Public Hearing, 14712-14713 [2019-07120]

Download as PDF 14712 Federal Register / Vol. 84, No. 70 / Thursday, April 11, 2019 / Notices the relocation project, as here, will not disrupt service to shippers and thus qualifies for the class exemption at 49 CFR 1180.2(d)(5). As a condition to this exemption, any employees affected by the trackage rights will be protected by the conditions imposed in Norfolk & Western Railway—Trackage Rights— Burlington Northern, Inc., 354 I.C.C. 605 (1978), as modified in Mendocino Coast Railway—Lease & Operate—California Western Railroad, 360 I.C.C. 653 (1980). The transaction may be consummated on or after April 25, 2019, the effective date of the exemption (30 days after the verified notice was filed). If the verified notice contains false or misleading information, the exemption is void ab initio. Petitions to revoke the exemption under 49 U.S.C. 10502(d) may be filed at any time. The filing of a petition to revoke will not automatically stay the transaction. Petitions to stay must be filed by April 18, 2019 (at least seven days before the exemption becomes effective). An original and 10 copies of all pleadings, referring to Docket No. FD 36285, must be filed with the Surface Transportation Board, 395 E Street SW, Washington, DC 20423–0001. In addition, a copy of each pleading must be served on YRC’s representative, Eric M. Hocky, Clark Hill PLC, One Commerce Square, 2005 Market Street, Suite 1000, Philadelphia, PA 19103. Board decisions and notices are available at www.stb.gov. Decided: April 8, 2019. By the Board, Allison C. Davis, Acting Director, Office of Proceedings. Brendetta Jones, Clearance Clerk. [FR Doc. 2019–07201 Filed 4–10–19; 8:45 am] BILLING CODE 4915–01–P SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing Susquehanna River Basin Commission. ACTION: Notice. AGENCY: The Susquehanna River Basin Commission will hold a public hearing on May 9, 2019, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the SUPPLEMENTARY INFORMATION section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for June 14, 2019, which will be noticed amozie on DSK9F9SC42PROD with NOTICES SUMMARY: VerDate Sep<11>2014 16:50 Apr 10, 2019 Jkt 247001 separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is May 20, 2019. DATES: The public hearing will convene on May 9, 2019, at 2:30 p.m. The public hearing will end at 5:00 p.m. or at the conclusion of public testimony, whichever is sooner. The deadline for the submission of written comments is May 20, 2019. ADDRESSES: The public hearing will be conducted at the Pennsylvania State Capitol, East Wing, Room 8EB, Harrisburg, Pa. FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and Secretary to the Commission, telephone: (717) 238–0423; fax: (717) 238–2436. Information concerning the applications for these projects is available at the Commission’s Water Application and Approval Viewer at https://mdw.srbc. net/waav. Additional supporting documents are available to inspect and copy in accordance with the Commission’s Access to Records Policy at www.srbc.net/regulatory/policiesguidance/docs/access-to-records-policy2009-02.pdf. SUPPLEMENTARY INFORMATION: The public hearing will cover the following projects: Projects Scheduled for Action 1. Project Sponsor and Facility: Project Sponsor and Facility: ARD Operating, LLC (Pine Creek), McHenry Township, Lycoming County, Pa. Application for renewal of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No. 20150601). 2. Project Sponsor and Facility: BKV Operating, LLC (Meshoppen Creek), Washington Township, Wyoming County, Pa. Application for renewal of surface water withdrawal of up to 2.160 mgd (peak day) (Docket No. 20150602). 3. Project Sponsor and Facility: BKV Operating, LLC (Susquehanna River), Washington Township, Wyoming County, Pa. Application for surface water withdrawal of up to 2.914 mgd (peak day). 4. Project Sponsor and Facility: BKV Operating, LLC (Unnamed Tributary to Middle Branch Wyalusing Creek), Forest Lake Township, Susquehanna County, Pa. Application for renewal of surface water withdrawal of up to 0.648 mgd (peak day) (Docket No. 20150603). 5. Project Sponsor and Facility: Town of Chenango, Broome County, N.Y. Application for renewal of groundwater withdrawal of up to 0.600 mgd (30-day PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 average) from Well 12A (Docket No. 19871103). 6. Project Sponsor and Facility: Epsilon Energy USA, Inc. (East Branch Wyalusing Creek), Rush Township, Susquehanna County, Pa. Application for surface water withdrawal of up to 0.715 mgd (peak day). 7. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg Borough, Tioga County, Pa. Application for renewal of groundwater withdrawal of up to 0.216 mgd (30-day average) from Well HR–1 (Docket No. 20150608). 8. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg Borough, Tioga County, Pa. Application for renewal of consumptive use of up to 0.316 mgd (peak day) (Docket No. 20150608). 9. Project Sponsor: Project Sponsor and Facility: Keystone Clearwater Solutions, LLC (Lycoming Creek), Lewis Township, Lycoming County, Pa. Application for renewal of surface water withdrawal of up to 1.250 mgd (peak day) (Docket No. 20150610). 10. Project Sponsor: Ski Roundtop Operating Corporation. Project Facility: Roundtop Mountain Resort (Unnamed Tributary to Beaver Creek), Warrington Township, York County, Pa. Modification to change from peak day to 30-day average for surface water withdrawal and consumptive use limits (Docket No. 20031209). 11. Project Sponsor and Facility: Stewartstown Borough Authority, Hopewell Township, York County, Pa. Application for renewal of groundwater withdrawal of up to 0.019 mgd (30-day average) from Well 5A4 (Docket No. 19890703). 12. Project Sponsor and Facility: Stewartstown Borough Authority, Hopewell Township, York County, Pa. Application for renewal of groundwater withdrawal of up to 0.033 mgd (30-day average) from Well 5J2 (Docket No. 19890703). 13. Project Sponsor and Facility: Stewartstown Borough Authority, Hopewell Township, York County, Pa. Application for renewal of groundwater withdrawal of up to 0.051 mgd (30-day average) from Well 5R2 (Docket No. 19890703). 14. Project Sponsor: SUEZ Water Pennsylvania Inc. Project Facility: Newberry Operation, Newberry Township, York County, Pa. Application for renewal of groundwater withdrawal of up to 0.072 mgd (30-day average) from the Dupont Well (Docket No. 19880401). 