Combined Notice of Filings #1, 13281-13283 [2019-06590]

Download as PDF Federal Register / Vol. 84, No. 65 / Thursday, April 4, 2019 / Notices Dated: April 1, 2019. Kate Mullan, PRA Coordinator, Information Collection Clearance Program, Information Management Branch, Office of the Chief Information Officer. [FR Doc. 2019–06608 Filed 4–3–19; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14958–000] jbell on DSK30RV082PROD with NOTICES Oceanus Power & Water, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 27, 2018, Oceanus Power & Water, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Integrated Pumped Hydroelectric Reverse Osmosis Clean Energy System at the Vandenberg Air Force Base (IPHROCES at Vandenberg AFB Project or project) to be located on coast of the Pacific Ocean, near Vandenberg Air Force, Santa Barbara County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A rock-fill dam (dimensions and position to be determined based energy and water storage volume requirements under the permit term, if issued); (2) a upper reservoir having a total storage capacity of 5,000 acre-feet at a normal maximum operating elevation of 1,310 feet mean sea level (msl); (3) two 12,450-foot-long, 11-foot-diameter penstocks running above ground between the upper reservoir and the powerhouse; (4) an underground powerhouse with approximate footprint of 0.4-acre and containing two variable speed reversible Francis reversible pump/turbine-motor/ generator units rated for 75 megawatts each at 1,310 feet of gross head; (5) a 50foot-high seawater reverse osmosis desalinization facility with an approximate footprint of 15-acres located approximately 325-feet from the powerhouse; (6) two 11-foot-diameter tailrace pipelines, each with six 35-foot- VerDate Sep<11>2014 17:25 Apr 03, 2019 Jkt 247001 long, 11-foot-diameter Johnson screens, extending from the powerhouse to the intake/outlet structure; (7) a seawater intake/outlet structure located in the Pacific Ocean; (8) a brine concentrate storage lagoon to store brine concentrate during times when the project is inoperable or in pumping mode; (9) a 10-mile-long, transmission line extending from the project to the existing Divide Substation (the point of interconnection), the number of circuits, voltage, and configuration to be determined during the term of the permit, if issued; and (10) appurtenant facilities. The lower reservoir for the proposed project would be the Pacific Ocean. The estimated annual generation of the IPHROCES at Vandenberg AFB Project would be 415 gigawatt-hours. Applicant Contact: Mr. Neal Aronson, Director, President/CEO, Oceanus Power & Water, LLC, 900 High Street, Palo Alto, California 94301; phone: (650) 380–3323. FERC Contact: Kelly Wolcott; phone: (202) 502–6480. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14958–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14958) in the docket number field to access the document. For assistance, contact FERC Online Support. PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 13281 Dated: March 29, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–06596 Filed 4–3–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–38–000. Applicants: Northern States Power Company, a Minnesota corporation, Mankato Energy Center, LLC, Mankato Energy Center II, LLC. Description: Supplement to December 18, 2018 Joint Application Authorization (Exhibit N) of Northern States Power Company, a Minnesota corporation, et al. Filed Date: 3/29/19. Accession Number: 20190329–5322. Comments Due: 5 p.m. ET 4/12/19. Docket Numbers: EC19–46–000. Applicants: Orange and Rockland Utilities, Inc. Description: Clarification and Revised Exhibits A and B to January 15, 2019 Application for order pursuant to Section 203 of the Federal Power Act of Orange and Rockland Utilities, Inc. Filed Date: 3/28/19. Accession Number: 20190328–5326. Comments Due: 5 p.m. ET 4/11/19. Docket Numbers: EC19–72–000. Applicants: Northern States Power Company, a Minnesota corporation, Lake Benton Power Partners II, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act, et al. of Northern States Power Company, a Minnesota corporation, et al. Filed Date: 3/28/19. Accession Number: 20190328–5318. Comments Due: 5 p.m. ET 4/18/19. Docket Numbers: EC19–73–000. Applicants: NGV Emerald Acquisition Co., LLC, Great Plains Windpark Legacy, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of NGV Emerald Acquisition Co., LLC, et al. Filed Date: 3/28/19. Accession Number: 20190328–5323. Comments Due: 5 p.m. ET 4/18/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2422–006. E:\FR\FM\04APN1.SGM 04APN1 jbell on DSK30RV082PROD with NOTICES 13282 Federal Register / Vol. 84, No. 65 / Thursday, April 4, 2019 / Notices Applicants: Rocky Mountain Power, LLC. Description: Notice of Non-Material Change in Status of Rocky Mountain Power, LLC. Filed Date: 3/28/19. Accession Number: 20190328–5286. Comments Due: 5 p.m. ET 4/18/19. Docket Numbers: ER16–2716–005. Applicants: NextEra Energy Transmission MidAtlantic, LLC. Description: Compliance filing: NextEra Energy Transmission MidAtlantic Revised Compliance Filing to be effective 11/30/2016. Filed Date: 3/29/19. Accession Number: 20190329–5362. