Combined Notice of Filings #1, 11758-11759 [2019-05897]

Download as PDF 11758 Federal Register / Vol. 84, No. 60 / Thursday, March 28, 2019 / Notices comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on April 10, 2019. Dated: March 21, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–05902 Filed 3–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission amozie on DSK9F9SC42PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1107–009. Applicants: Pacific Gas and Electric Company. Description: Notice of Non-Material Change in Status of Pacific Gas and Electric Company. Filed Date: 3/21/19. Accession Number: 20190321–5103. Comments Due: 5 p.m. ET 4/11/19. Docket Numbers: ER12–524–004. Applicants: Longview Power, LLC. Description: Report Filing: Refund Report ? Informational Filing to be effective N/A. Filed Date: 3/21/19. Accession Number: 20190321–5142. Comments Due: 5 p.m. ET 4/11/19. Docket Numbers: ER19–839–001. Applicants: Virginia Electric and Power Company, PJM Interconnection, L.L.C. Description: Compliance filing: Dominion submits an errata to OATT, VerDate Sep<11>2014 18:57 Mar 27, 2019 Jkt 247001 Att. H–16A revisions in Docket No. ER19–839 to be effective 6/27/2018. Filed Date: 3/21/19. Accession Number: 20190321–5131. Comments Due: 5 p.m. ET 4/11/19. Docket Numbers: ER19–1392–000. Applicants: High Lonesome Mesa Wind, LLC. Description: Baseline eTariff Filing: High Lonesome Mesa Wind, LLC Application for Market-Based Rates to be effective 5/19/2019. Filed Date: 3/20/19. Accession Number: 20190320–5149. Comments Due: 5 p.m. ET 4/10/19. Docket Numbers: ER19–1393–000. Applicants: Endeavor Wind I, LLC. Description: Baseline eTariff Filing: Endeavor Wind I, LLC Application for Market-Based Rates to be effective 5/19/ 2019. Filed Date: 3/20/19. Accession Number: 20190320–5150. Comments Due: 5 p.m. ET 4/10/19. Docket Numbers: ER19–1394–000. Applicants: Endeavor Wind II, LLC. Description: Baseline eTariff Filing: Endeavor Wind II, LLC Application for Market-Based Rates to be effective 5/5/ 2019. Filed Date: 3/20/19. Accession Number: 20190320–5151. Comments Due: 5 p.m. ET 4/10/19. Docket Numbers: ER19–1395–000. Applicants: NSTAR Electric Company. Description: Tariff Cancellation: Cancellation of Design Engineering Construction Agrmnt w/NSTAR & New England Pwr to be effective 3/21/2019. Filed Date: 3/21/19. Accession Number: 20190321–5030. Comments Due: 5 p.m. ET 4/11/19. Docket Numbers: ER19–1397–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–03–21_SA 3278 Beaver Creek Grimes MPFCA (J498 J524 J534 J535) to be effective 3/7/2019. Filed Date: 3/21/19. Accession Number: 20190321–5057. Comments Due: 5 p.m. ET 4/11/19. Docket Numbers: ER19–1399–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–03–21_SA 3279 Johnson JunctionOrtonville Line MPFCA (J493 J526) MRES to be effective 3/7/2019. Filed Date: 3/21/19. Accession Number: 20190321–5093. Comments Due: 5 p.m. ET 4/11/19. Docket Numbers: ER19–1400–000. Applicants: Emera Maine. Description: § 205(d) Rate Filing: MPD OATT Formula Rates Revisions to be effective 6/1/2019. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Filed Date: 3/21/19. Accession Number: 20190321–5095. Comments Due: 5 p.m. ET 4/11/19. Docket Numbers: ER19–1401–000. Applicants: Niagara Mohawk Power Corporation, New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: 205 agreement filing between Niagara Mohawk and Greenway Conservnacy to be effective 2/19/2019. Filed Date: 3/21/19. Accession Number: 20190321–5114. Comments Due: 5 p.m. ET 4/11/19. Docket Numbers: ER19–1402–000. Applicants: Coyote Ridge Wind, LLC. Description: Baseline eTariff Filing: Coyote Ridge Wind, LLC Application for Market-Based Rate Authority to be effective 5/21/2019. Filed Date: 3/21/19. Accession Number: 20190321–5120. Comments Due: 5 p.m. ET 4/11/19. Docket Numbers: ER19–1403–000. Applicants: Duke Energy Carolinas, LLC. Description: Notice of Cancellation of Jurisdictional Transmission Service Agreements Nos. 414, et al. of Duke Energy Carolinas, LLC. Filed Date: 3/21/19. Accession Number: 20190321–5129. Comments Due: 5 p.m. ET 4/11/19. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR19–5–000. Applicants: North American Electric Reliability Corporation, Texas Reliability Entity, Inc. Description: Joint Petition of the North American Electric Reliability Corporation and Texas Reliability Entity, Inc. for Approval of Amendments to the Texas Reliability Entity, Inc. Bylaws. Filed Date: 3/20/19. Accession Number: 20190320–5172. Comments Due: 5 p.m. ET 4/10/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings E:\FR\FM\28MRN1.SGM 28MRN1 Federal Register / Vol. 84, No. 60 / Thursday, March 28, 2019 / Notices can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 21, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–05897 Filed 3–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PL19–3–000] Inquiry Regarding the Commission’s Electric Transmission Incentives Policy Federal Energy Regulatory Commission. ACTION: Notice of inquiry. AGENCY: In this Notice of Inquiry, the Federal Energy Regulatory Commission (Commission) seeks comments on the scope and implementation of its electric transmission incentives regulations and policy. DATES: Initial Comments are due June 25, 2019, and Reply Comments are due July 25, 2019. ADDRESSES: Comments, identified by docket number, may be filed electronically at https://www.ferc.gov in acceptable native applications and print-to-PDF, but not in scanned or picture format. For those unable to file electronically, comments may be filed by mail or hand-delivery to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. The Comment Procedures section of this document contains more detailed filing procedures. FOR FURTHER INFORMATION CONTACT: SUMMARY: 11759 David Tobenkin (Technical Information), Office of Energy Policy and Innovation, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, (202) 502–6445, david.tobenkin@ ferc.gov. Adam Batenhorst (Legal Information), Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, (202) 502–6150, adam.batenhorst@ferc.gov. Adam Pollock (Technical Information), Office of Energy Market Regulation, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, (202) 502– 8458, adam.pollock@ferc.gov. SUPPLEMENTARY INFORMATION: Table of Contents Paragraph Nos. amozie on DSK9F9SC42PROD with NOTICES I. Background ...................................................................................................................................................................................... A. FPA