Download as PDF Federal Register / Vol. 84, No. 75 / Thursday, April 18, 2019 / Notices jbell on DSK30RV082PROD with NOTICES The final EIS addresses the potential environmental effects of the construction and operation of the following project facilities: • Three LNG trains, each with a nominal capacity of 0.33 MTPA of LNG for export, resulting in a total nominal capacity of 1.0 MTPA; • One LNG storage tank with a net capacity of 45,000 m3; • Marine facilities with a concrete access trestle and loading platform, and two liquid loading arms capable of docking and mooring a range of LNG vessels with an LNG cargo capacity of up to 45,000 m3; • LNG truck loading facilities with a dual bay capable of loading 260 to 520 LNG trucks per year; • A boil-off gas compression system; • On-site refrigerant storage; • Ground flare and cold vent systems; and • Utilities and support facilities (e.g., administration, control, and workshop buildings; roads and parking areas; power and communications; water, air, septic, and stormwater systems). The Commission mailed a copy of the Notice of Availability to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the project area. The EIS is only available in electronic format. It may be viewed and downloaded from the FERC’s website (www.ferc.gov), on the Environmental Documents page (https://www.ferc.gov/ industries/gas/enviro/eis.asp). In addition, the final EIS may be accessed by using the eLibrary link on the FERC’s website. Click on the eLibrary link (https://www.ferc.gov/docs-filing/ elibrary.asp), click on General Search, and enter the docket number in the ‘‘Docket Number’’ field, excluding the last three digits (i.e., CP17–41). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Questions? Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. VerDate Sep<11>2014 17:37 Apr 17, 2019 Jkt 247001 In addition, the Commission offers a free service called eSubscription that allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Dated: April 12, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–07749 Filed 4–17–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2835–009. Applicants: Google Energy LLC. Description: Erratum to December 18, 2018 Triennial Market Power Analysis for the SPP Region of Google Energy LLC. Filed Date: 4/9/19. Accession Number: 20190409–5161. Comments Due: 5 p.m. ET 4/30/19. Docket Numbers: ER16–120–008. Applicants: New York Independent System Operator, Inc. Description: Compliance filing: Compliance: physical withholding determinations—generator deactivation process to be effective 7/23/2018. Filed Date: 4/10/19. Accession Number: 20190410–5143. Comments Due: 5 p.m. ET 5/1/19. Docket Numbers: ER19–1541–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Supplement to April 9, 2019 Pre-Arranged/Pre-Agreed (Stipulation and Offer of Settlement) Filing, et al. of the Midcontinent Independent System Operator, Inc., et al. Filed Date: 4/10/19. Accession Number: 20190410–5088. Comments Due: 5 p.m. ET 5/1/19. Docket Numbers: ER19–1542–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2019–04–09 Bid Generation Exemption Amendment—Request Expedited Treatment to be effective 4/1/2019. Filed Date: 4/9/19. Accession Number: 20190409–5125. PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 16255 Comments Due: 5 p.m. ET 4/23/19. Docket Numbers: ER19–1543–000. Applicants: Virginia Electric and Power Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Dominion submits revisions to OATT, Att. H–16C re: 2018 Actual OPEB Expenses to be effective 6/15/2019. Filed Date: 4/10/19. Accession Number: 20190410–5028. Comments Due: 5 p.m. ET 5/1/19. Docket Numbers: ER19–1544–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MAIT submits an ECSA, Service Agreement No. 5270 with PPL Electric to be effective 6/9/2019. Filed Date: 4/10/19. Accession Number: 20190410–5051. Comments Due: 5 p.m. ET 5/1/19. Docket Numbers: ER19–1545–000. Applicants: American Transmission Systems, Incorporated, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ATSI submits Revised Interconnection Agreement (IA) SA No. 3994 to be effective 6/9/2019. Filed Date: 4/10/19. Accession Number: 20190410–5054. Comments Due: 5 p.m. ET 5/1/19. Docket Numbers: ER19–1546–000. Applicants: PJM Interconnection, L.L.C., American Transmission Systems, Incorporated. Description: § 205(d) Rate Filing: ATSI submits an ECSA, Service Agreement No. 5277 with Cleveland Electric to be effective 6/9/2019. Filed Date: 4/10/19. Accession Number: 20190410–5101. Comments Due: 5 p.m. ET 5/1/19. Docket Numbers: ER19–1547–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: IFA & DSA Rincon Project SA Nos. 1077 and 1078 to be effective 6/10/2019. Filed Date: 4/10/19. Accession Number: 20190410–5110. Comments Due: 5 p.m. ET 5/1/19. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH19–9–000. Applicants: KeyCorp. Description: FERC 65–B Notice of Material Change in Facts of Waiver Notification. Filed Date: 4/10/19. Accession Number: 20190410–5076. Comments Due: 5 p.m. ET 5/1/19. The filings are accessible in the Commission’s eLibrary system by E:\FR\FM\18APN1.SGM 18APN1 16256 Federal Register / Vol. 84, No. 75 / Thursday, April 18, 2019 / Notices clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 10, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–07772 Filed 4–17–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–118–000] jbell on DSK30RV082PROD with NOTICES Notice of Application: Trans-Foreland Pipeline Company LLC Take notice that on March 29, 2019, Trans-Foreland Pipeline Company LLC (Trans-Foreland), 539 South Main Street, Findlay, Ohio 45840 filed an application in Docket No. CP19–118– 000 pursuant to section 3(a) of the Natural Gas Act (NGA) and Part 153 of the Commission’s regulations requesting authorization to construct and install modifications to the existing Kenai LNG Plant located in Kenai, Alaska. TransForeland proposes to make facility modifications to bring parts of Kenai LNG Plant out of its current warm idle status and add a 1,000 horsepower electric-driven boil-off gas compressor unit. Trans-Foreland avers that Kenai LNG Plant facilities will not be used to render any transportation service, as more fully described in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. VerDate Sep<11>2014 17:37 Apr 17, 2019 Jkt 247001 Any questions regarding this application should be directed to Martin J. Marz, Tariff Manager, Tesoro Logistics GP LLC, 19100 Ridgewood Parkway, San Antonio, Texas 78259, by telephone at (210) 626–6517, by facsimile at (205) 623–2396, or by email at martin.j.marz@ andeavor.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 3 copies of filings made in the proceeding with the Commission and must provide a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be PO 00000 Frm 00018 Fmt 4703 Sfmt 9990 taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. As of the February 27, 2018 date of the Commission’s order in Docket No. CP16–4–001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new NGA section 3 or section 7 proceeding.1 Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-of-time, the movant is required to show good cause why the time limitation should be waived, and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission’s Rules and Regulations.2 The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: May 3, 2019. Dated: April 12, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–07744 Filed 4–17–19; 8:45 am] BILLING CODE 6717–01–P 1 Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at 50 (2018). 2 18 CFR 385.214(d)(1). E:\FR\FM\18APN1.SGM 18APN1

