Notice of Effectiveness of Exempt Wholesale Generator, 11085 [2019-05633]

Download as PDF Federal Register / Vol. 84, No. 57 / Monday, March 25, 2019 / Notices Decrease Calculations to be effective 3/ 14/2019. Filed Date: 3/13/19. Accession Number: 20190313–5128. Comments Due: 5 p.m. ET 4/3/19. Docket Numbers: ER19–1278–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended GIA and Distrib Serv Agmt Johanna Energy Center—Santa Ana Storage Proj to be effective 3/14/2019. Filed Date: 3/13/19. Accession Number: 20190313–5137. Comments Due: 5 p.m. ET 4/3/19. Docket Numbers: ER19–1279–000. Applicants: Messer Energy Services, Inc. Description: § 205(d) Rate Filing: Notice of Succession to be effective 3/ 14/2019. Filed Date: 3/13/19. Accession Number: 20190313–5149. Comments Due: 5 p.m. ET 4/3/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 13, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–05629 Filed 3–22–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Docket Nos. Crocker Wind Farm, LLC .............. Wheelabrator Concord Company, L.P. Vermillion Power, L.L.C ................. Coolidge Power LLC ..................... Valentine Solar, LLC ..................... Techren Solar V LLC ..................... VerDate Sep<11>2014 16:47 Mar 22, 2019 EG19–29–000 EG19–30–000 EG19–31–000 EG19–32–000 EG19–33–000 EG19–34–000 Jkt 247001 Docket Nos. 226HC 8me LLC ............................ Ranchero Wind Farm, LLC ........... Stryker 22 LLC .............................. Plumsted 537 LLC ......................... Pinetree Power LLC ...................... Innovative Solar 54, LLC ............... CCP–PL Lessee IV, LLC ............... Innovative Solar 67, LLC ............... CCP–PL Lessee V, LLC ................ EG19–35–000 EG19–36–000 EG19–37–000 EG19–38–000 EG19–40–000 EG19–41–000 EG19–42–000 EG19–43–000 EG19–44–000 Take notice that during the month of February 2019, the status of the abovecaptioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations. 18 CFR 366.7(a) (2018). Dated: March 13, 2019. Nathaniel J. Davis, Sr., Deputy Secretary [FR Doc. 2019–05633 Filed 3–22–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–52–000] Natural Gas Pipeline Company of America, LLC; Notice of Schedule for Environmental Review of the Lockridge Extension Pipeline Project On January 18, 2019, Natural Gas Pipeline Company of America, LLC (Natural) filed an application in Docket No. CP19–52–000 with the Federal Energy Regulatory Commission (FERC or Commission) pursuant to section 7(c) of the Natural Gas Act to construct, operate and maintain new facilities in Ward, Reeves, and Pecos Counties, Texas. The proposed project is known as the Lockridge Extension Pipeline Project (Project) and would provide up to 500 million standard cubic feet per day of firm transportation capacity southbound on Natural’s existing system to a new bidirectional interconnect with Trans-Pecos Pipeline, LLC, at the Waha Hub, a major natural gas trading point in the Gulf region. On February 1, 2019, the Commission issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 11085 Schedule for Environmental Review Issuance of EA—May 31, 2019 90-day Federal Authorization Decision Deadline—August 29, 2019 If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. Project Description The Lockridge Extension Pipeline Project would consist of the following facilities: • approximately 16.8 miles, of new 30-inch-diameter pipeline in Ward, Reeves, and Pecos Counties, Texas; • a new bidirectional interconnect, including two 10-inch-diameter ultrasonic meter runs and a 30-inchdiameter tap, in Pecos County, Texas; and • appurtenant and auxiliary facilities, including: Æ two 30-inch-diameter tees, valves, and risers for potential future use; Æ piping and valves to interconnect the pipeline extension to the existing Lockridge Pipeline in Ward County, Texas; and Æ relocating a pig receiver currently at the beginning of the pipeline extension to the end of pipeline extension in Pecos County, Texas.1 Background On March 1, 2019, the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Proposed Lockridge Extension Pipeline Project and Request for Comments on Environmental Issues (NOI). The NOI was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. All substantive comments will be addressed in the EA. Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. 1 A ‘‘pig’’ is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections, or other purposes. E:\FR\FM\25MRN1.SGM 25MRN1

Agencies

[Federal Register Volume 84, Number 57 (Monday, March 25, 2019)]
[Notices]
[Page 11085]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05633]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator

------------------------------------------------------------------------
                                                    Docket Nos.
------------------------------------------------------------------------
Crocker Wind Farm, LLC...................  EG19-29-000
Wheelabrator Concord Company, L.P........  EG19-30-000
Vermillion Power, L.L.C..................  EG19-31-000
Coolidge Power LLC.......................  EG19-32-000
Valentine Solar, LLC.....................  EG19-33-000
Techren Solar V LLC......................  EG19-34-000
226HC 8me LLC............................  EG19-35-000
Ranchero Wind Farm, LLC..................  EG19-36-000
Stryker 22 LLC...........................  EG19-37-000
Plumsted 537 LLC.........................  EG19-38-000
Pinetree Power LLC.......................  EG19-40-000
Innovative Solar 54, LLC.................  EG19-41-000
CCP-PL Lessee IV, LLC....................  EG19-42-000
Innovative Solar 67, LLC.................  EG19-43-000
CCP-PL Lessee V, LLC.....................  EG19-44-000
------------------------------------------------------------------------


    Take notice that during the month of February 2019, the status of 
the above-captioned entities as Exempt Wholesale Generators became 
effective by operation of the Commission's regulations. 18 CFR 366.7(a) 
(2018).

    Dated: March 13, 2019.
 Nathaniel J. Davis, Sr.,
 Deputy Secretary
[FR Doc. 2019-05633 Filed 3-22-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.