Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by May 25, 2019.
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, this
meeting will satisfy the NEPA scoping
requirements, irrespective of whether an
EA or EIS is issued by the Commission.
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and location of
these meetings are as follows:
Evening Scoping Meeting
Date and Time: Wednesday, April 24,
2019 at 6:30 p.m.
Location: Vinton Library, 300 S
Pollard Street, Vinton, VA 24179, (540)
857–5043.
Daytime Scoping Meeting
17:22 Mar 29, 2019
The applicant and Commission staff
will conduct an environmental site
review of the project on Wednesday,
April 24, 2019 at 10:00 a.m. All
participants should meet at Niagara
Dam located at 1495 Niagara Road,
Vinton, VA 24179; thereafter,
participants should be prepared to drive
or carpool to other locations within the
project boundary. To attend the
environmental site review, please RSVP
via email to Jon Magalski at
jmmagalski@aep.com. Persons not
providing an RSVP by April 19, 2019,
will not be allowed on the
environmental site review.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n of this document.
Meeting Procedures
Date and Time: Thursday, April 25,
2019 at 9:00 a.m.
Location: Vinton Library, 300 S
Pollard Street, Vinton, VA 24179, (540)
857–5043.
SD1, which outlines the subject areas
to be addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
VerDate Sep<11>2014
Environmental Site Review
Jkt 247001
The meetings will be recorded by a
stenographer and will be placed in the
public record of the project.
Dated: March 26, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–06235 Filed 3–29–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–70–000.
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
12245
Applicants: High Lonesome Mesa,
LLC, High Lonesome Mesa Wind, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of High
Lonesome Mesa, LLC, et al.
Filed Date: 3/25/19.
Accession Number: 20190325–5200.
Comments Due: 5 p.m. ET 4/15/19.
Docket Numbers: EC19–71–000.
Applicants: PPL Electric Utilities
Corporation.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of PPL Electric
Utilities Corporation.
Filed Date: 3/25/19.
Accession Number: 20190325–5203.
Comments Due: 5 p.m. ET 4/15/19.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–83–000.
Applicants: FirstLight CT Housatonic
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of FirstLight CT
Housatonic LLC.
Filed Date: 3/26/19.
Accession Number: 20190326–5161.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: EG19–84–000.
Applicants: FirstLight CT Hydro LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of FirstLight CT Hydro
LLC.
Filed Date: 3/26/19.
Accession Number: 20190326–5165.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: EG19–85–000.
Applicants: FirstLight MA Hydro
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of FirstLight MA
Hydro LLC.
Filed Date: 3/26/19.
Accession Number: 20190326–5166.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: EG19–86–000.
Applicants: Northfield Mountain LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Northfield Mountain
LLC.
Filed Date: 3/26/19.
Accession Number: 20190326–5226.
Comments Due: 5 p.m. ET 4/16/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–1568–003.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Updated Request for Deferral of
E:\FR\FM\01APN1.SGM
01APN1
12246
Federal Register / Vol. 84, No. 62 / Monday, April 1, 2019 / Notices
Effective Date-Order No. 831
Compliance Filing to be effective N/A.
Filed Date: 3/26/19.
Accession Number: 20190326–5067.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–709–002.
Applicants: Entergy Louisiana, LLC.
Description: Tariff Amendment:
Entergy OpCos Reactive Power Update
to be effective 1/1/2019.
Filed Date: 3/26/19.
Accession Number: 20190326–5089.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19–1417–000.
Applicants: GenOn Power Midwest,
LP.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5112.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1417–001.
Applicants: GenOn Power Midwest,
LP.
Description: Tariff Amendment:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5131.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1434–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised WMPA No. 4869; Queue No.
AD2–044/AC2–138 to be effective 2/22/
2019.
Filed Date: 3/25/19.
Accession Number: 20190325–5166.
Comments Due: 5 p.m. ET 4/15/19.
Docket Numbers: ER19–1435–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ICSA, SA No. 5310; Queue No.
AB2–174 to be effective 2/22/2019.
Filed Date: 3/25/19.
Accession Number: 20190325–5170.
Comments Due: 5 p.m. ET 4/15/19.
Docket Numbers: ER19–1436–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised WMPA No. 4880; Queue No.
AD2–021/AC2–137 to be effective 2/22/
2019.
