Combined Notice of Filings #1, 16251-16253 [2019-07756]
Download as PDF
Federal Register / Vol. 84, No. 75 / Thursday, April 18, 2019 / Notices
State Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Beaver Falls Municipal District as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Beaver Falls Municipal District
filed a Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at ferconlineSupport@ferc.gov,
(866) 208–3676 (toll free), or (202) 502–
8659 (TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 3451.
Pursuant to 18 CFR 16.8, 16.9, and
16.10, each application for a new
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by July 31, 2022.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: April 11, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–07743 Filed 4–17–19; 8:45 am]
jbell on DSK30RV082PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:37 Apr 17, 2019
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14983–000]
Tomlin Energy LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 19, 2019, Tomlin Energy
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Closed Loop Pumped Storage Project
(project) to be located on the Kiamichi
River, in Pushmataha County,
Oklahoma. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A 2,050-foot-long,
200-foot-high earth embankment upper
dam; (2) an upper reservoir with a
surface area of 100 acres and a storage
capacity of 10,000 acre-feet; (3) a 8,200foot-long, 32-foot-diameter tunnel
connecting the upper and lower
reservoirs with a; (4) a pumping station/
powerhouse containing four pump/
generating units with a total capacity of
1,200 megawatts; (5) a 7,600-foot-long,
40-foot-high earth embankment lower
dam with a 300-foot-wide emergency
spillway and channel to the
impoundment pond; (6) a lower
reservoir with a surface area of 200
acres, and a storage capacity of 28,000
acre-feet; (7) two 1,000-foot-long pipes,
with a pump station structure, from the
lower reservoir to an impoundment
pond; (8) an impoundment pond with a
surface area of 30 acres, and a storage
capacity of 1,800 acre-feet, which will
fill with periodic overflow from the
Kiamichi River; and (9) a 46-mile-long
transmission line to the Tenaska
Kiamichi Generation Station, then an
85-mile-long transmission line to the
Luminant Valley Power Plant.
The proposed project would have an
estimated average annual generation of
4,200,000 megawatt-hours.
Applicant Contact: Mr. Daniel O.
Tomlin III, 4265 Kellway Circle
Addison, Texas 75001; phone: (972)
239–0707.
FERC Contact: Michael Spencer, (202)
502–6093, michael.spencer@ferc.gov.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
16251
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
Days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14983–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the eLibrary
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14983) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: April 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–07747 Filed 4–17–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–2118–001;
ER10–1846–009; ER10–1849–015;
ER10–1852–021; ER10–1855–009;
ER10–1887–015; ER10–1920–017;
ER10–1928–017; ER10–1952–015;
ER10–1961–015; ER10–1994–009;
ER10–1995–010; ER10–2551–010;
ER10–2720–017; ER11–2642–010;
ER11–4428–017; ER11–4462–030;
ER12–1228–017; ER12–1880–016;
ER12–2227–015; ER12–569–016; ER12–
895–015; ER13–2474–011; ER13–712–
017; ER14–2707–012; ER14–2708–013;
E:\FR\FM\18APN1.SGM
18APN1
jbell on DSK30RV082PROD with NOTICES
16252
Federal Register / Vol. 84, No. 75 / Thursday, April 18, 2019 / Notices
ER14–2709–012; ER14–2710–012;
ER15–1925–009; ER15–2676–008;
ER15–30–010; ER15–58–010; ER16–
1440–006; ER16–1672–006; ER16–2190–
005; ER16–2191–005; ER16–2240–006;
ER16–2241–005; ER16–2275–005;
ER16–2276–005; ER16–2297–005;
ER16–2453–006; ER17–2152–002;
ER17–838–005; ER18–1981–001; ER18–
2003–001; ER18–2032–001; ER18–2066–
001; ER18–2067–002; ER18–2182–001;
ER18–2314–002; ER18–882–001.
