Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process: Beaver Falls Municipal District, 16250-16251 [2019-07743]

Download as PDF 16250 Federal Register / Vol. 84, No. 75 / Thursday, April 18, 2019 / Notices point; however, if a written statement is not received at least three calendar days prior to the meeting, which is the subject of this notice, then it may not be provided to or considered by the DSB until a later date. Dated: April 12, 2019. Aaron T. Siegel, Alternate OSD Federal Register Liaison Officer, Department of Defense. [FR Doc. 2019–07755 Filed 4–17–19; 8:45 am] BILLING CODE 5001–06–P DEPARTMENT OF DEFENSE Department of the Navy Notice of Extension of Public Comment Period for the Draft Supplemental Environmental Impact Statement/Overseas Environmental Impact Statement for Northwest Training and Testing Department of the Navy, DoD. ACTION: Notice. AGENCY: A notice of public meetings was published in the Federal Register by the Department of the Navy on March 29, 2019 for the Draft Supplemental Environmental Impact Statement/Overseas Environmental Impact Statement (EIS/OEIS) for the Northwest Training and Testing (NWTT) Study Area. DATES: This notice announces a 15-day extension of the public comment period from May 28, 2019, to June 12, 2019. ADDRESSES: Comments may be mailed to Naval Facilities Engineering Command Northwest, Attention: NWTT Supplemental EIS/OEIS Project Manager, 3730 N. Charles Porter Avenue, Building 385, Oak Harbor, WA 98278–3500, or electronically via the project website at www.NWTTEIS.com. All comments submitted during the public comment period will become part of the public record and substantive comments will be addressed in the Final Supplemental EIS/OEIS. All comments must be postmarked or received online by June 12, 2019, Pacific Standard Time, for consideration in the Final Supplemental EIS/OEIS. Naval Facilities Engineering Command Northwest, Attention: NWTT Supplemental EIS/OEIS Project Manager, 3730 N. Charles Porter Avenue, Building 385, Oak Harbor, WA 98278–3500. SUPPLEMENTARY INFORMATION: The Draft Supplemental EIS/OEIS was distributed to federal agencies and federally recognized tribes, with which the DoN consulted. Copies of the Draft Supplemental EIS/OEIS are available for jbell on DSK30RV082PROD with NOTICES SUMMARY: VerDate Sep<11>2014 17:37 Apr 17, 2019 Jkt 247001 public review at the following public locations: 1. Everett Main Library, 2702 Hoyt Avenue, Everett, WA 98201–3506. 2. Gig Harbor Library, 4424 Point Fosdick Drive NW, Gig Harbor, WA 98335–1700. 3. Jefferson County Library, Port Hadlock, 620 Cedar Avenue, Port Hadlock, WA 98339–5001. 4. Kitsap Regional Library, Poulsbo, 700 NE Lincoln Road, Poulsbo, WA 98370–7688. 5. Kitsap Regional Library, Sylvan Way (Bremerton), 1301 Sylvan Way, Bremerton, WA 98310–3466. 6. North Olympic Library System, Forks Branch, 171 S. Forks Avenue, Forks, WA 98331–9023. 7. Lopez Island Library, 2225 Fisherman Bay Road, Lopez Island, WA 98261–8676. 8. Oak Harbor Public Library, 1000 SE Regatta Drive, Oak Harbor, WA 98277– 3091. 9. Port Angeles Main Library, 2210 S. Peabody Street, Port Angeles, WA 98362–6536. 10. Port Townsend Public Library, 1220 Lawrence Street, Port Townsend, WA 98368–6527. 11. San Juan Island Library, 1010 Guard Street, Friday Harbor, WA 98250–9240. 12. Timberland Regional Library, Aberdeen, 121 E. Market Street, Aberdeen, WA 98520–5216. 13. Timberland Regional Library, Hoquiam, 420 Seventh Street, Hoquiam, WA 98550–3616. 14. Astoria Public Library, 450 10th Street, Astoria, OR 97103–4602. 15. Driftwood Public Library, 801 SW Highway 101 #201, Lincoln City, OR 97367–2720. 16. Newport Public Library, 35 NW Nye Street, Newport, OR 97365–3714. 17. Oregon State University, Guin Library Hatfield Marine Science Center, 2030 SE Marine Science Drive, Newport, OR 97365–5300. 18. Tillamook Main Library, 1716 Third Street, Tillamook, OR 97141– 2124. 19. Fort Bragg Branch Library, 499 Laurel Street, Fort Bragg, CA 95437– 3511. 20. Humboldt County Public Library, Arcata Branch Library, 500 Seventh Street, Arcata, CA 95521–6315. 21. Humboldt County Public Library, Eureka Main Library, 1313 Third Street, Eureka, CA 95501–0546. 22. Redwood Coast Senior Center, 490 N. Harold Street, Fort Bragg, CA 95437– 3331. 23. Juneau Public Library, Downtown Branch, 292 Marine Way, Juneau, AK 99801–1361. PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 24. Ketchikan Public Library, 1110 Copper Ridge Lane, Ketchikan, AK 99901–6250. Dated: April 15, 2019. M.S. Werner, Commander, Judge Advocate General’s Corps, U.S. Navy, Federal Register Liaison Officer. [FR Doc. 2019–07815 Filed 4–17–19; 8:45 am] BILLING CODE 3810–FF–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3451–001] Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process: Beaver Falls Municipal District a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 3451–001 c. Date Filed: February 12, 2019 d. Submitted By: Beaver Falls Municipal District e. Name of Project: Townsend Water Power Project f. Location: On the Beaver River, in the Borough of New Brighton, Beaver County, Pennsylvania. