Combined Notice of Filings #1, 15205-15206 [2019-07360]
Download as PDF
Federal Register / Vol. 84, No. 72 / Monday, April 15, 2019 / Notices
use https://www.regulations.gov by
searching the Docket ID number ED–
2019–ICCD–0050. Comments submitted
in response to this notice should be
submitted electronically through the
Federal eRulemaking Portal at https://
www.regulations.gov by selecting the
Docket ID number or via postal mail,
commercial delivery, or hand delivery.
If the regulations.gov site is not
available to the public for any reason,
ED will temporarily accept comments at
ICDocketMgr@ed.gov. Please include the
docket ID number and the title of the
information collection request when
requesting documents or submitting
comments. Please note that comments
submitted by fax or email and those
submitted after the comment period will
not be accepted. Written requests for
information or comments submitted by
postal mail or delivery should be
addressed to the Director of the
Information Collection Clearance
Division, U.S. Department of Education,
550 12th Street SW, PCP, Room 9089,
Washington, DC 20202–0023.
For
specific questions related to collection
activities, please contact Erica Johnson,
202–245–7676.
FOR FURTHER INFORMATION CONTACT:
The
Department of Education (ED), in
accordance with the Paperwork
Reduction Act of 1995 (PRA) (44 U.S.C.
3506(c)(2)(A)), provides the general
public and Federal agencies with an
opportunity to comment on proposed,
revised, and continuing collections of
information. This helps the Department
assess the impact of its information
collection requirements and minimize
the public’s reporting burden. It also
helps the public understand the
Department’s information collection
requirements and provide the requested
data in the desired format. ED is
soliciting comments on the proposed
information collection request (ICR) that
is described below. The Department of
Education is especially interested in
public comment addressing the
following issues: (1) Is this collection
necessary to the proper functions of the
Department; (2) will this information be
processed and used in a timely manner;
(3) is the estimate of burden accurate;
(4) how might the Department enhance
the quality, utility, and clarity of the
information to be collected; and (5) how
might the Department minimize the
burden of this collection on the
respondents, including through the use
of information technology. Please note
that written comments received in
response to this notice will be
considered public records.
amozie on DSK9F9SC42PROD with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Sep<11>2014
17:16 Apr 12, 2019
Jkt 247001
Title of Collection: Individuals with
Disabilities Education Act (IDEA) State
and Local Implementation Study 2019.
OMB Control Number: 1850–NEW.
Type of Review: A new information
collection.
Respondents/Affected Public: State,
Local, and Tribal Governments.
Total Estimated Number of Annual
Responses: 1,153.
Total Estimated Number of Annual
Burden Hours: 970.
Abstract: The data collection for the
Individuals with Disabilities Education
Act (IDEA) State and Local
Implementation Study 2019 will
examine how states, districts, and
schools are identifying and supporting
children and youth with disabilities.
The study is one component of a
Congressionally-mandated National
Assessment of IDEA.
The purpose of this data collection is
to develop an up-to-date national
picture of how states, districts, and
schools are implementing IDEA in order
to provide ED, Congress, and other
stakeholders with knowledge that can
inform the next reauthorization of IDEA
and, ultimately, how services are
provided to children. This study of
IDEA is necessary because a decade has
passed since the previous IDEA national
implementation study, and subsequent
developments may have influenced the
context and implementation of special
education and early intervention.
The surveys will be administered in
Fall 2019. All respondents will have the
opportunity to complete an electronic
survey (or paper survey, if preferred).
The survey respondents are described
briefly below:
State Surveys: The study team will
administer three separate electronic
surveys that focus on the Part C program
for infants and toddlers (administered to
the Part C infants and toddlers program
coordinator), the Part B program for
preschool-age children (administered to
the Part B program for preschool-age
children coordinator), and the Part B
program for school-age children and
youth (administered to the special
education director). Three surveys are
necessary because different state
administrators are likely to oversee
IDEA programs for children at those
different age levels. The state surveys
will be administered to the respondents
in each of the 61 state-level entities that
receive IDEA funding: all 50 states, the
District of Columbia, 8 U.S. territories,
the Bureau of Indian Education, and the
Department of Defense Education
Activity.
School District Surveys: The study
team will administer two separate
electronic surveys that focus on the Part
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
15205
B program for preschool-age children
(administered to the Part B program for
pre-school age children coordinator)
and the IDEA Part B program for schoolage children and youth (administered to
the special education director). If a
district does not have a Part B program
for preschool-age children coordinator,
the study team will work with the
district to identify the survey’s most
appropriate respondent, likely someone
in the pre-school special education
leadership. Two surveys are necessary
because different district staff members
are likely to oversee IDEA programs for
students at those different age levels.
