Combined Notice of Filings #1, 16255-16256 [2019-07772]
Download as PDF
Federal Register / Vol. 84, No. 75 / Thursday, April 18, 2019 / Notices
jbell on DSK30RV082PROD with NOTICES
The final EIS addresses the potential
environmental effects of the
construction and operation of the
following project facilities:
• Three LNG trains, each with a
nominal capacity of 0.33 MTPA of LNG
for export, resulting in a total nominal
capacity of 1.0 MTPA;
• One LNG storage tank with a net
capacity of 45,000 m3;
• Marine facilities with a concrete
access trestle and loading platform, and
two liquid loading arms capable of
docking and mooring a range of LNG
vessels with an LNG cargo capacity of
up to 45,000 m3;
• LNG truck loading facilities with a
dual bay capable of loading 260 to 520
LNG trucks per year;
• A boil-off gas compression system;
• On-site refrigerant storage;
• Ground flare and cold vent systems;
and
• Utilities and support facilities (e.g.,
administration, control, and workshop
buildings; roads and parking areas;
power and communications; water, air,
septic, and stormwater systems).
The Commission mailed a copy of the
Notice of Availability to federal, state,
and local government representatives
and agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. The EIS is only available in
electronic format. It may be viewed and
downloaded from the FERC’s website
(www.ferc.gov), on the Environmental
Documents page (https://www.ferc.gov/
industries/gas/enviro/eis.asp). In
addition, the final EIS may be accessed
by using the eLibrary link on the FERC’s
website. Click on the eLibrary link
(https://www.ferc.gov/docs-filing/
elibrary.asp), click on General Search,
and enter the docket number in the
‘‘Docket Number’’ field, excluding the
last three digits (i.e., CP17–41). Be sure
you have selected an appropriate date
range. For assistance, please contact
FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659.
Questions?
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
VerDate Sep<11>2014
17:37 Apr 17, 2019
Jkt 247001
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Dated: April 12, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–07749 Filed 4–17–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2835–009.
Applicants: Google Energy LLC.
Description: Erratum to December 18,
2018 Triennial Market Power Analysis
for the SPP Region of Google Energy
LLC.
Filed Date: 4/9/19.
Accession Number: 20190409–5161.
Comments Due: 5 p.m. ET 4/30/19.
Docket Numbers: ER16–120–008.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
Compliance: physical withholding
determinations—generator deactivation
process to be effective 7/23/2018.
Filed Date: 4/10/19.
Accession Number: 20190410–5143.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19–1541–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Supplement to April 9,
2019 Pre-Arranged/Pre-Agreed
(Stipulation and Offer of Settlement)
Filing, et al. of the Midcontinent
Independent System Operator, Inc., et
al.
Filed Date: 4/10/19.
Accession Number: 20190410–5088.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19–1542–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–04–09 Bid Generation Exemption
Amendment—Request Expedited
Treatment to be effective 4/1/2019.
Filed Date: 4/9/19.
Accession Number: 20190409–5125.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
16255
Comments Due: 5 p.m. ET 4/23/19.
Docket Numbers: ER19–1543–000.
Applicants: Virginia Electric and
Power Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Dominion submits revisions to OATT,
Att. H–16C re: 2018 Actual OPEB
Expenses to be effective 6/15/2019.
Filed Date: 4/10/19.
Accession Number: 20190410–5028.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19–1544–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits an ECSA, Service
Agreement No. 5270 with PPL Electric
to be effective 6/9/2019.
Filed Date: 4/10/19.
Accession Number: 20190410–5051.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19–1545–000.
Applicants: American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ATSI submits Revised Interconnection
Agreement (IA) SA No. 3994 to be
effective 6/9/2019.
Filed Date: 4/10/19.
Accession Number: 20190410–5054.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19–1546–000.
Applicants: PJM Interconnection,
L.L.C., American Transmission Systems,
Incorporated.
Description: § 205(d) Rate Filing:
ATSI submits an ECSA, Service
Agreement No. 5277 with Cleveland
Electric to be effective 6/9/2019.
Filed Date: 4/10/19.
Accession Number: 20190410–5101.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19–1547–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: IFA
& DSA Rincon Project SA Nos. 1077 and
1078 to be effective 6/10/2019.
Filed Date: 4/10/19.
Accession Number: 20190410–5110.
Comments Due: 5 p.m. ET 5/1/19.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH19–9–000.
Applicants: KeyCorp.
Description: FERC 65–B Notice of
Material Change in Facts of Waiver
Notification.
Filed Date: 4/10/19.
Accession Number: 20190410–5076.
Comments Due: 5 p.m. ET 5/1/19.
