid out to the grantee) by September 30, 2026.
After this date, unliquidated funds are no longer available to the
project. As part of the review and selection process described in
Section E.2., DOT will consider a project's likelihood of being ready
to proceed with an obligation of BUILD Transportation grant funds and
complete liquidation of these obligations, within the statutory
timelines. No waiver is possible for these deadlines.
---------------------------------------------------------------------------
\1\ Pre-award costs are only costs incurred directly pursuant to
the negotiation and anticipation of the BUILD award where such costs
are necessary for efficient and timely performance of the scope of
work, as determined by DOT. Costs incurred under an advance
construction (23 U.S.C. 115) authorization before the DOT announces
that a project is selected for a FY 2019 BUILD award cannot be
charged to FY 2019 BUILD funds.
Likewise, costs incurred under an FTA Letter of No Prejudice
under Chapter 53 of title 49 U.S.C. before the DOT announces that a
project is selected for a FY 2019 BUILD award cannot be charged to
FY 2019 BUILD funds.
---------------------------------------------------------------------------
5. Previous BUILD/TIGER Awards
Recipients of BUILD/TIGER grants may apply for funding to support
additional phases of a project previously awarded funds in the BUILD/
TIGER program. However, to be competitive, the applicant should
demonstrate the extent to which the previously funded project phase has
met estimated project schedules and budget, as well as the ability to
realize the benefits expected for the project.
C. Eligibility Information
To be selected for a BUILD Transportation grant, an applicant must
be an Eligible Applicant and the project must be an Eligible Project.
1. Eligible Applicants
Eligible Applicants for BUILD Transportation grants are State,
local, and tribal governments, including U.S. territories, transit
agencies, port authorities, metropolitan planning organizations (MPOs),
and other political subdivisions of State or local governments.
Multiple States or jurisdictions may submit a joint application and
must identify a lead applicant as the primary point of contact and also
identify the primary recipient of the award. Each applicant in a joint
application must be an Eligible Applicant. Joint applications must
include a description of the roles and responsibilities of each
applicant and must be signed by each applicant.
2. Cost Sharing or Matching
Per the FY 2019 Appropriations Act, the Federal share of project
costs for which an expenditure is made under the BUILD Transportation
grant program may not exceed 80 percent for a project located in an
urban area.\2\ The Secretary may increase the Federal share of costs
above 80 percent for a project located in a rural area. Urban area and
rural area are defined in Section C.3.ii of this notice.
---------------------------------------------------------------------------
\2\ To meet match requirements, the minimum total project cost
for a project located in an urban area must be $6.25 million.
---------------------------------------------------------------------------
Non-Federal sources include State funds originating from programs
funded by State revenue, local funds originating from State or local
revenue-funded programs, or private funds. Toll credits under 23 U.S.C.
120(i) are considered a Federal source under the BUILD program and,
therefore, cannot be used to satisfy the statutory cost sharing
requirement of a BUILD award. Unless otherwise authorized by statute,
non-Federal cost-share may not be counted as the non-Federal share for
both the BUILD Transportation grant and another Federal grant program.
The Department will not consider previously incurred costs or
previously expended or encumbered funds towards the matching
requirement for any project. Matching funds are subject to the same
Federal requirements described in Section F.2. as awarded funds. If
repaid from non-Federal sources, Federal credit assistance is
considered non-Federal share.
3. Other
i. Eligible Projects
Eligible projects for BUILD Transportation grants are surface
transportation capital projects that include, but are not limited to:
(1) Highway, bridge, or other road projects eligible under title 23,
United States Code; (2) public transportation projects eligible under
chapter 53 of title 49, United States Code; (3) passenger and freight
rail transportation projects; (4) port infrastructure investments
(including inland port infrastructure and land ports of entry); and (5)
intermodal projects.\3\
---------------------------------------------------------------------------
\3\ Please note that the Department may use a BUILD
Transportation grant to pay for the surface transportation
components of a broader project that has non-surface transportation
components, and applicants are encouraged to apply for BUILD
Transportation grants to pay for the surface transportation
components of these projects.
---------------------------------------------------------------------------
Improvements to Federally owned facilities are ineligible under the
FY 2019 BUILD program. Research, demonstration, or pilot projects are
eligible only if they will result in long-term, permanent surface
transportation infrastructure that has independent utility as defined
in Section C.3.iii.
The FY 2019 Appropriations Act allows up to $15 million for the
planning, preparation or design of eligible projects. Activities
eligible for funding under BUILD Transportation planning grants are
related to the planning, preparation, or design--including
environmental analysis, feasibility studies, and other pre-construction
activities--of surface transportation capital projects.
Applicants are strongly encouraged to submit applications only for
eligible award amounts.
ii. Rural/Urban Definition
For purposes of this notice, a project is designated as urban if it
is located within (or on the boundary of) a Census-designated urbanized
area \4\ that had a population greater than 200,000 in the 2010 Census.
\5\ If a project is located outside a Census-designated urbanized area
with a population greater than 200,000, it is designated as a rural
project.
---------------------------------------------------------------------------
\4\ Updated lists of UAs as defined by the Census Bureau are
available on the Census Bureau website at https://www2.census.gov/geo/maps/dc10map/UAUC_RefMap/ua/.
\5\ See www.transportation.gov/BUILDgrants for a list of UAs.
---------------------------------------------------------------------------
[[Page 16935]]
Rural and urban definitions differ in some other DOT programs,
including TIFIA.
A project located in both an urban and a rural area will be
designated as urban if the majority of the project's costs will be
spent in urban areas. Conversely, a project located in both an urban
area and a rural area will be designated as rural if the majority of
the project's costs will be spent in rural areas.
This definition affects four aspects of the program: (1) Not more
than $450 million of the funds provided for BUILD Transportation grants
are to be used for projects in rural areas; (2) not more than $450
million of the funds provided for BUILD Transportation grants are to be
used for projects in urban areas; (3) for a project in a rural area the
minimum award is $1 million; and (4) the Secretary may increase the
Federal share above 80 percent to pay for the costs of a project in a
rural area.
iii. Project Components
An application may describe a project that contains more than one
component, and may describe components that may be carried out by
parties other than the applicant. DOT may award funds for a component,
instead of the larger project, if that component (1) independently
meets minimum award amounts described in Section B and all eligibility
requirements described in Section C; (2) independently aligns well with
the selection criteria specified in Section E; and (3) meets National
Environmental Policy Act (NEPA) requirements with respect to
independent utility. Independent utility means that the component will
represent a transportation improvement that is usable and represents a
reasonable expenditure of DOT funds even if no other improvements are
made in the area, and will be ready for intended use upon completion of
that component's construction. All project components that are
presented together in a single application must demonstrate a
relationship or connection between them. (See Section D.2.iv. for
Required Approvals).