The study team will administer the Part
B program for preschool-age children
survey to a nationally representative
sample of 602 school districts and the
Part B program for school-age children
survey to a nationally representative
sample of 665 school districts. (Of the
665 districts selected overall, 63 do not
offer pre-kindergarten instruction and
are not eligible for the preschool-age
district survey.)
School Surveys: A single school
survey covers the Part B program for
school-age children, the Part B program
for preschool-age children, the
transition from the Part C infants and
toddlers program, and transition
planning for secondary school students.
The school survey will be administered
to the school principal or lead special
education staff. The study team will
administer an electronic survey to a
nationally representative sample of
2,750 schools from the 665 selected
districts.
Dated: April 10, 2019.
Stephanie Valentine,
PRA Clearance Coordinator, Information
Collection Clearance Program, Information
Management Branch, Office of the Chief
Information Officer.
[FR Doc. 2019–07424 Filed 4–12–19; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–76–000.
Applicants: Osceola Windpower, LLC,
Endeavor Wind I, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Osceola
Windpower, LLC, et al.
Filed Date: 4/5/19.
E:\FR\FM\15APN1.SGM
15APN1
amozie on DSK9F9SC42PROD with NOTICES
15206
Federal Register / Vol. 84, No. 72 / Monday, April 15, 2019 / Notices
Accession Number: 20190405–5190.
Comments Due: 5 p.m. ET 4/26/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–2594–007;
ER17–953–003.
Applicants: GridLiance High Plains
LLC.
Description: Compliance filing of
GridLiance High Plains LLC.
Filed Date: 4/5/19.
Accession Number: 20190405–5197.
Comments Due: 5 p.m. ET 4/26/19.
Docket Numbers: ER16–505–005.
Applicants: GridLiance High Plains
LLC.
Description: Compliance filing:
GridLiance HP Compliance Filing
ER16–505 to be effective 4/1/2016.
Filed Date: 4/5/19.
Accession Number: 20190405–5148.
Comments Due: 5 p.m. ET 4/26/19.
Docket Numbers: ER18–2401–002.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Further Compliance Filing Concerning
Order No. 844 to Amend Effective Date
to be effective 1/1/2019.
Filed Date: 4/8/19.
Accession Number: 20190408–5081.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19–1530–000.
Applicants: NextEra Energy
Transmission West, LLC.
Description: § 205(d) Rate Filing:
Horizon West Transmission, LLC Notice
of Succession to be effective 3/13/2019.
Filed Date: 4/5/19.
Accession Number: 20190405–5147.
Comments Due: 5 p.m. ET 4/26/19.
Docket Numbers: ER19–1531–000.
Applicants: AEP Indiana Michigan
Transmission Company, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing: AEP
Indiana Michigan submits three
Contribution in Aid of Construction
Agreement to be effective 3/27/2019.
Filed Date: 4/8/19.
Accession Number: 20190408–5098.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19–1532–000.
Applicants: GenOn REMA, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession, Revisions to
Reactive Service Rate Schedule to be
effective 3/11/2019.
Filed Date: 4/8/19.
Accession Number: 20190408–5142.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19–1533–000.
Applicants: GenOn Power Midwest,
LP.
Description: Tariff Cancellation:
Request for Administrative Cancellation
VerDate Sep<11>2014
17:16 Apr 12, 2019
Jkt 247001
and Request for Waivers to be effective
9/30/2012.
Filed Date: 4/8/19.
Accession Number: 20190408–5143.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19–1534–000.
Applicants: GenOn Power Midwest,
LP.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
Reactive Service Rate Schedule to be
effective 3/8/2019.
Filed Date: 4/8/19.
Accession Number: 20190408–5145.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19–1535–000.
Applicants: Lower Mount Bethel
Energy, LLC.
Description: Tariff Cancellation:
Notice of Cancellation to be effective
4/8/2019.
Filed Date: 4/8/19.
Accession Number: 20190408–5152.
Comments Due: 5 p.m. ET 4/29/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–07360 Filed 4–12–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings.
Docket Numbers: EC19–77–000.
Applicants: Public Service Company
of Colorado, Twin Eagle Resource
Management, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Federal Power Act, et al. of Twin Eagle
Resource Management, LLC, et al.
Filed Date: 4/8/19.
Accession Number: 20190408–5194.
Comments Due: 5 p.m. ET 4/29/19.
Take notice that the Commission
received the following electric rate
filings.
Docket Numbers: ER18–228–002.
Applicants: Southwestern Public
Service Company.
Description: Compliance filing: SPS
Depreciation Settlement Compliance
Filing ER18–228 to be effective 1/1/
2018.
Filed Date: 4/8/19.