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER16–2719–007. Applicants: NextEra Energy Transmission New York, Inc. Description: Compliance filing: NextEra Energy Transmission New York Revised Compliance Filing to be effective 11/30/2016. Filed Date: 3/29/19. Accession Number: 20190329–5363. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER19–1103–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2019–03–28_Amendment to Attachment X revisions for Hybrid Interconnection to be effective 3/28/2019. Filed Date: 3/28/19. Accession Number: 20190328–5259. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: ER19–1464–000. Applicants: Sierra Pacific Power Company. Description: § 205(d) Rate Filing: Service Agreement No. 18–00088 EPC SPPC/Fallon to be effective 3/29/2019. Filed Date: 3/28/19. Accession Number: 20190328–5253. Comments Due: 5 p.m. ET 4/18/19. Docket Numbers: ER19–1465–000. Applicants: Sierra Pacific Power Company. Description: § 205(d) Rate Filing: Service Agreement No. 18–00089 Amded NITSA SPPC/Fallon to be effective 5/28/2019. Filed Date: 3/28/19. Accession Number: 20190328–5254. Comments Due: 5 p.m. ET 4/18/19. Docket Numbers: ER19–1466–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: PG&E Steelhead BESS SGIA (SA 416) to be effective 5/27/2019. Filed Date: 3/28/19. Accession Number: 20190328–5271. Comments Due: 5 p.m. ET 4/18/19. Docket Numbers: ER19–1467–000. VerDate Sep<11>2014 17:25 Apr 03, 2019 Jkt 247001 Applicants: Arizona Public Service Company. Description: Tariff Cancellation: Cancellation of Service Agreement Nos. 308, 352, 357, and 358 to be effective 5/28/2019. Filed Date: 3/28/19. Accession Number: 20190328–5277. Comments Due: 5 p.m. ET 4/18/19. Docket Numbers: ER19–1468–000. Applicants: Niagara Mohawk Power Corporation, New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: 205 Cost Reimbursement Agreement (SA 2448) NMPC and NYPA to be effective 3/1/2019. Filed Date: 3/29/19. Accession Number: 20190329–5003. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER19–1469–000. Applicants: New England Power Pool Participants Committee. Description: § 205(d) Rate Filing: April 2019 Membership Filing to be effective 4/1/2019. Filed Date: 3/29/19. Accession Number: 20190329–5071. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER19–1470–000. Applicants: ISO New England Inc., Emera Maine. Description: § 205(d) Rate Filing: Emera Maine; Changes to ISO–NE OATT Schedule 21–EM to be effective 6/1/2019. Filed Date: 3/29/19. Accession Number: 20190329–5082. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER19–1471–000. Applicants: Wisconsin Electric Power Company. Description: § 205(d) Rate Filing: Update to Reactive Supply Service Revenue Requirement to be effective 4/ 1/2019. Filed Date: 3/29/19. Accession Number: 20190329–5087. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER19–1472–000. Applicants: Wisconsin Electric Power Company. Description: Notice of Cancellation of Rate Schedule No. 103 of Wisconsin Electric Power Company. Filed Date: 3/28/19. Accession Number: 20190328–5314. Comments Due: 5 p.m. ET 4/18/19. Docket Numbers: ER19–1473–000. Applicants: AES Alamitos Energy, LLC. Description: Baseline eTariff Filing: AES Alamitos Energy MBR Application to be effective 5/29/2019. Filed Date: 3/29/19. Accession Number: 20190329–5126. Comments Due: 5 p.m. ET 4/19/19. PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 Docket Numbers: ER19–1474–000. Applicants: AES Huntington Beach Energy, LLC. Description: Baseline eTariff Filing: AES Huntington Beach Energy Application to be effective 5/29/2019. Filed Date: 3/29/19. Accession Number: 20190329–5143. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER19–1475–000. Applicants: Potomac Electric Power Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: PEPCO submits revisions to OATT, Att. H–9A and H–9B re: True-up to be effective 6/1/2019. Filed Date: 3/29/19. Accession Number: 20190329–5170. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER19–1476–000. Applicants: Duke Energy Progress, LLC. Description: § 205(d) Rate Filing: DEPFayetteville PWC (RS No. 184) Amended PSCA to be effective 6/1/ 2019. Filed Date: 3/29/19. Accession Number: 20190329–5190. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER19–1477–000. Applicants: Entergy Louisiana, LLC. Description: § 205(d) Rate Filing: ELL–SRMPA 15th Extension of Interim Agreement to be effective 4/1/2019. Filed Date: 3/29/19. Accession Number: 20190329–5198. