Jordan Cove Energy Project LP, Pacific Connector Gas Pipeline L.P.; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Jordan Cove Energy Project, 13648-13649 [2019-06715]
Download as PDF
13648
Federal Register / Vol. 84, No. 66 / Friday, April 5, 2019 / Notices
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers
to receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 1, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–06724 Filed 4–4–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP17–495–000; CP17–494–
000]
khammond on DSKBBV9HB2PROD with NOTICES
Jordan Cove Energy Project LP,
Pacific Connector Gas Pipeline L.P.;
Notice of Availability of the Draft
Environmental Impact Statement for
the Proposed Jordan Cove Energy
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) with the participation of
the cooperating agencies listed below,
has prepared a draft environmental
impact statement (EIS) for the Jordan
Cove Liquefied Natural Gas Project
proposed by Jordan Cove Energy Project
LP (Jordan Cove) and the Pacific
Connector Gas Pipeline Project
proposed by Pacific Connector Gas
Pipeline L.P. (Pacific Connector)
(collectively referred to as the Jordan
Cove Energy Project or Project). Under
Section 3 of the Natural Gas Act (NGA),
Jordan Cove requests authorization to
liquefy at a terminal in Coos Bay,
Oregon up to 1.04 billion cubic feet of
natural gas per day for export for to
overseas markets. Pacific Connector
seeks a Certificate of Public
Convenience and Necessity under
VerDate Sep<11>2014
18:46 Apr 04, 2019
Jkt 247001
Section 7 of the NGA to construct and
operate an interstate natural gas
transmission pipeline providing about
1.2 billion cubic feet per day of natural
gas from the Malin hub to the Jordan
Cove terminal, crossing portions of
Klamath, Jackson, Douglas, and Coos
Counties, Oregon.
The draft EIS assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). As
described in the draft EIS, the FERC
staff concludes that approval of the
Project would result in a number of
significant environmental impacts;
however, the majority of impacts would
be less than significant because of the
impact avoidance, minimization, and
mitigation measures proposed by Jordan
Cove and Pacific Connector and those
recommended by staff in the draft EIS.
The United States Department of the
Interior Bureau of Land Management
(BLM); U.S. Department of Agriculture
Forest Service (Forest Service); Bureau
of Reclamation (Reclamation); U.S.
Department of Energy; U.S. Army Corps
of Engineers; U.S. Environmental
Protection Agency; U.S. Department of
the Interior Fish and Wildlife Service;
U.S. Department of Commerce National
Oceanic and Atmospheric
Administration’s National Marine
Fisheries Service; U.S. Department of
Homeland Security Coast Guard; the
Coquille Indian Tribe; and the Pipeline
and Hazardous Materials Safety
Administration within the U.S.
Department of Transportation
participated as cooperating agencies in
preparation of this EIS. Cooperating
agencies have jurisdiction by law or
special expertise with respect to
resources potentially affected by the
proposal and participate in the NEPA
analysis. The cooperating agencies
provided input into the conclusions and
recommendations presented in the draft
EIS. Following issuance of the final EIS,
the cooperating agencies will issue
subsequent decisions, determinations,
permits or authorizations for the Project
in accordance with each individual
agency’s regulatory requirements.
The BLM, with the concurrence of the
Forest Service and Reclamation, would
adopt and use the EIS to consider
issuing a right-of-way grant for the
portion of the Project on federal lands.
Other cooperating agencies would use
this EIS in their regulatory process, and
to satisfy compliance with NEPA and
other related federal environmental laws
(e.g., the National Historic Preservation
Act).
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
The BLM and the Forest Service
would also use this EIS to evaluate
proposed amendments to their District
or National Forest land management
plans that would make provision for the
Pacific Connector pipeline. In order to
consider the Pacific Connector right-ofway grant, the BLM must amend the
affected Resource Management Plans
(RMPs). The BLM therefore proposes to
amend the RMPs to re-allocate all lands
within the proposed temporary use area
and right-of-way to a District-Designated
Reserve, with management direction to
manage the lands for the purposes of the
Pacific Connector right-of-way.