Applicants: Armadillo Flats Wind
Project, LLC, Baldwin Wind, LLC,
Blackwell Wind, LLC, Brady
Interconnection, LLC, Brady Wind, LLC,
Brady Wind II, LLC, Breckinridge Wind
Project, LLC, Cedar Bluff Wind, LLC,
Chaves County Solar, LLC, Cimarron
Wind Energy, LLC, Cottonwood Wind
Project, LLC, Day County Wind, LLC,
Elk City Wind, LLC, Elk City
Renewables II, LLC, Ensign Wind, LLC,
Florida Power & Light Company, FPL
Energy Burleigh County Wind, LLC, FPL
Energy Cowboy Wind, LLC, FPL Energy
Oklahoma Wind, LLC, FPL Energy
Sooner Wind, LLC, FPL Energy South
Dakota Wind, LLC, Gray County Wind
Energy, LLC, High Majestic Wind
Energy Center, LLC, High Majestic Wind
II, LLC, Kingman Wind Energy I, LLC,
Kingman Wind Energy II, LLC, Lorenzo
Wind, LLC, Mammoth Plains Wind
Project, LLC, Minco Wind, LLC, Minco
Wind II, LLC, Minco Wind III, LLC,
Minco Wind Interconnection Services,
LLC, Minco Wind IV, LLC, Minco IV &
V Interconnection, LLC, Minco Wind V,
LLC, Ninnescah Wind Energy, LLC,
Osborn Wind Energy, LLC, Palo Duro
Wind Energy, LLC, Palo Duro Wind
Interconnection Services, LLC, Pratt
Wind, LLC, Roswell Solar, LLC, Rush
Springs Wind Energy, LLC, Seiling
Wind, LLC, Seiling Wind II, LLC,
Seiling Wind Interconnection Services,
LLC, Sholes Wind Energy, LLC, Steele
Flats Wind Project, LLC, Wessington
Wind Energy Center, LLC, Wildcat
Ranch Wind Project, LLC, Wilton Wind
II, LLC, NEPM II, LLC, NextEra Energy
Marketing, LLC.
Description: Amendment to December
28, 2018 Triennial Market Power
Update for the Southwest Power Pool,
Inc. Region of the NextEra Companies.
Filed Date: 4/12/19.
Accession Number: 20190412–5082.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER18–2337–003.
Applicants: Blackstone Wind Farm,
LLC.
Description: Compliance filing:
Compliance filing from April Order to
be effective 10/28/2018.
Filed Date: 4/12/19.
Accession Number: 20190412–5008.
VerDate Sep<11>2014
17:37 Apr 17, 2019
Jkt 247001
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19–605–003.
Applicants: Republic Transmission,
LLC.
Description: Tariff Amendment:
Republic Transmission, LLC Deficiency
Filing ER19–605 to be effective 2/26/
2019.
Filed Date: 4/12/19.
Accession Number: 20190412–5142.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19–1561–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–04–11 RDRR Dispatch
Clarification Amendment to be effective
6/11/2019.
Filed Date: 4/11/19.
Accession Number: 20190411–5142.
Comments Due: 5 p.m. ET 5/2/19.
Docket Numbers: ER19–1562–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–04–11 RAAIM Exempted Outages
Amendment to be effective 6/17/2019.
Filed Date: 4/11/19.
Accession Number: 20190411–5149.
Comments Due: 5 p.m. ET 5/2/19.
Docket Numbers: ER19–1563–000.
Applicants: Consolidated Edison
Company of New York, Inc.
Description: § 205(d) Rate Filing:
Energy Storage Filing 4–11–2019 to be
effective 4/24/2019.
Filed Date: 4/12/19.
Accession Number: 20190412–5001.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19–1564–000.
Applicants: Spruance Genco, LLC.
Description: Petition for Limited
Waiver of Tariff Deadlines, et al. of
Spruance Genco, LLC.
Filed Date: 4/11/19.
Accession Number: 20190411–5163.
Comments Due: 5 p.m. ET 5/2/19.
Docket Numbers: ER19–1565–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: Notice of Cancellation of
Conforming Service Agreements (AEP
SA Nos. 17 and 162) of Duke Energy
Carolinas, LLC.
Filed Date: 4/12/19.
Accession Number: 20190412–5047.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19–1566–000.
Applicants: Duke Energy Florida,
LLC.
Description: Notice of Cancellation of
Conforming Service Agreement (SA No.
999C) of Duke Energy Florida, LLC.
Filed Date: 4/12/19.
Accession Number: 20190412–5048.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19–1567–000.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Applicants: Duke Energy Beckjord,
LLC.
Description: Tariff Cancellation: Duke
Energy Beckjord Tariff Cancellation to
be effective 6/12/2019.
