Combined Notice of Filings #1, 15205-15206 [2019-07360]

Download as PDF Federal Register / Vol. 84, No. 72 / Monday, April 15, 2019 / Notices use https://www.regulations.gov by searching the Docket ID number ED– 2019–ICCD–0050. Comments submitted in response to this notice should be submitted electronically through the Federal eRulemaking Portal at https:// www.regulations.gov by selecting the Docket ID number or via postal mail, commercial delivery, or hand delivery. If the regulations.gov site is not available to the public for any reason, ED will temporarily accept comments at ICDocketMgr@ed.gov. Please include the docket ID number and the title of the information collection request when requesting documents or submitting comments. Please note that comments submitted by fax or email and those submitted after the comment period will not be accepted. Written requests for information or comments submitted by postal mail or delivery should be addressed to the Director of the Information Collection Clearance Division, U.S. Department of Education, 550 12th Street SW, PCP, Room 9089, Washington, DC 20202–0023. For specific questions related to collection activities, please contact Erica Johnson, 202–245–7676. FOR FURTHER INFORMATION CONTACT: The Department of Education (ED), in accordance with the Paperwork Reduction Act of 1995 (PRA) (44 U.S.C. 3506(c)(2)(A)), provides the general public and Federal agencies with an opportunity to comment on proposed, revised, and continuing collections of information. This helps the Department assess the impact of its information collection requirements and minimize the public’s reporting burden. It also helps the public understand the Department’s information collection requirements and provide the requested data in the desired format. ED is soliciting comments on the proposed information collection request (ICR) that is described below. The Department of Education is especially interested in public comment addressing the following issues: (1) Is this collection necessary to the proper functions of the Department; (2) will this information be processed and used in a timely manner; (3) is the estimate of burden accurate; (4) how might the Department enhance the quality, utility, and clarity of the information to be collected; and (5) how might the Department minimize the burden of this collection on the respondents, including through the use of information technology. Please note that written comments received in response to this notice will be considered public records. amozie on DSK9F9SC42PROD with NOTICES SUPPLEMENTARY INFORMATION: VerDate Sep<11>2014 17:16 Apr 12, 2019 Jkt 247001 Title of Collection: Individuals with Disabilities Education Act (IDEA) State and Local Implementation Study 2019. OMB Control Number: 1850–NEW. Type of Review: A new information collection. Respondents/Affected Public: State, Local, and Tribal Governments. Total Estimated Number of Annual Responses: 1,153. Total Estimated Number of Annual Burden Hours: 970. Abstract: The data collection for the Individuals with Disabilities Education Act (IDEA) State and Local Implementation Study 2019 will examine how states, districts, and schools are identifying and supporting children and youth with disabilities. The study is one component of a Congressionally-mandated National Assessment of IDEA. The purpose of this data collection is to develop an up-to-date national picture of how states, districts, and schools are implementing IDEA in order to provide ED, Congress, and other stakeholders with knowledge that can inform the next reauthorization of IDEA and, ultimately, how services are provided to children. This study of IDEA is necessary because a decade has passed since the previous IDEA national implementation study, and subsequent developments may have influenced the context and implementation of special education and early intervention. The surveys will be administered in Fall 2019. All respondents will have the opportunity to complete an electronic survey (or paper survey, if preferred). The survey respondents are described briefly below: State Surveys: The study team will administer three separate electronic surveys that focus on the Part C program for infants and toddlers (administered to the Part C infants and toddlers program coordinator), the Part B program for preschool-age children (administered to the Part B program for preschool-age children coordinator), and the Part B program for school-age children and youth (administered to the special education director). Three surveys are necessary because different state administrators are likely to oversee IDEA programs for children at those different age levels. The state surveys will be administered to the respondents in each of the 61 state-level entities that receive IDEA funding: all 50 states, the District of Columbia, 8 U.S. territories, the Bureau of Indian Education, and the Department of Defense Education Activity. School District Surveys: The study team will administer two separate electronic surveys that focus on the Part PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 15205 B program for preschool-age children (administered to the Part B program for pre-school age children coordinator) and the IDEA Part B program for schoolage children and youth (administered to the special education director). If a district does not have a Part B program for preschool-age children coordinator, the study team will work with the district to identify the survey’s most appropriate respondent, likely someone in the pre-school special education leadership. Two surveys are necessary because different district staff members are likely to oversee IDEA programs for students at those different age levels. The study team will administer the Part B program for preschool-age children survey to a nationally representative sample of 602 school districts and the Part B program for school-age children survey to a nationally representative sample of 665 school districts. (Of the 665 districts selected overall, 63 do not offer pre-kindergarten instruction