Approximately 885 acres would be reallocated. District-Designated Reserve
allocations establish specific
management for a specific use or to
protect specific values and resources. In
accordance with Code of Federal
Regulations (CFR) part 36 CFR 219.16,
the Forest Service gives notice of its
intent to consider amendments of Land
and Resource Management Plans
(LRMP) for the Umpqua, Rogue River
and Winema National Forests. Proposed
amendments of LRMPs include
reallocation of matrix lands to Late
Successional Reserves and site-specific
exemptions from standards and
guidelines and other LRMP
requirements to allow construction of
the Pacific Connector pipeline.
Exemptions from standards and
guidelines include requirements to
protect known sites of Survey and
Manage species, changes in visual
quality objectives at specific locations,
limitations on detrimental soil
conditions, removal of effective shade at
perennial stream crossings and the
construction of utility corridors in
riparian areas. Further information on
Forest Service LRMP amendments is
included below.
The Commission mailed a copy of the
Notice of Availability of the draft EIS to
federal, state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Indian Tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
Project area. The draft EIS is only
available in electronic format. It may be
viewed and downloaded from the
FERC’s website (www.ferc.gov), on the
Environmental Documents page (https://
www.ferc.gov/industries/gas/enviro/
eis.asp). In addition, the draft EIS may
be accessed by using the eLibrary link
on the FERC’s website. Click on the
eLibrary link (https://www.ferc.gov/
docs-filing/elibrary.asp), click on
General Search, and enter the docket
E:\FR\FM\05APN1.SGM
05APN1
khammond on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 84, No. 66 / Friday, April 5, 2019 / Notices
number in the ‘‘Docket Number’’ field,
excluding the last three digits (i.e.,
CP17–494 or CP17–495). Be sure you
have selected an appropriate date range.
For assistance, please contact FERC
Online Support at FercOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
for TTY, contact (202) 502–8659.
Any person wishing to comment on
the draft EIS may do so. Your comments
should focus on the draft EIS’s
disclosure and discussion of potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. To
ensure consideration of your comments
on the proposal in the final EIS, it is
important that the Commission receive
your comments on or before 5:00 p.m.
Eastern Time on July 5, 2019.
For your convenience, there are four
methods you can use to submit your
comments to the Commission.1 The
Commission will provide equal
consideration to all comments received,
whether filed in written form or
provided verbally. The Commission
encourages electronic filing of
comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ If you are filing
a comment on a particular project,
please select ‘‘Comment on a Filing’’ as
the filing type; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the Project docket numbers (CP17–494–
000 and CP17–495–000) with your
submission: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426
(4) In lieu of sending written or
electronic comments, the Commission
invites you to attend a public comment
session that will be held in the Project
area to receive comments on the draft
EIS. The dates, locations, and times of
these sessions will be provided in a
supplemental notice.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214). Motions
to intervene are more fully described at
https://www.ferc.gov/resources/guides/
how-to/intervene.asp. Only intervenors
have the right to seek rehearing or
judicial review of the Commission’s
decision. The Commission grants
affected landowners and others with
environmental concerns intervenor
status upon showing good cause by
stating that they have a clear and direct
interest in this proceeding which no
other party can adequately represent.
Simply filing environmental comments
will not give you intervenor status, but
you do not need intervenor status to
have your comments considered.
Subsequent decisions, determination,
permits, and authorization by the
cooperating agencies are subject to the
administrative procedures of each
respective agency.
1 The contents of your comment including your
address, phone number, email address, or other
personal identifying information may be made
available to the public. While you may request that
your personal identifying information be withheld
from public view, we cannot guarantee that we will
be able to do so.
Dated: March 29, 2019.
Kimberly D. Bose,
Secretary.
VerDate Sep<11>2014
18:46 Apr 04, 2019
Jkt 247001
Questions?
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
[FR Doc. 2019–06715 Filed 4–4–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
13649
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–112–000]
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Request Under
Blanket Authorization
Take notice that on March 20, 2019,
Tennessee Gas Pipeline Company,
L.L.C. (Tennessee Gas), 1001 Louisiana
Street, Houston, Texas 77002, filed in
Docket No. CP19–112–000 a prior notice
request pursuant to sections 157.203,
157.205, and 157.216 of the
Commission’s regulations under the
Natural Gas Act for authorization to
abandon one inactive supply lateral
designated as Line No. 520A–100
(Supply Lateral) and associated meter,
platforms, and appurtenances located in
Terrebonne Parish, Louisiana, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Ben J.
