Environmental Impact Statements; Notice of Availability, 13662 [2019-06688]
Download as PDF
khammond on DSKBBV9HB2PROD with NOTICES
13662
Federal Register / Vol. 84, No. 66 / Friday, April 5, 2019 / Notices
stressed communities. 40 CFR
35.10055(a)(13).
(viii) 20 points: The extent to which
the project reduces exposure to lead in
the nation’s drinking water systems or
addresses emergent contaminants. 40
CFR 35.10055(b).
Project Readiness:
(i) 50 points: The readiness of the
project to proceed toward development,
including a demonstration by the
obligor that there is a reasonable
expectation that the contracting process
for construction of the project can
commence by not later than 90 days
after the date on which a federal credit
instrument is obligated for the project
under [WIFIA]. 33 U.S.C. 3907(b)(2)(J);
40 CFR 35.10055(a)(9).
(ii) 30 points: Preliminary engineering
feasibility analysis score. 33 U.S.C.
3907(a)(2); 33 U.S.C. 3907(a)(6); 40 CFR
35.10015(c); 40 CFR 35.10045(a).
(iii) 20 points: The extent to which the
project uses new or innovative
approaches. 33 U.S.C. 3907(b)(2)(D); 40
CFR 35.10055(a)(3).
Borrower Creditworthiness:
(i) 10 points: The likelihood that
assistance under [WIFIA] would enable
the project to proceed at an earlier date
than the project would otherwise be
able to proceed. 33 U.S.C. 3907(b)(2)(C);
40 CFR 35.10055(a)(2).
(ii) 10 points: The extent to which the
project financing plan includes public
or private financing in addition to
assistance under [WIFIA]. 33 U.S.C.
3907(b)(2)(B); 40 CFR 35.10055(a)(10).
(iii) 10 points: The extent to which
assistance under [WIFIA] reduces the
contribution of Federal assistance to the
project. 33 U.S.C. 3907(b)(2)(K); 40 CFR
35.10055(a)(11).
(iv) 10 points: The amount of budget
authority required to fund the Federal
credit instrument made available under
[WIFIA]. 33 U.S.C. 3907(b)(2)(E).
(v) 60 points: Preliminary
creditworthiness assessment score. 33
U.S.C. 3907(a)(1); 40 CFR 35.10015(c);
40 CFR 35.10045(a)(1); 40 CFR
35.10045(a)(4); 40 CFR 35.10045(b).
In addition to the selection criteria
score, the EPA is required by 33 U.S.C.
3902(a) to ‘‘ensure a diversity of project
types and geographical locations.’’
Following analysis by the WIFIA
program staff, a final score is calculated
for each project. Projects will be
selected in order of score, subject to the
requirement to ensure a diversity of
project types and geographical
locations. To ensure diversity, the EPA
will establish a ceiling for each project
type and geographical location. The
EPA will select projects in rank order up
until the point that the ceiling is
reached. Thereafter, the next highest
VerDate Sep<11>2014
18:46 Apr 04, 2019
Jkt 247001
project that adds diversity will be
selected.
The scoring scales and guidance used
to evaluate each project against the
selection criteria are available in the
WIFIA program handbook. Prospective
borrowers considering WIFIA should
review the WIFIA program handbook
and discuss how the project addresses
each of the selection criteria in the LOI
submission.
Authority: 33 U.S.C. 3901–3914; 40 CFR
part 35.
Dated: March 29, 2019.
Andrew R. Wheeler,
Administrator.
[FR Doc. 2019–06731 Filed 4–4–19; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9044–2]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/
nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 03/25/2019 Through 03/29/2019
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20190042, Draft, USFS, WY,
Invasive Plant Management Draft
Environmental Impact Statement for
the Bridger-Teton National Forest,
Comment Period Ends: 05/20/2019,
Contact: Chad Hayward 307–276–
5817.
EIS No. 20190043, Draft, FHWA, AZ,
Draft Tier 1 Environmental Impact
Statement and Preliminary Section
4(f) Evaluation for Interstate 11
Corridor between Nogales and
Wickenburg, Arizona, Comment
Period Ends: 05/31/2019, Contact:
Rebecca Yedlin 602–382–8979.
EIS No. 20190045, Draft, USFWS, MT,
National Bison Range Draft
Comprehensive Conservation Plan,
Environmental Impact Statement, and
Compatibility Determinations,
Comment Period Ends: 05/20/2019,
Contact: Vanessa Fields 406–644–
2211.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
EIS No. 20190046, Draft Supplement,
FHWA, AL, Project No. DPI–
0030(005) I–10 Mobile River Bridge
and Bayway, Mobile and Baldwin
Counties, Alabama, Comment Period
Ends: 05/20/2019, Contact: Mr. Mark
D. Bartlett, P.E. 334–274–6350.
EIS No. 20190047, Draft Supplement,
NRC, FL, Generic Environmental
Impact Statement for License Renewal
of Nuclear Plants, Supplement 5,
Second Renewal, Regarding
Subsequent License Renewal for
Turkey Point Nuclear Generating Unit
Nos. 3 and 4, Comment Period Ends:
05/20/2019, Contact: David Drucker
301–415–6223.