Agencies

[Federal Register Volume 84, Number 75 (Thursday, April 18, 2019)]
[Notices]
[Pages 16255-16256]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07772]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER10-2835-009.
    Applicants: Google Energy LLC.
    Description: Erratum to December 18, 2018 Triennial Market Power 
Analysis for the SPP Region of Google Energy LLC.
    Filed Date: 4/9/19.
    Accession Number: 20190409-5161.
    Comments Due: 5 p.m. ET 4/30/19.

    Docket Numbers: ER16-120-008.
    Applicants: New York Independent System Operator, Inc.
    Description: Compliance filing: Compliance: physical withholding 
determinations--generator deactivation process to be effective 7/23/
2018.
    Filed Date: 4/10/19.
    Accession Number: 20190410-5143.
    Comments Due: 5 p.m. ET 5/1/19.

    Docket Numbers: ER19-1541-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Supplement to April 9, 2019 Pre-Arranged/Pre-Agreed 
(Stipulation and Offer of Settlement) Filing, et al. of the 
Midcontinent Independent System Operator, Inc., et al.
    Filed Date: 4/10/19.
    Accession Number: 20190410-5088.
    Comments Due: 5 p.m. ET 5/1/19.

    Docket Numbers: ER19-1542-000.
    Applicants: California Independent System Operator Corporation.
    Description: Sec.  205(d) Rate Filing: 2019-04-09 Bid Generation 
Exemption Amendment--Request Expedited Treatment to be effective 4/1/
2019.
    Filed Date: 4/9/19.
    Accession Number: 20190409-5125.
    Comments Due: 5 p.m. ET 4/23/19.

    Docket Numbers: ER19-1543-000.
    Applicants: Virginia Electric and Power Company, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Dominion submits revisions 
to OATT, Att. H-16C re: 2018 Actual OPEB Expenses to be effective 6/15/
2019.
    Filed Date: 4/10/19.
    Accession Number: 20190410-5028.
    Comments Due: 5 p.m. ET 5/1/19.

    Docket Numbers: ER19-1544-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: MAIT submits an ECSA, 
Service Agreement No. 5270 with PPL Electric to be effective 6/9/2019.
    Filed Date: 4/10/19.
    Accession Number: 20190410-5051.
    Comments Due: 5 p.m. ET 5/1/19.

    Docket Numbers: ER19-1545-000.
    Applicants: American Transmission Systems, Incorporated, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: ATSI submits Revised 
Interconnection Agreement (IA) SA No. 3994 to be effective 6/9/2019.
    Filed Date: 4/10/19.
    Accession Number: 20190410-5054.
    Comments Due: 5 p.m. ET 5/1/19.

    Docket Numbers: ER19-1546-000.
    Applicants: PJM Interconnection, L.L.C., American Transmission 
Systems, Incorporated.
    Description: Sec.  205(d) Rate Filing: ATSI submits an ECSA, 
Service Agreement No. 5277 with Cleveland Electric to be effective 6/9/
2019.
    Filed Date: 4/10/19.
    Accession Number: 20190410-5101.
    Comments Due: 5 p.m. ET 5/1/19.

    Docket Numbers: ER19-1547-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: IFA & DSA Rincon Project SA 
Nos. 1077 and 1078 to be effective 6/10/2019.
    Filed Date: 4/10/19.
    Accession Number: 20190410-5110.
    Comments Due: 5 p.m. ET 5/1/19.

    Take notice that the Commission received the following public 
utility holding company filings:
    Docket Numbers: PH19-9-000.
    Applicants: KeyCorp.
    Description: FERC 65-B Notice of Material Change in Facts of Waiver 
Notification.
    Filed Date: 4/10/19.
    Accession Number: 20190410-5076.
    Comments Due: 5 p.m. ET 5/1/19.

    The filings are accessible in the Commission's eLibrary system by

[[Page 16256]]

clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: April 10, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-07772 Filed 4-17-19; 8:45 am]
 BILLING CODE 6717-01-P