Filed Date: 4/12/19.
Accession Number: 20190412–5190.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19–1568–000.
Applicants: Duke Energy SAM, LLC.
Description: Tariff Cancellation:
Cancellation of Tariff ID to be effective
6/12/2019.
Filed Date: 4/12/19.
Accession Number: 20190412–5193.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19–1569–000.
Applicants: Virginia Electric and
Power Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Dominion submits revisions to OATT,
Att. H–16A re: M&S Inventory
Component to be effective 6/15/2019.
Filed Date: 4/12/19.
Accession Number: 20190412–5198.
Comments Due: 5 p.m. ET 5/3/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–20–000.
Applicants: Monongahela Power
Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue or Borrow
Securities, et al. of Monongahela Power
Company.
Filed Date: 4/11/19.
Accession Number: 20190411–5161.
Comments Due: 5 p.m. ET 5/2/19.
Docket Numbers: ES19–21–000.
Applicants: DTE Electric Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of DTE
Electric Company.
Filed Date: 4/12/19.
Accession Number: 20190412–5094.
Comments Due: 5 p.m. ET 5/3/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
E:\FR\FM\18APN1.SGM
18APN1
16253
Federal Register / Vol. 84, No. 75 / Thursday, April 18, 2019 / Notices
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 12, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–07756 Filed 4–17–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12726–002]
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments:
Warm Springs Hydro, LLC
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original
Minor license.
b. Project No.: 12726–002.
c. Date filed: April 1, 2019.
d. Applicant: Warm Springs Hydro,
LLC.
e. Name of Project: Rock Creek
Hydroelectric Project.
f. Location: The Rock Creek
Hydroelectric Project is located on Rock
Creek in Haines County, Oregon. The
project would occupy 1.8 acres of the
Wallowa Whitman National Forest,
which is administered by the US Forest
Service.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Nicholas E.
Josten, GeoSense, 2742 Saint Charles
Avenue, Idaho Falls, ID 43404, (208)
528–6152.
i. FERC Contact: Kelly Wolcott, (202)
502–6480, kelly.wolcott@ferc.gov.
j. The application is not ready for
environmental analysis at this time.
k. The proposed project would consist
of: (1) A new diversion and fish screen
on Rock Creek; (2) a new 8,300-footlong, 18–24 inch-diameter low-pressure
penstock, to be buried in an existing
flume right-of-way and ending at the top
of the ridge above the powerhouse site;
(3) a new 3,100-foot-long, 20 to 24-inchdiameter high-pressure penstock,
extending from the end of the lowpressure penstock to the new
powerhouse; (4) a new approximately
20-foot-long, 15-foot-wide powerhouse,
located adjacent to Rock Creek just
above the existing Wilcox Ditch
diversion, containing a single 0.85megawatt (MW) Pelton turbine; (5) a
new 500-foot-long 12.5-kV transmission
line to deliver energy from the
powerhouse to an Oregon Trail Electric
Consumers Cooperative distribution
line; and (6) appurtenant facilities. The
estimated average annual generation
would be 3,900-megawatt hours (MWh).
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural schedule:
The application will be processed
according to the following preliminary
schedule. Revisions to the schedule will
be made as appropriate.
Milestone
Target Date
Notice of Acceptance/Notice of Ready for Environmental Analysis ..........................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .......................
Commission issues Non-Draft Environmental Assessment (EA) ..............................................................
Comments on EA .......................................................................................................................................
Modified terms and conditions ...................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: April 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–07746 Filed 4–17–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSK30RV082PROD with NOTICES
[Docket Nos. CP19–125–000]
Gulf South Pipeline Company, LP;
Notice of Application
Take notice that on March 29, 2019,
2018, Gulf South Pipeline Company, LP
(Gulf South) 9 Greenway Plaza, Suite
VerDate Sep<11>2014
17:37 Apr 17, 2019
Jkt 247001
2800, Houston, Texas 77046, filed in
Docket No. CP19–125–000, an
application pursuant to section 7(c) and
7(e) of the Natural Gas Act and Part 157
of the Commission’s regulations to
construct and maintain the 99
Expansion Project, a new pipeline and
auxiliary facilities, located in San
Augustine and Sabine Counties, Texas,
and Bienville Parish, Louisiana.
