Public Hearing, 14712-14713 [2019-07120]
Download as PDF
14712
Federal Register / Vol. 84, No. 70 / Thursday, April 11, 2019 / Notices
the relocation project, as here, will not
disrupt service to shippers and thus
qualifies for the class exemption at 49
CFR 1180.2(d)(5).
As a condition to this exemption, any
employees affected by the trackage
rights will be protected by the
conditions imposed in Norfolk &
Western Railway—Trackage Rights—
Burlington Northern, Inc., 354 I.C.C. 605
(1978), as modified in Mendocino Coast
Railway—Lease & Operate—California
Western Railroad, 360 I.C.C. 653 (1980).
The transaction may be consummated
on or after April 25, 2019, the effective
date of the exemption (30 days after the
verified notice was filed).
If the verified notice contains false or
misleading information, the exemption
is void ab initio. Petitions to revoke the
exemption under 49 U.S.C. 10502(d)
may be filed at any time. The filing of
a petition to revoke will not
automatically stay the transaction.
Petitions to stay must be filed by April
18, 2019 (at least seven days before the
exemption becomes effective).
An original and 10 copies of all
pleadings, referring to Docket No. FD
36285, must be filed with the Surface
Transportation Board, 395 E Street SW,
Washington, DC 20423–0001. In
addition, a copy of each pleading must
be served on YRC’s representative, Eric
M. Hocky, Clark Hill PLC, One
Commerce Square, 2005 Market Street,
Suite 1000, Philadelphia, PA 19103.
Board decisions and notices are
available at www.stb.gov.
Decided: April 8, 2019.
By the Board, Allison C. Davis, Acting
Director, Office of Proceedings.
Brendetta Jones,
Clearance Clerk.
[FR Doc. 2019–07201 Filed 4–10–19; 8:45 am]
BILLING CODE 4915–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Public Hearing
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will hold a public hearing
on May 9, 2019, in Harrisburg,
Pennsylvania. At this public hearing,
the Commission will hear testimony on
the projects listed in the SUPPLEMENTARY
INFORMATION section of this notice. Such
projects are intended to be scheduled
for Commission action at its next
business meeting, tentatively scheduled
for June 14, 2019, which will be noticed
amozie on DSK9F9SC42PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
16:50 Apr 10, 2019
Jkt 247001
separately. The public should take note
that this public hearing will be the only
opportunity to offer oral comment to the
Commission for the listed projects. The
deadline for the submission of written
comments is May 20, 2019.
DATES: The public hearing will convene
on May 9, 2019, at 2:30 p.m. The public
hearing will end at 5:00 p.m. or at the
conclusion of public testimony,
whichever is sooner. The deadline for
the submission of written comments is
May 20, 2019.
ADDRESSES: The public hearing will be
conducted at the Pennsylvania State
Capitol, East Wing, Room 8EB,
Harrisburg, Pa.
FOR FURTHER INFORMATION CONTACT:
Jason Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423; fax: (717) 238–2436.
Information concerning the applications
for these projects is available at the
Commission’s Water Application and
Approval Viewer at https://mdw.srbc.
net/waav. Additional supporting
documents are available to inspect and
copy in accordance with the
Commission’s Access to Records Policy
at www.srbc.net/regulatory/policiesguidance/docs/access-to-records-policy2009-02.pdf.
SUPPLEMENTARY INFORMATION: The
public hearing will cover the following
projects:
Projects Scheduled for Action
1. Project Sponsor and Facility:
Project Sponsor and Facility: ARD
Operating, LLC (Pine Creek), McHenry
Township, Lycoming County, Pa.
Application for renewal of surface water
withdrawal of up to 1.500 mgd (peak
day) (Docket No. 20150601).
2. Project Sponsor and Facility: BKV
Operating, LLC (Meshoppen Creek),
Washington Township, Wyoming
County, Pa. Application for renewal of
surface water withdrawal of up to 2.160
mgd (peak day) (Docket No. 20150602).
