Combined Notice of Filings #1, 11969-11970 [2019-06121]
Download as PDF
Federal Register / Vol. 84, No. 61 / Friday, March 29, 2019 / Notices
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: March 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–06125 Filed 3–28–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: March 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[Docket No. ER19–1394–000]
jbell on DSK30RV082PROD with NOTICES
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Endeavor Wind II, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
[FR Doc. 2019–06124 Filed 3–28–19; 8:45 am]
This is a supplemental notice in the
above-referenced proceeding of
Endeavor Wind II, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is April 11,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
DEPARTMENT OF ENERGY
VerDate Sep<11>2014
17:48 Mar 28, 2019
Jkt 247001
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1709–001.
Applicants: Stoneray Power Partners,
LLC.
Description: Notice of Change in
Status of Stoneray Power Partners, LLC.
Filed Date: 3/22/19.
Accession Number: 20190322–5094.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1405–000.
Applicants: Precept Power LLC.
Description: Baseline eTariff Filing:
INITIAL TARIFF, WAIVERS AND
BLANKET AUTHORITY to be effective
5/1/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5042.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1406–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–03–22_SA 3282 POI-Hill Structure
Replacement MPFCA (J475 J530) to be
effective 3/8/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5044.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1407–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–03–22_SA 3283 Franklin-Wall
Lake 161 kV Line Upgrade MPFCA (J498
J535) to be effective 3/8/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5063.
Comments Due: 5 p.m. ET 4/12/19.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
11969
Docket Numbers: ER19–1408–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Great River Energy.
Description: § 205(d) Rate Filing:
2019–03–22_SA 3292 GRE- DLP TIA
(Frog Creek Bypass Switch) to be
effective 3/1/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5070.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1409–000.
Applicants: Birdsboro Power LLC.
Description: Baseline eTariff Filing:
Reactive Power Tariff Application to be
effective 5/1/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5089.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1410–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits OIA SA Nos. 4577 and
4578 to be effective 5/21/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5100.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1411–000.
Applicants: GenOn Bowline, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5104.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1412–000.
Applicants: GenOn Canal, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5105.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1413–000.
Applicants: GenOn Chalk Point, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5106.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1414–000.
Applicants: GenOn REMA, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5109.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1415–000.
Applicants: GenOn California South,
LP.
E:\FR\FM\29MRN1.SGM
29MRN1
jbell on DSK30RV082PROD with NOTICES
11970
Federal Register / Vol. 84, No. 61 / Friday, March 29, 2019 / Notices
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5110.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1416–000.
Applicants: GenOn Florida, LP.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5111.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1418–000.
Applicants: GenOn Wholesale
Generation, LP.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5113.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1419–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
OATT Revised Attachment H–1 (Rev
Depreciation Rates 2019) to be effective
6/1/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5114.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1420–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–03–22 Gridforce Dynamic Transfer
Balancing Authority Operating
Agreement to be effective 5/22/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5117.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1421–000.
Applicants: Duke Energy Indiana,
LLC.
Description: § 205(d) Rate Filing: 2019
Annual Reconciliation Filing to be
effective 7/1/2018.
Filed Date: 3/22/19.
Accession Number: 20190322–5143.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1422–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
4360; Queue No. AA1–080 to be
effective 5/2/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5144.
Comments Due: 5 p.m. ET 4/12/19.
Take notice that the Commission
received the following public utility
holding company filings:
VerDate Sep<11>2014
17:48 Mar 28, 2019
Jkt 247001
Docket Numbers: PH19–8–000.
Applicants: Pacolet Milliken
Enterprises, LLC.
Description: Pacolet Milliken
Enterprises, LLC submits FERC 65–B
Waiver Notification.
Filed Date: 3/22/19.
Accession Number: 20190322–5136.
Comments Due: 5 p.m. ET 4/12/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–06121 Filed 3–28–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–111–000 Corporation]
CenterPoint Energy Resources; Notice
of Application
Take notice that on March 19, 2019,
CenterPoint Energy Resources
Corporation (CERC), 401 West Capitol
Avenue, Suite 102, Little Rock, AR
77201, filed in Docket No. CP19–111–
000 an application pursuant to section
7(f) of the Natural Gas Act (NGA)
requesting a service area determination
so that it may expand or enlarge its
facilities, without further authorization
from the Commission. CERC requests a
service area determination with respect
to CERC’s activities as a local
distribution company (LDC) in the states
of Arkansas, Louisiana, and Texas.
