Environmental Impact Statements; Notice of Availability, 16485 [2019-07779]
Download as PDF
Federal Register / Vol. 84, No. 76 / Friday, April 19, 2019 / Notices
• State of Louisiana Coastal
Protection and Restoration Authority
(CPRA), Oil Spill Coordinator’s Office
(LOSCO), Department of Environmental
Quality (LDEQ), Department of Wildlife
and Fisheries (LDWF), and Department
of Natural Resources (LDNR);
• State of Mississippi Department of
Environmental Quality;
• State of Alabama Department of
Conservation and Natural Resources and
Geological Survey of Alabama;
• State of Florida Department of
Environmental Protection and Fish and
Wildlife Conservation Commission; and
• State of Texas Parks and Wildlife
Department, General Land Office, and
Commission on Environmental Quality.
On April 4, 2016, the Trustees
reached and finalized a settlement of
their natural resource damage claims
with BP in a Consent Decree approved
by the United States District Court for
the Eastern District of Louisiana.
Pursuant to that Consent Decree,
restoration projects in the Louisiana
Restoration Area are now chosen and
managed by the Louisiana TIG. The
Louisiana TIG is composed of the
following Trustees: CPRA, LOSCO,
LDEQ, LDWF, LDNR, EPA, DOI, NOAA,
USDA.
khammond on DSKBBV9HB2PROD with NOTICES
Background
Administrative Record
The documents comprising the
Administrative Record for the Draft
Supplemental RP/EA can be viewed
electronically at https://www.doi.gov/
deepwaterhorizon/adminrecord.
Authority
The authority for this action is the Oil
Pollution Act of 1990 (33 U.S.C. 2701 et
seq.), its implementing NRDA
regulations found at 15 CFR part 990,
and the NEPA (42 U.S.C. 4321 et seq.).
Dated: April 2, 2019.
Benita Best-Wong,
Deputy Assistant Administrator, Office of
Water.
[FR Doc. 2019–07441 Filed 4–18–19; 8:45 am]
The original scope and design of the
Lake Charles SCEC project were
evaluated in the Final RP/EA #2, which
was published on July 20, 2018. As
proposed in the Final RP/EA #2, the
Lake Charles SCEC project would
enhance recreational opportunities by
providing indoor and outdoor public
visitation and outreach components,
including fisheries extension, access,
outreach, and education to the public.
Following release of the Final RP/EA #2,
the City of Lake Charles requested that
the Louisiana TIG consider collocating
the Lake Charles SCEC with the City’s
planned LCCM. The Louisiana TIG
prepared the Draft Supplemental RP/EA
to evaluate modifications to the Lake
Charles SCEC project and consider
alternatives, consistent with the purpose
and need of the original project.
Alternatives considered in the Draft
Supplemental RP/EA include the
collocation of the Lake Charles SCEC
and LCCM with variations of indoor and
outdoor components to support
recreational and educational
opportunities. The Louisiana TIG
prepared the Draft Supplemental RP/EA
to inform the public about potential
modifications to the Lake Charles SCEC
project and to seek public comment.
VerDate Sep<11>2014
Next Steps
The public is encouraged to review
and comment on the Draft
Supplemental RP/EA. A public meeting
is scheduled to also help facilitate the
public review and comment process. A
summary of comments received on the
Draft Supplemental RP/EA and the
Louisiana TIG’s responses, where
applicable, will be included in the Final
Supplemental RP/EA. Public comments
on the Draft Supplemental RP/EA will
inform the Louisiana TIG’s decision on
whether to select the Lake Charles SCEC
project, as modified, in the Final
Supplemental RP/EA.
16:23 Apr 18, 2019
Jkt 247001
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9044–4]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 04/01/2019 Through 04/05/2019
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20190044, Final, BLM, NM,
Copper Flat Copper Mine, Review
Period Ends: 05/20/2019, Contact:
Leighandra Keeven 575–525–4337
EIS No. 20190057, Final, USFS, WY,
Medicine Bow Landscape Vegetation
Analysis (LaVA) Project, Review
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
16485
Period Ends: 05/20/2019, Contact:
Melissa Martin 307–745–2371
EIS No. 20190058, Final, FHWA, NY,
Hunts Point Interstate Access
Improvement Project, Contact: Erik
Koester—NYSDOT Project Director
718–482–4683. Under 23 U.S.C.