15. Project Sponsor and Facility: Sunset Golf Course, Londonderry Township, Dauphin County, Pa. Application for groundwater E:\FR\FM\11APN1.SGM 11APN1 Federal Register / Vol. 84, No. 70 / Thursday, April 11, 2019 / Notices withdrawal of up to 0.059 mgd (30-day average) from Well 7. 16. Project Sponsor and Facility: Sunset Golf Course, Londonderry Township, Dauphin County, Pa. Minor modification to add a new source (Well 7) to existing consumptive use approval (no increase requested in consumptive use quantity) (Docket No. 19990506). 17. Project Sponsor and Facility: Warwick Township Municipal Authority, Warwick Township, Lancaster County, Pa. Application for renewal of groundwater withdrawal of up to 0.288 mgd (30-day average) from Well 1 (Docket No. 19890103). Opportunity To Appear and Comment Interested parties may appear at the hearing to offer comments to the Commission on any business listed above required to be subject of a public hearing. The presiding officer reserves the right to limit oral statements in the interest of time and to otherwise control the course of the hearing. Guidelines for the public hearing are posted on the Commission’s website, www.srbc.net, prior to the hearing for review. The presiding officer reserves the right to modify or supplement such guidelines at the hearing. Written comments on any business listed above required to be subject of a public hearing may also be mailed to Mr. Jason Oyler, Secretary to the Commission, Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, Pa. 17110–1788, or submitted electronically through www.srbc.net/about/meetings-events/ public-hearing.html. Comments mailed or electronically submitted must be received by the Commission on or before May 20, 2019, to be considered. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: April 5, 2019. Jason E. Oyler, General Counsel and Secretary to the Commission. [FR Doc. 2019–07120 Filed 4–10–19; 8:45 am] BILLING CODE 7040–01–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration amozie on DSK9F9SC42PROD with NOTICES [Summary Notice No. 2019–08] Petition for Exemption; Summary of Petition Received; General Atomics Aeronautical Systems, Incorporated Federal Aviation Administration (FAA), Department of Transportation (DOT). ACTION: Notice. AGENCY: VerDate Sep<11>2014 16:50 Apr 10, 2019 Jkt 247001 This notice contains a summary of a petition seeking relief from specified requirements of Federal Aviation Regulations. The purpose of this notice is to improve the public’s awareness of, and participation in, the FAA’s exemption process. Neither publication of this notice nor the inclusion or omission of information in the summary is intended to affect the legal status of the petition or its final disposition. DATES: Comments on this petition must identify the petition docket number and must be received on or before May 1, 2019. ADDRESSES: Send comments identified by docket number FAA–2019–0091 using any of the following methods: • Federal eRulemaking Portal: Go to https://www.regulations.gov and follow the online instructions for sending your comments electronically. • Mail: Send comments to Docket Operations, M–30; U.S. Department of Transportation, 1200 New Jersey Avenue SE, Room W12–140, West Building Ground Floor, Washington, DC 20590–0001. • Hand Delivery or Courier: Take comments to Docket Operations in Room W12–140 of the West Building Ground Floor at 1200 New Jersey Avenue SE, Washington, DC 20590– 0001, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. • Fax: Fax comments to Docket Operations at (202) 493–2251. Privacy: In accordance with 5 U.S.C. 553(c), DOT solicits comments from the public to better inform its rulemaking process. DOT posts these comments, without edit, including any personal information the commenter provides, to https://www.regulations.gov, as described in the system of records notice (DOT/ALL–14 FDMS), which can be reviewed at https://www.dot.gov/ privacy. Docket: Background documents or comments received may be read at https://www.regulations.gov at any time. Follow the online instructions for accessing the docket or go to the Docket Operations in Room W12–140 of the West Building Ground Floor at 1200 New Jersey Avenue SE, Washington, DC 20590–0001, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: Brittany Newton (202) 267–6691, Office of Rulemaking, Federal Aviation Administration, 800 Independence Avenue SW, Washington, DC 20591. This notice is published pursuant to 14 CFR 11.85. SUMMARY: PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 14713 Issued in Washington, DC, on March 28, 2019. Lirio Liu, Executive Director, Office of Rulemaking. Petition for Exemption Docket No.: FAA–2019–0091. Petitioner: General Atomics Aeronautical Systems, Incorporated. Section(s) of 14 CFR Affected: 21.185 (b). Description of Relief Sought: Request for exemption from the military surplus regulatory provision of Title 14 Code of Federal Regulations § 21.185(b) to allow the restricted category type certification of a General Atomics Aeronautical Systems, Inc. owned MQ–9A Reaper Unmanned Aircraft Systems (V AS) that have not previously been accepted or used by an Armed Force of the United States. [FR Doc. 2019–07143 Filed 4–10–19; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration [Summary Notice No. 2019–14] Petition for Exemption; Summary of Petition Received; Near Earth Autonomy, Inc Federal Aviation Administration (FAA), Department of Transportation (DOT). ACTION: Notice. AGENCY: This notice contains a summary of a petition seeking relief from specified requirements of Federal Aviation Regulations. The purpose of this notice is to improve the public’s awareness of, and participation in, the FAA’s exemption process. Neither publication of this notice nor the inclusion or omission of information in the summary is intended to affect the legal status of the petition or its final disposition. DATES: Comments on this petition must identify the petition docket number and must be received on or before May 1, 2019. ADDRESSES: Send comments identified by docket number FAA–2018–1057 using any of the following methods: • Federal eRulemaking Portal: Go to https://www.regulations.gov and follow the online instructions for sending your comments electronically. • Mail: Send comments to Docket Operations, M–30; U.S. Department of Transportation, 1200 New Jersey Avenue SE, Room W12–140, West Building Ground Floor, Washington, DC 20590–0001. SUMMARY: E:\FR\FM\11APN1.SGM 11APN1