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER19–1478–000. Applicants: Commonwealth Edison Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ComEd submits revisions to OATT, Att. H–13A re: Superconductor Cable Project to be effective 5/28/2019. Filed Date: 3/29/19. Accession Number: 20190329–5200. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER19–1479–000. Applicants: Trans-Allegheny Interstate Line Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: TrAILCo submits Transmission Facility Interconnection Agreement, SA No. 4239 to be effective 5/30/2019. Filed Date: 3/29/19. Accession Number: 20190329–5204. Comments Due: 5 p.m. ET 4/19/19. Docket Numbers: ER19–1480–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: 2019 TACBAA Update to be effective 6/1/ 2019. Filed Date: 3/29/19. Accession Number: 20190329–5211. Comments Due: 5 p.m. ET 4/19/19. E:\FR\FM\04APN1.SGM 04APN1 Federal Register / Vol. 84, No. 65 / Thursday, April 4, 2019 / Notices Docket Numbers: ER19–1481–000. Applicants: Trans-Allegheny Interstate Line Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: TrAILCo submits Transmission Facility Interconnection Agreement, SA No. 4368 to be effective 5/30/2019. Filed Date: 3/29/19. Accession Number: 20190329–5212. Comments Due: 5 p.m. ET 4/19/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 29, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–06590 Filed 4–3–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–1461–000] jbell on DSK30RV082PROD with NOTICES Greenlight Energy Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced Greenlight Energy Inc.’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to VerDate Sep<11>2014 17:25 Apr 03, 2019 Jkt 247001 intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is April 18, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 29, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–06592 Filed 4–3–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD10–12–010] Increasing Market and Planning Efficiency and Enhancing Resilience Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day-Ahead Market Efficiency and Enhancing Resilience Through Improved Software Take notice that Commission staff will convene a technical conference on June 25, 26, and 27, 2019 to discuss PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 13283 opportunities for increasing real-time and day-ahead market efficiency and enhancing the resilience of the bulk power system through improved software. A detailed agenda with the list of and times for the selected speakers will be published on the Commission’s website 1 after May 13, 2019. Staff has held similar conferences in this proceeding in the past few years, all focused on enhancing market efficiency. The Commission last year initiated a proceeding in Docket No. AD18–7 to explore bulk power system resilience issues and expanded the scope of the 2018 conference to include opportunities for enhancing resilience through improved software. As in past conferences, this conference will bring together experts from diverse backgrounds and experiences, including electric system operators, software developers, and those from government, research centers and academia for the purposes of stimulating discussion, sharing information, and identifying fruitful avenues for research concerning the technical aspects of improved software for increasing efficiency and resilience of the bulk power system. This conference is intended to build on the discussions initiated in the previous Commission staff technical conferences on increasing market and planning efficiency and for enhancing resilience through improved software. A number of the topics that have been discussed during previous conferences have relevance to resilience in addition to market efficiency. Staff will be facilitating a discussion to explore research and operational advances with respect to market modeling that appear to have significant promise for potential efficiency improvements. Given the priority the Commission places on resilience, presentations that also discuss research and operational advances that could enhance resilience of the bulk power system are encouraged. Broadly, such topics fall into the following categories: (1) Improvements to the representation of physical constraints that are either not currently modeled or currently modeled using mathematical approximations (e.g., voltage and reactive power constraints, stability constraints, fuel delivery constraints, and constraints related to contingencies); (2) Consideration of uncertainty to better maximize economic efficiency (expected market surplus) and better understand events that could impact resilience of the bulk power system, e.g., 1 https://www.ferc.gov/industries/electric/indusact/market-planning.asp. E:\FR\FM\04APN1.SGM 04APN1