Specifically, Gulf South proposes to
construct (i) approximately 22 miles of
30-inch diameter natural gas pipeline in
San Augustine and Sabine Counties,
Texas and (ii) other auxiliary
appurtenant facilities at both the
existing Hall Summit Compressor
Station in Bienville Parish, Louisiana
and the Magasco Compressor Station in
Sabine County, Texas. The proposed
project will allow Gulf South to provide
up to 500,000 dekatherm per day of new
natural gas supply from the Shelby
Trough in east Texas to existing
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
July 2019.
September 2019.
March 2020.
April 2020.
June 2020.
interconnects, all as more fully set forth
in the application, which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Juan
Eligio Jr., Supervisor Regulatory Affairs,
Gulf South Pipeline Company, LP, 9
Greenway Plaza, Suite 2800, Houston,
Texas 77046, by telephone (713) 479–
3480, or by email juan.eligio@
bwpmplp.com or Payton Barrientos,
Senior Regulatory Analyst, Gulf South
Pipeline Company, LP, 9 Greenway
Plaza, Suite 2800, Houston, Texas
E:\FR\FM\18APN1.SGM
18APN1
Agencies
[Federal Register Volume 84, Number 75 (Thursday, April 18, 2019)]
[Notices]
[Pages 16251-16253]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07756]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-2118-001; ER10-1846-009; ER10-1849-015; ER10-
1852-021; ER10-1855-009; ER10-1887-015; ER10-1920-017; ER10-1928-017;
ER10-1952-015; ER10-1961-015; ER10-1994-009; ER10-1995-010; ER10-2551-
010; ER10-2720-017; ER11-2642-010; ER11-4428-017; ER11-4462-030; ER12-
1228-017; ER12-1880-016; ER12-2227-015; ER12-569-016; ER12-895-015;
ER13-2474-011; ER13-712-017; ER14-2707-012; ER14-2708-013;
[[Page 16252]]
ER14-2709-012; ER14-2710-012; ER15-1925-009; ER15-2676-008; ER15-30-
010; ER15-58-010; ER16-1440-006; ER16-1672-006; ER16-2190-005; ER16-
2191-005; ER16-2240-006; ER16-2241-005; ER16-2275-005; ER16-2276-005;
ER16-2297-005; ER16-2453-006; ER17-2152-002; ER17-838-005; ER18-1981-
001; ER18-2003-001; ER18-2032-001; ER18-2066-001; ER18-2067-002; ER18-
2182-001; ER18-2314-002; ER18-882-001.
Applicants: Armadillo Flats Wind Project, LLC, Baldwin Wind, LLC,
Blackwell Wind, LLC, Brady Interconnection, LLC, Brady Wind, LLC, Brady
Wind II, LLC, Breckinridge Wind Project, LLC, Cedar Bluff Wind, LLC,
Chaves County Solar, LLC, Cimarron Wind Energy, LLC, Cottonwood Wind
Project, LLC, Day County Wind, LLC, Elk City Wind, LLC, Elk City
Renewables II, LLC, Ensign Wind, LLC, Florida Power & Light Company,
FPL Energy Burleigh County Wind, LLC, FPL Energy Cowboy Wind, LLC, FPL
Energy Oklahoma Wind, LLC, FPL Energy Sooner Wind, LLC, FPL Energy
South Dakota Wind, LLC, Gray County Wind Energy, LLC, High Majestic
Wind Energy Center, LLC, High Majestic Wind II, LLC, Kingman Wind
Energy I, LLC, Kingman Wind Energy II, LLC, Lorenzo Wind, LLC, Mammoth
Plains Wind Project, LLC, Minco Wind, LLC, Minco Wind II, LLC, Minco
Wind III, LLC, Minco Wind Interconnection Services, LLC, Minco Wind IV,
LLC, Minco IV & V Interconnection, LLC, Minco Wind V, LLC, Ninnescah
Wind Energy, LLC, Osborn Wind Energy, LLC, Palo Duro Wind Energy, LLC,
Palo Duro Wind Interconnection Services, LLC, Pratt Wind, LLC, Roswell
Solar, LLC, Rush Springs Wind Energy, LLC, Seiling Wind, LLC, Seiling
Wind II, LLC, Seiling Wind Interconnection Services, LLC, Sholes Wind
Energy, LLC, Steele Flats Wind Project, LLC, Wessington Wind Energy
Center, LLC, Wildcat Ranch Wind Project, LLC, Wilton Wind II, LLC, NEPM
II, LLC, NextEra Energy Marketing, LLC.