3. Project Sponsor and Facility: BKV
Operating, LLC (Susquehanna River),
Washington Township, Wyoming
County, Pa. Application for surface
water withdrawal of up to 2.914 mgd
(peak day).
4. Project Sponsor and Facility: BKV
Operating, LLC (Unnamed Tributary to
Middle Branch Wyalusing Creek), Forest
Lake Township, Susquehanna County,
Pa. Application for renewal of surface
water withdrawal of up to 0.648 mgd
(peak day) (Docket No. 20150603).
5. Project Sponsor and Facility: Town
of Chenango, Broome County, N.Y.
Application for renewal of groundwater
withdrawal of up to 0.600 mgd (30-day
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
average) from Well 12A (Docket No.
19871103).
6. Project Sponsor and Facility:
Epsilon Energy USA, Inc. (East Branch
Wyalusing Creek), Rush Township,
Susquehanna County, Pa. Application
for surface water withdrawal of up to
0.715 mgd (peak day).
7. Project Sponsor and Facility: Hydro
Recovery, LP, Blossburg Borough, Tioga
County, Pa. Application for renewal of
groundwater withdrawal of up to 0.216
mgd (30-day average) from Well HR–1
(Docket No. 20150608).
8. Project Sponsor and Facility: Hydro
Recovery, LP, Blossburg Borough, Tioga
County, Pa. Application for renewal of
consumptive use of up to 0.316 mgd
(peak day) (Docket No. 20150608).
9. Project Sponsor: Project Sponsor
and Facility: Keystone Clearwater
Solutions, LLC (Lycoming Creek), Lewis
Township, Lycoming County, Pa.
Application for renewal of surface water
withdrawal of up to 1.250 mgd (peak
day) (Docket No. 20150610).
10. Project Sponsor: Ski Roundtop
Operating Corporation. Project Facility:
Roundtop Mountain Resort (Unnamed
Tributary to Beaver Creek), Warrington
Township, York County, Pa.
Modification to change from peak day to
30-day average for surface water
withdrawal and consumptive use limits
(Docket No. 20031209).
11. Project Sponsor and Facility:
Stewartstown Borough Authority,
Hopewell Township, York County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.019 mgd (30-day
average) from Well 5A4 (Docket No.
19890703).
12. Project Sponsor and Facility:
Stewartstown Borough Authority,
Hopewell Township, York County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.033 mgd (30-day
average) from Well 5J2 (Docket No.
19890703).
13. Project Sponsor and Facility:
Stewartstown Borough Authority,
Hopewell Township, York County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.051 mgd (30-day
average) from Well 5R2 (Docket No.
19890703).
14. Project Sponsor: SUEZ Water
Pennsylvania Inc. Project Facility:
Newberry Operation, Newberry
Township, York County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.072 mgd (30-day
average) from the Dupont Well (Docket
No. 19880401).
15. Project Sponsor and Facility:
Sunset Golf Course, Londonderry
Township, Dauphin County, Pa.
Application for groundwater
E:\FR\FM\11APN1.SGM
11APN1
Federal Register / Vol. 84, No. 70 / Thursday, April 11, 2019 / Notices
withdrawal of up to 0.059 mgd (30-day
average) from Well 7.
16. Project Sponsor and Facility:
Sunset Golf Course, Londonderry
Township, Dauphin County, Pa. Minor
modification to add a new source (Well
7) to existing consumptive use approval
(no increase requested in consumptive
use quantity) (Docket No. 19990506).
17. Project Sponsor and Facility:
Warwick Township Municipal
Authority, Warwick Township,
Lancaster County, Pa. Application for
renewal of groundwater withdrawal of
up to 0.288 mgd (30-day average) from
Well 1 (Docket No. 19890103).
