New England Hydropower Company, LLC; Notice of Application Accepted for Filing, and Soliciting Motions To Intervene and Protests, 15611-15612 [2019-07534]
Download as PDF
Federal Register / Vol. 84, No. 73 / Tuesday, April 16, 2019 / Notices
125, 626 Cochrans Mill Road,
Pittsburgh, PA 15236–0940; Telephone
412–386–5981 thomas.sarkus@
netl.doe.gov
khammond on DSKBBV9HB2PROD with NOTICES
SUPPLEMENTARY INFORMATION:
Purpose of the Council: The National
Coal Council provides advice and
recommendations to the Secretary of
Energy on general policy matters
relating to coal and the coal industry.
Purpose of Meeting: The National
Coal Council (the Council) will hold a
virtual meeting via webcast at 11:30
a.m.–12:15 p.m. (EST) on May 15th,
2019 for the sole purpose of reviewing
and voting on the following report:
‘‘Coal in a New Carbon Age: Powering
a Wave of Innovation in Advanced
Products and Manufacturing.’’ The
Council membership will be asked to
accept this report and forward it to the
U.S. Secretary of Energy. The draft
report is available on the National Coal
Council website at the following URL:
https://www.nationalcoalcouncil.org/
page-NCC-Studies.html.
Tentative Agenda:
• Call to order by Thomas Sarkus,
NCC Deputy Designated Federal Officer,
Division Director Major Projects,
National Energy Technology Laboratory,
U.S. Department of Energy.
• NCC Report Presentation on ‘‘Coal
in a New Carbon Age: Powering a Wave
of Innovation in Advanced Products and
Manufacturing’’ by report chairs Randall
Atkins, Chairman and Chief Executive,
Ramaco Carbon.
• Public Comment Period & Closing
Remarks.
• Adjourn.
All attendees are requested to register
in advance for the meeting at: https://
www.nationalcoalcouncil.org/pageNCC-Events.html.
Public Participation: The meeting is
open to the public. If you would like to
file a written statement to be read
during the virtual webcast, you may do
so within five calendar days of the
event. Please email your written
statement to Thomas Sarkus at
thomas.sarkus@netl.doe.gov by 5 p.m.
EST on Friday, May 10th. If you would
like to make an oral statement during
the call regarding the reports being
reviewed, you must both register to
attend the webcast and also contact
Thomas Sarkus 412–386–5981 or
thomas.sarkus@netl.doe.gov to state
your desire to speak. You must make
your request for an oral statement by 5
p.m. (EST) on Friday, May 10th.
Reasonable provision will be made to
include oral statements at the
conclusion of the meeting. However,
those who fail to register in advance
may not be accommodated. Oral
VerDate Sep<11>2014
16:32 Apr 15, 2019
Jkt 247001
statements are limited to 5-minutes per
organization and per person.
Minutes: A recording of the call will
be posted on the FACA Database
website: https://facadatabase.gov/
committee/
historymeetings.aspx?cid=408&fy=2017.
Signed in Washington, DC on April 11,
2019.
Antoinette M. Watkins,
Acting Deputy Committee Management
Officer.
[FR Doc. 2019–07556 Filed 4–15–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14633–001]
New England Hydropower Company,
LLC; Notice of Application Accepted
for Filing, and Soliciting Motions To
Intervene and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
From Licensing.
b. Project No.: 14633–001.
c. Date filed: October 1, 2018.
d. Applicant: New England
Hydropower Company, LLC (NEHC).
e. Name of Project: Albion Dam
Hydroelectric Project.
f. Location: On the Blackstone River,
near the Towns of Cumberland and
Lincoln, Providence County, Rhode
Island. No federal or tribal lands would
be occupied by project works or located
within the project boundary.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708 (2012), amended by
the Hydropower Regulatory Efficiency
Act of 2013, Public Law 113–23, 127
Stat. 493 (2013).
h. Applicant Contact: Michael C. Kerr,
100 Cummings Center, Suite 451C,
Beverly, MA 01915; (978) 360–2547 or
email at Michael@neydropower.com.
