Jordan Cove Energy Project LP, Pacific Connector Gas Pipeline L.P.; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Jordan Cove Energy Project, 13648-13649 [2019-06715]

Download as PDF 13648 Federal Register / Vol. 84, No. 66 / Friday, April 5, 2019 / Notices eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 1, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–06724 Filed 4–4–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP17–495–000; CP17–494– 000] khammond on DSKBBV9HB2PROD with NOTICES Jordan Cove Energy Project LP, Pacific Connector Gas Pipeline L.P.; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Jordan Cove Energy Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) with the participation of the cooperating agencies listed below, has prepared a draft environmental impact statement (EIS) for the Jordan Cove Liquefied Natural Gas Project proposed by Jordan Cove Energy Project LP (Jordan Cove) and the Pacific Connector Gas Pipeline Project proposed by Pacific Connector Gas Pipeline L.P. (Pacific Connector) (collectively referred to as the Jordan Cove Energy Project or Project). Under Section 3 of the Natural Gas Act (NGA), Jordan Cove requests authorization to liquefy at a terminal in Coos Bay, Oregon up to 1.04 billion cubic feet of natural gas per day for export for to overseas markets. Pacific Connector seeks a Certificate of Public Convenience and Necessity under VerDate Sep<11>2014 18:46 Apr 04, 2019 Jkt 247001 Section 7 of the NGA to construct and operate an interstate natural gas transmission pipeline providing about 1.2 billion cubic feet per day of natural gas from the Malin hub to the Jordan Cove terminal, crossing portions of Klamath, Jackson, Douglas, and Coos Counties, Oregon. The draft EIS assesses the potential environmental effects of the construction and operation of the Project in accordance with the requirements of the National Environmental Policy Act (NEPA). As described in the draft EIS, the FERC staff concludes that approval of the Project would result in a number of significant environmental impacts; however, the majority of impacts would be less than significant because of the impact avoidance, minimization, and mitigation measures proposed by Jordan Cove and Pacific Connector and those recommended by staff in the draft EIS. The United States Department of the Interior Bureau of Land Management (BLM); U.S. Department of Agriculture Forest Service (Forest Service); Bureau of Reclamation (Reclamation); U.S. Department of Energy; U.S. Army Corps of Engineers; U.S. Environmental Protection Agency; U.S. Department of the Interior Fish and Wildlife Service; U.S. Department of Commerce National Oceanic and Atmospheric Administration’s National Marine Fisheries Service; U.S. Department of Homeland Security Coast Guard; the Coquille Indian Tribe; and the Pipeline and Hazardous Materials Safety Administration within the U.S. Department of Transportation participated as cooperating agencies in preparation of this EIS. Cooperating agencies have jurisdiction by law or special expertise with respect to resources potentially affected by the proposal and participate in the NEPA analysis. The cooperating agencies provided input into the conclusions and recommendations presented in the draft EIS. Following issuance of the final EIS, the cooperating agencies will issue subsequent decisions, determinations, permits or authorizations for the Project in accordance with each individual agency’s regulatory requirements. The BLM, with the concurrence of the Forest Service and Reclamation, would adopt and use the EIS to consider issuing a right-of-way grant for the portion of the Project on federal lands. Other cooperating agencies would use this EIS in their regulatory process, and to satisfy compliance with NEPA and other related federal environmental laws (e.g., the National Historic Preservation Act). PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 The BLM and the Forest Service would also use this EIS to evaluate proposed amendments to their District or National Forest land management plans that would make provision for the Pacific Connector pipeline. In order to consider the Pacific Connector right-ofway grant, the BLM must amend the affected Resource Management Plans (RMPs). The BLM therefore proposes to amend the RMPs to re-allocate all lands within the proposed temporary use area and right-of-way to a District-Designated Reserve, with management direction to manage the lands for the purposes of the Pacific Connector right-of-way. Approximately 885 acres would be reallocated. District-Designated Reserve allocations establish specific management for a specific use or to protect specific values and resources. In accordance with Code of Federal Regulations (CFR) part 36 CFR 219.16, the Forest Service gives notice of its intent to consider amendments of Land and Resource Management Plans (LRMP) for the Umpqua, Rogue River and Winema National Forests. Proposed amendments of LRMPs include reallocation of matrix lands to Late Successional Reserves and site-specific exemptions from standards and guidelines and other LRMP requirements to allow construction of the Pacific Connector