Opportunity To Appear and Comment
Interested parties may appear at the
hearing to offer comments to the
Commission on any business listed
above required to be subject of a public
hearing. The presiding officer reserves
the right to limit oral statements in the
interest of time and to otherwise control
the course of the hearing. Guidelines for
the public hearing are posted on the
Commission’s website, www.srbc.net,
prior to the hearing for review. The
presiding officer reserves the right to
modify or supplement such guidelines
at the hearing. Written comments on
any business listed above required to be
subject of a public hearing may also be
mailed to Mr. Jason Oyler, Secretary to
the Commission, Susquehanna River
Basin Commission, 4423 North Front
Street, Harrisburg, Pa. 17110–1788, or
submitted electronically through
www.srbc.net/about/meetings-events/
public-hearing.html. Comments mailed
or electronically submitted must be
received by the Commission on or
before May 20, 2019, to be considered.
Authority: Pub. L. 91–575, 84 Stat. 1509
et seq., 18 CFR parts 806, 807, and 808.
Dated: April 5, 2019.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2019–07120 Filed 4–10–19; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
amozie on DSK9F9SC42PROD with NOTICES
[Summary Notice No. 2019–08]
Petition for Exemption; Summary of
Petition Received; General Atomics
Aeronautical Systems, Incorporated
Federal Aviation
Administration (FAA), Department of
Transportation (DOT).
ACTION: Notice.
AGENCY:
VerDate Sep<11>2014
16:50 Apr 10, 2019
Jkt 247001
This notice contains a
summary of a petition seeking relief
from specified requirements of Federal
Aviation Regulations. The purpose of
this notice is to improve the public’s
awareness of, and participation in, the
FAA’s exemption process. Neither
publication of this notice nor the
inclusion or omission of information in
the summary is intended to affect the
legal status of the petition or its final
disposition.
DATES: Comments on this petition must
identify the petition docket number and
must be received on or before May 1,
2019.
ADDRESSES: Send comments identified
by docket number FAA–2019–0091
using any of the following methods:
• Federal eRulemaking Portal: Go to
https://www.regulations.gov and follow
the online instructions for sending your
comments electronically.
• Mail: Send comments to Docket
Operations, M–30; U.S. Department of
Transportation, 1200 New Jersey
Avenue SE, Room W12–140, West
Building Ground Floor, Washington, DC
20590–0001.
• Hand Delivery or Courier: Take
comments to Docket Operations in
Room W12–140 of the West Building
Ground Floor at 1200 New Jersey
Avenue SE, Washington, DC 20590–
0001, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
• Fax: Fax comments to Docket
Operations at (202) 493–2251.
Privacy: In accordance with 5 U.S.C.
553(c), DOT solicits comments from the
public to better inform its rulemaking
process. DOT posts these comments,
without edit, including any personal
information the commenter provides, to
https://www.regulations.gov, as
described in the system of records
notice (DOT/ALL–14 FDMS), which can
be reviewed at https://www.dot.gov/
privacy.
Docket: Background documents or
comments received may be read at
https://www.regulations.gov at any time.
Follow the online instructions for
accessing the docket or go to the Docket
Operations in Room W12–140 of the
West Building Ground Floor at 1200
New Jersey Avenue SE, Washington, DC
20590–0001, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT:
Brittany Newton (202) 267–6691, Office
of Rulemaking, Federal Aviation
Administration, 800 Independence
Avenue SW, Washington, DC 20591.
This notice is published pursuant to
14 CFR 11.85.
SUMMARY:
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
14713
Issued in Washington, DC, on March 28,
2019.
Lirio Liu,
Executive Director, Office of Rulemaking.
Petition for Exemption
Docket No.: FAA–2019–0091.
Petitioner: General Atomics
Aeronautical Systems, Incorporated.
Section(s) of 14 CFR Affected: 21.185
(b).
Description of Relief Sought: Request
for exemption from the military surplus
regulatory provision of Title 14 Code of
Federal Regulations § 21.185(b) to allow
the restricted category type certification
of a General Atomics Aeronautical
Systems, Inc. owned MQ–9A Reaper
Unmanned Aircraft Systems (V AS) that
have not previously been accepted or
used by an Armed Force of the United
States.