Accession Number: 20190408–5184.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19–303–001.
Applicants: Duquesne Light
Company.
Description: Compliance Filing of
Duquesne Light Company.
Filed Date: 3/1/19.
Accession Number: 20190301–5399.
Comments Due: 5 p.m. ET 4/24/19.
Docket Numbers: ER19–478–001.
Applicants: FirstEnergy Solutions
Corp.
Description: Compliance filing: Notice
of Effective Date for Rate Schedule
FERC No. 1 [ER19–1007] to be effective
3/29/2019.
Filed Date: 4/9/19.
Accession Number: 20190409–5000.
Comments Due: 5 p.m. ET 4/30/19.
Docket Numbers: ER19–1127–000.
Applicants: Calpine King City Cogen,
LLC.
Description: Supplement to February
26, 2019 Calpine King City Cogen, LLC
tariff filing.
Filed Date: 3/26/19.
Accession Number: 20190326–5256.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19–1536–000.
Applicants: South Carolina Electric &
Gas Company.
Description: Tariff Cancellation:
Notice of Termination of WR Tariff
(sections) to be effective 3/30/2010.
Filed Date: 4/8/19.
Accession Number: 20190408–5153.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19–1537–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Taygete Energy Project II
Interconnection Agreement to be
effective 3/27/2019.
Filed Date: 4/9/19.
Accession Number: 20190409–5030.
Comments Due: 5 p.m. ET 4/30/19.
Docket Numbers: ER19–1538–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
31 20th Rev—NITSA with Philips 66
Company to be effective 7/1/2019.
E:\FR\FM\15APN1.SGM
15APN1
Agencies
[Federal Register Volume 84, Number 72 (Monday, April 15, 2019)]
[Notices]
[Pages 15205-15206]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07360]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-76-000.
Applicants: Osceola Windpower, LLC, Endeavor Wind I, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Osceola Windpower, LLC, et al.
Filed Date: 4/5/19.
[[Page 15206]]
Accession Number: 20190405-5190.
Comments Due: 5 p.m. ET 4/26/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-2594-007; ER17-953-003.
Applicants: GridLiance High Plains LLC.
Description: Compliance filing of GridLiance High Plains LLC.
Filed Date: 4/5/19.
Accession Number: 20190405-5197.
Comments Due: 5 p.m. ET 4/26/19.
Docket Numbers: ER16-505-005.
Applicants: GridLiance High Plains LLC.
Description: Compliance filing: GridLiance HP Compliance Filing
ER16-505 to be effective 4/1/2016.
Filed Date: 4/5/19.
Accession Number: 20190405-5148.
Comments Due: 5 p.m. ET 4/26/19.
Docket Numbers: ER18-2401-002.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Further Compliance Filing
Concerning Order No. 844 to Amend Effective Date to be effective 1/1/
2019.
Filed Date: 4/8/19.
Accession Number: 20190408-5081.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19-1530-000.
Applicants: NextEra Energy Transmission West, LLC.
Description: Sec. 205(d) Rate Filing: Horizon West Transmission,
LLC Notice of Succession to be effective 3/13/2019.
Filed Date: 4/5/19.
Accession Number: 20190405-5147.
Comments Due: 5 p.m. ET 4/26/19.
Docket Numbers: ER19-1531-000.
Applicants: AEP Indiana Michigan Transmission Company, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: AEP Indiana Michigan submits
three Contribution in Aid of Construction Agreement to be effective 3/
27/2019.
Filed Date: 4/8/19.
Accession Number: 20190408-5098.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19-1532-000.
Applicants: GenOn REMA, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession,
Revisions to Reactive Service Rate Schedule to be effective 3/11/2019.
Filed Date: 4/8/19.
Accession Number: 20190408-5142.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19-1533-000.
Applicants: GenOn Power Midwest, LP.
Description: Tariff Cancellation: Request for Administrative
Cancellation and Request for Waivers to be effective 9/30/2012.
Filed Date: 4/8/19.
Accession Number: 20190408-5143.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19-1534-000.
Applicants: GenOn Power Midwest, LP.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revisions to Reactive Service Rate Schedule to be effective 3/8/2019.
Filed Date: 4/8/19.
Accession Number: 20190408-5145.
Comments Due: 5 p.m. ET 4/29/19.
Docket Numbers: ER19-1535-000.
Applicants: Lower Mount Bethel Energy, LLC.
Description: Tariff Cancellation: Notice of Cancellation to be
effective 4/8/2019.
Filed Date: 4/8/19.
Accession Number: 20190408-5152.
Comments Due: 5 p.m. ET 4/29/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-07360 Filed 4-12-19; 8:45 am]
BILLING CODE 6717-01-P