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Applicant Contacts: Roy Stintzi, Beaver Falls Municipal District, P.O. Box 400, Beaver Falls, Pennsylvania, 15010; Laura Cowan, Project Manager, Kleinschmidt Associates, 2 Thornton Hill, Ossining, New York, 10562, (717) 983–4056, Laura.Cowan@ kleinschmidtgroup.com. i. FERC Contact: Emily Carter at (202) 502–6512; or email at emily.carter@ ferc.gov. j. Beaver Falls Municipal District filed its request to use the Traditional Licensing Process on February 12, 2019. Beaver Falls Municipal District provided public notice of its request on February 11, 2019. In a letter dated April 11, 2019, the Director of the Division of Hydropower Licensing approved Beaver Falls Municipal District’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, part 402. We also are initiating consultation with the Pennsylvania E:\FR\FM\18APN1.SGM 18APN1 Federal Register / Vol. 84, No. 75 / Thursday, April 18, 2019 / Notices State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Beaver Falls Municipal District as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. Beaver Falls Municipal District filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the eLibrary link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online Support at ferconlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502– 8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 3451. Pursuant to 18 CFR 16.8, 16.9, and 16.10, each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by July 31, 2022. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: April 11, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–07743 Filed 4–17–19; 8:45 am] jbell on DSK30RV082PROD with NOTICES BILLING CODE 6717–01–P VerDate Sep<11>2014 17:37 Apr 17, 2019 Jkt 247001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14983–000] Tomlin Energy LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 19, 2019, Tomlin Energy LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Closed Loop Pumped Storage Project (project) to be located on the Kiamichi River, in Pushmataha County, Oklahoma. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 2,050-foot-long, 200-foot-high earth embankment upper dam; (2) an upper reservoir with a surface area of 100 acres and a storage capacity of 10,000 acre-feet; (3) a 8,200foot-long, 32-foot-diameter tunnel connecting the upper and lower reservoirs with a; (4) a pumping station/ powerhouse containing four pump/ generating units with a total capacity of 1,200 megawatts; (5) a 7,600-foot-long, 40-foot-high earth embankment lower dam with a 300-foot-wide emergency spillway and channel to the impoundment pond; (6) a lower reservoir with a surface area of 200 acres, and a storage capacity of 28,000 acre-feet; (7) two 1,000-foot-long pipes, with a pump station structure, from the lower reservoir to an impoundment pond; (8) an impoundment pond with a surface area of 30 acres, and a storage capacity of 1,800 acre-feet, which will fill with periodic overflow from the Kiamichi River; and (9) a 46-mile-long transmission line to the Tenaska Kiamichi Generation Station, then an 85-mile-long transmission line to the Luminant Valley Power Plant. The proposed project would have an estimated average annual generation of 4,200,000 megawatt-hours. Applicant Contact: Mr. Daniel O. Tomlin III, 4265 Kellway Circle Addison, Texas 75001; phone: (972) 239–0707. FERC Contact: Michael Spencer, (202) 502–6093, michael.spencer@ferc.gov. PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 16251 Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 Days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14983–000. More information about this project, including a copy of the application, can be viewed or printed on the eLibrary link of Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14983) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: April 12, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–07747 Filed 4–17–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–2118–001; ER10–1846–009; ER10–1849–015; ER10–1852–021; ER10–1855–009; ER10–1887–015; ER10–1920–017; ER10–1928–017; ER10–1952–015; ER10–1961–015; ER10–1994–009; ER10–1995–010; ER10–2551–010; ER10–2720–017; ER11–2642–010; ER11–4428–017; ER11–4462–030; ER12–1228–017; ER12–1880–016; ER12–2227–015; ER12–569–016; ER12– 895–015; ER13–2474–011; ER13–712– 017; ER14–2707–012; ER14–2708–013; E:\FR\FM\18APN1.SGM 18APN1