pipeline. Exemptions from standards and guidelines include requirements to protect known sites of Survey and Manage species, changes in visual quality objectives at specific locations, limitations on detrimental soil conditions, removal of effective shade at perennial stream crossings and the construction of utility corridors in riparian areas. Further information on Forest Service LRMP amendments is included below. The Commission mailed a copy of the Notice of Availability of the draft EIS to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Indian Tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the Project area. The draft EIS is only available in electronic format. It may be viewed and downloaded from the FERC’s website (www.ferc.gov), on the Environmental Documents page (https:// www.ferc.gov/industries/gas/enviro/ eis.asp). In addition, the draft EIS may be accessed by using the eLibrary link on the FERC’s website. Click on the eLibrary link (https://www.ferc.gov/ docs-filing/elibrary.asp), click on General Search, and enter the docket E:\FR\FM\05APN1.SGM 05APN1 khammond on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 84, No. 66 / Friday, April 5, 2019 / Notices number in the ‘‘Docket Number’’ field, excluding the last three digits (i.e., CP17–494 or CP17–495). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Any person wishing to comment on the draft EIS may do so. Your comments should focus on the draft EIS’s disclosure and discussion of potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. To ensure consideration of your comments on the proposal in the final EIS, it is important that the Commission receive your comments on or before 5:00 p.m. Eastern Time on July 5, 2019. For your convenience, there are four methods you can use to submit your comments to the Commission.1 The Commission will provide equal consideration to all comments received, whether filed in written form or provided verbally. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’ as the filing type; or (3) You can file a paper copy of your comments by mailing them to the following address. Be sure to reference the Project docket numbers (CP17–494– 000 and CP17–495–000) with your submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426 (4) In lieu of sending written or electronic comments, the Commission invites you to attend a public comment session that will be held in the Project area to receive comments on the draft EIS. The dates, locations, and times of these sessions will be provided in a supplemental notice. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR 385.214). Motions to intervene are more fully described at https://www.ferc.gov/resources/guides/ how-to/intervene.asp. Only intervenors have the right to seek rehearing or judicial review of the Commission’s decision. The Commission grants affected landowners and others with environmental concerns intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which no other party can adequately represent. Simply filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Subsequent decisions, determination, permits, and authorization by the cooperating agencies are subject to the administrative procedures of each respective agency. 1 The contents of your comment including your address, phone number, email address, or other personal identifying information may be made available to the public. While you may request that your personal identifying information be withheld from public view, we cannot guarantee that we will be able to do so. Dated: March 29, 2019. Kimberly D. Bose, Secretary. VerDate Sep<11>2014 18:46 Apr 04, 2019 Jkt 247001 Questions? Additional information about the Project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription that allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. [FR Doc. 2019–06715 Filed 4–4–19; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 13649 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–112–000] Tennessee Gas Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization Take notice that on March 20, 2019, Tennessee Gas Pipeline Company, L.L.C. (Tennessee Gas), 1001 Louisiana Street, Houston, Texas 77002, filed in Docket No. CP19–112–000 a prior notice request pursuant to sections 157.203, 157.205, and 157.216 of the Commission’s regulations under the Natural Gas Act for authorization to abandon one inactive supply lateral designated as Line No. 520A–100 (Supply Lateral) and associated meter, platforms, and appurtenances located in Terrebonne Parish, Louisiana, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Ben J. Carranza, Director, Regulatory, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, at (713) 420–5535 or at Ben_Carranza@kindermorgan.com. Specifically, Tennessee Gas proposes to abandon Line No. 520A–100, a 10.77mile-long Supply Lateral in Terrebonne Parish, which is located approximately 3.3 miles southeast of Amelia, Louisiana. Also, a non-company owned meter designated as Meter NO, 01–2843, two associated platforms, and appurtenances are proposed to be abandoned, all located in Terrebonne Parish, Louisiana. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the E:\FR\FM\05APN1.SGM 05APN1

