point; however, if a written statement is
not received at least three calendar days
prior to the meeting, which is the
subject of this notice, then it may not be
provided to or considered by the DSB
until a later date.
Dated: April 12, 2019.
Aaron T. Siegel,
Alternate OSD Federal Register Liaison
Officer, Department of Defense.
[FR Doc. 2019–07755 Filed 4–17–19; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF DEFENSE
Department of the Navy
Notice of Extension of Public
Comment Period for the Draft
Supplemental Environmental Impact
Statement/Overseas Environmental
Impact Statement for Northwest
Training and Testing
Department of the Navy, DoD.
ACTION: Notice.
AGENCY:
A notice of public meetings
was published in the Federal Register
by the Department of the Navy on
March 29, 2019 for the Draft
Supplemental Environmental Impact
Statement/Overseas Environmental
Impact Statement (EIS/OEIS) for the
Northwest Training and Testing
(NWTT) Study Area.
DATES: This notice announces a 15-day
extension of the public comment period
from May 28, 2019, to June 12, 2019.
ADDRESSES: Comments may be mailed to
Naval Facilities Engineering Command
Northwest, Attention: NWTT
Supplemental EIS/OEIS Project
Manager, 3730 N. Charles Porter
Avenue, Building 385, Oak Harbor, WA
98278–3500, or electronically via the
project website at www.NWTTEIS.com.
All comments submitted during the
public comment period will become
part of the public record and substantive
comments will be addressed in the Final
Supplemental EIS/OEIS. All comments
must be postmarked or received online
by June 12, 2019, Pacific Standard Time,
for consideration in the Final
Supplemental EIS/OEIS.
Naval Facilities Engineering
Command Northwest, Attention: NWTT
Supplemental EIS/OEIS Project
Manager, 3730 N. Charles Porter
Avenue, Building 385, Oak Harbor, WA
98278–3500.
SUPPLEMENTARY INFORMATION: The Draft
Supplemental EIS/OEIS was distributed
to federal agencies and federally
recognized tribes, with which the DoN
consulted. Copies of the Draft
Supplemental EIS/OEIS are available for
jbell on DSK30RV082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:37 Apr 17, 2019
Jkt 247001
public review at the following public
locations:
1. Everett Main Library, 2702 Hoyt
Avenue, Everett, WA 98201–3506.
2. Gig Harbor Library, 4424 Point
Fosdick Drive NW, Gig Harbor, WA
98335–1700.
3. Jefferson County Library, Port
Hadlock, 620 Cedar Avenue, Port
Hadlock, WA 98339–5001.
4. Kitsap Regional Library, Poulsbo,
700 NE Lincoln Road, Poulsbo, WA
98370–7688.
5. Kitsap Regional Library, Sylvan
Way (Bremerton), 1301 Sylvan Way,
Bremerton, WA 98310–3466.
6. North Olympic Library System,
Forks Branch, 171 S. Forks Avenue,
Forks, WA 98331–9023.
7. Lopez Island Library, 2225
Fisherman Bay Road, Lopez Island, WA
98261–8676.
8. Oak Harbor Public Library, 1000 SE
Regatta Drive, Oak Harbor, WA 98277–
3091.
9. Port Angeles Main Library, 2210 S.
Peabody Street, Port Angeles, WA
98362–6536.
10. Port Townsend Public Library,
1220 Lawrence Street, Port Townsend,
WA 98368–6527.
11. San Juan Island Library, 1010
Guard Street, Friday Harbor, WA
98250–9240.
12. Timberland Regional Library,
Aberdeen, 121 E. Market Street,
Aberdeen, WA 98520–5216.
13. Timberland Regional Library,
Hoquiam, 420 Seventh Street, Hoquiam,
WA 98550–3616.
14. Astoria Public Library, 450 10th
Street, Astoria, OR 97103–4602.
15. Driftwood Public Library, 801 SW
Highway 101 #201, Lincoln City, OR
97367–2720.