and are not eligible for the preschool-age district survey.) School Surveys: A single school survey covers the Part B program for school-age children, the Part B program for preschool-age children, the transition from the Part C infants and toddlers program, and transition planning for secondary school students. The school survey will be administered to the school principal or lead special education staff. The study team will administer an electronic survey to a nationally representative sample of 2,750 schools from the 665 selected districts. Dated: April 10, 2019. Stephanie Valentine, PRA Clearance Coordinator, Information Collection Clearance Program, Information Management Branch, Office of the Chief Information Officer. [FR Doc. 2019–07424 Filed 4–12–19; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–76–000. Applicants: Osceola Windpower, LLC, Endeavor Wind I, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of Osceola Windpower, LLC, et al. Filed Date: 4/5/19. E:\FR\FM\15APN1.SGM 15APN1 amozie on DSK9F9SC42PROD with NOTICES 15206 Federal Register / Vol. 84, No. 72 / Monday, April 15, 2019 / Notices Accession Number: 20190405–5190. Comments Due: 5 p.m. ET 4/26/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER15–2594–007; ER17–953–003. Applicants: GridLiance High Plains LLC. Description: Compliance filing of GridLiance High Plains LLC. Filed Date: 4/5/19. Accession Number: 20190405–5197. Comments Due: 5 p.m. ET 4/26/19. Docket Numbers: ER16–505–005. Applicants: GridLiance High Plains LLC. Description: Compliance filing: GridLiance HP Compliance Filing ER16–505 to be effective 4/1/2016. Filed Date: 4/5/19. Accession Number: 20190405–5148. Comments Due: 5 p.m. ET 4/26/19. Docket Numbers: ER18–2401–002. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Further Compliance Filing Concerning Order No. 844 to Amend Effective Date to be effective 1/1/2019. Filed Date: 4/8/19. Accession Number: 20190408–5081. Comments Due: 5 p.m. ET 4/29/19. Docket Numbers: ER19–1530–000. Applicants: NextEra Energy Transmission West, LLC. Description: § 205(d) Rate Filing: Horizon West Transmission, LLC Notice of Succession to be effective 3/13/2019. Filed Date: 4/5/19. Accession Number: 20190405–5147. Comments Due: 5 p.m. ET 4/26/19. Docket Numbers: ER19–1531–000. Applicants: AEP Indiana Michigan Transmission Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: AEP Indiana Michigan submits three Contribution in Aid of Construction Agreement to be effective 3/27/2019. Filed Date: 4/8/19. Accession Number: 20190408–5098. Comments Due: 5 p.m. ET 4/29/19. Docket Numbers: ER19–1532–000. Applicants: GenOn REMA, LLC. Description: § 205(d) Rate Filing: Notice of Succession, Revisions to Reactive Service Rate Schedule to be effective 3/11/2019. Filed Date: 4/8/19. Accession Number: 20190408–5142. Comments Due: 5 p.m. ET 4/29/19. Docket Numbers: ER19–1533–000. Applicants: GenOn Power Midwest, LP. Description: Tariff Cancellation: Request for Administrative Cancellation VerDate Sep<11>2014 17:16 Apr 12, 2019 Jkt 247001 and Request for Waivers to be effective 9/30/2012. Filed Date: 4/8/19. Accession Number: 20190408–5143. Comments Due: 5 p.m. ET 4/29/19. Docket Numbers: ER19–1534–000. Applicants: GenOn Power Midwest, LP. Description: § 205(d) Rate Filing: Notice of Succession and Revisions to Reactive Service Rate Schedule to be effective 3/8/2019. Filed Date: 4/8/19. Accession Number: 20190408–5145. Comments Due: 5 p.m. ET 4/29/19. Docket Numbers: ER19–1535–000. Applicants: Lower Mount Bethel Energy, LLC. Description: Tariff Cancellation: Notice of Cancellation to be effective 4/8/2019. Filed Date: 4/8/19. Accession Number: 20190408–5152. Comments Due: 5 p.m. ET 4/29/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 8, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–07360 Filed 4–12–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings. Docket Numbers: EC19–77–000. Applicants: Public Service Company of Colorado, Twin Eagle Resource Management, LLC. Description: Joint Application for Authorization Under Section 203 of the PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Federal Power Act, et al. of Twin Eagle Resource Management, LLC, et al. Filed Date: 4/8/19. Accession Number: 20190408–5194. Comments Due: 5 p.m. ET 4/29/19. Take notice that the Commission received the following electric rate filings. Docket Numbers: ER18–228–002. Applicants: Southwestern Public Service Company. Description: Compliance filing: SPS Depreciation Settlement Compliance Filing ER18–228 to be effective 1/1/ 2018. Filed Date: 4/8/19. Accession Number: 20190408–5184. Comments Due: 5 p.m. ET 4/29/19. Docket Numbers: ER19–303–001. Applicants: Duquesne Light Company. Description: Compliance Filing of Duquesne Light Company. Filed Date: 3/1/19. Accession Number: 20190301–5399. Comments Due: 5 p.m. ET 4/24/19. Docket Numbers: ER19–478–001. Applicants: FirstEnergy Solutions Corp. Description: Compliance filing: Notice of Effective Date for Rate Schedule FERC No. 1 [ER19–1007] to be effective 3/29/2019. Filed Date: 4/9/19. Accession Number: 20190409–5000. Comments Due: 5 p.m. ET 4/30/19. Docket Numbers: ER19–1127–000. Applicants: Calpine King City Cogen, LLC. Description: Supplement to February 26, 2019 Calpine King City Cogen, LLC tariff filing. Filed Date: 3/26/19. Accession Number: 20190326–5256. Comments Due: 5 p.m. ET 4/16/19. Docket Numbers: ER19–1536–000. Applicants: South Carolina Electric & Gas Company. Description: Tariff Cancellation: Notice of Termination of WR Tariff (sections) to be effective 3/30/2010. Filed Date: 4/8/19. Accession Number: 20190408–5153. Comments Due: 5 p.m. ET 4/29/19. Docket Numbers: ER19–1537–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX-Taygete Energy Project II Interconnection Agreement to be effective 3/27/2019. Filed Date: 4/9/19. Accession Number: 20190409–5030. Comments Due: 5 p.m. ET 4/30/19. Docket Numbers: ER19–1538–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 31 20th Rev—NITSA with Philips 66 Company to be effective 7/1/2019. E:\FR\FM\15APN1.SGM 15APN1