Agencies

[Federal Register Volume 84, Number 65 (Thursday, April 4, 2019)]
[Notices]
[Pages 13281-13283]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-06590]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-38-000.
    Applicants: Northern States Power Company, a Minnesota corporation, 
Mankato Energy Center, LLC, Mankato Energy Center II, LLC.
    Description: Supplement to December 18, 2018 Joint Application 
Authorization (Exhibit N) of Northern States Power Company, a Minnesota 
corporation, et al.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5322.
    Comments Due: 5 p.m. ET 4/12/19.

    Docket Numbers: EC19-46-000.
    Applicants: Orange and Rockland Utilities, Inc.
    Description: Clarification and Revised Exhibits A and B to January 
15, 2019 Application for order pursuant to Section 203 of the Federal 
Power Act of Orange and Rockland Utilities, Inc.
    Filed Date: 3/28/19.
    Accession Number: 20190328-5326.
    Comments Due: 5 p.m. ET 4/11/19.

    Docket Numbers: EC19-72-000.
    Applicants: Northern States Power Company, a Minnesota corporation, 
Lake Benton Power Partners II, LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act, et al. of Northern States Power Company, a 
Minnesota corporation, et al.
    Filed Date: 3/28/19.
    Accession Number: 20190328-5318.
    Comments Due: 5 p.m. ET 4/18/19.

    Docket Numbers: EC19-73-000.
    Applicants: NGV Emerald Acquisition Co., LLC, Great Plains Windpark 
Legacy, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act, et al. of NGV Emerald Acquisition Co., LLC, et al.
    Filed Date: 3/28/19.
    Accession Number: 20190328-5323.
    Comments Due: 5 p.m. ET 4/18/19.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2422-006.

[[Page 13282]]

    Applicants: Rocky Mountain Power, LLC.
    Description: Notice of Non-Material Change in Status of Rocky 
Mountain Power, LLC.
    Filed Date: 3/28/19.
    Accession Number: 20190328-5286.
    Comments Due: 5 p.m. ET 4/18/19.

    Docket Numbers: ER16-2716-005.
    Applicants: NextEra Energy Transmission MidAtlantic, LLC.
    Description: Compliance filing: NextEra Energy Transmission 
MidAtlantic Revised Compliance Filing to be effective 11/30/2016.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5362.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER16-2719-007.
    Applicants: NextEra Energy Transmission New York, Inc.
    Description: Compliance filing: NextEra Energy Transmission New 
York Revised Compliance Filing to be effective 11/30/2016.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5363.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1103-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Tariff Amendment: 2019-03-28_Amendment to Attachment X 
revisions for Hybrid Interconnection to be effective 3/28/2019.
    Filed Date: 3/28/19.
    Accession Number: 20190328-5259.
    Comments Due: 5 p.m. ET 4/8/19.

    Docket Numbers: ER19-1464-000.
    Applicants: Sierra Pacific Power Company.
    Description: Sec.  205(d) Rate Filing: Service Agreement No. 18-
00088 EPC SPPC/Fallon to be effective 3/29/2019.
    Filed Date: 3/28/19.
    Accession Number: 20190328-5253.
    Comments Due: 5 p.m. ET 4/18/19.

    Docket Numbers: ER19-1465-000.
    Applicants: Sierra Pacific Power Company.
    Description: Sec.  205(d) Rate Filing: Service Agreement No. 18-
00089 Amded NITSA SPPC/Fallon to be effective 5/28/2019.
    Filed Date: 3/28/19.
    Accession Number: 20190328-5254.
    Comments Due: 5 p.m. ET 4/18/19.