i. FERC Contact: Patrick Crile, (202)
502–8042, or email at Patrick.Crile@
ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
15611
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–14633–001.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The proposed Albion Dam
Hydroelectric Project would consist of:
(1) An approximately 266-foot-long
existing concrete gravity dam with an
ogee spillway; (2) an existing 20.4-acre
impoundment with a normal storage
capacity of 235 acre-feet at an operating
elevation of approximately 87.0 feet
North American Vertical Datum of 1988;
(3) a new 51-foot-long, 45.75-foot-wide
intake canal; (4) two new 14-foot-wide,
10.4-foot-high hydraulically-powered
sluice gates, each equipped with a 15foot-wide, 9.7-foot-high steel trashrack
with 9-inch clear-bar spacing; (5) two
new 30-foot-long, 15-foot-wide, 9.7-foothigh concrete penstocks; (6) a new 50foot-long, 24-foot-wide, 18-foot-high
concrete powerhouse containing two
210-kilowatt (kW) Archimedes Screw
turbine-generator units, for a total
installed capacity of 420 kW; (7) a new
50-foot-long concrete tailrace; (8) a new
step-up transformer and 500-foot-long,
above-ground transmission line
connecting the project to the
distribution system owned by the
Narragansett Electric Company; (9) a
new access road; and (10) appurtenant
facilities. The existing Albion Dam and
appurtenant works are owned by the
State of Rhode Island.
NEHC proposes to operate the project
in a run-of-river mode with an estimated
annual energy production of
approximately 2,034 megawatt-hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
E:\FR\FM\16APN1.SGM
16APN1
khammond on DSKBBV9HB2PROD with NOTICES
15612
Federal Register / Vol. 84, No. 73 / Tuesday, April 16, 2019 / Notices
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE,’’ ‘‘NOTICE OF
INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
o. Waiver of Pre-filing Consultation:
Based on a review of the application,
resource agency consultation letters,
and comments filed to date, we accept
VerDate Sep<11>2014
16:32 Apr 15, 2019
Jkt 247001
the consultation that has occurred on
this project as satisfying our
requirements for the standard 3-stage
consultation process under 18 CFR 4.38,
and are waiving the requirement to
conduct second stage consultation
pursuant to section 4.38(c)(4) of the
regulations, as requested by NEHC.
Dated: April 10, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–07534 Filed 4–15–19; 8:45 am]
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
Josh
Smeraldi, Office of Resource
Conservation and Recovery (Mail Code
5303P), U.S. Environmental Protection
Agency, 1200 Pennsylvania Ave. NW,
Washington, DC 20460; telephone
number: 703–308–0441; email address:
smeraldi.josh@epa.gov.
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
Supporting documents which explain in
detail the information that the EPA will
ENVIRONMENTAL PROTECTION
be collecting are available in the public
AGENCY
docket for this ICR. The docket can be
[EPA–HQ–OLEM–2018–0305, FRL- 9991–77– viewed online at www.regulations.gov
or in person at the EPA Docket Center,
OLEM]
WJC West, Room 3334, 1301
Agency Information Collection
Constitution Ave. NW, Washington, DC
Activities; Proposed Collection;
20460. The telephone number for the
Comment Request; Guidance for
Docket Center is 202–566–1744. For
Applicants Requesting To Treat/
additional information about EPA’s
Dispose of PCBs Using Incineration or public docket, visit https://www.epa.gov/
an Alternative Method
dockets.
Pursuant to section 3506(c)(2)(A) of
AGENCY: Environmental Protection
the PRA, the EPA is soliciting comments
Agency (EPA).
and information to enable it to: (i)
ACTION: Notice.
Evaluate whether the proposed
SUMMARY: The Environmental Protection collection of information is necessary
for the proper performance of the
Agency (EPA) is planning to submit a
functions of the Agency, including
new information collection request
whether the information will have
(ICR) for Guidance for Applicants
practical utility; (ii) evaluate the
Requesting to Treat/Dispose of PCBs
accuracy of the Agency’s estimate of the
Using Incineration or an Alternative
burden of the proposed collection of
Method (EPA ICR No. 2596.01, OMB
Control No. 2050–NEW) to the Office of information, including the validity of
the methodology and assumptions used;
Management and Budget (OMB) for
review and approval in accordance with (iii) enhance the quality, utility, and
clarity of the information to be
the Paperwork Reduction Act (PRA).
collected; and (iv) minimize the burden
Before doing so, the EPA is soliciting
of the collection of information on those
public comments on specific aspects of
who are to respond, including through
the proposed information collection as
the use of appropriate automated
described below. This is a request of a
electronic, mechanical, or other
new collection. An Agency may not
technological collection techniques or
conduct or sponsor, and a person is not
other forms of information technology,
required to respond to a collection of
e.g., permitting electronic submission of
information, unless it displays a
responses. The EPA will consider the
currently valid OMB control number.
comments received and amend the ICR
DATES: Comments must be submitted on
as appropriate. The final ICR package
or before June 17, 2019.