The filings are accessible in the
Commission’s eLibrary system by
E:\FR\FM\18APN1.SGM
18APN1
16256
Federal Register / Vol. 84, No. 75 / Thursday, April 18, 2019 / Notices
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 10, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–07772 Filed 4–17–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–118–000]
jbell on DSK30RV082PROD with NOTICES
Notice of Application: Trans-Foreland
Pipeline Company LLC
Take notice that on March 29, 2019,
Trans-Foreland Pipeline Company LLC
(Trans-Foreland), 539 South Main
Street, Findlay, Ohio 45840 filed an
application in Docket No. CP19–118–
000 pursuant to section 3(a) of the
Natural Gas Act (NGA) and Part 153 of
the Commission’s regulations requesting
authorization to construct and install
modifications to the existing Kenai LNG
Plant located in Kenai, Alaska. TransForeland proposes to make facility
modifications to bring parts of Kenai
LNG Plant out of its current warm idle
status and add a 1,000 horsepower
electric-driven boil-off gas compressor
unit. Trans-Foreland avers that Kenai
LNG Plant facilities will not be used to
render any transportation service, as
more fully described in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the web at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
VerDate Sep<11>2014
17:37 Apr 17, 2019
Jkt 247001
Any questions regarding this
application should be directed to Martin
J. Marz, Tariff Manager, Tesoro Logistics
GP LLC, 19100 Ridgewood Parkway,
San Antonio, Texas 78259, by telephone
at (210) 626–6517, by facsimile at (205)
623–2396, or by email at martin.j.marz@
andeavor.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made in the
proceeding with the Commission and
must provide a copy to the applicant
and to every other party. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
PO 00000
Frm 00018
Fmt 4703
Sfmt 9990
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new NGA section 3 or section 7
proceeding.1 Persons desiring to become
a party to a certificate proceeding are to
intervene in a timely manner. If seeking
to intervene out-of-time, the movant is
required to show good cause why the
time limitation should be waived, and
should provide justification by reference
to factors set forth in Rule 214(d)(1) of
the Commission’s Rules and
Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 3 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE, Washington, DC
20426.
Comment Date: May 3, 2019.
Dated: April 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–07744 Filed 4–17–19; 8:45 am]
BILLING CODE 6717–01–P
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC 61,167 at 50 (2018).
2 18 CFR 385.214(d)(1).
E:\FR\FM\18APN1.SGM
18APN1
Agencies
[Federal Register Volume 84, Number 75 (Thursday, April 18, 2019)]
[Notices]
[Pages 16255-16256]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07772]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2835-009.
Applicants: Google Energy LLC.
Description: Erratum to December 18, 2018 Triennial Market Power
Analysis for the SPP Region of Google Energy LLC.
Filed Date: 4/9/19.
Accession Number: 20190409-5161.
Comments Due: 5 p.m. ET 4/30/19.
Docket Numbers: ER16-120-008.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: Compliance: physical withholding
determinations--generator deactivation process to be effective 7/23/
2018.
Filed Date: 4/10/19.
Accession Number: 20190410-5143.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19-1541-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Supplement to April 9, 2019 Pre-Arranged/Pre-Agreed
(Stipulation and Offer of Settlement) Filing, et al. of the
Midcontinent Independent System Operator, Inc., et al.
Filed Date: 4/10/19.
Accession Number: 20190410-5088.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19-1542-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-04-09 Bid Generation
Exemption Amendment--Request Expedited Treatment to be effective 4/1/
2019.
Filed Date: 4/9/19.
Accession Number: 20190409-5125.
Comments Due: 5 p.m. ET 4/23/19.
Docket Numbers: ER19-1543-000.
Applicants: Virginia Electric and Power Company, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Dominion submits revisions
to OATT, Att. H-16C re: 2018 Actual OPEB Expenses to be effective 6/15/
2019.
Filed Date: 4/10/19.
Accession Number: 20190410-5028.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19-1544-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: MAIT submits an ECSA,
Service Agreement No. 5270 with PPL Electric to be effective 6/9/2019.
Filed Date: 4/10/19.
Accession Number: 20190410-5051.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19-1545-000.
Applicants: American Transmission Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ATSI submits Revised
Interconnection Agreement (IA) SA No. 3994 to be effective 6/9/2019.
Filed Date: 4/10/19.
Accession Number: 20190410-5054.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19-1546-000.
Applicants: PJM Interconnection, L.L.C., American Transmission
Systems, Incorporated.
Description: Sec. 205(d) Rate Filing: ATSI submits an ECSA,
Service Agreement No. 5277 with Cleveland Electric to be effective 6/9/
2019.
Filed Date: 4/10/19.
Accession Number: 20190410-5101.
Comments Due: 5 p.m. ET 5/1/19.
Docket Numbers: ER19-1547-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: IFA & DSA Rincon Project SA
Nos. 1077 and 1078 to be effective 6/10/2019.
Filed Date: 4/10/19.
Accession Number: 20190410-5110.
Comments Due: 5 p.m. ET 5/1/19.
Take notice that the Commission received the following public
utility holding company filings:
Docket Numbers: PH19-9-000.
Applicants: KeyCorp.
Description: FERC 65-B Notice of Material Change in Facts of Waiver
Notification.
Filed Date: 4/10/19.
Accession Number: 20190410-5076.
Comments Due: 5 p.m. ET 5/1/19.
The filings are accessible in the Commission's eLibrary system by
[[Page 16256]]
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 10, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-07772 Filed 4-17-19; 8:45 am]