139(n)(2), FHWA has issued a single
document that consists of a final
environmental impact statement and
record of decision. Therefore, the 30day wait/review period under NEPA
does not apply to this action.
EIS No. 20190059, Draft, BLM, WY,
Moneta Divide Natural Gas and Oil
Development Project, Comment
Period Ends: 07/18/2019, Contact:
Kristin Yannone 307–332–8400
EIS No. 20190060, Draft, USFWS, CA,
Proposed Habitat Conservation Plan
and Incidental Take Permit for Sierra
Pacific Industries, Comment Period
Ends: 06/18/2019, Contact: Kim
Turner 916–414–6600
EIS No. 20190061, Draft, BIA, CA,
Redding Rancheria Fee-to-Trust and
Casino Project, Comment Period Ends:
06/03/2019, Contact: Chad Broussard
916–978–6165
EIS No. 20190062, Final, FERC, FL,
Eagle LNG Partners Jacksonville, LLC
Jacksonville Project, Review Period
Ends: 05/20/2019, Contact: Office of
External Affairs 866–208–3372
Amended Notice
EIS No. 20180087, Draft, USDA, NAT,
Southern Gardens Citrus Nursery,
LLC Permit to Release Genetically
Engineered Citrus tristeza virus Draft
Environmental Impact Statement,
Comment Period Ends: 04/30/2019,
Contact: Joanne Serrels 301–851–
3867. Revision to FR Notice Published
05/11/2018; APHIS has reopened the
comment period to end on 04/30/
2019.
Dated: April 15, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019–07779 Filed 4–18–19; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2018–0604; FRL–9990–36]
Materials Supporting the Colour Index
(C. I.) Pigment Violet 29 Risk
Evaluation; Notice of Availability and
Comment Opportunity
Correction
In notice document 2019–07708
appearing on page 16011 in the issue of
Wednesday, April 17, 2019, make the
following correction:
E:\FR\FM\19APN1.SGM
19APN1
Agencies
[Federal Register Volume 84, Number 76 (Friday, April 19, 2019)]
[Notices]
[Page 16485]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07779]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9044-4]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information 202-564-5632 or https://www.epa.gov/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 04/01/2019 Through 04/05/2019
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20190044, Final, BLM, NM, Copper Flat Copper Mine, Review
Period Ends: 05/20/2019, Contact: Leighandra Keeven 575-525-4337
EIS No. 20190057, Final, USFS, WY, Medicine Bow Landscape Vegetation
Analysis (LaVA) Project, Review Period Ends: 05/20/2019, Contact:
Melissa Martin 307-745-2371
EIS No. 20190058, Final, FHWA, NY, Hunts Point Interstate Access
Improvement Project, Contact: Erik Koester--NYSDOT Project Director
718-482-4683. Under 23 U.S.C. 139(n)(2), FHWA has issued a single
document that consists of a final environmental impact statement and
record of decision. Therefore, the 30-day wait/review period under NEPA
does not apply to this action.
EIS No. 20190059, Draft, BLM, WY, Moneta Divide Natural Gas and Oil
Development Project, Comment Period Ends: 07/18/2019, Contact: Kristin
Yannone 307-332-8400
EIS No. 20190060, Draft, USFWS, CA, Proposed Habitat Conservation Plan
and Incidental Take Permit for Sierra Pacific Industries, Comment
Period Ends: 06/18/2019, Contact: Kim Turner 916-414-6600
EIS No. 20190061, Draft, BIA, CA, Redding Rancheria Fee-to-Trust and
Casino Project, Comment Period Ends: 06/03/2019, Contact: Chad
Broussard 916-978-6165
EIS No. 20190062, Final, FERC, FL, Eagle LNG Partners Jacksonville, LLC
Jacksonville Project, Review Period Ends: 05/20/2019, Contact: Office
of External Affairs 866-208-3372
Amended Notice
EIS No. 20180087, Draft, USDA, NAT, Southern Gardens Citrus Nursery,
LLC Permit to Release Genetically Engineered Citrus tristeza virus
Draft Environmental Impact Statement, Comment Period Ends: 04/30/2019,
Contact: Joanne Serrels 301-851-3867. Revision to FR Notice Published
05/11/2018; APHIS has reopened the comment period to end on 04/30/2019.
Dated: April 15, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019-07779 Filed 4-18-19; 8:45 am]
BILLING CODE 6560-50-P