CenterPoint Energy Resources; Notice of Application, 11970-11971 [2019-06083]
Download as PDF
jbell on DSK30RV082PROD with NOTICES
11970
Federal Register / Vol. 84, No. 61 / Friday, March 29, 2019 / Notices
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5110.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1416–000.
Applicants: GenOn Florida, LP.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5111.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1418–000.
Applicants: GenOn Wholesale
Generation, LP.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
MBR Tariff and Request for Waivers to
be effective 3/11/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5113.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1419–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
OATT Revised Attachment H–1 (Rev
Depreciation Rates 2019) to be effective
6/1/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5114.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1420–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–03–22 Gridforce Dynamic Transfer
Balancing Authority Operating
Agreement to be effective 5/22/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5117.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1421–000.
Applicants: Duke Energy Indiana,
LLC.
Description: § 205(d) Rate Filing: 2019
Annual Reconciliation Filing to be
effective 7/1/2018.
Filed Date: 3/22/19.
Accession Number: 20190322–5143.
Comments Due: 5 p.m. ET 4/12/19.
Docket Numbers: ER19–1422–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
4360; Queue No. AA1–080 to be
effective 5/2/2019.
Filed Date: 3/22/19.
Accession Number: 20190322–5144.
Comments Due: 5 p.m. ET 4/12/19.
Take notice that the Commission
received the following public utility
holding company filings:
VerDate Sep<11>2014
17:48 Mar 28, 2019
Jkt 247001
Docket Numbers: PH19–8–000.
Applicants: Pacolet Milliken
Enterprises, LLC.
Description: Pacolet Milliken
Enterprises, LLC submits FERC 65–B
Waiver Notification.
Filed Date: 3/22/19.
Accession Number: 20190322–5136.
Comments Due: 5 p.m. ET 4/12/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–06121 Filed 3–28–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–111–000 Corporation]
CenterPoint Energy Resources; Notice
of Application
Take notice that on March 19, 2019,
CenterPoint Energy Resources
Corporation (CERC), 401 West Capitol
Avenue, Suite 102, Little Rock, AR
77201, filed in Docket No. CP19–111–
000 an application pursuant to section
7(f) of the Natural Gas Act (NGA)
requesting a service area determination
so that it may expand or enlarge its
facilities, without further authorization
from the Commission. CERC requests a
service area determination with respect
to CERC’s activities as a local
distribution company (LDC) in the states
of Arkansas, Louisiana, and Texas.
CERC also requests: (i) A finding that
CERC qualifies as an LDC for the
purposes of section 311 of the Natural
Gas Policy Act of 1978 (NGPA); (ii) a
waiver of the Commission’s accounting
and reporting requirements and other
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
regulatory requirements ordinarily
applicable to natural gas companies
under the NGA and the NGPA; and (iii)
such further relief as the Commission
may deem appropriate, all as more fully
described in the application which is on
file with the Commission and open to
public inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Debra
Ann Palmer, Reed Smith LLP, 1301 K
Street NW, Washington, DC 20005, by
telephone at (202) 414–9200, or by
email dpalmer@reedsmith.com; or
Stephanie Hammons, Associate General
Counsel, CenterPoint Energy, 401 West
Capitol Avenue, Suite 102, Little Rock,
AR 77201, by telephone at (501) 377–
4612, or by email stephanie.hammons@
centerpointenergy.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
E:\FR\FM\29MRN1.SGM
29MRN1
jbell on DSK30RV082PROD with NOTICES
Federal Register / Vol. 84, No. 61 / Friday, March 29, 2019 / Notices
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made in the
proceeding with the Commission and
must provide a copy to the applicant
and to every other party. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new Natural Gas Act section 3 or section
7 proceeding.1 Persons desiring to
become a party to a certificate
proceeding are to intervene in a timely
manner. If seeking to intervene out-oftime, the movant is required to ‘‘show
good cause why the time limitation
should be waived,’’ and should provide
justification by reference to factors set
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC ¶ 61,167 at ¶ 50 (2018).
VerDate Sep<11>2014
17:48 Mar 28, 2019
Jkt 247001
forth in Rule 214(d)(1) of the
Commission’s Rules and Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5 p.m. Eastern time on
April 15, 2019.
Dated: March 25, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–06083 Filed 3–28–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2014–0076; FRL–9989–
91–OEI]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NESHAP
for the Surface Coating of Large
Household and Commercial
Appliances (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
NESHAP for the Surface Coating of
Large Household and Commercial
Appliances (EPA ICR Number 1954.07,
OMB Control Number 2060–0457), to
the Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act. This is a proposed
extension of the ICR, which is currently
approved through March 31, 2019.