Filed Date: 3/25/19.
Accession Number: 20190325–5171.
Comments Due: 5 p.m. ET 4/15/19.
Docket Numbers: ER19–1437–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA SA No.
VerDate Sep<11>2014
17:22 Mar 29, 2019
Jkt 247001
3904; Queue No. AA1–108 to be
effective 4/8/2019.
Filed Date: 3/25/19.
Accession Number: 20190325–5172.
Comments Due: 5 p.m. ET 4/15/19.
Docket Numbers: ER19–1438–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: 2nd
Amendment to CDWR WPA for the
Thermalito Restoration Project (SA 275)
to be effective 3/27/2019.
Filed Date: 3/26/19.
Accession Number: 20190326–5010.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19–1439–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–03–26_SA 3288 Sugar Creek Wind
One—Ameren Illinois GIA (J756) to be
effective 3/12/2019.
Filed Date: 3/26/19.
Accession Number: 20190326–5090.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19–1440–000.
Applicants: DTE Electric Company.
Description: § 205(d) Rate Filing:
Update to Reactive Revenue to be
effective 3/27/2019.
Filed Date: 3/26/19.
Accession Number: 20190326–5095.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19–1441–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–03–26_SA 3289 Sugar River
Wind—ATC GIA (J584) to be effective 3/
12/2019.
Filed Date: 3/26/19.
Accession Number: 20190326–5108.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19–1442–000.
Applicants: Sage Solar I LLC.
Description: § 205(d) Rate Filing: Sage
Solar I LLC Shared Facilities Agreement
to be effective 5/1/2019.
Filed Date: 3/26/19.
Accession Number: 20190326–5199.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19–1443–000.
Applicants: Sage Solar II LLC.
Description: § 205(d) Rate Filing: Sage
Solar II LLC Shared Facilities
Agreement to be effective 5/1/2019.
Filed Date: 3/26/19.
Accession Number: 20190326–5212.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19–1444–000.
Applicants: Sage Solar III LLC.
Description: § 205(d) Rate Filing: Sage
Solar III LLC Shared Facilities
Agreement to be effective 5/1/2019.
Filed Date: 3/26/19.
Accession Number: 20190326–5224.
Comments Due: 5 p.m. ET 4/16/19.
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–06225 Filed 3–29–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9991–24–ORD]
Human Studies Review Board;
Notification of Public Meetings
Environmental Protection
Agency.
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA), Office of the Science
Advisor announces two separate public
meetings of the Human Studies Review
Board (HSRB) to advise the Agency on
the ethical and scientific review of
research involving human subjects.
DATES: A virtual public meeting will be
held on Wednesday, April 24, 2019,
from 1:00 p.m. to approximately 5:30
p.m. Eastern Time. A separate,
subsequent teleconference meeting is
planned for Tuesday, June 11th, 2019,
from 2:00 p.m. to approximately 3:30
p.m. Eastern Time for the HSRB to
finalize its Report of the April 24, 2019
meeting and review other possible
topics.
SUMMARY:
All of these meetings will be
conducted entirely by telephone and on
the internet using Adobe Connect. For
detailed access information visit the
HSRB website: https://www2.epa.gov/
osa/human-studies-review-board.
FOR FURTHER INFORMATION CONTACT: Any
member of the public who wishes to
receive further information should
ADDRESSES:
E:\FR\FM\01APN1.SGM
01APN1
Agencies
[Federal Register Volume 84, Number 62 (Monday, April 1, 2019)]
[Notices]
[Pages 12245-12246]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-06225]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-70-000.
Applicants: High Lonesome Mesa, LLC, High Lonesome Mesa Wind, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of High Lonesome Mesa, LLC, et al.
Filed Date: 3/25/19.
Accession Number: 20190325-5200.
Comments Due: 5 p.m. ET 4/15/19.
Docket Numbers: EC19-71-000.
Applicants: PPL Electric Utilities Corporation.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of PPL Electric Utilities Corporation.
Filed Date: 3/25/19.
Accession Number: 20190325-5203.
Comments Due: 5 p.m. ET 4/15/19.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-83-000.
Applicants: FirstLight CT Housatonic LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of FirstLight CT Housatonic LLC.
Filed Date: 3/26/19.
Accession Number: 20190326-5161.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: EG19-84-000.
