New York State Electric & Gas Corporation; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 16481-16482 [2019-07949]
Download as PDF
Federal Register / Vol. 84, No. 76 / Friday, April 19, 2019 / Notices
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: April 15, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–07945 Filed 4–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2934–029]
khammond on DSKBBV9HB2PROD with NOTICES
New York State Electric & Gas
Corporation; Notice of Application
Tendered for Filing With the
Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2934–029.
c. Date Filed: April 1, 2019.
d. Applicant: New York State Electric
& Gas Corporation (NYSEG).
e. Name of Project: Upper
Mechanicville Hydroelectric Project.
f. Location: The existing project is
located on the Hudson River, in
Saratoga and Rensselaer Counties, New
York. The project does not occupy any
federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Hugh J. Ives,
Manager, NYSEG Hydro Operations, 89
East Avenue, Rochester, NY 14649;
(585) 724–8209; hugh.ives@
avangrid.com.
i. FERC Contact: Jody Callihan, (202)
502–8278 or jody.callihan@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The existing
Upper Mechanicville Hydroelectric
Project consists of: (1) A 700-foot-long
concrete gravity dam with a crest
elevation of 66.6 feet National Geodetic
Vertical Datum of 1929 (NGVD29); (2) 3
spillway bays each extending 222 feet
across the length of the dam and
separated by a 7.5-foot to 10.5-foot-wide
concrete pier, with each spillway bay
containing 12 pneumatic Obermeyer
crest gates that are 6 feet high; (3) a 1.8mile-long impoundment with a 380-acre
surface area and gross storage capacity
of 10,735 acre-feet at a normal pool
elevation of 72.6 feet NGVD29; (4) an
intake channel with two reinforced
guide walls and three 35-foot-diameter
cofferdam walls constructed of sheet
piling; (5) a 20-foot-wide and 7.5-foothigh intake bypass sluice gate; (6) a
105.5-foot-long by 122-foot-wide
powerhouse containing two 12,780
horsepower Kaplan turbines and two
Siemens-Allis generators each having a
rated capacity of 8,265 kilowatts; (7) a
tailrace approximately 1,200 feet long
and 120 feet wide with a bi-level bottom
designed to minimize cross-currents; (8)
one 1.10-mile-long, 34.5-kilovolt
transmission line; and (9) appurtenant
facilities.
During the non-navigation season
(typically from December 1 through
April 30), NYSEG operates the project in
a run-of-river (ROR) mode and
maintains the impoundment at an
elevation of 72.6 feet NGVD29. During
the navigation season (typically May 1
through November 30), NYSEG
periodically spills water to lower the
impoundment up to 3 feet below full
pool, as directed by the New York State
Canal Corporation, to accommodate
navigation at lock C–3, and uses all
available remaining inflow (that is not
used to support navigation) for
generation purposes. NYSEG proposes
to continue operating the project as it
does currently, to support both
generation and navigation. In addition,
NYSEG proposes to enhance fish
passage at the project by: (1) Installing
upstream passage for American eel (4
years post-license); (2) developing an
agreement with the New York State
Canal Corporation to modify lock
operations to accommodate the
upstream passage of blueback herring
and American shad (commencing 2
years post-license); and (3) modifying
the project’s intake bypass sluice gate to
provide an additional route of
downstream fish passage from April 1
through November 30. The project
currently generates an annual average of
88,537 megawatt-hours.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659. A copy is
also available for inspection and
reproduction at the Mechanicville
District Public Library located at 190
North Main Street, Mechanicville, NY
12118 and the A.E. Diver Memorial
Library located at 136 Main Street,
Schaghticoke, NY 12154.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis .............................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ..........................................................
Commission issues Environmental Assessment (EA) ..................................................................................................................
Comments on EA ..........................................................................................................................................................................
VerDate Sep<11>2014
16:23 Apr 18, 2019
Jkt 247001
PO 00000
Frm 00027
Fmt 4703
16481
Sfmt 4703
E:\FR\FM\19APN1.SGM
19APN1
June 2019.
August 2019.
December 2019.
February 2020.
16482
Federal Register / Vol. 84, No. 76 / Friday, April 19, 2019 / Notices
Milestone
Target date
Modified Terms and Conditions ....................................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: April 15, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–07949 Filed 4–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
khammond on DSKBBV9HB2PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP19–1122–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: TETLP
Apr2018 Customer Name Change
Cleanup Filing to be effective 5/11/
2019.
Filed Date: 4/11/19.
Accession Number: 20190411–5000.
Comments Due: 5 p.m. ET 4/23/19.
Docket Numbers: RP19–1123–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Apr2019 Negotiated Rates Cleanup
Filing to be effective 5/11/2019.
Filed Date: 4/11/19.
Accession Number: 20190411–5022.
Comments Due: 5 p.m. ET 4/23/19.
Docket Numbers: RP19–1124–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—Apr2019 Cleanup
Filing to be effective 5/11/2019.
Filed Date: 4/11/19.
Accession Number: 20190411–5029.
Comments Due: 5 p.m. ET 4/23/19.
Docket Numbers: RP19–1125–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 041219
Negotiated Rates—Castleton
Commodities Merchant Trading R–
4010–15 to be effective 4/15/2019.
Filed Date: 4/12/19.