Public comments were previously
requested, via the Federal Register, on
May 30, 2018 during a 60-day comment
period. This notice allows for an
additional 30 days for public comments.
A fuller description of the ICR is given
below, including its estimated burden
and cost to the public. An agency may
neither conduct nor sponsor, and a
person is not required to respond to, a
collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before April 29, 2019.
SUMMARY:
2 18
PO 00000
CFR 385.214(d)(1).
Frm 00046
Fmt 4703
Sfmt 4703
11971
Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2014–0076, to: (1) EPA
online using www.regulations.gov (our
preferred method), or by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460; and (2) OMB via
email to oira_submission@omb.eop.gov.
Address comments to OMB Desk Officer
for EPA.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI), or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: (202) 564–
2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain
in detail the information that EPA will
be collecting, are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
WJC West, Room 3334, 1301
Constitution Ave. NW, Washington, DC.
The telephone number for the Docket
Center is 202–566–1744. For additional
information about EPA’s public docket,
visit: https://www.epa.gov/dockets.
Abstract: The National Emission
Standards for Hazardous Air Pollutants
(NESHAP) for the Surface Coating of
Large Household and Commercial
Appliances (40 CFR part 63, subpart
NNNN) apply to both existing and new
facilities that perform surface coating of
large household and commercial
appliances and related parts where the
total Hazardous Air Pollutants (HAPs)
emitted are greater than or equal to 10
tons per year of any one HAP, or where
the total HAPs emitted are greater than
or equal to 25 tons per year of any
combination of HAPs. New facilities
include those that commenced
construction or reconstruction after the
date of proposal. In general, all NESHAP
standards require initial notifications,
performance tests, and periodic reports
by the owners/operators of the affected
facilities. They are also required to
maintain records of the occurrence and
duration of any startup, shutdown, or
ADDRESSES:
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 84, Number 61 (Friday, March 29, 2019)]
[Notices]
[Pages 11970-11971]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-06083]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-111-000 Corporation]
CenterPoint Energy Resources; Notice of Application
Take notice that on March 19, 2019, CenterPoint Energy Resources
Corporation (CERC), 401 West Capitol Avenue, Suite 102, Little Rock, AR
77201, filed in Docket No. CP19-111-000 an application pursuant to
section 7(f) of the Natural Gas Act (NGA) requesting a service area
determination so that it may expand or enlarge its facilities, without
further authorization from the Commission. CERC requests a service area
determination with respect to CERC's activities as a local distribution
company (LDC) in the states of Arkansas, Louisiana, and Texas. CERC
also requests: (i) A finding that CERC qualifies as an LDC for the
purposes of section 311 of the Natural Gas Policy Act of 1978 (NGPA);
(ii) a waiver of the Commission's accounting and reporting requirements
and other regulatory requirements ordinarily applicable to natural gas
companies under the NGA and the NGPA; and (iii) such further relief as
the Commission may deem appropriate, all as more fully described in the
application which is on file with the Commission and open to public
inspection.
The filing is available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's website web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions concerning this application may be directed to Debra
Ann Palmer, Reed Smith LLP, 1301 K Street NW, Washington, DC 20005, by
telephone at (202) 414-9200, or by email [email protected]; or
Stephanie Hammons, Associate General Counsel, CenterPoint Energy, 401
West Capitol Avenue, Suite 102, Little Rock, AR 77201, by telephone at
(501) 377-4612, or by email [email protected].
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and
[[Page 11971]]
Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA
(18 CFR 157.10). A person obtaining party status will be placed on the
service list maintained by the Secretary of the Commission and will
receive copies of all documents filed by the applicant and by all other
parties. A party must submit 3 copies of filings made in the proceeding
with the Commission and must provide a copy to the applicant and to
every other party. Only parties to the proceeding can ask for court
review of Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of filed documents on all other parties. However, the non-party
commenters will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
As of the February 27, 2018 date of the Commission's order in
Docket No. CP16-4-001, the Commission will apply its revised practice
concerning out-of-time motions to intervene in any new Natural Gas Act
section 3 or section 7 proceeding.\1\ Persons desiring to become a
party to a certificate proceeding are to intervene in a timely manner.
If seeking to intervene out-of-time, the movant is required to ``show
good cause why the time limitation should be waived,'' and should
provide justification by reference to factors set forth in Rule
214(d)(1) of the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------
\1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC ] 61,167 at
] 50 (2018).
\2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 3 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Comment Date: 5 p.m. Eastern time on April 15, 2019.
Dated: March 25, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-06083 Filed 3-28-19; 8:45 am]
BILLING CODE 6717-01-P