Agencies

[Federal Register Volume 84, Number 72 (Monday, April 15, 2019)]
[Notices]
[Pages 15205-15206]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07360]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-76-000.
    Applicants: Osceola Windpower, LLC, Endeavor Wind I, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act, et al. of Osceola Windpower, LLC, et al.
    Filed Date: 4/5/19.

[[Page 15206]]

    Accession Number: 20190405-5190.
    Comments Due: 5 p.m. ET 4/26/19.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER15-2594-007; ER17-953-003.
    Applicants: GridLiance High Plains LLC.
    Description: Compliance filing of GridLiance High Plains LLC.
    Filed Date: 4/5/19.
    Accession Number: 20190405-5197.
    Comments Due: 5 p.m. ET 4/26/19.

    Docket Numbers: ER16-505-005.
    Applicants: GridLiance High Plains LLC.
    Description: Compliance filing: GridLiance HP Compliance Filing 
ER16-505 to be effective 4/1/2016.
    Filed Date: 4/5/19.
    Accession Number: 20190405-5148.
    Comments Due: 5 p.m. ET 4/26/19.

    Docket Numbers: ER18-2401-002.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Further Compliance Filing 
Concerning Order No. 844 to Amend Effective Date to be effective 1/1/
2019.
    Filed Date: 4/8/19.
    Accession Number: 20190408-5081.
    Comments Due: 5 p.m. ET 4/29/19.

    Docket Numbers: ER19-1530-000.
    Applicants: NextEra Energy Transmission West, LLC.
    Description: Sec.  205(d) Rate Filing: Horizon West Transmission, 
LLC Notice of Succession to be effective 3/13/2019.
    Filed Date: 4/5/19.
    Accession Number: 20190405-5147.
    Comments Due: 5 p.m. ET 4/26/19.

    Docket Numbers: ER19-1531-000.
    Applicants: AEP Indiana Michigan Transmission Company, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: AEP Indiana Michigan submits 
three Contribution in Aid of Construction Agreement to be effective 3/
27/2019.
    Filed Date: 4/8/19.
    Accession Number: 20190408-5098.
    Comments Due: 5 p.m. ET 4/29/19.

    Docket Numbers: ER19-1532-000.
    Applicants: GenOn REMA, LLC.
    Description: Sec.  205(d) Rate Filing: Notice of Succession, 
Revisions to Reactive Service Rate Schedule to be effective 3/11/2019.
    Filed Date: 4/8/19.
    Accession Number: 20190408-5142.
    Comments Due: 5 p.m. ET 4/29/19.

    Docket Numbers: ER19-1533-000.
    Applicants: GenOn Power Midwest, LP.
    Description: Tariff Cancellation: Request for Administrative 
Cancellation and Request for Waivers to be effective 9/30/2012.
    Filed Date: 4/8/19.
    Accession Number: 20190408-5143.
    Comments Due: 5 p.m. ET 4/29/19.

    Docket Numbers: ER19-1534-000.
    Applicants: GenOn Power Midwest, LP.
    Description: Sec.  205(d) Rate Filing: Notice of Succession and 
Revisions to Reactive Service Rate Schedule to be effective 3/8/2019.
    Filed Date: 4/8/19.
    Accession Number: 20190408-5145.
    Comments Due: 5 p.m. ET 4/29/19.

    Docket Numbers: ER19-1535-000.
    Applicants: Lower Mount Bethel Energy, LLC.
    Description: Tariff Cancellation: Notice of Cancellation to be 
effective 4/8/2019.
    Filed Date: 4/8/19.
    Accession Number: 20190408-5152.
    Comments Due: 5 p.m. ET 4/29/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: April 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-07360 Filed 4-12-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.