Applicants should be aware that, depending upon the relationship
between project components and applicable Federal law, DOT funding of
only some project components may make other project components subject
to Federal requirements as described in Section F.2.
DOT strongly encourages applicants to identify in their
applications the project components that have independent utility and
separately detail costs and requested BUILD Transportation grant
funding for those components. If the application identifies one or more
independent project components, the application should clearly identify
how each independent component addresses selection criteria and
produces benefits on its own, in addition to describing how the full
proposal of which the independent component is a part addresses
selection criteria.
iv. Application Limit
Each lead applicant may submit no more than three applications.
Unrelated project components should not be bundled in a single
application for the purpose of adhering to the limit. If a lead
applicant submits more than three applications as the lead applicant,
only the first three received will be considered.
D. Application and Submission Information
1. Address
Applications must be submitted to Grants.gov. Instructions for
submitting applications can be found at www.transportation.gov/BUILDgrants along with specific instructions for the forms and
attachments required for submission.
2. Content and Form of Application Submission
The application must include the Standard Form 424 (Application for
Federal Assistance), cover page, and the Project Narrative. More
detailed information about the Project Narrative follows. Applicants
should also complete and attach to their application the ``BUILD 2019
Project Information'' form available at www.transportation.gov/BUILDgrants.
The Department recommends that the project narrative follow the
basic outline below to address the program requirements and assist
evaluators in locating relevant information.
____________________________________
____________________________________
I. Project Description.................... See D.2.i.
II. Project Location...................... See D.2.ii.
III. Grant Funds, Sources and Uses of all See D.2.iii.
Project Funding.
IV. Selection Criteria.................... See D.2.iv. and E.1.i.
V. Project Readiness...................... See D.2.v. and E.1.ii.
VI. Benefit Cost Analysis................. See D.2.vi. and E.1.iii.
------------------------------------------------------------------------
The project narrative should include the information necessary for
the Department to determine that the project satisfies project
requirements described in Sections B and C and to assess the selection
criteria specified in Section E.1. To the extent practicable,
applicants should provide supporting data and documentation in a form
that is directly verifiable by the Department. The Department may ask
any applicant to supplement data in its application but expects
applications to be complete upon submission.
In addition to a detailed statement of work, detailed project
schedule, and detailed project budget, the project narrative should
include a table of contents, maps and graphics, as appropriate, to make
the information easier to review. The Department recommends that the
project narrative be prepared with standard formatting preferences (a
single-spaced document, using a standard 12-point font such as Times
New Roman, with 1-inch margins). The project narrative may not exceed
30 pages in length, excluding cover pages and table of contents. The
only substantive portions that may exceed the 30-page limit are
documents supporting assertions or conclusions made in the 30-page
project narrative. If possible, website links to supporting
documentation should be provided rather than copies of these supporting
materials. If supporting documents are submitted, applicants should
clearly identify within the project narrative the relevant portion of
the project narrative that each supporting document supports. The
Department recommends using appropriately descriptive file names (e.g.,
``Project Narrative,'' ``Maps,'' ``Memoranda of Understanding and
Letters of Support,'' etc.) for all attachments. DOT recommends
applications include the following sections:
i. Project Description
The first section of the application should provide a concise
description of the project, the transportation challenges that it is
intended to address, and how it will address those challenges. This
section should discuss the project's history, including a description
of any previously completed components. The applicant may use this
section to place the project into a broader context of other
transportation infrastructure investments being pursued by the project
sponsor, and, if applicable, how it will benefit communities in rural
areas.
ii. Project Location
This section of the application should describe the project
location, including a detailed geographical description of the proposed
project, a map of the project's location and connections to existing
transportation infrastructure, and geospatial data describing the
project location. If the project is located within the boundary of a
Census-designated urbanized area, the
[[Page 16936]]
application should identify that urbanized area.
iii. Grant Funds, Sources and Uses of Project Funds
This section of the application should describe the project's
budget. This budget should not include any previously incurred
expenses. At a minimum, it should include:
(A) Project costs;
(B) For all funds to be used for eligible project costs, the source
and amount of those funds;
(C) For non-Federal funds to be used for eligible project costs,
documentation of funding commitments should be referenced here and
included as an appendix to the application;
(D) For Federal funds to be used for eligible project costs, the
amount, nature, and source of any required non-Federal match for those
funds; and
(E) A budget showing how each source of funds will be spent. The
budget should show how each funding source will share in each major
construction activity, and present that data in dollars and
percentages. Funding sources should be grouped into three categories:
Non-Federal; BUILD; and other Federal. If the project contains
individual components, the budget should separate the costs of each
project component. If the project will be completed in phases, the
budget should separate the costs of each phase. The budget detail
should sufficiently demonstrate that the project satisfies the
statutory cost-sharing requirements described in Section C.2.
In addition to the information enumerated above, this section
should provide complete information on how all project funds may be
used. For example, if a particular source of funds is available only
after a condition is satisfied, the application should identify that
condition and describe the applicant's control over whether it is
satisfied. Similarly, if a particular source of funds is available for
expenditure only during a fixed time period, the application should
describe that restriction. Complete information about project funds
will ensure that the Department's expectations for award execution
align with any funding restrictions unrelated to the Department, even
if an award differs from the applicant's request.
iv. Selection Criteria
This section of the application should demonstrate how the project
aligns with the Criteria described in Section E.1 of this notice. The
Department encourages applicants to either address each criterion or
expressly state that the project does not address the criterion.
Applicants are not required to follow a specific format, but the
outline suggested below, which addresses each criterion separately,
promotes a clear discussion that assists project evaluators. To
minimize redundant information in the application, the Department
encourages applicants to cross-reference from this section of their
application to relevant substantive information in other sections of
the application. The guidance in this section is about how the
applicant should organize their application. Guidance describing how
the Department will evaluate projects against the Selection Criteria is
in Section E.1 of this notice. Applicants also should review that
section before considering how to organize their application.
(1) Primary Selection Criteria
(a) Safety
This section of the application should describe the anticipated
outcomes of the project that support the Safety criterion (described in
Section E.1.i.(a) of this notice). The applicant should include
information on, and to the extent possible, quantify, how the project
would improve safety outcomes within the project area or wider
transportation network, to include how the project will reduce the
number, rate, and consequences of transportation-related accidents,
serious injuries, and fatalities. If applicable, the applicant should
also include information on how the project will eliminate unsafe grade
crossings or contribute to preventing unintended releases of hazardous
materials.
(b) State of Good Repair
This section of the application should describe how the project
will contribute to a state of good repair by improving the condition or
resilience of existing transportation facilities and systems (described
in Section E.1.i.(b) of this notice), including the project's current
condition and how the proposed project will improve it, and any
estimates of impacts on long-term cost structures or overall life-cycle
costs. If the project will contribute to a state of good repair of
transportation infrastructure that supports border security, the
applicant should describe how.