16. Newport Public Library, 35 NW
Nye Street, Newport, OR 97365–3714.
17. Oregon State University, Guin
Library Hatfield Marine Science Center,
2030 SE Marine Science Drive,
Newport, OR 97365–5300.
18. Tillamook Main Library, 1716
Third Street, Tillamook, OR 97141–
2124.
19. Fort Bragg Branch Library, 499
Laurel Street, Fort Bragg, CA 95437–
3511.
20. Humboldt County Public Library,
Arcata Branch Library, 500 Seventh
Street, Arcata, CA 95521–6315.
21. Humboldt County Public Library,
Eureka Main Library, 1313 Third Street,
Eureka, CA 95501–0546.
22. Redwood Coast Senior Center, 490
N. Harold Street, Fort Bragg, CA 95437–
3331.
23. Juneau Public Library, Downtown
Branch, 292 Marine Way, Juneau, AK
99801–1361.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
24. Ketchikan Public Library, 1110
Copper Ridge Lane, Ketchikan, AK
99901–6250.
Dated: April 15, 2019.
M.S. Werner,
Commander, Judge Advocate General’s Corps,
U.S. Navy, Federal Register Liaison Officer.
[FR Doc. 2019–07815 Filed 4–17–19; 8:45 am]
BILLING CODE 3810–FF–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3451–001]
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process: Beaver
Falls Municipal District
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 3451–001
c. Date Filed: February 12, 2019
d. Submitted By: Beaver Falls
Municipal District
e. Name of Project: Townsend Water
Power Project
f. Location: On the Beaver River, in
the Borough of New Brighton, Beaver
County, Pennsylvania. No federal lands
are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Applicant Contacts: Roy Stintzi,
Beaver Falls Municipal District, P.O.
Box 400, Beaver Falls, Pennsylvania,
15010; Laura Cowan, Project Manager,
Kleinschmidt Associates, 2 Thornton
Hill, Ossining, New York, 10562, (717)
983–4056, Laura.Cowan@
kleinschmidtgroup.com.
i. FERC Contact: Emily Carter at (202)
502–6512; or email at emily.carter@
ferc.gov.
j. Beaver Falls Municipal District filed
its request to use the Traditional
Licensing Process on February 12, 2019.
Beaver Falls Municipal District
provided public notice of its request on
February 11, 2019. In a letter dated
April 11, 2019, the Director of the
Division of Hydropower Licensing
approved Beaver Falls Municipal
District’s request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service under section 7 of
the Endangered Species Act and the
joint agency regulations thereunder at
50 CFR, part 402. We also are initiating
consultation with the Pennsylvania
E:\FR\FM\18APN1.SGM
18APN1
Federal Register / Vol. 84, No. 75 / Thursday, April 18, 2019 / Notices
State Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Beaver Falls Municipal District as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Beaver Falls Municipal District
filed a Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at ferconlineSupport@ferc.gov,
(866) 208–3676 (toll free), or (202) 502–
8659 (TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 3451.
Pursuant to 18 CFR 16.8, 16.9, and
16.10, each application for a new
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by July 31, 2022.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: April 11, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–07743 Filed 4–17–19; 8:45 am]
jbell on DSK30RV082PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:37 Apr 17, 2019
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14983–000]
Tomlin Energy LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 19, 2019, Tomlin Energy
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Closed Loop Pumped Storage Project
(project) to be located on the Kiamichi
River, in Pushmataha County,
Oklahoma. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A 2,050-foot-long,
200-foot-high earth embankment upper
dam; (2) an upper reservoir with a
surface area of 100 acres and a storage
capacity of 10,000 acre-feet; (3) a 8,200foot-long, 32-foot-diameter tunnel
connecting the upper and lower
reservoirs with a; (4) a pumping station/
powerhouse containing four pump/
generating units with a total capacity of
1,200 megawatts; (5) a 7,600-foot-long,
40-foot-high earth embankment lower
dam with a 300-foot-wide emergency
spillway and channel to the
impoundment pond; (6) a lower
reservoir with a surface area of 200
acres, and a storage capacity of 28,000
acre-feet; (7) two 1,000-foot-long pipes,
with a pump station structure, from the
lower reservoir to an impoundment
pond; (8) an impoundment pond with a
surface area of 30 acres, and a storage
capacity of 1,800 acre-feet, which will
fill with periodic overflow from the
Kiamichi River; and (9) a 46-mile-long
transmission line to the Tenaska
Kiamichi Generation Station, then an
85-mile-long transmission line to the
Luminant Valley Power Plant.