[FR Doc. 2019–07143 Filed 4–10–19; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
[Summary Notice No. 2019–14]
Petition for Exemption; Summary of
Petition Received; Near Earth
Autonomy, Inc
Federal Aviation
Administration (FAA), Department of
Transportation (DOT).
ACTION: Notice.
AGENCY:
This notice contains a
summary of a petition seeking relief
from specified requirements of Federal
Aviation Regulations. The purpose of
this notice is to improve the public’s
awareness of, and participation in, the
FAA’s exemption process. Neither
publication of this notice nor the
inclusion or omission of information in
the summary is intended to affect the
legal status of the petition or its final
disposition.
DATES: Comments on this petition must
identify the petition docket number and
must be received on or before May 1,
2019.
ADDRESSES: Send comments identified
by docket number FAA–2018–1057
using any of the following methods:
• Federal eRulemaking Portal: Go to
https://www.regulations.gov and follow
the online instructions for sending your
comments electronically.
• Mail: Send comments to Docket
Operations, M–30; U.S. Department of
Transportation, 1200 New Jersey
Avenue SE, Room W12–140, West
Building Ground Floor, Washington, DC
20590–0001.
SUMMARY:
E:\FR\FM\11APN1.SGM
11APN1
Agencies
[Federal Register Volume 84, Number 70 (Thursday, April 11, 2019)]
[Notices]
[Pages 14712-14713]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-07120]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Public Hearing
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Susquehanna River Basin Commission will hold a public
hearing on May 9, 2019, in Harrisburg, Pennsylvania. At this public
hearing, the Commission will hear testimony on the projects listed in
the Supplementary Information section of this notice. Such projects are
intended to be scheduled for Commission action at its next business
meeting, tentatively scheduled for June 14, 2019, which will be noticed
separately. The public should take note that this public hearing will
be the only opportunity to offer oral comment to the Commission for the
listed projects. The deadline for the submission of written comments is
May 20, 2019.
DATES: The public hearing will convene on May 9, 2019, at 2:30 p.m. The
public hearing will end at 5:00 p.m. or at the conclusion of public
testimony, whichever is sooner. The deadline for the submission of
written comments is May 20, 2019.
ADDRESSES: The public hearing will be conducted at the Pennsylvania
State Capitol, East Wing, Room 8EB, Harrisburg, Pa.
FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and
Secretary to the Commission, telephone: (717) 238-0423; fax: (717) 238-
2436. Information concerning the applications for these projects is
available at the Commission's Water Application and Approval Viewer at
https://mdw.srbc.net/waav. Additional supporting documents are
available to inspect and copy in accordance with the Commission's
Access to Records Policy at www.srbc.net/regulatory/policies-guidance/docs/access-to-records-policy-2009-02.pdf.
SUPPLEMENTARY INFORMATION: The public hearing will cover the following
projects:
Projects Scheduled for Action
1. Project Sponsor and Facility: Project Sponsor and Facility: ARD
Operating, LLC (Pine Creek), McHenry Township, Lycoming County, Pa.
Application for renewal of surface water withdrawal of up to 1.500 mgd
(peak day) (Docket No. 20150601).
2. Project Sponsor and Facility: BKV Operating, LLC (Meshoppen
Creek), Washington Township, Wyoming County, Pa. Application for
renewal of surface water withdrawal of up to 2.160 mgd (peak day)
(Docket No. 20150602).
3. Project Sponsor and Facility: BKV Operating, LLC (Susquehanna
River), Washington Township, Wyoming County, Pa. Application for
surface water withdrawal of up to 2.914 mgd (peak day).
4. Project Sponsor and Facility: BKV Operating, LLC (Unnamed
Tributary to Middle Branch Wyalusing Creek), Forest Lake Township,
Susquehanna County, Pa. Application for renewal of surface water
withdrawal of up to 0.648 mgd (peak day) (Docket No. 20150603).
5. Project Sponsor and Facility: Town of Chenango, Broome County,
N.Y. Application for renewal of groundwater withdrawal of up to 0.600
mgd (30-day average) from Well 12A (Docket No. 19871103).