(c) Economic Competitiveness
This section of the application should describe how the project
will support the Economic Competitiveness criterion (described in
Section E.1.i.(c) of this notice). The applicant should include
information about expected impacts of the project on the movement of
goods and people, including how the project increases the efficiency of
movement and thereby reduces costs of doing business, improves local
and regional freight connectivity to the national and global economy,
reduces burdens of commuting, and improves overall well-being. The
applicant should describe the extent to which the project contributes
to the functioning and growth of the economy, including the extent to
which the project addresses congestion or freight connectivity, bridges
service gaps in rural areas, or promotes the expansion of private
economic development including in Opportunity Zones.
(d) Environmental Sustainability
This section of the application should describe how the project
addresses the environmental sustainability criterion (described in
Section E.1.i.(d) of this notice). Applicants are encouraged to provide
quantitative information, including baseline information that
demonstrates how the project will reduce energy consumption, reduce
stormwater runoff, or achieve other benefits for the environment such
as brownfield redevelopment.
(e) Quality of Life
This section should describe how the project increases
transportation choices for individuals, expands access to essential
services for people in communities across the United States, improves
connectivity for citizens to jobs, health care, and other critical
destinations, particularly for rural communities, or otherwise
addresses the quality of life criterion (described in Section E.1.i.(e)
of this notice). If construction of the transportation project will
allow concurrent installation of fiber or other broadband deployment as
an essential service, the applicant should describe those activities
and how they support quality of life. Unless the concurrent activities
support transportation, they will not be eligible for reimbursement.
(2) Secondary Selection Criteria
(a) Innovation
This section of the application should describe innovative
strategies used and the anticipated benefits of using those strategies,
including those corresponding to three categories (described in Section
E.1.i.(f) of this notice): (i) Innovative Technologies, (ii) Innovative
Project Delivery, or (iii) Innovative Financing.
[[Page 16937]]
(i) Innovative Technologies
If an applicant is proposing to adopt innovative safety approaches
or technology, the application should demonstrate the applicant's
capacity to implement those innovations, the applicant's understanding
of applicable Federal requirements and whether the innovations may
require extraordinary permitting, approvals, exemptions, waivers, or
other procedural actions, and the effects of those innovations on the
project delivery timeline.
If an applicant is proposing to deploy innovative traveler
information systems or technologies as part of the surface
transportation capital project, including work zone data exchanges or
related data exchanges, the application should demonstrate the
applicant's capacity to implement these innovations, the applicant's
understanding of applicable data standards, and whether the proposed
innovations will advance safety or other benefits during and after
project completion.
If an applicant is proposing to deploy autonomous vehicles or other
innovative motor vehicle technology, the application should demonstrate
that all vehicles will comply with applicable safety requirements,
including those administered by the National Highway Traffic Safety
Administration (NHTSA) and Federal Motor Carrier Safety Administration
(FMCSA). Specifically, the application should show that vehicles
acquired for the proposed project will comply with applicable Federal
Motor Vehicle Safety Standards (FMVSS) and Federal Motor Carrier Safety
Regulations (FMCSR). If the vehicles may not comply, the application
should either (1) show that the vehicles and their proposed operations
are within the scope of an exemption or wavier that has already been
granted by NHTSA, FMCSA, or both agencies or (2) directly address
whether the project will require exemptions or waivers from the FMVSS,
FMCSR, or any other regulation and, if the project will require
exemptions or waivers, present a plan for obtaining them.
(ii) Innovative Project Delivery
If an applicant plans to use innovative approaches to project
delivery or is located in a State with NEPA delegation authority,
applicants should describe those project delivery methods and how they
are expected to improve the efficiency of the project development or
expedite project delivery.
If an applicant is proposing to use SEP-14 or SEP-15 (as described
in section E.1.i.(f) of this notice) the applicant should describe that
proposal. The applicant should also provide sufficient information for
evaluators to confirm that the applicant's proposal would meet the
requirements of the specific experimental authority program.\6\
---------------------------------------------------------------------------
\6\ SEP-14 information is available at https://www.fhwa.dot.gov/programadmin/contracts/sep_a.cfm. SEP-15 information is available at
https://www.fhwa.dot.gov/ipd/p3/toolkit/usdot/sep15/implementation_procedure/.
---------------------------------------------------------------------------
(iii) Innovative Financing
If an applicant plans to incorporate innovative funding or
financing, the applicant should describe the funding or financing
approach, including a description of all activities undertaken to
pursue private funding or financing for the project and the outcomes of
those activities.
(b) Partnership
This section of the application should include information to
assess the partnership criterion (described in Section E.1.i.(g) of
this notice) including a list of all project parties and details about
the proposed grant recipient and other public and private parties who
are involved in delivering the project. This section should also
describe efforts to collaborate among stakeholders, including with the
private sector. Applications for projects involving other Federal
agencies, or requiring action from other Federal agencies, should
demonstrate commitment and involvement of those agencies. For example,
projects involving border infrastructure should demonstrate evidence of
concurrent investment from U.S. Customs and Border Patrol, U.S.
Department of State, and other relevant Federal agencies; relevant port
projects should demonstrate alignment with U.S. Army Corps of Engineers
investment strategies.
v. Project Readiness
This section of the application should include information that,
when considered with the project budget information presented elsewhere
in the application, is sufficient for the Department to evaluate
whether the project is reasonably expected to begin construction in a
timely manner. To assist the Department's project readiness assessment,
the applicant should provide the information requested on technical
feasibility, project schedule, project approvals, and project risks,
each of which is described in greater detail in the following sections.
Applicants are not required to follow the specific format described
here, but this organization, which addresses each relevant aspect of
project readiness, promotes a clear discussion that assists project
evaluators. To minimize redundant information in the application, the
Department encourages applicants to cross-reference from this section
of their application to relevant substantive information in other
sections of the application.
The guidance here is about what information applicants should
provide and how the applicant should organize their application.
Guidance describing how the Department will evaluate a project's
readiness is described in Section E.1.ii of this notice. Applicants
should review that section when considering how to organize their
application.
(a) Technical Feasibility
The applicant should demonstrate the technical feasibility of the
project with engineering and design studies and activities; the
development of design criteria and/or a basis of design; the basis for
the cost estimate presented in the BUILD application, including the
identification of contingency levels appropriate to its level of
design; and any scope, schedule, and budget risk-mitigation measures.
Applicants should include a detailed statement of work that focuses on
the technical and engineering aspects of the project and describes in
detail the project to be constructed.