Agencies

[Federal Register Volume 84, Number 66 (Friday, April 5, 2019)]
[Notices]
[Pages 13648-13649]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-06715]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP17-495-000; CP17-494-000]


Jordan Cove Energy Project LP, Pacific Connector Gas Pipeline 
L.P.; Notice of Availability of the Draft Environmental Impact 
Statement for the Proposed Jordan Cove Energy Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) with the participation of the cooperating agencies listed 
below, has prepared a draft environmental impact statement (EIS) for 
the Jordan Cove Liquefied Natural Gas Project proposed by Jordan Cove 
Energy Project LP (Jordan Cove) and the Pacific Connector Gas Pipeline 
Project proposed by Pacific Connector Gas Pipeline L.P. (Pacific 
Connector) (collectively referred to as the Jordan Cove Energy Project 
or Project). Under Section 3 of the Natural Gas Act (NGA), Jordan Cove 
requests authorization to liquefy at a terminal in Coos Bay, Oregon up 
to 1.04 billion cubic feet of natural gas per day for export for to 
overseas markets. Pacific Connector seeks a Certificate of Public 
Convenience and Necessity under Section 7 of the NGA to construct and 
operate an interstate natural gas transmission pipeline providing about 
1.2 billion cubic feet per day of natural gas from the Malin hub to the 
Jordan Cove terminal, crossing portions of Klamath, Jackson, Douglas, 
and Coos Counties, Oregon.
    The draft EIS assesses the potential environmental effects of the 
construction and operation of the Project in accordance with the 
requirements of the National Environmental Policy Act (NEPA). As 
described in the draft EIS, the FERC staff concludes that approval of 
the Project would result in a number of significant environmental 
impacts; however, the majority of impacts would be less than 
significant because of the impact avoidance, minimization, and 
mitigation measures proposed by Jordan Cove and Pacific Connector and 
those recommended by staff in the draft EIS.
    The United States Department of the Interior Bureau of Land 
Management (BLM); U.S. Department of Agriculture Forest Service (Forest 
Service); Bureau of Reclamation (Reclamation); U.S. Department of 
Energy; U.S. Army Corps of Engineers; U.S. Environmental Protection 
Agency; U.S. Department of the Interior Fish and Wildlife Service; U.S. 
Department of Commerce National Oceanic and Atmospheric 
Administration's National Marine Fisheries Service; U.S. Department of 
Homeland Security Coast Guard; the Coquille Indian Tribe; and the 
Pipeline and Hazardous Materials Safety Administration within the U.S. 
Department of Transportation participated as cooperating agencies in 
preparation of this EIS. Cooperating agencies have jurisdiction by law 
or special expertise with respect to resources potentially affected by 
the proposal and participate in the NEPA analysis. The cooperating 
agencies provided input into the conclusions and recommendations 
presented in the draft EIS. Following issuance of the final EIS, the 
cooperating agencies will issue subsequent decisions, determinations, 
permits or authorizations for the Project in accordance with each 
individual agency's regulatory requirements.
    The BLM, with the concurrence of the Forest Service and 
Reclamation, would adopt and use the EIS to consider issuing a right-
of-way grant for the portion of the Project on federal lands. Other 
cooperating agencies would use this EIS in their regulatory process, 
and to satisfy compliance with NEPA and other related federal 
environmental laws (e.g., the National Historic Preservation Act).
    The BLM and the Forest Service would also use this EIS to evaluate 
proposed amendments to their District or National Forest land 
management plans that would make provision for the Pacific Connector 
pipeline. In order to consider the Pacific Connector right-of-way 
grant, the BLM must amend the affected Resource Management Plans 
(RMPs). The BLM therefore proposes to amend the RMPs to re-allocate all 
lands within the proposed temporary use area and right-of-way to a 
District-Designated Reserve, with management direction to manage the 
lands for the purposes of the Pacific Connector right-of-way. 
Approximately 885 acres would be re-allocated. District-Designated 
Reserve allocations establish specific management for a specific use or 
to protect specific values and resources. In accordance with Code of 
Federal Regulations (CFR) part 36 CFR 219.16, the Forest Service gives 
notice of its intent to consider amendments of Land and Resource 
Management Plans (LRMP) for the Umpqua, Rogue River and Winema National 
Forests. Proposed amendments of LRMPs include reallocation of matrix 
lands to Late Successional Reserves and site-specific exemptions from 
standards and guidelines and other LRMP requirements to allow 
construction of the Pacific Connector pipeline. Exemptions from 
standards and guidelines include requirements to protect known sites of 
Survey and Manage species, changes in visual quality objectives at 
specific locations, limitations on detrimental soil conditions, removal 
of effective shade at perennial stream crossings and the construction 
of utility corridors in riparian areas. Further information on Forest 
Service LRMP amendments is included below.
    The Commission mailed a copy of the Notice of Availability of the 
draft EIS to federal, state, and local government representatives and 
agencies; elected officials; environmental and public interest groups; 
Indian Tribes; potentially affected landowners and other interested 
individuals and groups; and newspapers and libraries in the Project 
area. The draft EIS is only available in electronic format. It may be 
viewed and downloaded from the FERC's website (www.ferc.gov), on the 
Environmental Documents page (https://www.ferc.gov/industries/gas/enviro/eis.asp). In addition, the draft EIS may be accessed by using 
the eLibrary link on the FERC's website. Click on the eLibrary link 
(https://www.ferc.gov/docs-filing/elibrary.asp), click on General 
Search, and enter the docket