CERC also requests: (i) A finding that
CERC qualifies as an LDC for the
purposes of section 311 of the Natural
Gas Policy Act of 1978 (NGPA); (ii) a
waiver of the Commission’s accounting
and reporting requirements and other
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
regulatory requirements ordinarily
applicable to natural gas companies
under the NGA and the NGPA; and (iii)
such further relief as the Commission
may deem appropriate, all as more fully
described in the application which is on
file with the Commission and open to
public inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Debra
Ann Palmer, Reed Smith LLP, 1301 K
Street NW, Washington, DC 20005, by
telephone at (202) 414–9200, or by
email dpalmer@reedsmith.com; or
Stephanie Hammons, Associate General
Counsel, CenterPoint Energy, 401 West
Capitol Avenue, Suite 102, Little Rock,
AR 77201, by telephone at (501) 377–
4612, or by email stephanie.hammons@
centerpointenergy.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 84, Number 61 (Friday, March 29, 2019)]
[Notices]
[Pages 11969-11970]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-06121]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-1709-001.
Applicants: Stoneray Power Partners, LLC.
Description: Notice of Change in Status of Stoneray Power Partners,
LLC.
Filed Date: 3/22/19.
Accession Number: 20190322-5094.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1405-000.
Applicants: Precept Power LLC.
Description: Baseline eTariff Filing: INITIAL TARIFF, WAIVERS AND
BLANKET AUTHORITY to be effective 5/1/2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5042.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1406-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-03-22_SA 3282 POI-Hill
Structure Replacement MPFCA (J475 J530) to be effective 3/8/2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5044.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1407-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-03-22_SA 3283 Franklin-
Wall Lake 161 kV Line Upgrade MPFCA (J498 J535) to be effective 3/8/
2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5063.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1408-000.
Applicants: Midcontinent Independent System Operator, Inc., Great
River Energy.
Description: Sec. 205(d) Rate Filing: 2019-03-22_SA 3292 GRE- DLP
TIA (Frog Creek Bypass Switch) to be effective 3/1/2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5070.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1409-000.
Applicants: Birdsboro Power LLC.
Description: Baseline eTariff Filing: Reactive Power Tariff
Application to be effective 5/1/2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5089.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1410-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: MAIT submits OIA SA Nos.
4577 and 4578 to be effective 5/21/2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5100.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1411-000.
Applicants: GenOn Bowline, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revisions to MBR Tariff and Request for Waivers to be effective 3/11/
2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5104.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1412-000.
Applicants: GenOn Canal, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revisions to MBR Tariff and Request for Waivers to be effective 3/11/
2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5105.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1413-000.
Applicants: GenOn Chalk Point, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revisions to MBR Tariff and Request for Waivers to be effective 3/11/
2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5106.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1414-000.
Applicants: GenOn REMA, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revisions to MBR Tariff and Request for Waivers to be effective 3/11/
2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5109.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1415-000.
Applicants: GenOn California South, LP.
[[Page 11970]]
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revisions to MBR Tariff and Request for Waivers to be effective 3/11/
2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5110.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1416-000.
Applicants: GenOn Florida, LP.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revisions to MBR Tariff and Request for Waivers to be effective 3/11/
2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5111.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1418-000.
Applicants: GenOn Wholesale Generation, LP.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revisions to MBR Tariff and Request for Waivers to be effective 3/11/
2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5113.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1419-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: OATT Revised Attachment H-1
(Rev Depreciation Rates 2019) to be effective 6/1/2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5114.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1420-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-03-22 Gridforce Dynamic
Transfer Balancing Authority Operating Agreement to be effective 5/22/
2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5117.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1421-000.
Applicants: Duke Energy Indiana, LLC.
Description: Sec. 205(d) Rate Filing: 2019 Annual Reconciliation
Filing to be effective 7/1/2018.
Filed Date: 3/22/19.
Accession Number: 20190322-5143.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19-1422-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of WMPA SA
No. 4360; Queue No. AA1-080 to be effective 5/2/2019.
Filed Date: 3/22/19.
Accession Number: 20190322-5144.
Comments Due: 5 p.m. ET 4/12/19.
Take notice that the Commission received the following public
utility holding company filings:
Docket Numbers: PH19-8-000.
Applicants: Pacolet Milliken Enterprises, LLC.
Description: Pacolet Milliken Enterprises, LLC submits FERC 65-B
Waiver Notification.
Filed Date: 3/22/19.
Accession Number: 20190322-5136.
Comments Due: 5 p.m. ET 4/12/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-06121 Filed 3-28-19; 8:45 am]
BILLING CODE 6717-01-P