    Docket Numbers: ER19-1466-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: PG&E Steelhead BESS SGIA (SA 
416) to be effective 5/27/2019.
    Filed Date: 3/28/19.
    Accession Number: 20190328-5271.
    Comments Due: 5 p.m. ET 4/18/19.

    Docket Numbers: ER19-1467-000.
    Applicants: Arizona Public Service Company.
    Description: Tariff Cancellation: Cancellation of Service Agreement 
Nos. 308, 352, 357, and 358 to be effective 5/28/2019.
    Filed Date: 3/28/19.
    Accession Number: 20190328-5277.
    Comments Due: 5 p.m. ET 4/18/19.

    Docket Numbers: ER19-1468-000.
    Applicants: Niagara Mohawk Power Corporation, New York Independent 
System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 205 Cost Reimbursement 
Agreement (SA 2448) NMPC and NYPA to be effective 3/1/2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5003.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1469-000.
    Applicants: New England Power Pool Participants Committee.
    Description: Sec.  205(d) Rate Filing: April 2019 Membership Filing 
to be effective 4/1/2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5071.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1470-000.
    Applicants: ISO New England Inc., Emera Maine.
    Description: Sec.  205(d) Rate Filing: Emera Maine; Changes to ISO-
NE OATT Schedule 21-EM to be effective 6/1/2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5082.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1471-000.
    Applicants: Wisconsin Electric Power Company.
    Description: Sec.  205(d) Rate Filing: Update to Reactive Supply 
Service Revenue Requirement to be effective 4/1/2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5087.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1472-000.
    Applicants: Wisconsin Electric Power Company.
    Description: Notice of Cancellation of Rate Schedule No. 103 of 
Wisconsin Electric Power Company.
    Filed Date: 3/28/19.
    Accession Number: 20190328-5314.
    Comments Due: 5 p.m. ET 4/18/19.

    Docket Numbers: ER19-1473-000.
    Applicants: AES Alamitos Energy, LLC.
    Description: Baseline eTariff Filing: AES Alamitos Energy MBR 
Application to be effective 5/29/2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5126.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1474-000.
    Applicants: AES Huntington Beach Energy, LLC.
    Description: Baseline eTariff Filing: AES Huntington Beach Energy 
Application to be effective 5/29/2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5143.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1475-000.
    Applicants: Potomac Electric Power Company, PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: PEPCO submits revisions to 
OATT, Att. H-9A and H-9B re: True-up to be effective 6/1/2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5170.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1476-000.
    Applicants: Duke Energy Progress, LLC.
    Description: Sec.  205(d) Rate Filing: DEP-Fayetteville PWC (RS No. 
184) Amended PSCA to be effective 6/1/2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5190.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1477-000.
    Applicants: Entergy Louisiana, LLC.
    Description: Sec.  205(d) Rate Filing: ELL-SRMPA 15th Extension of 
Interim Agreement to be effective 4/1/2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5198.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1478-000.
    Applicants: Commonwealth Edison Company, PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: ComEd submits revisions to 
OATT, Att. H-13A re: Superconductor Cable Project to be effective 5/28/
2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5200.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1479-000.
    Applicants: Trans-Allegheny Interstate Line Company, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: TrAILCo submits Transmission 
Facility Interconnection Agreement, SA No. 4239 to be effective 5/30/
2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5204.
    Comments Due: 5 p.m. ET 4/19/19.

    Docket Numbers: ER19-1480-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: 2019 TACBAA Update to be 
effective 6/1/2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5211.
    Comments Due: 5 p.m. ET 4/19/19.


[[Page 13283]]


    Docket Numbers: ER19-1481-000.
    Applicants: Trans-Allegheny Interstate Line Company, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: TrAILCo submits Transmission 
Facility Interconnection Agreement, SA No. 4368 to be effective 5/30/
2019.
    Filed Date: 3/29/19.
    Accession Number: 20190329-5212.
    Comments Due: 5 p.m. ET 4/19/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 29, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-06590 Filed 4-3-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.