Inquiry Regarding the Commission's Electric Transmission Incentives Policy, 13033 [C1-2019-05895]
Download as PDF
khammond on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 84, No. 64 / Wednesday, April 3, 2019 / Notices
Filed Date: 3/27/19.
Accession Number: 20190327–5225.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: RP19–925–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—Chevron to EcoEnergy 8956845 to be effective 4/1/2019.
Filed Date: 3/27/19.
Accession Number: 20190327–5180.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: RP19–926–000.
Applicants: Rendezvous Pipeline
Company, LLC.
Description: Compliance filing
NAESB Compliance Filing—Order No.
587–Y to be effective 8/1/2019.
Filed Date: 3/27/19.
Accession Number: 20190327–5178.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: RP19–927–000.
Applicants: Bison Pipeline LLC.
Description: Compliance filing
Compliance to Docket No. RM96–1–041
to be effective 8/1/2019.
Filed Date: 3/27/19.
Accession Number: 20190327–5213.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: RP19–928–000.
Applicants: Sierrita Gas Pipeline LLC.
Description: Compliance filing Order
No. 587–Y Compliance Filing to be
effective 8/1/2019.
Filed Date: 3/27/19.
Accession Number: 20190327–5215.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: RP19–929–000.
Applicants: TransColorado Gas
Transmission Company LLC.
Description: Compliance filing Order
No. 587–Y Compliance Filing to be
effective 8/1/2019.
Filed Date: 3/27/19.
Accession Number: 20190327–5217.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: RP19–930–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: Compliance filing Order
No. 587–Y Compliance Filing to be
effective 8/1/2019.
Filed Date: 3/27/19.
Accession Number: 20190327–5218.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: RP19–931–000.
Applicants: Ruby Pipeline, L.L.C.
Description: Compliance filing Order
No. 587–Y Compliance Filing to be
effective 8/1/2019.
Filed Date: 3/27/19.
Accession Number: 20190327–5219.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: RP19–932–000.
Applicants: Northern Border Pipeline
Company.
Description: Compliance filing
Compliance to Docket No. RM96–1–041
to be effective 8/1/2019.
VerDate Sep<11>2014
17:19 Apr 02, 2019
Jkt 247001
Filed Date: 3/27/19.
Accession Number: 20190327–5220.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: RP19–933–000.
Applicants: Mojave Pipeline
Company, L.L.C.
Description: Compliance filing Order
No. 587–Y Compliance Filing to be
effective 8/1/2019.
Filed Date: 3/27/19.
Accession Number: 20190327–5221.
Comments Due: 5 p.m. ET 4/8/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–06456 Filed 4–2–19; 8:45 am]
BILLING CODE 6717–01–P
13033
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–51–000]
Columbia Gas Transmission, LLC;
Notice of Schedule for Environmental
Review of the VNG Suffolk No. 3 Meter
Station Expansion Project
On January 17, 2019, Columbia Gas
Transmission, LLC (Columbia) filed an
application in Docket No. CP19–51–000
requesting a Certificate of Public
Convenience and Necessity pursuant to
Sections 7(b) and 7(c) of the Natural Gas
Act to abandon, construct, and operate
certain natural gas facilities. The
proposed project is known as the VNG
Suffolk No. 3 Meter Station Expansion
Project (Project) in Suffolk, Virginia,
which would increase the current
maximum daily delivery obligations of
natural gas from 3.73 million cubic feet
to 12 million cubic feet per day between
various delivery points on Columbia’s
system in southeastern Virginia.
On January 31, 2019, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
DEPARTMENT OF ENERGY
Schedule for Environmental Review
Federal Energy Regulatory
Commission
Inquiry Regarding the Commission’s
Electric Transmission Incentives
Policy
Issuance of EA May 17, 2019
90-day Federal Authorization Decision
Deadline August 15, 2019
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Correction
Project Description
In notice document 2019–05895
beginning on page 11759 in the issue of
Thursday, March 28, 2019, make the
following correction:
On page 11759, in the second column
the DATES paragraph should read as
follows:
Columbia proposes to install new
meter station facilities to replace its
existing facilities at the VNG Suffolk No.
3 Meter Station (MS–831056). Columbia
would design the proposed facilities for
a maximum allowable operating
pressure of 600 pounds per square inch
gauge, which is consistent with the
supply pressure of Columbia’s existing
VM–107 and VM–108 pipeline system.
Upon completion of the new meter
station facilities, Columbia would
abandon the existing meter station.
[Docket No. PL19–3–000]
Initial Comments are due June
26, 2019, and Reply Comments are due
July 26, 2019.
DATES:
[FR Doc. C1–2019–05895 Filed 4–2–19; 8:45 am]
BILLING CODE 1301–00–D
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
E:\FR\FM\03APN1.SGM
03APN1
Agencies
[Federal Register Volume 84, Number 64 (Wednesday, April 3, 2019)]
[Notices]
[Page 13033]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: C1-2019-05895]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PL19-3-000]
Inquiry Regarding the Commission's Electric Transmission
Incentives Policy
Correction
In notice document 2019-05895 beginning on page 11759 in the issue
of Thursday, March 28, 2019, make the following correction:
On page 11759, in the second column the DATES paragraph should read
as follows:
DATES: Initial Comments are due June 26, 2019, and Reply Comments are
due July 26, 2019.
[FR Doc. C1-2019-05895 Filed 4-2-19; 8:45 am]
BILLING CODE 1301-00-D