Agencies

[Federal Register Volume 84, Number 75 (Thursday, April 18, 2019)]
[Notices]
[Pages 16250-16251]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07743]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3451-001]


Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approving Use of the Traditional Licensing 
Process: Beaver Falls Municipal District

    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process.
    b. Project No.: 3451-001
    c. Date Filed: February 12, 2019
    d. Submitted By: Beaver Falls Municipal District
    e. Name of Project: Townsend Water Power Project
    f. Location: On the Beaver River, in the Borough of New Brighton, 
Beaver County, Pennsylvania. No federal lands are occupied by the 
project works or located within the project boundary.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Applicant Contacts: Roy Stintzi, Beaver Falls Municipal 
District, P.O. Box 400, Beaver Falls, Pennsylvania, 15010; Laura Cowan, 
Project Manager, Kleinschmidt Associates, 2 Thornton Hill, Ossining, 
New York, 10562, (717) 983-4056, [email protected].
    i. FERC Contact: Emily Carter at (202) 502-6512; or email at 
[email protected].
    j. Beaver Falls Municipal District filed its request to use the 
Traditional Licensing Process on February 12, 2019. Beaver Falls 
Municipal District provided public notice of its request on February 
11, 2019. In a letter dated April 11, 2019, the Director of the 
Division of Hydropower Licensing approved Beaver Falls Municipal 
District's request to use the Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service under section 7 of the Endangered 
Species Act and the joint agency regulations thereunder at 50 CFR, part 
402. We also are initiating consultation with the Pennsylvania

[[Page 16251]]

State Historic Preservation Officer, as required by section 106, 
National Historic Preservation Act, and the implementing regulations of 
the Advisory Council on Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating Beaver Falls Municipal 
District as the Commission's non-federal representative for carrying 
out informal consultation pursuant to section 7 of the Endangered 
Species Act; and consultation pursuant to section 106 of the National 
Historic Preservation Act.
    m. Beaver Falls Municipal District filed a Pre-Application Document 
(PAD; including a proposed process plan and schedule) with the 
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's website 
(https://www.ferc.gov), using the eLibrary link. Enter the docket 
number, excluding the last three digits, in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    o. The licensee states its unequivocal intent to submit an 
application for a new license for Project No. 3451. Pursuant to 18 CFR 
16.8, 16.9, and 16.10, each application for a new license and any 
competing license applications must be filed with the Commission at 
least 24 months prior to the expiration of the existing license. All 
applications for license for this project must be filed by July 31, 
2022.
    p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: April 11, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-07743 Filed 4-17-19; 8:45 am]
 BILLING CODE 6717-01-P