Accession Number: 20190412–5010.
VerDate Sep<11>2014
16:23 Apr 18, 2019
Jkt 247001
Comments Due: 5 p.m. ET 4/24/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 15, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–07944 Filed 4–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL19–62–000]
Notice of Complaint: City Utilities of
Springfield, Missouri v. Southwest
Power Pool, Inc.
Take notice that on April 12, 2019,
pursuant to sections 206, 306, and 309
of the Federal Power Act, 16 U.S.C.
824e, 825e, 825h and Rule 206 of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206,
City Utilities of Springfield, Missouri
(Complainant) filed a formal complaint
against Southwest Power Pool, Inc. (SPP
or Respondent), requesting the
Commission to: (1) Enforce current
Section III.D.4 of Attachment J of SPP’s
Open Access Transmission Tariff
(OATT) for the period from June 19,
2010 through the refund effective date
established in this proceeding; and (2)
revise Section III.D.4 of Attachment J of
SPP’s OATT on a prospective basis, all
as more fully explained in the
complaint.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
April 2020.
The Complainant certifies that copies
of the complaint were served on the
contacts listed for Respondent’s, as well
as affected regulatory agencies and other
entities under Rule 206(c) of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.206(c), as listed
on the Commission’s list of Corporate
Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commissions’ Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondents’ answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 2, 2019.
Dated: April 15, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–07946 Filed 4–18–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\19APN1.SGM
19APN1
Agencies
[Federal Register Volume 84, Number 76 (Friday, April 19, 2019)]
[Notices]
[Pages 16481-16482]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07949]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2934-029]
New York State Electric & Gas Corporation; Notice of Application
Tendered for Filing With the Commission and Establishing Procedural
Schedule for Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2934-029.
c. Date Filed: April 1, 2019.
d. Applicant: New York State Electric & Gas Corporation (NYSEG).
e. Name of Project: Upper Mechanicville Hydroelectric Project.
f. Location: The existing project is located on the Hudson River,
in Saratoga and Rensselaer Counties, New York. The project does not
occupy any federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Hugh J. Ives, Manager, NYSEG Hydro
Operations, 89 East Avenue, Rochester, NY 14649; (585) 724-8209;
[email protected].
i. FERC Contact: Jody Callihan, (202) 502-8278 or
[email protected].
j. This application is not ready for environmental analysis at this
time.
k. Project Description: The existing Upper Mechanicville
Hydroelectric Project consists of: (1) A 700-foot-long concrete gravity
dam with a crest elevation of 66.6 feet National Geodetic Vertical
Datum of 1929 (NGVD29); (2) 3 spillway bays each extending 222 feet
across the length of the dam and separated by a 7.5-foot to 10.5-foot-
wide concrete pier, with each spillway bay containing 12 pneumatic
Obermeyer crest gates that are 6 feet high; (3) a 1.8-mile-long
impoundment with a 380-acre surface area and gross storage capacity of
10,735 acre-feet at a normal pool elevation of 72.6 feet NGVD29; (4) an
intake channel with two reinforced guide walls and three 35-foot-
diameter cofferdam walls constructed of sheet piling; (5) a 20-foot-
wide and 7.5-foot-high intake bypass sluice gate; (6) a 105.5-foot-long
by 122-foot-wide powerhouse containing two 12,780 horsepower Kaplan
turbines and two Siemens-Allis generators each having a rated capacity
of 8,265 kilowatts; (7) a tailrace approximately 1,200 feet long and
120 feet wide with a bi-level bottom designed to minimize cross-
currents; (8) one 1.10-mile-long, 34.5-kilovolt transmission line; and
(9) appurtenant facilities.
During the non-navigation season (typically from December 1 through
April 30), NYSEG operates the project in a run-of-river (ROR) mode and
maintains the impoundment at an elevation of 72.6 feet NGVD29. During
the navigation season (typically May 1 through November 30), NYSEG
periodically spills water to lower the impoundment up to 3 feet below
full pool, as directed by the New York State Canal Corporation, to
accommodate navigation at lock C-3, and uses all available remaining
inflow (that is not used to support navigation) for generation
purposes. NYSEG proposes to continue operating the project as it does
currently, to support both generation and navigation. In addition,
NYSEG proposes to enhance fish passage at the project by: (1)
Installing upstream passage for American eel (4 years post-license);
(2) developing an agreement with the New York State Canal Corporation
to modify lock operations to accommodate the upstream passage of
blueback herring and American shad (commencing 2 years post-license);
and (3) modifying the project's intake bypass sluice gate to provide an
additional route of downstream fish passage from April 1 through
November 30. The project currently generates an annual average of
88,537 megawatt-hours.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's website at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at [email protected]
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the Mechanicville
District Public Library located at 190 North Main Street,
Mechanicville, NY 12118 and the A.E. Diver Memorial Library located at
136 Main Street, Schaghticoke, NY 12154.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for June 2019.
Environmental Analysis.
Filing of recommendations, preliminary terms August 2019.
and conditions, and fishway prescriptions.
Commission issues Environmental Assessment December 2019.
(EA).
Comments on EA.............................. February 2020.
[[Page 16482]]
Modified Terms and Conditions............... April 2020.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: April 15, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-07949 Filed 4-18-19; 8:45 am]