Carranza, Director, Regulatory,
Tennessee Gas Pipeline Company,
L.L.C., 1001 Louisiana Street, Houston,
Texas 77002, at (713) 420–5535 or at
Ben_Carranza@kindermorgan.com.
Specifically, Tennessee Gas proposes
to abandon Line No. 520A–100, a 10.77mile-long Supply Lateral in Terrebonne
Parish, which is located approximately
3.3 miles southeast of Amelia,
Louisiana. Also, a non-company owned
meter designated as Meter NO, 01–2843,
two associated platforms, and
appurtenances are proposed to be
abandoned, all located in Terrebonne
Parish, Louisiana.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
E:\FR\FM\05APN1.SGM
05APN1
Agencies
[Federal Register Volume 84, Number 66 (Friday, April 5, 2019)]
[Notices]
[Pages 13648-13649]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-06715]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP17-495-000; CP17-494-000]
Jordan Cove Energy Project LP, Pacific Connector Gas Pipeline
L.P.; Notice of Availability of the Draft Environmental Impact
Statement for the Proposed Jordan Cove Energy Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) with the participation of the cooperating agencies listed
below, has prepared a draft environmental impact statement (EIS) for
the Jordan Cove Liquefied Natural Gas Project proposed by Jordan Cove
Energy Project LP (Jordan Cove) and the Pacific Connector Gas Pipeline
Project proposed by Pacific Connector Gas Pipeline L.P. (Pacific
Connector) (collectively referred to as the Jordan Cove Energy Project
or Project). Under Section 3 of the Natural Gas Act (NGA), Jordan Cove
requests authorization to liquefy at a terminal in Coos Bay, Oregon up
to 1.04 billion cubic feet of natural gas per day for export for to
overseas markets. Pacific Connector seeks a Certificate of Public
Convenience and Necessity under Section 7 of the NGA to construct and
operate an interstate natural gas transmission pipeline providing about
1.2 billion cubic feet per day of natural gas from the Malin hub to the
Jordan Cove terminal, crossing portions of Klamath, Jackson, Douglas,
and Coos Counties, Oregon.
The draft EIS assesses the potential environmental effects of the
construction and operation of the Project in accordance with the
requirements of the National Environmental Policy Act (NEPA). As
described in the draft EIS, the FERC staff concludes that approval of
the Project would result in a number of significant environmental
impacts; however, the majority of impacts would be less than
significant because of the impact avoidance, minimization, and
mitigation measures proposed by Jordan Cove and Pacific Connector and
those recommended by staff in the draft EIS.
The United States Department of the Interior Bureau of Land
Management (BLM); U.S. Department of Agriculture Forest Service (Forest
Service); Bureau of Reclamation (Reclamation); U.S. Department of
Energy; U.S. Army Corps of Engineers; U.S. Environmental Protection
Agency; U.S. Department of the Interior Fish and Wildlife Service; U.S.
Department of Commerce National Oceanic and Atmospheric
Administration's National Marine Fisheries Service; U.S. Department of
Homeland Security Coast Guard; the Coquille Indian Tribe; and the
Pipeline and Hazardous Materials Safety Administration within the U.S.
Department of Transportation participated as cooperating agencies in
preparation of this EIS. Cooperating agencies have jurisdiction by law
or special expertise with respect to resources potentially affected by
the proposal and participate in the NEPA analysis. The cooperating
agencies provided input into the conclusions and recommendations
presented in the draft EIS. Following issuance of the final EIS, the
cooperating agencies will issue subsequent decisions, determinations,
permits or authorizations for the Project in accordance with each
individual agency's regulatory requirements.
The BLM, with the concurrence of the Forest Service and
Reclamation, would adopt and use the EIS to consider issuing a right-
of-way grant for the portion of the Project on federal lands. Other
cooperating agencies would use this EIS in their regulatory process,
and to satisfy compliance with NEPA and other related federal
environmental laws (e.g., the National Historic Preservation Act).
The BLM and the Forest Service would also use this EIS to evaluate
proposed amendments to their District or National Forest land
management plans that would make provision for the Pacific Connector
pipeline. In order to consider the Pacific Connector right-of-way
grant, the BLM must amend the affected Resource Management Plans
(RMPs). The BLM therefore proposes to amend the RMPs to re-allocate all
lands within the proposed temporary use area and right-of-way to a
District-Designated Reserve, with management direction to manage the
lands for the purposes of the Pacific Connector right-of-way.