Description: Amendment to December 28, 2018 Triennial Market Power
Update for the Southwest Power Pool, Inc. Region of the NextEra
Companies.
Filed Date: 4/12/19.
Accession Number: 20190412-5082.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER18-2337-003.
Applicants: Blackstone Wind Farm, LLC.
Description: Compliance filing: Compliance filing from April Order
to be effective 10/28/2018.
Filed Date: 4/12/19.
Accession Number: 20190412-5008.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19-605-003.
Applicants: Republic Transmission, LLC.
Description: Tariff Amendment: Republic Transmission, LLC
Deficiency Filing ER19-605 to be effective 2/26/2019.
Filed Date: 4/12/19.
Accession Number: 20190412-5142.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19-1561-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-04-11 RDRR Dispatch
Clarification Amendment to be effective 6/11/2019.
Filed Date: 4/11/19.
Accession Number: 20190411-5142.
Comments Due: 5 p.m. ET 5/2/19.
Docket Numbers: ER19-1562-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-04-11 RAAIM Exempted
Outages Amendment to be effective 6/17/2019.
Filed Date: 4/11/19.
Accession Number: 20190411-5149.
Comments Due: 5 p.m. ET 5/2/19.
Docket Numbers: ER19-1563-000.
Applicants: Consolidated Edison Company of New York, Inc.
Description: Sec. 205(d) Rate Filing: Energy Storage Filing 4-11-
2019 to be effective 4/24/2019.
Filed Date: 4/12/19.
Accession Number: 20190412-5001.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19-1564-000.
Applicants: Spruance Genco, LLC.
Description: Petition for Limited Waiver of Tariff Deadlines, et
al. of Spruance Genco, LLC.
Filed Date: 4/11/19.
Accession Number: 20190411-5163.
Comments Due: 5 p.m. ET 5/2/19.
Docket Numbers: ER19-1565-000.
Applicants: Duke Energy Carolinas, LLC.
Description: Notice of Cancellation of Conforming Service
Agreements (AEP SA Nos. 17 and 162) of Duke Energy Carolinas, LLC.
Filed Date: 4/12/19.
Accession Number: 20190412-5047.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19-1566-000.
Applicants: Duke Energy Florida, LLC.
Description: Notice of Cancellation of Conforming Service Agreement
(SA No. 999C) of Duke Energy Florida, LLC.
Filed Date: 4/12/19.
Accession Number: 20190412-5048.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19-1567-000.
Applicants: Duke Energy Beckjord, LLC.
Description: Tariff Cancellation: Duke Energy Beckjord Tariff
Cancellation to be effective 6/12/2019.
Filed Date: 4/12/19.
Accession Number: 20190412-5190.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19-1568-000.
Applicants: Duke Energy SAM, LLC.
Description: Tariff Cancellation: Cancellation of Tariff ID to be
effective 6/12/2019.
Filed Date: 4/12/19.
Accession Number: 20190412-5193.
Comments Due: 5 p.m. ET 5/3/19.
Docket Numbers: ER19-1569-000.
Applicants: Virginia Electric and Power Company, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Dominion submits revisions
to OATT, Att. H-16A re: M&S Inventory Component to be effective 6/15/
2019.
Filed Date: 4/12/19.
Accession Number: 20190412-5198.
Comments Due: 5 p.m. ET 5/3/19.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES19-20-000.
Applicants: Monongahela Power Company.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue or Borrow Securities, et al. of Monongahela
Power Company.
Filed Date: 4/11/19.
Accession Number: 20190411-5161.
Comments Due: 5 p.m. ET 5/2/19.
Docket Numbers: ES19-21-000.
Applicants: DTE Electric Company.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of DTE Electric Company.
Filed Date: 4/12/19.
Accession Number: 20190412-5094.
Comments Due: 5 p.m. ET 5/3/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests,
[[Page 16253]]
service, and qualifying facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information,
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: April 12, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-07756 Filed 4-17-19; 8:45 am]