Inquiry Regarding the Commission's Electric Transmission Incentives Policy, 13033 [C1-2019-05895]

Download as PDF khammond on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 84, No. 64 / Wednesday, April 3, 2019 / Notices Filed Date: 3/27/19. Accession Number: 20190327–5225. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: RP19–925–000. Applicants: Texas Eastern Transmission, LP. Description: § 4(d) Rate Filing: Negotiated Rate—Chevron to EcoEnergy 8956845 to be effective 4/1/2019. Filed Date: 3/27/19. Accession Number: 20190327–5180. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: RP19–926–000. Applicants: Rendezvous Pipeline Company, LLC. Description: Compliance filing NAESB Compliance Filing—Order No. 587–Y to be effective 8/1/2019. Filed Date: 3/27/19. Accession Number: 20190327–5178. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: RP19–927–000. Applicants: Bison Pipeline LLC. Description: Compliance filing Compliance to Docket No. RM96–1–041 to be effective 8/1/2019. Filed Date: 3/27/19. Accession Number: 20190327–5213. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: RP19–928–000. Applicants: Sierrita Gas Pipeline LLC. Description: Compliance filing Order No. 587–Y Compliance Filing to be effective 8/1/2019. Filed Date: 3/27/19. Accession Number: 20190327–5215. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: RP19–929–000. Applicants: TransColorado Gas Transmission Company LLC. Description: Compliance filing Order No. 587–Y Compliance Filing to be effective 8/1/2019. Filed Date: 3/27/19. Accession Number: 20190327–5217. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: RP19–930–000. Applicants: El Paso Natural Gas Company, L.L.C. Description: Compliance filing Order No. 587–Y Compliance Filing to be effective 8/1/2019. Filed Date: 3/27/19. Accession Number: 20190327–5218. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: RP19–931–000. Applicants: Ruby Pipeline, L.L.C. Description: Compliance filing Order No. 587–Y Compliance Filing to be effective 8/1/2019. Filed Date: 3/27/19. Accession Number: 20190327–5219. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: RP19–932–000. Applicants: Northern Border Pipeline Company. Description: Compliance filing Compliance to Docket No. RM96–1–041 to be effective 8/1/2019. VerDate Sep<11>2014 17:19 Apr 02, 2019 Jkt 247001 Filed Date: 3/27/19. Accession Number: 20190327–5220. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: RP19–933–000. Applicants: Mojave Pipeline Company, L.L.C. Description: Compliance filing Order No. 587–Y Compliance Filing to be effective 8/1/2019. Filed Date: 3/27/19. Accession Number: 20190327–5221. Comments Due: 5 p.m. ET 4/8/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 28, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–06456 Filed 4–2–19; 8:45 am] BILLING CODE 6717–01–P 13033 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–51–000] Columbia Gas Transmission, LLC; Notice of Schedule for Environmental Review of the VNG Suffolk No. 3 Meter Station Expansion Project On January 17, 2019, Columbia Gas Transmission, LLC (Columbia) filed an application in Docket No. CP19–51–000 requesting a Certificate of Public Convenience and Necessity pursuant to Sections 7(b) and 7(c) of the Natural Gas Act to abandon, construct, and operate certain natural gas facilities. The proposed project is known as the VNG Suffolk No. 3 Meter Station Expansion Project (Project) in Suffolk, Virginia, which would increase the current maximum daily delivery obligations of natural gas from 3.73 million cubic feet to 12 million cubic feet per day between various delivery points on Columbia’s system in southeastern Virginia. On January 31, 2019, the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. DEPARTMENT OF ENERGY Schedule for Environmental Review Federal Energy Regulatory Commission Inquiry Regarding the Commission’s Electric Transmission Incentives Policy Issuance of EA May 17, 2019 90-day Federal Authorization Decision Deadline August 15, 2019 If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. Correction Project Description In notice document 2019–05895 beginning on page 11759 in the issue of Thursday, March 28, 2019, make the following correction: On page 11759, in the second column the DATES paragraph should read as follows: Columbia proposes to install new meter station facilities to replace its existing facilities at the VNG Suffolk No. 3 Meter Station (MS–831056). Columbia would design the proposed facilities for a maximum allowable operating pressure of 600 pounds per square inch gauge, which is consistent with the supply pressure of Columbia’s existing VM–107 and VM–108 pipeline system. Upon completion of the new meter station facilities, Columbia would abandon the existing meter station. [Docket No. PL19–3–000] Initial Comments are due June 26, 2019, and Reply Comments are due July 26, 2019. DATES: [FR Doc. C1–2019–05895 Filed 4–2–19; 8:45 am] BILLING CODE 1301–00–D PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\03APN1.SGM 03APN1

Agencies

[Federal Register Volume 84, Number 64 (Wednesday, April 3, 2019)]
[Notices]
[Page 13033]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: C1-2019-05895]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PL19-3-000]


Inquiry Regarding the Commission's Electric Transmission 
Incentives Policy

Correction

    In notice document 2019-05895 beginning on page 11759 in the issue 
of Thursday, March 28, 2019, make the following correction:
    On page 11759, in the second column the DATES paragraph should read 
as follows:

DATES: Initial Comments are due June 26, 2019, and Reply Comments are 
due July 26, 2019.

[FR Doc. C1-2019-05895 Filed 4-2-19; 8:45 am]