The proposed project would have an
estimated average annual generation of
4,200,000 megawatt-hours.
Applicant Contact: Mr. Daniel O.
Tomlin III, 4265 Kellway Circle
Addison, Texas 75001; phone: (972)
239–0707.
FERC Contact: Michael Spencer, (202)
502–6093, michael.spencer@ferc.gov.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
16251
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
Days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14983–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the eLibrary
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14983) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: April 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–07747 Filed 4–17–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–2118–001;
ER10–1846–009; ER10–1849–015;
ER10–1852–021; ER10–1855–009;
ER10–1887–015; ER10–1920–017;
ER10–1928–017; ER10–1952–015;
ER10–1961–015; ER10–1994–009;
ER10–1995–010; ER10–2551–010;
ER10–2720–017; ER11–2642–010;
ER11–4428–017; ER11–4462–030;
ER12–1228–017; ER12–1880–016;
ER12–2227–015; ER12–569–016; ER12–
895–015; ER13–2474–011; ER13–712–
017; ER14–2707–012; ER14–2708–013;
E:\FR\FM\18APN1.SGM
18APN1
Agencies
[Federal Register Volume 84, Number 75 (Thursday, April 18, 2019)]
[Notices]
[Pages 16250-16251]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07743]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3451-001]
Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approving Use of the Traditional Licensing
Process: Beaver Falls Municipal District
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 3451-001
c. Date Filed: February 12, 2019
d. Submitted By: Beaver Falls Municipal District
e. Name of Project: Townsend Water Power Project
f. Location: On the Beaver River, in the Borough of New Brighton,
Beaver County, Pennsylvania. No federal lands are occupied by the
project works or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Applicant Contacts: Roy Stintzi, Beaver Falls Municipal
District, P.O. Box 400, Beaver Falls, Pennsylvania, 15010; Laura Cowan,
Project Manager, Kleinschmidt Associates, 2 Thornton Hill, Ossining,
New York, 10562, (717) 983-4056, [email protected].
i. FERC Contact: Emily Carter at (202) 502-6512; or email at
[email protected].
j. Beaver Falls Municipal District filed its request to use the
Traditional Licensing Process on February 12, 2019. Beaver Falls
Municipal District provided public notice of its request on February
11, 2019. In a letter dated April 11, 2019, the Director of the
Division of Hydropower Licensing approved Beaver Falls Municipal
District's request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service under section 7 of the Endangered
Species Act and the joint agency regulations thereunder at 50 CFR, part
402. We also are initiating consultation with the Pennsylvania
[[Page 16251]]
State Historic Preservation Officer, as required by section 106,
National Historic Preservation Act, and the implementing regulations of
the Advisory Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Beaver Falls Municipal
District as the Commission's non-federal representative for carrying
out informal consultation pursuant to section 7 of the Endangered
Species Act; and consultation pursuant to section 106 of the National
Historic Preservation Act.
m. Beaver Falls Municipal District filed a Pre-Application Document
(PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the eLibrary link. Enter the docket
number, excluding the last three digits, in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 3451. Pursuant to 18 CFR
16.8, 16.9, and 16.10, each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by July 31,
2022.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: April 11, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-07743 Filed 4-17-19; 8:45 am]
BILLING CODE 6717-01-P