(b) Project Schedule
The applicant should include a detailed project schedule that
identifies all major project milestones. Examples of such milestones
include State and local planning approvals (e.g., programming on the
Statewide Transportation Improvement Program); start and completion of
NEPA and other Federal environmental reviews and approvals including
permitting; design completion; right of way acquisition; approval of
plans, specifications and estimates; procurement; State and local
approvals; project partnership and implementation agreements, including
agreements with railroads; and construction. The project schedule
should be sufficiently detailed to demonstrate that:
(1) All necessary activities will be complete to allow BUILD
Transportation grant funds to be obligated sufficiently in advance of
the statutory deadline (September 30, 2021 for FY 2019 funds), and that
any unexpected delays will not put the funds at risk of expiring before
they are obligated;
(2) the project can begin construction quickly upon obligation of
grant funds
[[Page 16938]]
and that those funds will be spent expeditiously once construction
starts, with all funds expended by September 30, 2026; and
(3) all real property and right-of-way acquisition will be
completed in a timely manner in accordance with 49 CFR part 24, 23 CFR
part 710, and other applicable legal requirements or a statement that
no acquisition is necessary.
(c) Required Approvals
(1) Environmental Permits and Reviews. The application should
demonstrate receipt (or reasonably anticipated receipt) of all
environmental approvals and permits necessary for the project to
proceed to construction on the timeline specified in the project
schedule and necessary to meet the statutory obligation deadline,
including satisfaction of all Federal, State and local requirements and
completion of the NEPA process. Specifically, the application should
include:
(a) Information about the NEPA status of the project. If the NEPA
process is complete, an applicant should indicate the date of
completion, and provide a website link or other reference to the final
Categorical Exclusion, Finding of No Significant Impact, Record of
Decision, and any other NEPA documents prepared. If the NEPA process is
underway, but not complete, the application should detail the type of
NEPA review underway, where the project is in the process, and indicate
the anticipated date of completion of all milestones and of the final
NEPA determination. If the last agency action with respect to NEPA
documents occurred more than three years before the application date,
the applicant should describe why the project has been delayed and
include a proposed approach for verifying and, if necessary, updating
this material in accordance with applicable NEPA requirements.
(b) Information on reviews, approvals, and permits by other
agencies. An application should indicate whether the proposed project
requires reviews or approval actions by other agencies,\7\ indicate the
status of such actions, and provide detailed information about the
status of those reviews or approvals and should demonstrate compliance
with any other applicable Federal, State or local requirements, and
when such approvals are expected. Applicants should provide a website
link or other reference to copies of any reviews, approvals, and
permits prepared.
---------------------------------------------------------------------------
\7\ Projects that may impact protected resources such as
wetlands, species habitat, cultural or historic resources require
review and approval by Federal and State agencies with jurisdiction
over those resources.
---------------------------------------------------------------------------
(c) Environmental studies or other documents, preferably through a
website link, that describe in detail known project impacts, and
possible mitigation for those impacts.
(d) A description of discussions with the appropriate DOT operating
administration field or headquarters office regarding the project's
compliance with NEPA and other applicable Federal environmental reviews
and approvals.
(e) A description of public engagement about the project that has
occurred, including details on the degree to which public comments and
commitments have been integrated into project development and design.
(2) State and Local Approvals. The applicant should demonstrate
receipt of State and local approvals on which the project depends, such
as State and local environmental and planning approvals and Statewide
Transportation Improvement Program (STIP) or (Transportation
Improvement Program) TIP funding. Additional support from relevant
State and local officials is not required; however, an applicant should
demonstrate that the project has broad public support.
(3) Federal Transportation Requirements Affecting State and Local
Planning. The planning requirements applicable to the relevant
operating administration apply to all BUILD Transportation grant
projects,\8\ including intermodal projects located at airport
facilities.\9\ Applicants should demonstrate that a project that is
required to be included in the relevant State, metropolitan, and local
planning documents has been or will be included in such documents. If
the project is not included in a relevant planning document at the time
the application is submitted, the applicant should submit a statement
from the appropriate planning agency that actions are underway to
include the project in the relevant planning document.
---------------------------------------------------------------------------
\8\ Under 23 U.S.C. 134 and 135, all projects requiring an
action by FHWA must be in the applicable plan and programming
documents (e.g., metropolitan transportation plan, transportation
improvement program (TIP) and statewide transportation improvement
program (STIP)). Further, in air quality non-attainment and
maintenance areas, all regionally significant projects, regardless
of the funding source, must be included in the conforming
metropolitan transportation plan and TIP. Inclusion in the STIP is
required under certain circumstances. To the extent a project is
required to be on a metropolitan transportation plan, TIP, and/or
STIP, it will not receive a BUILD Transportation grant until it is
included in such plans. Plans that do not currently include the
awarded BUILD project can be amended by the State and MPO. Projects
that are not required to be in long range transportation plans,
STIPs, and TIPs will not need to be included in such plans in order
to receive a BUILD Transportation grant. Port, freight rail, and
intermodal projects are not required to be on the State Rail Plans
called for in the Passenger Rail Investment and Improvement Act of
2008, or in a State Freight Plan as described in the FAST Act.
However, applicants seeking funding for freight projects are
encouraged to demonstrate that they have done sufficient planning to
ensure that projects fit into a prioritized list of capital needs
and are consistent with long-range goals. Means of demonstrating
this consistency would include whether the project is in a TIP or a
State Freight Plan that conforms to the requirements 49 U.S.C. 70202
prior to the start of construction. Port planning guidelines are
available at StrongPorts.gov.
\9\ Projects at grant obligated airports must be compatible with
the FAA-approved Airport Layout Plan, as well as aeronautical
surfaces associated with the landing and takeoff of aircraft at the
airport. Additionally, projects at an airport: Must comply with
established Sponsor Grant Assurances, including (but not limited to)
requirements for non-exclusive use facilities, consultation with
users, consistency with local plans including development of the
area surrounding the airport, and consideration of the interest of
nearby communities, among others; and must not adversely affect the
continued and unhindered access of passengers to the terminal.
---------------------------------------------------------------------------
To the extent possible, freight projects should be included in a
State Freight Plan and supported by a State Freight Advisory Committee
(49 U.S.C. 70201, 70202), if these exist. Applicants should provide
links or other documentation supporting this consideration.
Because projects have different schedules, the construction start
date for each BUILD Transportation grant must be specified in the
project-specific agreements signed by relevant operating administration
and the grant recipients, based on critical path items that applicants
identify in the application and will be consistent with relevant State
and local plans.
(d) Assessment of Project Risks and Mitigation Strategies
Project risks, such as procurement delays, environmental
uncertainties, increases in real estate acquisition costs, uncommitted
local match, unavailability of vehicles that either comply with Federal
Motor Vehicle Safety Standards or are exempt from Federal Motor Vehicle
Safety Standards in a manner that allows for their legal acquisition
and deployment, unavailability of domestically manufactured equipment,
or lack of legislative approval, affect the likelihood of successful
project start and completion. The applicant should identify all
material risks to the project and the strategies that the lead
applicant and any project partners have undertaken or will undertake in
order to mitigate those risks. The applicant should assess the greatest
risks to the project and identify how the project parties will mitigate
those risks.