Applicants: FirstLight CT Hydro LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of FirstLight CT Hydro LLC.
Filed Date: 3/26/19.
Accession Number: 20190326-5165.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: EG19-85-000.
Applicants: FirstLight MA Hydro LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of FirstLight MA Hydro LLC.
Filed Date: 3/26/19.
Accession Number: 20190326-5166.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: EG19-86-000.
Applicants: Northfield Mountain LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Northfield Mountain LLC.
Filed Date: 3/26/19.
Accession Number: 20190326-5226.
Comments Due: 5 p.m. ET 4/16/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-1568-003.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Updated Request for Deferral of
[[Page 12246]]
Effective Date-Order No. 831 Compliance Filing to be effective N/A.
Filed Date: 3/26/19.
Accession Number: 20190326-5067.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19-709-002.
Applicants: Entergy Louisiana, LLC.
Description: Tariff Amendment: Entergy OpCos Reactive Power Update
to be effective 1/1/2019.
Filed Date: 3/26/19.
Accession Number: 20190326-5089.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19-1417-000.
Applicants: GenOn Power Midwest, LP.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revisions to MBR Tariff and Request for Waivers to be effective 3/11/
2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5112.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1417-001.
Applicants: GenOn Power Midwest, LP.
Description: Tariff Amendment: Notice of Succession and Revisions
to MBR Tariff and Request for Waivers to be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5131.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1434-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised WMPA No. 4869;
Queue No. AD2-044/AC2-138 to be effective 2/22/2019.
Filed Date: 3/25/19.
Accession Number: 20190325-5166.
Comments Due: 5 p.m. ET 4/15/19.
Docket Numbers: ER19-1435-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ICSA, SA No. 5310;
Queue No. AB2-174 to be effective 2/22/2019.
Filed Date: 3/25/19.
Accession Number: 20190325-5170.
Comments Due: 5 p.m. ET 4/15/19.
Docket Numbers: ER19-1436-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised WMPA No. 4880;
Queue No. AD2-021/AC2-137 to be effective 2/22/2019.
Filed Date: 3/25/19.
Accession Number: 20190325-5171.
Comments Due: 5 p.m. ET 4/15/19.
Docket Numbers: ER19-1437-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of ISA SA
No. 3904; Queue No. AA1-108 to be effective 4/8/2019.
Filed Date: 3/25/19.
Accession Number: 20190325-5172.
Comments Due: 5 p.m. ET 4/15/19.
Docket Numbers: ER19-1438-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: 2nd Amendment to CDWR WPA
for the Thermalito Restoration Project (SA 275) to be effective 3/27/
2019.
Filed Date: 3/26/19.
Accession Number: 20190326-5010.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19-1439-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-03-26_SA 3288 Sugar
Creek Wind One--Ameren Illinois GIA (J756) to be effective 3/12/2019.
Filed Date: 3/26/19.
Accession Number: 20190326-5090.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19-1440-000.
Applicants: DTE Electric Company.
Description: Sec. 205(d) Rate Filing: Update to Reactive Revenue
to be effective 3/27/2019.
Filed Date: 3/26/19.
Accession Number: 20190326-5095.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19-1441-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-03-26_SA 3289 Sugar
River Wind--ATC GIA (J584) to be effective 3/12/2019.
Filed Date: 3/26/19.
Accession Number: 20190326-5108.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19-1442-000.
Applicants: Sage Solar I LLC.
Description: Sec. 205(d) Rate Filing: Sage Solar I LLC Shared
Facilities Agreement to be effective 5/1/2019.
Filed Date: 3/26/19.
Accession Number: 20190326-5199.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19-1443-000.
Applicants: Sage Solar II LLC.
Description: Sec. 205(d) Rate Filing: Sage Solar II LLC Shared
Facilities Agreement to be effective 5/1/2019.
Filed Date: 3/26/19.
Accession Number: 20190326-5212.
Comments Due: 5 p.m. ET 4/16/19.
Docket Numbers: ER19-1444-000.
Applicants: Sage Solar III LLC.
Description: Sec. 205(d) Rate Filing: Sage Solar III LLC Shared
Facilities Agreement to be effective 5/1/2019.
Filed Date: 3/26/19.
Accession Number: 20190326-5224.
Comments Due: 5 p.m. ET 4/16/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-06225 Filed 3-29-19; 8:45 am]