Section 219 ..................................................................................................................................................................... B. Order Nos. 679 and 679–A .................................................................................................................................................... C. 2012 Policy Statement ............................................................................................................................................................ D. Order No. 1000 ....................................................................................................................................................................... II. Subject of the Notice of Inquiry .................................................................................................................................................... A. Approach to Incentive Policy ................................................................................................................................................ 1. Incentives Based on Project Risks and Challenges ........................................................................................................ 2. Incentives Based on Expected Project Benefits .............................................................................................................. 3. Incentives Based on Project Characteristics ................................................................................................................... B. Incentive Objectives ............................................................................................................................................................... 1. Reliability Benefits ........................................................................................................................................................... 2. Economic Efficiency Benefits .......................................................................................................................................... 3. Persistent Geographic Needs ........................................................................................................................................... 4. Flexible Transmission System Operation ....................................................................................................................... 5. Security ............................................................................................................................................................................. 6. Resilience ......................................................................................................................................................................... 7. Improving Existing Transmission Facilities ................................................................................................................... 8. Interregional Transmission Projects ................................................................................................................................ 9. Unlocking Locationally Constrained Resources ............................................................................................................. 10. Ownership by Non-Public Utilities .............................................................................................................................. 11. Order No. 1000 Transmission Projects ......................................................................................................................... 12. Transmission Projects in Non-RTO/ISO Regions ......................................................................................................... C. Existing Incentives .................................................................................................................................................................. 1. ROE-Adder Incentives ..................................................................................................................................................... 2. Non-ROE Transmission Incentives ................................................................................................................................. D. Mechanics and Implementation ............................................................................................................................................ 1. Duration of Incentives ..................................................................................................................................................... 2. Case-by-Case vs. Automatic Approach in Reviewing Incentive Applications ............................................................. 3. Interaction Between Different Potential Incentives in Determining Correct Level of ROE Incentives ...................... 4. Bounds on ROE Incentives .............................................................................................................................................. E. Metrics for Evaluating the Effectiveness of Incentives ......................................................................................................... III. Comment Procedures .................................................................................................................................................................... IV. Document Availability ................................................................................................................................................................. 1. In this Notice of Inquiry, the Commission seeks comment on the scope and implementation of its electric transmission incentives regulations and policy pursuant to section 1241 of the Energy Policy Act of 2005 (EPAct VerDate Sep<11>2014 18:57 Mar 27, 2019 Jkt 247001 2005),1 codified as section 219 of the Federal Power Act (FPA),2 which directed the Commission to use transmission incentives to help ensure 1 Energy Policy Act of 2005, Public Law 109–58, sec. 1261 et seq., 119 Stat. 594 (2005). 2 16 U.S.C. 824s. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 3 3 6 9 11 13 14 15 16 18 19 22 24 25 26 27 28 29 30 31 32 33 35 36 37 40 44 44 45 46 47 48 49 53 reliability and reduce the cost of delivered power by reducing transmission congestion.3 In 2006, the 3 The Commission is generally reevaluating its ROE policy in a separate Notice of Inquiry issued concurrently with this notice. Inquiry Regarding the E:\FR\FM\28MRN1.SGM Continued 28MRN1