Approximately 885 acres would be re-allocated. District-Designated
Reserve allocations establish specific management for a specific use or
to protect specific values and resources. In accordance with Code of
Federal Regulations (CFR) part 36 CFR 219.16, the Forest Service gives
notice of its intent to consider amendments of Land and Resource
Management Plans (LRMP) for the Umpqua, Rogue River and Winema National
Forests. Proposed amendments of LRMPs include reallocation of matrix
lands to Late Successional Reserves and site-specific exemptions from
standards and guidelines and other LRMP requirements to allow
construction of the Pacific Connector pipeline. Exemptions from
standards and guidelines include requirements to protect known sites of
Survey and Manage species, changes in visual quality objectives at
specific locations, limitations on detrimental soil conditions, removal
of effective shade at perennial stream crossings and the construction
of utility corridors in riparian areas. Further information on Forest
Service LRMP amendments is included below.
The Commission mailed a copy of the Notice of Availability of the
draft EIS to federal, state, and local government representatives and
agencies; elected officials; environmental and public interest groups;
Indian Tribes; potentially affected landowners and other interested
individuals and groups; and newspapers and libraries in the Project
area. The draft EIS is only available in electronic format. It may be
viewed and downloaded from the FERC's website (www.ferc.gov), on the
Environmental Documents page (https://www.ferc.gov/industries/gas/enviro/eis.asp). In addition, the draft EIS may be accessed by using
the eLibrary link on the FERC's website. Click on the eLibrary link
(https://www.ferc.gov/docs-filing/elibrary.asp), click on General
Search, and enter the docket
[[Page 13649]]
number in the ``Docket Number'' field, excluding the last three digits
(i.e., CP17-494 or CP17-495). Be sure you have selected an appropriate
date range. For assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659.
Any person wishing to comment on the draft EIS may do so. Your
comments should focus on the draft EIS's disclosure and discussion of
potential environmental effects, reasonable alternatives, and measures
to avoid or lessen environmental impacts. To ensure consideration of
your comments on the proposal in the final EIS, it is important that
the Commission receive your comments on or before 5:00 p.m. Eastern
Time on July 5, 2019.
For your convenience, there are four methods you can use to submit
your comments to the Commission.\1\ The Commission will provide equal
consideration to all comments received, whether filed in written form
or provided verbally. The Commission encourages electronic filing of
comments and has staff available to assist you at (866) 208-3676 or
[email protected]. Please carefully follow these instructions
so that your comments are properly recorded.
---------------------------------------------------------------------------
\1\ The contents of your comment including your address, phone
number, email address, or other personal identifying information may
be made available to the public. While you may request that your
personal identifying information be withheld from public view, we
cannot guarantee that we will be able to do so.
---------------------------------------------------------------------------
(1) You can file your comments electronically using the eComment
feature on the Commission's website (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature on the Commission's website (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' If you are filing a comment on a particular project,
please select ``Comment on a Filing'' as the filing type; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the Project docket numbers
(CP17-494-000 and CP17-495-000) with your submission: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Room 1A, Washington, DC 20426
(4) In lieu of sending written or electronic comments, the
Commission invites you to attend a public comment session that will be
held in the Project area to receive comments on the draft EIS. The
dates, locations, and times of these sessions will be provided in a
supplemental notice.
Any person seeking to become a party to the proceeding must file a
motion to intervene pursuant to Rule 214 of the Commission's Rules of
Practice and Procedures (18 CFR 385.214). Motions to intervene are more
fully described at https://www.ferc.gov/resources/guides/how-to/intervene.asp. Only intervenors have the right to seek rehearing or
judicial review of the Commission's decision. The Commission grants
affected landowners and others with environmental concerns intervenor
status upon showing good cause by stating that they have a clear and
direct interest in this proceeding which no other party can adequately
represent. Simply filing environmental comments will not give you
intervenor status, but you do not need intervenor status to have your
comments considered. Subsequent decisions, determination, permits, and
authorization by the cooperating agencies are subject to the
administrative procedures of each respective agency.
Questions?
Additional information about the Project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link
also provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription that allows you to keep track of all formal issuances and
submittals in specific dockets. This can reduce the amount of time you
spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Dated: March 29, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-06715 Filed 4-4-19; 8:45 am]
BILLING CODE 6717-01-P