will then be submitted to OMB for
ADDRESSES: Submit your comments,
review and approval. At that time, the
referencing by Docket ID No. EPA–HQ–
EPA will issue another Federal Register
OLEM–2018–0305, online using
notice to announce the submission of
www.regulations.gov (our preferred
the ICR to OMB and the opportunity to
method), by email to rcra-docket@
submit additional comments to OMB.
epa.gov, or by mail to: EPA Docket
Abstract: Guidance documents were
Center, Environmental Protection
developed in 1986 for persons applying
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW, Washington, DC to EPA for approval to dispose of PCBs
using incineration (§ 761.70) or a
20460.
method alternative to incineration
EPA’s policy is that all comments
(§ 761.60(e)). The guidances are split
received will be included in the public
into two document (thermal and nondocket without change including any
thermal) and they present and discuss
personal information provided, unless
the comment includes profanity, threats, the format, content, and suggested level
BILLING CODE 6717–01–P
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
E:\FR\FM\16APN1.SGM
16APN1
Agencies
[Federal Register Volume 84, Number 73 (Tuesday, April 16, 2019)]
[Notices]
[Pages 15611-15612]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07534]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14633-001]
New England Hydropower Company, LLC; Notice of Application
Accepted for Filing, and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption From Licensing.
b. Project No.: 14633-001.
c. Date filed: October 1, 2018.
d. Applicant: New England Hydropower Company, LLC (NEHC).
e. Name of Project: Albion Dam Hydroelectric Project.
f. Location: On the Blackstone River, near the Towns of Cumberland
and Lincoln, Providence County, Rhode Island. No federal or tribal
lands would be occupied by project works or located within the project
boundary.
g. Filed Pursuant to: Public Utility Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708 (2012), amended by the Hydropower Regulatory
Efficiency Act of 2013, Public Law 113-23, 127 Stat. 493 (2013).
h. Applicant Contact: Michael C. Kerr, 100 Cummings Center, Suite
451C, Beverly, MA 01915; (978) 360-2547 or email at
[email protected].
i. FERC Contact: Patrick Crile, (202) 502-8042, or email at
[email protected].
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The
first page of any filing should include docket number P-14633-001.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
l. The proposed Albion Dam Hydroelectric Project would consist of:
(1) An approximately 266-foot-long existing concrete gravity dam with
an ogee spillway; (2) an existing 20.4-acre impoundment with a normal
storage capacity of 235 acre-feet at an operating elevation of
approximately 87.0 feet North American Vertical Datum of 1988; (3) a
new 51-foot-long, 45.75-foot-wide intake canal; (4) two new 14-foot-
wide, 10.4-foot-high hydraulically-powered sluice gates, each equipped
with a 15-foot-wide, 9.7-foot-high steel trashrack with 9-inch clear-
bar spacing; (5) two new 30-foot-long, 15-foot-wide, 9.7-foot-high
concrete penstocks; (6) a new 50-foot-long, 24-foot-wide, 18-foot-high
concrete powerhouse containing two 210-kilowatt (kW) Archimedes Screw
turbine-generator units, for a total installed capacity of 420 kW; (7)
a new 50-foot-long concrete tailrace; (8) a new step-up transformer and
500-foot-long, above-ground transmission line connecting the project to
the distribution system owned by the Narragansett Electric Company; (9)
a new access road; and (10) appurtenant facilities. The existing Albion
Dam and appurtenant works are owned by the State of Rhode Island.
NEHC proposes to operate the project in a run-of-river mode with an
estimated annual energy production of approximately 2,034 megawatt-
hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available
[[Page 15612]]
for inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application, or a notice of
intent to file such an application. Submission of a timely notice of
intent allows an interested person to file the competing development
application no later than 120 days after the specified intervention
deadline date. Applications for preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Anyone may submit a protest or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210, 385.211, and 385.214. In determining the appropriate action to
take, the Commission will consider all protests filed, but only those
who file a motion to intervene in accordance with the Commission's
Rules may become a party to the proceeding. Any protests or motions to
intervene must be received on or before the specified deadline date for
the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in
the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. Agencies may obtain copies of the application
directly from the applicant. A copy of any protest or motion to
intervene must be served upon each representative of the applicant
specified in the particular application.
o. Waiver of Pre-filing Consultation: Based on a review of the
application, resource agency consultation letters, and comments filed
to date, we accept the consultation that has occurred on this project
as satisfying our requirements for the standard 3-stage consultation
process under 18 CFR 4.38, and are waiving the requirement to conduct
second stage consultation pursuant to section 4.38(c)(4) of the
regulations, as requested by NEHC.
Dated: April 10, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-07534 Filed 4-15-19; 8:45 am]