[[Page 13649]]

number in the ``Docket Number'' field, excluding the last three digits 
(i.e., CP17-494 or CP17-495). Be sure you have selected an appropriate 
date range. For assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659.
    Any person wishing to comment on the draft EIS may do so. Your 
comments should focus on the draft EIS's disclosure and discussion of 
potential environmental effects, reasonable alternatives, and measures 
to avoid or lessen environmental impacts. To ensure consideration of 
your comments on the proposal in the final EIS, it is important that 
the Commission receive your comments on or before 5:00 p.m. Eastern 
Time on July 5, 2019.
    For your convenience, there are four methods you can use to submit 
your comments to the Commission.\1\ The Commission will provide equal 
consideration to all comments received, whether filed in written form 
or provided verbally. The Commission encourages electronic filing of 
comments and has staff available to assist you at (866) 208-3676 or 
[email protected]. Please carefully follow these instructions 
so that your comments are properly recorded.
---------------------------------------------------------------------------

    \1\ The contents of your comment including your address, phone 
number, email address, or other personal identifying information may 
be made available to the public. While you may request that your 
personal identifying information be withheld from public view, we 
cannot guarantee that we will be able to do so.
---------------------------------------------------------------------------

    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the Project docket numbers 
(CP17-494-000 and CP17-495-000) with your submission: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Room 1A, Washington, DC 20426
    (4) In lieu of sending written or electronic comments, the 
Commission invites you to attend a public comment session that will be 
held in the Project area to receive comments on the draft EIS. The 
dates, locations, and times of these sessions will be provided in a 
supplemental notice.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR 385.214). Motions to intervene are more 
fully described at https://www.ferc.gov/resources/guides/how-to/intervene.asp. Only intervenors have the right to seek rehearing or 
judicial review of the Commission's decision. The Commission grants 
affected landowners and others with environmental concerns intervenor 
status upon showing good cause by stating that they have a clear and 
direct interest in this proceeding which no other party can adequately 
represent. Simply filing environmental comments will not give you 
intervenor status, but you do not need intervenor status to have your 
comments considered. Subsequent decisions, determination, permits, and 
authorization by the cooperating agencies are subject to the 
administrative procedures of each respective agency.

Questions?

    Additional information about the Project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link 
also provides access to the texts of all formal documents issued by the 
Commission, such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription that allows you to keep track of all formal issuances and 
submittals in specific dockets. This can reduce the amount of time you 
spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: March 29, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-06715 Filed 4-4-19; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.