Agencies

[Federal Register Volume 84, Number 70 (Thursday, April 11, 2019)]
[Notices]
[Pages 14712-14713]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07120]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Public Hearing

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Susquehanna River Basin Commission will hold a public 
hearing on May 9, 2019, in Harrisburg, Pennsylvania. At this public 
hearing, the Commission will hear testimony on the projects listed in 
the Supplementary Information section of this notice. Such projects are 
intended to be scheduled for Commission action at its next business 
meeting, tentatively scheduled for June 14, 2019, which will be noticed 
separately. The public should take note that this public hearing will 
be the only opportunity to offer oral comment to the Commission for the 
listed projects. The deadline for the submission of written comments is 
May 20, 2019.

DATES: The public hearing will convene on May 9, 2019, at 2:30 p.m. The 
public hearing will end at 5:00 p.m. or at the conclusion of public 
testimony, whichever is sooner. The deadline for the submission of 
written comments is May 20, 2019.

ADDRESSES: The public hearing will be conducted at the Pennsylvania 
State Capitol, East Wing, Room 8EB, Harrisburg, Pa.

FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and 
Secretary to the Commission, telephone: (717) 238-0423; fax: (717) 238-
2436. Information concerning the applications for these projects is 
available at the Commission's Water Application and Approval Viewer at 
https://mdw.srbc.net/waav. Additional supporting documents are 
available to inspect and copy in accordance with the Commission's 
Access to Records Policy at www.srbc.net/regulatory/policies-guidance/docs/access-to-records-policy-2009-02.pdf.