[[Page 16939]]
If an applicant anticipates pursuing a waiver for relevant domestic
preference laws, the applicant should describe steps that have been or
will be taken to maximize the use of domestic goods, products, and
materials in constructing their project.
To the extent the applicant is unfamiliar with the Federal program,
the applicant should contact the appropriate DOT operating
administration field or headquarters offices, as found in contact
information at www.transportation.gov/BUILDgrants, for information on
the pre-requisite steps to obligate Federal funds in order to ensure
that their project schedule is reasonable and that there are no risks
of delays in satisfying Federal requirements.
BUILD Transportation planning grant applicants should describe
their capacity to successfully implement the proposed activities in a
timely manner.
vi. Benefit Cost Analysis
This section describes the recommended approach for the completion
and submission of a benefit-cost analysis (BCA) as an appendix to the
Project Narrative. The results of the analysis should be summarized in
the Project Narrative directly, as described in Section D.2.
The appendix should provide present value estimates of a project's
benefits and costs relative to a no-build baseline. To calculate
present values, applicants should apply a real discount rate (i.e., the
discount rate net of the inflation rate) of 7 percent per year to the
project's streams of benefits and costs. The purpose of the BCA is to
enable the Department to evaluate the project's cost-effectiveness by
estimating a benefit-cost ratio and calculating the magnitude of net
benefits for the project.
The primary economic benefits from projects eligible for BUILD
Transportation grants are likely to include savings in travel time
costs, vehicle or terminal operating costs, and safety costs for both
existing users of the improved facility and new users who may be
attracted to it as a result of the project. Reduced damages from
vehicle emissions and savings in maintenance costs to public agencies
may also be quantified. Applicants may describe other categories of
benefits in the BCA that are more difficult to quantify and value in
economic terms, such as improving the reliability of travel times or
improvements to the existing human and natural environments (such as
increased connectivity, improved public health, storm water runoff
mitigation, and noise reduction), while also providing numerical
estimates of the magnitude and timing of each of these additional
impacts wherever possible. Any benefits claimed for the project, both
quantified and unquantified, should be clearly tied to the expected
outcomes of the project.
The BCA should include the full costs of developing, constructing,
operating, and maintaining the proposed project, as well as the
expected timing or schedule for costs in each of these categories. The
BCA may also consider the present discounted value of any remaining
service life of the asset at the end of the analysis period. The costs
and benefits that are compared in the BCA should also cover the same
project scope.
The BCA should carefully document the assumptions and methodology
used to produce the analysis, including a description of the baseline,
the sources of data used to project the outcomes of the project, and
the values of key input parameters. Applicants should provide all
relevant files used for their BCA, including any spreadsheet files and
technical memos describing the analysis (whether created in-house or by
a contractor). The spreadsheets and technical memos should present the
calculations in sufficient detail and transparency to allow the
analysis to be reproduced by DOT evaluators. Detailed guidance for
estimating some types of quantitative benefits and costs, together with
recommended economic values for converting them to dollar terms and
discounting to their present values, are available in the Department's
guidance for conducting BCAs for projects seeking funding under the
BUILD Transportation grant program (see www.transportation.gov/BUILDgrants/additional-guidance).
3. Unique Entity Identifier and System for Award Management (SAM)
Each applicant must: (1) Be registered in SAM before submitting its
application; (2) provide a valid unique entity identifier in its
application; and (3) continue to maintain an active SAM registration
with current information at all times during which it has an active
Federal award or an application or plan under consideration by a
Federal awarding agency. The Department may not make a BUILD
Transportation grant to an applicant until the applicant has complied
with all applicable unique entity identifier and SAM requirements and,
if an applicant has not fully complied with the requirements by the
time the Department is ready to make a BUILD Transportation grant, the
Department may determine that the applicant is not qualified to receive
a BUILD Transportation grant and use that determination as a basis for
making a BUILD Transportation grant to another applicant.
4. Submission Dates and Times
i. Deadline
Applications must be submitted by 8:00 p.m. E.D.T. on July 15,
2019.
To submit an application through Grants.gov, applicants must:
(1) Obtain a Data Universal Numbering System (DUNS) number;
(2) Register with the System for Award Management (SAM) at
www.SAM.gov;
(3) Create a Grants.gov username and password; and
(4) The E-Business Point of Contact (POC) at the applicant's
organization must respond to the registration email from Grants.gov and
login at Grants.gov to authorize the applicant as the Authorized
Organization Representative (AOR). Please note that there can be more
than one AOR for an organization.
Please note that the Grants.gov registration process usually takes
2-4 weeks to complete and that the Department will not consider late
applications that are the result of failure to register or comply with
Grants.gov applicant requirements in a timely manner. For information
and instruction on each of these processes, please see instructions at
https://www.grants.gov/web/grants/applicants/applicant-faqs.html. If
applicants experience difficulties at any point during the registration
or application process, please call the Grants.gov Customer Service
Support Hotline at 1(800) 518-4726, Monday-Friday from 7:00 a.m. to
9:00 p.m. EST.
ii. Consideration of Applications:
Only applicants who comply with all submission deadlines described
in this notice and electronically submit valid applications through
Grants.gov will be eligible for award. Applicants are strongly
encouraged to make submissions in advance of the deadline.
iii. Late Applications
Applicants experiencing technical issues with Grants.gov that are
beyond the applicant's control must contact [email protected] prior
to the application deadline with the user name of the registrant and
details of the technical issue experienced. The applicant must provide:
(1) Details of the technical issue experienced;
(2) Screen capture(s) of the technical issues experienced along
with corresponding Grants.gov ``Grant tracking number;''
[[Page 16940]]
(3) The ``Legal Business Name'' for the applicant that was provided
in the SF-424;
(4) The AOR name submitted in the SF-424;
(5) The DUNS number associated with the application; and
(6) The Grants.gov Help Desk Tracking Number
To ensure a fair competition of limited discretionary funds, the
following conditions are not valid reasons to permit late submissions:
(1) Failure to complete the registration process before the deadline;
(2) failure to follow Grants.gov instructions on how to register and
apply as posted on its website; (3) failure to follow all instructions
in this notice of funding opportunity; and (4) technical issues
experienced with the applicant's computer or information technology
environment. After the Department reviews all information submitted and
contact the Grants.gov Help Desk to validate reported technical issues,
DOT staff will contact late applicants to approve or deny a request to
submit a late application through Grants.gov. If the reported technical
issues cannot be validated, late applications will be rejected as
untimely.