6. Project Sponsor and Facility: Epsilon Energy USA, Inc. (East
Branch Wyalusing Creek), Rush Township, Susquehanna County, Pa.
Application for surface water withdrawal of up to 0.715 mgd (peak day).
7. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg
Borough, Tioga County, Pa. Application for renewal of groundwater
withdrawal of up to 0.216 mgd (30-day average) from Well HR-1 (Docket
No. 20150608).
8. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg
Borough, Tioga County, Pa. Application for renewal of consumptive use
of up to 0.316 mgd (peak day) (Docket No. 20150608).
9. Project Sponsor: Project Sponsor and Facility: Keystone
Clearwater Solutions, LLC (Lycoming Creek), Lewis Township, Lycoming
County, Pa. Application for renewal of surface water withdrawal of up
to 1.250 mgd (peak day) (Docket No. 20150610).
10. Project Sponsor: Ski Roundtop Operating Corporation. Project
Facility: Roundtop Mountain Resort (Unnamed Tributary to Beaver Creek),
Warrington Township, York County, Pa. Modification to change from peak
day to 30-day average for surface water withdrawal and consumptive use
limits (Docket No. 20031209).
11. Project Sponsor and Facility: Stewartstown Borough Authority,
Hopewell Township, York County, Pa. Application for renewal of
groundwater withdrawal of up to 0.019 mgd (30-day average) from Well
5A4 (Docket No. 19890703).
12. Project Sponsor and Facility: Stewartstown Borough Authority,
Hopewell Township, York County, Pa. Application for renewal of
groundwater withdrawal of up to 0.033 mgd (30-day average) from Well
5J2 (Docket No. 19890703).
13. Project Sponsor and Facility: Stewartstown Borough Authority,
Hopewell Township, York County, Pa. Application for renewal of
groundwater withdrawal of up to 0.051 mgd (30-day average) from Well
5R2 (Docket No. 19890703).
14. Project Sponsor: SUEZ Water Pennsylvania Inc. Project Facility:
Newberry Operation, Newberry Township, York County, Pa. Application for
renewal of groundwater withdrawal of up to 0.072 mgd (30-day average)
from the Dupont Well (Docket No. 19880401).
15. Project Sponsor and Facility: Sunset Golf Course, Londonderry
Township, Dauphin County, Pa. Application for groundwater
[[Page 14713]]
withdrawal of up to 0.059 mgd (30-day average) from Well 7.
16. Project Sponsor and Facility: Sunset Golf Course, Londonderry
Township, Dauphin County, Pa. Minor modification to add a new source
(Well 7) to existing consumptive use approval (no increase requested in
consumptive use quantity) (Docket No. 19990506).
17. Project Sponsor and Facility: Warwick Township Municipal
Authority, Warwick Township, Lancaster County, Pa. Application for
renewal of groundwater withdrawal of up to 0.288 mgd (30-day average)
from Well 1 (Docket No. 19890103).
Opportunity To Appear and Comment
Interested parties may appear at the hearing to offer comments to
the Commission on any business listed above required to be subject of a
public hearing. The presiding officer reserves the right to limit oral
statements in the interest of time and to otherwise control the course
of the hearing. Guidelines for the public hearing are posted on the
Commission's website, www.srbc.net, prior to the hearing for review.
The presiding officer reserves the right to modify or supplement such
guidelines at the hearing. Written comments on any business listed
above required to be subject of a public hearing may also be mailed to
Mr. Jason Oyler, Secretary to the Commission, Susquehanna River Basin
Commission, 4423 North Front Street, Harrisburg, Pa. 17110-1788, or
submitted electronically through www.srbc.net/about/meetings-events/public-hearing.html. Comments mailed or electronically submitted must
be received by the Commission on or before May 20, 2019, to be
considered.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: April 5, 2019.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2019-07120 Filed 4-10-19; 8:45 am]
BILLING CODE 7040-01-P