SUPPLEMENTARY INFORMATION: The public hearing will cover the following 
projects:

Projects Scheduled for Action

    1. Project Sponsor and Facility: Project Sponsor and Facility: ARD 
Operating, LLC (Pine Creek), McHenry Township, Lycoming County, Pa. 
Application for renewal of surface water withdrawal of up to 1.500 mgd 
(peak day) (Docket No. 20150601).
    2. Project Sponsor and Facility: BKV Operating, LLC (Meshoppen 
Creek), Washington Township, Wyoming County, Pa. Application for 
renewal of surface water withdrawal of up to 2.160 mgd (peak day) 
(Docket No. 20150602).
    3. Project Sponsor and Facility: BKV Operating, LLC (Susquehanna 
River), Washington Township, Wyoming County, Pa. Application for 
surface water withdrawal of up to 2.914 mgd (peak day).
    4. Project Sponsor and Facility: BKV Operating, LLC (Unnamed 
Tributary to Middle Branch Wyalusing Creek), Forest Lake Township, 
Susquehanna County, Pa. Application for renewal of surface water 
withdrawal of up to 0.648 mgd (peak day) (Docket No. 20150603).
    5. Project Sponsor and Facility: Town of Chenango, Broome County, 
N.Y. Application for renewal of groundwater withdrawal of up to 0.600 
mgd (30-day average) from Well 12A (Docket No. 19871103).
    6. Project Sponsor and Facility: Epsilon Energy USA, Inc. (East 
Branch Wyalusing Creek), Rush Township, Susquehanna County, Pa. 
Application for surface water withdrawal of up to 0.715 mgd (peak day).
    7. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg 
Borough, Tioga County, Pa. Application for renewal of groundwater 
withdrawal of up to 0.216 mgd (30-day average) from Well HR-1 (Docket 
No. 20150608).
    8. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg 
Borough, Tioga County, Pa. Application for renewal of consumptive use 
of up to 0.316 mgd (peak day) (Docket No. 20150608).
    9. Project Sponsor: Project Sponsor and Facility: Keystone 
Clearwater Solutions, LLC (Lycoming Creek), Lewis Township, Lycoming 
County, Pa. Application for renewal of surface water withdrawal of up 
to 1.250 mgd (peak day) (Docket No. 20150610).
    10. Project Sponsor: Ski Roundtop Operating Corporation. Project 
Facility: Roundtop Mountain Resort (Unnamed Tributary to Beaver Creek), 
Warrington Township, York County, Pa. Modification to change from peak 
day to 30-day average for surface water withdrawal and consumptive use 
limits (Docket No. 20031209).
    11. Project Sponsor and Facility: Stewartstown Borough Authority, 
Hopewell Township, York County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.019 mgd (30-day average) from Well 
5A4 (Docket No. 19890703).
    12. Project Sponsor and Facility: Stewartstown Borough Authority, 
Hopewell Township, York County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.033 mgd (30-day average) from Well 
5J2 (Docket No. 19890703).
    13. Project Sponsor and Facility: Stewartstown Borough Authority, 
Hopewell Township, York County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.051 mgd (30-day average) from Well 
5R2 (Docket No. 19890703).
    14. Project Sponsor: SUEZ Water Pennsylvania Inc. Project Facility: 
Newberry Operation, Newberry Township, York County, Pa. Application for 
renewal of groundwater withdrawal of up to 0.072 mgd (30-day average) 
from the Dupont Well (Docket No. 19880401).
    15. Project Sponsor and Facility: Sunset Golf Course, Londonderry 
Township, Dauphin County, Pa. Application for groundwater

[[Page 14713]]

withdrawal of up to 0.059 mgd (30-day average) from Well 7.
    16. Project Sponsor and Facility: Sunset Golf Course, Londonderry 
Township, Dauphin County, Pa. Minor modification to add a new source 
(Well 7) to existing consumptive use approval (no increase requested in 
consumptive use quantity) (Docket No. 19990506).
    17. Project Sponsor and Facility: Warwick Township Municipal 
Authority, Warwick Township, Lancaster County, Pa. Application for 
renewal of groundwater withdrawal of up to 0.288 mgd (30-day average) 
from Well 1 (Docket No. 19890103).

Opportunity To Appear and Comment

    Interested parties may appear at the hearing to offer comments to 
the Commission on any business listed above required to be subject of a 
public hearing. The presiding officer reserves the right to limit oral 
statements in the interest of time and to otherwise control the course 
of the hearing. Guidelines for the public hearing are posted on the 
Commission's website, www.srbc.net, prior to the hearing for review. 
The presiding officer reserves the right to modify or supplement such 
guidelines at the hearing. Written comments on any business listed 
above required to be subject of a public hearing may also be mailed to 
Mr. Jason Oyler, Secretary to the Commission, Susquehanna River Basin 
Commission, 4423 North Front Street, Harrisburg, Pa. 17110-1788, or 
submitted electronically through www.srbc.net/about/meetings-events/public-hearing.html. Comments mailed or electronically submitted must 
be received by the Commission on or before May 20, 2019, to be 
considered.

    Authority:  Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806, 807, and 808.

    Dated: April 5, 2019.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2019-07120 Filed 4-10-19; 8:45 am]
 BILLING CODE 7040-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.