Agencies

[Federal Register Volume 84, Number 60 (Thursday, March 28, 2019)]
[Notices]
[Pages 11758-11759]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05897]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER10-1107-009.
    Applicants: Pacific Gas and Electric Company.
    Description: Notice of Non-Material Change in Status of Pacific Gas 
and Electric Company.
    Filed Date: 3/21/19.
    Accession Number: 20190321-5103.
    Comments Due: 5 p.m. ET 4/11/19.

    Docket Numbers: ER12-524-004.
    Applicants: Longview Power, LLC.
    Description: Report Filing: Refund Report ? Informational Filing to 
be effective N/A.
    Filed Date: 3/21/19.
    Accession Number: 20190321-5142.
    Comments Due: 5 p.m. ET 4/11/19.

    Docket Numbers: ER19-839-001.
    Applicants: Virginia Electric and Power Company, PJM 
Interconnection, L.L.C.
    Description: Compliance filing: Dominion submits an errata to OATT, 
Att. H-16A revisions in Docket No. ER19-839 to be effective 6/27/2018.
    Filed Date: 3/21/19.
    Accession Number: 20190321-5131.
    Comments Due: 5 p.m. ET 4/11/19.

    Docket Numbers: ER19-1392-000.
    Applicants: High Lonesome Mesa Wind, LLC.
    Description: Baseline eTariff Filing: High Lonesome Mesa Wind, LLC 
Application for Market-Based Rates to be effective 5/19/2019.
    Filed Date: 3/20/19.
    Accession Number: 20190320-5149.
    Comments Due: 5 p.m. ET 4/10/19.

    Docket Numbers: ER19-1393-000.
    Applicants: Endeavor Wind I, LLC.
    Description: Baseline eTariff Filing: Endeavor Wind I, LLC 
Application for Market-Based Rates to be effective 5/19/2019.
    Filed Date: 3/20/19.
    Accession Number: 20190320-5150.
    Comments Due: 5 p.m. ET 4/10/19.

    Docket Numbers: ER19-1394-000.
    Applicants: Endeavor Wind II, LLC.
    Description: Baseline eTariff Filing: Endeavor Wind II, LLC 
Application for Market-Based Rates to be effective 5/5/2019.
    Filed Date: 3/20/19.
    Accession Number: 20190320-5151.
    Comments Due: 5 p.m. ET 4/10/19.

    Docket Numbers: ER19-1395-000.
    Applicants: NSTAR Electric Company.
    Description: Tariff Cancellation: Cancellation of Design 
Engineering Construction Agrmnt w/NSTAR & New England Pwr to be 
effective 3/21/2019.
    Filed Date: 3/21/19.
    Accession Number: 20190321-5030.
    Comments Due: 5 p.m. ET 4/11/19.

    Docket Numbers: ER19-1397-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-03-21_SA 3278 Beaver 
Creek Grimes MPFCA (J498 J524 J534 J535) to be effective 3/7/2019.
    Filed Date: 3/21/19.
    Accession Number: 20190321-5057.
    Comments Due: 5 p.m. ET 4/11/19.

    Docket Numbers: ER19-1399-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-03-21_SA 3279 Johnson 
Junction-Ortonville Line MPFCA (J493 J526) MRES to be effective 3/7/
2019.
    Filed Date: 3/21/19.
    Accession Number: 20190321-5093.
    Comments Due: 5 p.m. ET 4/11/19.

    Docket Numbers: ER19-1400-000.
    Applicants: Emera Maine.
    Description: Sec.  205(d) Rate Filing: MPD OATT Formula Rates 
Revisions to be effective 6/1/2019.
    Filed Date: 3/21/19.
    Accession Number: 20190321-5095.
    Comments Due: 5 p.m. ET 4/11/19.

    Docket Numbers: ER19-1401-000.
    Applicants: Niagara Mohawk Power Corporation, New York Independent 
System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 205 agreement filing between 
Niagara Mohawk and Greenway Conservnacy to be effective 2/19/2019.
    Filed Date: 3/21/19.
    Accession Number: 20190321-5114.
    Comments Due: 5 p.m. ET 4/11/19.

    Docket Numbers: ER19-1402-000.
    Applicants: Coyote Ridge Wind, LLC.
    Description: Baseline eTariff Filing: Coyote Ridge Wind, LLC 
Application for Market-Based Rate Authority to be effective 5/21/2019.
    Filed Date: 3/21/19.
    Accession Number: 20190321-5120.
    Comments Due: 5 p.m. ET 4/11/19.

    Docket Numbers: ER19-1403-000.
    Applicants: Duke Energy Carolinas, LLC.
    Description: Notice of Cancellation of Jurisdictional Transmission 
Service Agreements Nos. 414, et al. of Duke Energy Carolinas, LLC.
    Filed Date: 3/21/19.
    Accession Number: 20190321-5129.
    Comments Due: 5 p.m. ET 4/11/19.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RR19-5-000.
    Applicants: North American Electric Reliability Corporation, Texas 
Reliability Entity, Inc.
    Description: Joint Petition of the North American Electric 
Reliability Corporation and Texas Reliability Entity, Inc. for Approval 
of Amendments to the Texas Reliability Entity, Inc. Bylaws.
    Filed Date: 3/20/19.
    Accession Number: 20190320-5172.
    Comments Due: 5 p.m. ET 4/10/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings

[[Page 11759]]

can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: March 21, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-05897 Filed 3-27-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.