E. Application Review Information
1. Criteria
This section specifies the criteria that DOT will use to evaluate
and award applications for BUILD Transportation grants. The criteria
incorporate the statutory eligibility requirements for this program,
which are specified in this notice as relevant. Projects will also be
evaluated for demonstrated project readiness and benefits and costs.
i. Primary Selection Criteria
Applications that do not demonstrate a potential for moderate long-
term benefits based on these criteria will not proceed in the
evaluation process. DOT does not consider any selection criterion more
important than the others. BUILD Transportation planning grant
applications will be evaluated against the same criteria as capital
grant applications. While the FY 2019 Appropriations Act allows funding
solely for pre-construction activities, the Department will prioritize
FY 2019 BUILD Transportation grant program funding for projects that
propose to move into the construction phase within the period of
obligation. Accordingly, applications for BUILD Transportation planning
grants will be less competitive than capital grants.
The selection criteria, which will receive equal consideration,
are:
(a) Safety
The Department will assess the project's ability to foster a safe
transportation system for the movement of goods and people. The
Department will consider the projected impacts on the number, rate, and
consequences of crashes, fatalities and injuries among transportation
users; the project's contribution to the elimination of highway/rail
grade crossings, or the project's contribution to preventing unintended
releases of hazardous materials.
(b) State of Good Repair
The Department will assess whether and to what extent: (1) The
project is consistent with relevant plans to maintain transportation
facilities or systems in a state of good repair and address current and
projected vulnerabilities; (2) if left unimproved, the poor condition
of the asset will threaten future transportation network efficiency,
mobility of goods or accessibility and mobility of people, or economic
growth; (3) the project is appropriately capitalized up front and uses
asset management approaches that optimize its long-term cost structure;
(4) a sustainable source of revenue is available for operations and
maintenance of the project and the project will reduce overall life-
cycle costs; (5) the project will maintain or improve transportation
infrastructure that supports border security functions; and (6) the
project includes a plan to maintain the transportation infrastructure
in a state of good repair. The Department will prioritize projects that
ensure the good condition of transportation infrastructure, including
rural transportation infrastructure, that support commerce and economic
growth.
(c) Economic Competitiveness
The Department will assess whether the project will (1) decrease
transportation costs and improve access, especially for rural
communities or communities in Opportunity Zones,\10\ through reliable
and timely access to employment centers and job opportunities; (2)
improve long-term efficiency, reliability or costs in the movement of
workers or goods; (3) increase the economic productivity of land,
capital, or labor, including assets in Opportunity Zones; (4) result in
long-term job creation and other economic opportunities; or (5) help
the United States compete in a global economy by facilitating efficient
and reliable freight movement.
---------------------------------------------------------------------------
\10\ See https://www.cdfifund.gov/Pages/Opportunity-Zones.aspx
for more information on Opportunity Zones.
---------------------------------------------------------------------------
Projects that address congestion in major urban areas, particularly
those that do so through the use of congestion pricing or the
deployment of advanced technology, projects that bridge gaps in service
in rural areas, and projects that attract private economic development,
all support local or regional economic competitiveness.
(d) Environmental Sustainability
The Department will consider the extent to which the project
improves energy efficiency, reduces dependence on oil, reduces
congestion-related emissions, improves water quality, avoids and
mitigates environmental impacts and otherwise benefits the environment,
including through alternative right of way uses demonstrating
innovative ways to improve or streamline environmental reviews while
maintaining the same outcomes. The Department will assess the project's
ability to: (i) reduce energy use and air or water pollution through
congestion mitigation strategies; (ii) avoid adverse environmental
impacts to air or water quality, wetlands, and endangered species; or
(iii) provide environmental benefits, such as brownfield redevelopment,
ground water recharge in areas of water scarcity, wetlands creation or
improved habitat connectivity, and stormwater mitigation.
(e) Quality of Life
The Department will consider the extent to which the project: (i)
Increases transportation choices for individuals to provide more
freedom on transportation decisions; (ii) expands access to essential
services for communities across the United States, particularly for
rural communities; or (iii) improves connectivity for citizens to jobs,
health care, and other critical destinations, particularly for rural
communities. Americans living in rural areas and on Tribal lands
continue to disproportionately lack access and connectivity, and the
Department will consider whether and the extent to which the
construction of the transportation project will allow concurrent
installation of fiber or other broadband deployment as an essential
service.
ii. Secondary Selection Criteria
(a) Innovation
The Department will assess the extent to which the applicant uses
innovative strategies, including: (i) Innovative technologies, (ii)
innovative project delivery, or (iii) innovative financing.
[[Page 16941]]
(i) Innovative Technologies
DOT will assess innovative approaches to transportation safety,
particularly in relation to automated vehicles and the detection,
mitigation, and documentation of safety risks. When making BUILD
Transportation grant award decisions, the Department will consider any
innovative safety approaches proposed by the applicant, particularly
projects which incorporate innovative design solutions, enhance the
environment for automated vehicles, or use technology to improve the
detection, mitigation, and documentation of safety risks. Innovative
safety approaches may include, but are not limited to:
Conflict detection and mitigation technologies (e.g.,
intersection alerts and signal prioritization);
Dynamic signaling, smart traffic signals, or pricing
systems to reduce congestion;
Traveler information systems, to include work zone data
exchanges;
Signage and design features that facilitate autonomous or
semi-autonomous vehicle technologies;
Applications to automatically capture and report safety-
related issues (e.g., identifying and documenting near-miss incidents);
and
Cybersecurity elements to protect safety-critical systems.
For innovative safety proposals, the Department will evaluate
safety benefits that those approaches could produce and the broader
applicability of the potential results. DOT will also assess the extent
to which the project uses innovative technology that supports surface
transportation to significantly enhance the operational performance of
the transportation system.
Innovative technologies include: Broadband deployment and the
installation of high-speed networks concurrent with the project
construction; connecting Intelligent Transportation System (ITS)
infrastructure; and providing direct fiber connections that support
surface transportation to public and private entities, which can
provide a platform and catalyst for growth of rural communities. The
Department will consider whether and the extent to which the
construction of the transportation project will allow concurrent
broadband deployment and the installation of high-speed networks.
(ii) Innovative Project Delivery
DOT will consider the extent to which the project utilizes
innovative practices in contracting (such as public-private
partnerships), congestion management, asset management, or long-term
operations and maintenance.
The Department also seeks projects that employ innovative
approaches to improve the efficiency and effectiveness of the
environmental permitting and review to accelerate project delivery and
achieve improved outcomes for communities and the environment. The
Department's objective is to achieve timely and consistent
environmental review and permit decisions. Accordingly, projects from
States with NEPA assignment authority under 23 U.S.C. 327 are
considered to use an innovative approach to project delivery.
Participation in innovative project delivery approaches will not remove
any statutory requirements affecting project delivery.
While BUILD Transportation grant award recipients are not required
to employ innovative approaches, the Department encourages BUILD
Transportation grant applicants to describe innovative project delivery
methods for proposed projects.
