Notice of Effectiveness of Exempt Wholesale Generator, 11085 [2019-05633]
Download as PDF
Federal Register / Vol. 84, No. 57 / Monday, March 25, 2019 / Notices
Decrease Calculations to be effective 3/
14/2019.
Filed Date: 3/13/19.
Accession Number: 20190313–5128.
Comments Due: 5 p.m. ET 4/3/19.
Docket Numbers: ER19–1278–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended GIA and Distrib Serv Agmt
Johanna Energy Center—Santa Ana
Storage Proj to be effective 3/14/2019.
Filed Date: 3/13/19.
Accession Number: 20190313–5137.
Comments Due: 5 p.m. ET 4/3/19.
Docket Numbers: ER19–1279–000.
Applicants: Messer Energy Services,
Inc.
Description: § 205(d) Rate Filing:
Notice of Succession to be effective 3/
14/2019.
Filed Date: 3/13/19.
Accession Number: 20190313–5149.
Comments Due: 5 p.m. ET 4/3/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 13, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–05629 Filed 3–22–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator
Docket Nos.
Crocker Wind Farm, LLC ..............
Wheelabrator Concord Company,
L.P.
Vermillion Power, L.L.C .................
Coolidge Power LLC .....................
Valentine Solar, LLC .....................
Techren Solar V LLC .....................
VerDate Sep<11>2014
16:47 Mar 22, 2019
EG19–29–000
EG19–30–000
EG19–31–000
EG19–32–000
EG19–33–000
EG19–34–000
Jkt 247001
Docket Nos.
226HC 8me LLC ............................
Ranchero Wind Farm, LLC ...........
Stryker 22 LLC ..............................
Plumsted 537 LLC .........................
Pinetree Power LLC ......................
Innovative Solar 54, LLC ...............
CCP–PL Lessee IV, LLC ...............
Innovative Solar 67, LLC ...............
CCP–PL Lessee V, LLC ................
EG19–35–000
EG19–36–000
EG19–37–000
EG19–38–000
EG19–40–000
EG19–41–000
EG19–42–000
EG19–43–000
EG19–44–000
Take notice that during the month of
February 2019, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a) (2018).
Dated: March 13, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary
[FR Doc. 2019–05633 Filed 3–22–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–52–000]
Natural Gas Pipeline Company of
America, LLC; Notice of Schedule for
Environmental Review of the
Lockridge Extension Pipeline Project
On January 18, 2019, Natural Gas
Pipeline Company of America, LLC
(Natural) filed an application in Docket
No. CP19–52–000 with the Federal
Energy Regulatory Commission (FERC
or Commission) pursuant to section 7(c)
of the Natural Gas Act to construct,
operate and maintain new facilities in
Ward, Reeves, and Pecos Counties,
Texas. The proposed project is known
as the Lockridge Extension Pipeline
Project (Project) and would provide up
to 500 million standard cubic feet per
day of firm transportation capacity
southbound on Natural’s existing
system to a new bidirectional
interconnect with Trans-Pecos Pipeline,
LLC, at the Waha Hub, a major natural
gas trading point in the Gulf region.
On February 1, 2019, the Commission
issued its Notice of Application for the
Project. Among other things, that notice
alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
11085
Schedule for Environmental Review
Issuance of EA—May 31, 2019
90-day Federal Authorization Decision
Deadline—August 29, 2019
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The Lockridge Extension Pipeline
Project would consist of the following
facilities:
• approximately 16.8 miles, of new
30-inch-diameter pipeline in Ward,
Reeves, and Pecos Counties, Texas;
• a new bidirectional interconnect,
including two 10-inch-diameter
ultrasonic meter runs and a 30-inchdiameter tap, in Pecos County, Texas;
and
• appurtenant and auxiliary facilities,
including:
Æ two 30-inch-diameter tees, valves,
and risers for potential future use;
Æ piping and valves to interconnect
the pipeline extension to the existing
Lockridge Pipeline in Ward County,
Texas; and
Æ relocating a pig receiver currently
at the beginning of the pipeline
extension to the end of pipeline
extension in Pecos County, Texas.1
Background
On March 1, 2019, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Lockridge Extension Pipeline
Project and Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. All
substantive comments will be addressed
in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
1 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
E:\FR\FM\25MRN1.SGM
25MRN1
Agencies
[Federal Register Volume 84, Number 57 (Monday, March 25, 2019)]
[Notices]
[Page 11085]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05633]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Crocker Wind Farm, LLC................... EG19-29-000
Wheelabrator Concord Company, L.P........ EG19-30-000
Vermillion Power, L.L.C.................. EG19-31-000
Coolidge Power LLC....................... EG19-32-000
Valentine Solar, LLC..................... EG19-33-000
Techren Solar V LLC...................... EG19-34-000
226HC 8me LLC............................ EG19-35-000
Ranchero Wind Farm, LLC.................. EG19-36-000
Stryker 22 LLC........................... EG19-37-000
Plumsted 537 LLC......................... EG19-38-000
Pinetree Power LLC....................... EG19-40-000
Innovative Solar 54, LLC................. EG19-41-000
CCP-PL Lessee IV, LLC.................... EG19-42-000
Innovative Solar 67, LLC................. EG19-43-000
CCP-PL Lessee V, LLC..................... EG19-44-000
------------------------------------------------------------------------
Take notice that during the month of February 2019, the status of
the above-captioned entities as Exempt Wholesale Generators became
effective by operation of the Commission's regulations. 18 CFR 366.7(a)
(2018).
Dated: March 13, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary
[FR Doc. 2019-05633 Filed 3-22-19; 8:45 am]