EIS No. 20190048, Draft, HUD, NY, East
Side Coastal Resiliency (ESCR),
Comment Period Ends: 08/15/2019,
Contact: Eram Qadri 212–788–6282.
EIS No. 20190049, Draft Supplement,
USFS, AZ, Tonto National Forest
Motorized Travel Management,
Comment Period Ends: 05/21/2019,
Contact: Gregory Schuster 602–225–
5200.
EIS No. 20190051, Draft, FERC, OR, The
Jordan Cove Energy Project, Comment
Period Ends: 05/20/2019, Contact:
Office of External Affairs 866–208–
3372.
Amended Notice
EIS No. 20180284, Draft Supplement,
USFS, MT, Stonewall Vegetation
Project, Comment Period Ends: 04/12/
2019, Contact: Allen Byrd 406–495–
3903. Revision to FR Notice Published
03/01/2019; Extending the Comment
Period from 03/25/2019 to 04/12/
2019.
EIS No. 20180335, Draft Supplement,
USN, GU, Mariana Islands Training
and Testing Draft Supplemental
Environmental Impact Statement/
Overseas Environmental Impact
Statement, Comment Period Ends: 04/
17/2019, Contact: Nora Macariola-See
808–472–1402, Revision to FR Notice
Published 02/01/2019; Extending the
Comment Period from 03/18/2019 to
04/17/2019.
Dated: April 2, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019–06688 Filed 4–4–19; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9991–52–OMS]
Good Neighbor Environmental Board
Environmental Protection
Agency (EPA).
AGENCY:
E:\FR\FM\05APN1.SGM
05APN1
Agencies
[Federal Register Volume 84, Number 66 (Friday, April 5, 2019)]
[Notices]
[Page 13662]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-06688]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9044-2]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information 202-564-5632 or https://www.epa.gov/nepa/ nepa/.
Weekly receipt of Environmental Impact Statements
Filed 03/25/2019 Through 03/29/2019
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20190042, Draft, USFS, WY, Invasive Plant Management Draft
Environmental Impact Statement for the Bridger-Teton National Forest,
Comment Period Ends: 05/20/2019, Contact: Chad Hayward 307-276-5817.
EIS No. 20190043, Draft, FHWA, AZ, Draft Tier 1 Environmental Impact
Statement and Preliminary Section 4(f) Evaluation for Interstate 11
Corridor between Nogales and Wickenburg, Arizona, Comment Period Ends:
05/31/2019, Contact: Rebecca Yedlin 602-382-8979.
EIS No. 20190045, Draft, USFWS, MT, National Bison Range Draft
Comprehensive Conservation Plan, Environmental Impact Statement, and
Compatibility Determinations, Comment Period Ends: 05/20/2019, Contact:
Vanessa Fields 406-644-2211.
EIS No. 20190046, Draft Supplement, FHWA, AL, Project No. DPI-0030(005)
I-10 Mobile River Bridge and Bayway, Mobile and Baldwin Counties,
Alabama, Comment Period Ends: 05/20/2019, Contact: Mr. Mark D.
Bartlett, P.E. 334-274-6350.
EIS No. 20190047, Draft Supplement, NRC, FL, Generic Environmental
Impact Statement for License Renewal of Nuclear Plants, Supplement 5,
Second Renewal, Regarding Subsequent License Renewal for Turkey Point
Nuclear Generating Unit Nos. 3 and 4, Comment Period Ends: 05/20/2019,
Contact: David Drucker 301-415-6223.
EIS No. 20190048, Draft, HUD, NY, East Side Coastal Resiliency (ESCR),
Comment Period Ends: 08/15/2019, Contact: Eram Qadri 212-788-6282.
EIS No. 20190049, Draft Supplement, USFS, AZ, Tonto National Forest
Motorized Travel Management, Comment Period Ends: 05/21/2019, Contact:
Gregory Schuster 602-225-5200.
EIS No. 20190051, Draft, FERC, OR, The Jordan Cove Energy Project,
Comment Period Ends: 05/20/2019, Contact: Office of External Affairs
866-208-3372.
Amended Notice
EIS No. 20180284, Draft Supplement, USFS, MT, Stonewall Vegetation
Project, Comment Period Ends: 04/12/2019, Contact: Allen Byrd 406-495-
3903. Revision to FR Notice Published 03/01/2019; Extending the Comment
Period from 03/25/2019 to 04/12/2019.
EIS No. 20180335, Draft Supplement, USN, GU, Mariana Islands Training
and Testing Draft Supplemental Environmental Impact Statement/Overseas
Environmental Impact Statement, Comment Period Ends: 04/17/2019,
Contact: Nora Macariola-See 808-472-1402, Revision to FR Notice
Published 02/01/2019; Extending the Comment Period from 03/18/2019 to
04/17/2019.
Dated: April 2, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019-06688 Filed 4-4-19; 8:45 am]
BILLING CODE 6560-50-P