Additionally, DOT is interested in projects that apply innovative
strategies to improve the efficiency of project development or expedite
project delivery by using FHWA's Special Experimental Project No. 14
(SEP-14) and Special Experimental Project No. 15 (SEP-15). Under SEP-14
and SEP-15, FHWA may waive statutory and regulatory requirements under
title 23 on a project-by-project basis to explore innovative processes
that could be adopted through legislation. This experimental authority
is available to test changes that would improve the efficiency of
project delivery in a manner that is consistent with the purposes
underlying existing requirements; it is not available to frustrate the
purposes of existing requirements.
When making BUILD Transportation grant award decisions, the
Department will consider the applicant's proposals to use SEP-14 or
SEP-15, whether the proposals are consistent with the objectives and
requirements of those programs, the potential benefits that
experimental authorities or waivers might provide to the project, and
the broader applicability of potential results. The Department is not
replacing the application processes for SEP-14 or SEP-15 with this
notice or the BUILD Transportation grant program application. Instead,
it seeks detailed expressions of interest in those programs. If
selected for an BUILD Transportation grant award, the applicant would
need to satisfy the relevant programs' requirements and complete the
appropriate application processes. Selection for a BUILD Transportation
grant award does not mean a project's SEP-14 or SEP-15 proposal has
been approved. The Department will make a separate determination in
accordance with those programs' processes on the appropriateness of a
waiver.
(iii) Innovative Financing
DOT will assess the extent to which the project incorporates
innovations in transportation funding and finance through both
traditional and innovative means, including by using private sector
funding or financing and recycled revenue from the competitive sale or
lease of publicly owned or operated assets.
(b) Partnership
The Department will consider the extent to which projects
demonstrate strong collaboration among a broad range of stakeholders.
Projects with strong partnership typically involve multiple partners in
project development and funding, such as State and local governments,
other public entities, and private or nonprofit entities. DOT will
consider applicants that partner with State, local, or private entities
for the completion and operation of transportation infrastructure to
have strong partnership. DOT will also assess the extent to which the
project application demonstrates collaboration among neighboring or
regional jurisdictions to achieve local or regional benefits. In the
context of public-private partnerships, DOT will assess the extent to
which partners are encouraged to ensure long-term asset performance,
such as through pay-for-success approaches.
DOT will also consider the extent to which projects include
partnerships that bring together diverse transportation agencies or are
supported, financially or otherwise, by other stakeholders that are
pursuing similar objectives. For example, DOT will consider the extent
to which transportation projects are coordinated with economic
development, housing, water and waste infrastructure, power and
electric infrastructure, broadband and land use plans and policies or
other public service efforts.
ii. Demonstrated Project Readiness
During application evaluation, the Department may consider project
readiness to assess the likelihood of a successful project. In that
analysis, the Department will consider significant risks to successful
completion of a project, including risks associated with environmental
review, permitting,
[[Page 16942]]
technical feasibility, funding, and the applicant's capacity to manage
project delivery. Risks do not disqualify projects from award, but
competitive applications clearly and directly describe achievable risk
mitigation strategies. A project with mitigated risks or with a risk
mitigation plan is more competitive than a comparable project with
unaddressed risks.
iii. Project Costs and Benefits
The Department may consider the costs and benefits of projects
seeking BUILD Transportation grant funding. To the extent possible, the
Department will rely on quantitative, data-supported analysis to assess
how well a project addresses this criterion, including an assessment of
the project's estimated benefit-cost ratio and net quantifiable
benefits based on the applicant-supplied BCA described in Section
D.2.vi.
iv. Additional Considerations
The FY 2019 Appropriations Act requires the Department to consider
contributions to geographic diversity among recipients, including the
need for a balance between the needs of rural and urban communities
when selecting BUILD Transportation grant awards.
2. Review and Selection Process
DOT reviews all eligible applications received by the deadline. The
BUILD Transportation grants review and selection process consists of at
least Technical Review and Senior Review. In the Technical Review,
teams comprising staff from the Office of the Secretary (OST) and
operating administrations review all eligible applications and rate
projects based on how well the projects align with the selection
criteria. The Senior Review Team, which includes senior leadership from
OST and the operating administrations, determines which projects to
advance to the Secretary as Highly Rated. The FY 2019 Appropriations
Act mandated BUILD Transportation grant awards by November 12, 2019.
The Secretary selects from the Highly Rated projects for final awards.
3. Additional Information
Prior to award, each selected applicant will be subject to a risk
assessment as required by 2 CFR 200.205. The Department must review and
consider any information about the applicant that is in the designated
integrity and performance system accessible through SAM (currently the
Federal Awardee Performance and Integrity Information System (FAPIIS).
An applicant may review information in FAPIIS and comment on any
information about itself. The Department will consider comments by the
applicant, in addition to the other information in FAPIIS, in making a
judgment about the applicant's integrity, business ethics, and record
of performance under Federal awards when completing the review of risk
posed by applicants.
F. Federal Award Administration Information
1. Federal Award Notice
Following the evaluation outlined in Section E, the Secretary will
announce awarded projects by posting a list of selected projects at
www.transportation.gov/BUILDgrants. Notice of selection is not
authorization to begin performance. Following that announcement, the
relevant operating administration will contact the point of contact
listed in the SF 424 to initiate negotiation of the grant agreement for
authorization.
2. Administrative and National Policy Requirements
All awards will be administered pursuant to the Uniform
Administrative Requirements, Cost Principles and Audit Requirements for
Federal Awards found in 2 CFR part 200, as adopted by DOT at 2 CFR part
1201. Federal wage rate requirements included in subchapter IV of
chapter 31 of title 40, U.S.C., apply to all projects receiving funds
under this program, and apply to all parts of the project, whether
funded with BUILD Transportation Grant funds, other Federal funds, or
non-Federal funds.
In connection with any program or activity conducted with or
benefiting from funds awarded under this notice, recipients of funds
must comply with all applicable requirements of Federal law, including,
without limitation, the Constitution of the United States; the
conditions of performance, non-discrimination requirements, and other
assurances made applicable to the award of funds in accordance with
regulations of the Department of Transportation; and applicable Federal
financial assistance and contracting principles promulgated by the
Office of Management and Budget. In complying with these requirements,
recipients, in particular, must ensure that no concession agreements
are denied or other contracting decisions made on the basis of speech
or other activities protected by the First Amendment. If the Department
determines that a recipient has failed to comply with applicable
Federal requirements, the Department may terminate the award of funds
and disallow previously incurred costs, requiring the recipient to
reimburse any expended award funds.
Additionally, applicable Federal laws, rules and regulations of the
relevant operating administration administering the project will apply
to the projects that receive BUILD Transportation grant awards,
including planning requirements, Service Outcome Agreements,
Stakeholder Agreements, Buy America compliance, and other requirements
under DOT's other highway, transit, rail, and port grant programs. In
particular, Executive Order 13858 directs the Executive Branch
Departments and agencies to maximize the use of goods, products, and
materials produced in the United States through the terms and
conditions of Federal financial assistance awards. If selected for an
award, grantees must be prepared to demonstrate how they will maximize
the use of domestic goods, products, and materials in constructing
their project BUILD Transportation grant projects involving vehicle
acquisition must involve only vehicles that comply with applicable
Federal Motor Vehicle Safety Standards and Federal Motor Vehicle Safety
Regulations, or vehicles that are exempt from Federal Motor Carrier
Safety Standards or Federal Motor Carrier Safety Regulations in a
manner that allows for the legal acquisition and deployment of the
vehicle or vehicles.
For projects administered by FHWA, applicable Federal laws, rules,
and regulations set forth in Title 23 U.S.C. and Title 23 CFR apply,
including the 23 U.S.C. 129 restrictions on the use of toll revenues,
and Section 4(f) preservation of parklands and historic properties
requirements under 23 U.S.C. 138. .For an illustrative list of the
other applicable laws, rules, regulations, executive orders, polices,
guidelines, and requirements as they relate to a BUILD Transportation
grant project administered by the FHWA, please see https://ops.fhwa.dot.gov/Freight/infrastructure/tiger/fy2016_gr_exhbt/index.htm.
For BUILD Transportation projects administered by the Federal
Transit Administration and partially funded with Federal transit
assistance, all relevant requirements under chapter 53 of title 49
U.S.C. apply. For transit projects funded exclusively with BUILD
Transportation grant funds, some requirements of chapter 53 of title 49
U.S.C. and chapter VI of title 49 CFR apply.
For projects administered by the Federal Railroad Administration,
FRA requirements described in 49 U.S.C. Subtitle V, Part C apply.
[[Page 16943]]
For each project that receives a BUILD Transportation grant award,
the terms of the award will require the recipient to complete the
project using at least the level of non-Federal funding that was
specified in the application. If the actual costs of the project are
greater than the costs estimated in the application, the recipient will
be responsible for increasing the non-Federal contribution. If the
actual costs of the project are less than the costs estimated in the
application, DOT will generally reduce the Federal contribution.
3. Reporting
i. Progress Reporting on Grant Activities
Each applicant selected for BUILD Transportation grant funding must
submit quarterly progress reports and Federal Financial Reports (SF-
425) to monitor project progress and ensure accountability and
financial transparency in the BUILD Transportation grant program.
ii. System Performance Reporting
Each applicant selected for BUILD Transportation grant funding must
collect and report to the DOT information on the project's performance.
The specific performance information and reporting time period will be
determined on a project-by-project basis. Performance indicators will
not include formal goals or targets, but will include observed measures
under baseline (pre-project) as well as post-implementation outcomes,
and will be used to evaluate and compare projects and monitor the
results that grant funds achieve to the intended long-term outcomes of
the BUILD Transportation grant program are achieved. To the extent
possible, performance indicators used in the reporting should align
with the measures included in the application and should relate to at
least one of the selection criteria defined in Section E. Performance
reporting continues for several years after project construction is
completed, and DOT does not provide BUILD Transportation grant funding
specifically for performance reporting.
iii. Reporting of Matters Related to Recipient Integrity and
Performance
If the total value of a selected applicant's currently active
grants, cooperative agreements, and procurement contracts from all
Federal awarding agencies exceeds $10,000,000 for any period of time
during the period of performance of this Federal award, then the
applicant during that period of time must maintain the currency of
information reported to the SAM that is made available in the
designated integrity and performance system (currently FAPIIS) about
civil, criminal, or administrative proceedings described in paragraph 2
of this award term and condition. This is a statutory requirement under
section 872 of Public Law 110-417, as amended (41 U.S.C. 2313). As
required by section 3010 of Public Law 111-212, all information posted
in the designated integrity and performance system on or after April
15, 2011, except past performance reviews required for Federal
procurement contracts, will be publicly available.
G. Federal Awarding Agency Contacts
For further information concerning this notice please contact the
BUILD Transportation grant program staff via email at
[email protected], or call Howard Hill at 202-366-0301. A TDD is
available for individuals who are deaf or hard of hearing at 202-366-
3993. In addition, DOT will post answers to questions and requests for
clarifications on DOT's website at www.transportation.gov/BUILDgrants.
To ensure applicants receive accurate information about eligibility or
the program, the applicant is encouraged to contact DOT directly,
rather than through intermediaries or third parties, with questions.
DOT staff may also conduct briefings on the BUILD Transportation grant
selection and award process upon request.
H. Other information
1. Protection of Confidential Business Information
All information submitted as part of or in support of any
application shall use publicly available data or data that can be made
public and methodologies that are accepted by industry practice and
standards, to the extent possible. If the applicant submits information
that the applicant considers to be a trade secret or confidential
commercial or financial information, the applicant must provide that
information in a separate document, which the applicant may cross-
reference from the application narrative or other portions of the
application. For the separate document containing confidential
information, the applicant must do the following: (1) State on the
cover of that document that it ``Contains Confidential Business
Information (CBI)''; (2) mark each page that contains confidential
information with ``CBI''; (3) highlight or otherwise denote the
confidential content on each page; and (4) at the end of the document,
explain how disclosure of the confidential information would cause
substantial competitive harm. DOT will protect confidential information
complying with these requirements to the extent required under
applicable law. If DOT receives a Freedom of Information Act (FOIA)
request for the information that the applicant has marked in accordance
with this section, DOT will follow the procedures described in its FOIA
regulations at 49 CFR 7.29. Only information that is in the separate
document, marked in accordance with this section, and ultimately
determined to be confidential under Sec. 7.29 will be exempt from
disclosure under FOIA.
2. Publication/Sharing of Application Information
Following the completion of the selection process and announcement
of awards, the Department intends to publish a list of all applications
received along with the names of the applicant organizations and
funding amounts requested. Except for the information properly marked
as described in Section H.1., the Department may make application
narratives publicly available or share application information within
the Department or with other Federal agencies if the Department
determines that sharing is relevant to the respective program's
objectives.
3. Department Feedback on Applications
The Department strives to provide as much information as possible
to assist applicants with the application process. The Department will
not review applications in advance, but Department staff are available
for technical questions and assistance. To efficiently use Department
resources, the Department will prioritize interactions with applicants
who have not already received a debrief on their FY 2018 BUILD
Transportation grant application. Program staff will address questions
to [email protected] throughout the application period. Department
staff will make reasonable efforts to schedule meetings on projects
through May 31, 2019. After that date, Department staff will schedule
meetings only to the extent possible and consistent with timely
completion of other activities.
Issued On: April 16, 2019.
Elaine L. Chao,
Secretary.
[FR Doc. 2019-08137 Filed 4-22-19; 8:45 am]
BILLING CODE 4910-9X-P