Combined Notice of Filings #1, 11081-11082 [2019-05628]

Download as PDF Federal Register / Vol. 84, No. 57 / Monday, March 25, 2019 / Notices Total Estimated Number of Annual Burden Hours: 1,110. Abstract: In October 2015, the Institute for Community Inclusion (ICI), UMass Boston received a five-year cooperative agreement from the Office of Postsecondary Education to serve as the National Coordinating Center (NCC) for colleges and universities implementing inclusive higher education programs for students with intellectual disabilities, including 25 newly-funded model demonstration projects aimed at creating inclusive comprehensive transition and postsecondary programs for students with intellectual disabilities known as Transition and Postsecondary Programs for Students with Intellectual Disabilities (TPSIDs). To reduce respondent burden, the NCC has streamlined and simplified the previously approved evaluation system for the TPSID programs. The NCC will enhance the collection and analyses of longitudinal follow up data from the new 25 TPSID model programs via an already developed and previously OMB approved evaluation system for the TPSID programs. The revised data collection system is part of an evaluation effort. The system will collect program data at the institutions from TPSID program staff via an online, secure data management system. Dated: March 20, 2019. Stephanie Valentine, PRA Clearance Coordinator, Information Collection Clearance Program, Information Management Branch, Office of the Chief Information Officer. [FR Doc. 2019–05638 Filed 3–22–19; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–68–000. Applicants: Clearway Energy Group LLC, Clearway Energy, Inc. Description: Application for Authorization Under Section 203 of the Federal Power Act of Clearway Energy Group LLC, et al. Filed Date: 3/18/19. Accession Number: 20190318–5118. Comments Due: 5 p.m. ET 4/8/19. Take notice that the Commission received the following electric rate filings: VerDate Sep<11>2014 16:47 Mar 22, 2019 Jkt 247001 Docket Numbers: ER10–2794–028; ER12–1825–026; ER14–2672–013. Applicants: EDF Trading North America, LLC, EDF Energy Services, LLC, EDF Industrial Power Services (CA), LLC. Description: Notice of Non-Material Change in Status of the EDF Sellers. Filed Date: 3/18/19. Accession Number: 20190318–5124. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: ER19–1371–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: FPL and FKEC Amendments to Rate Schedule FERC No. 322 to be effective 1/1/2018. Filed Date: 3/18/19. Accession Number: 20190318–5103. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: ER19–1372–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: FPL and LCEC Amendments to Rate Schedule FERC No. 317 to be effective 1/1/2018. Filed Date: 3/18/19. Accession Number: 20190318–5109. Comments Due: 5 p.m. ET 4/8/19. Docket Numbers: ER19–1373–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–03–19_SA 3269 Flying Cow Wind—Otter Tail GIA (J493) to be effective 3/5/2019. Filed Date: 3/19/19. Accession Number: 20190319–5035. Comments Due: 5 p.m. ET 4/9/19. Docket Numbers: ER19–1374–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–03–19_SA 3271 BondurantMontezuma 345kV Structure Replacement MPFCA to be effective 3/20/2019. Filed Date: 3/19/19. Accession Number: 20190319–5065. Comments Due: 5 p.m. ET 4/9/19. Docket Numbers: ER19–1375–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–03–19_SA 3273 150 Mvar Cap Bank at Blackhawk 345kV MPFCA to be effective 3/20/2019. Filed Date: 3/19/19. Accession Number: 20190319–5070. Comments Due: 5 p.m. ET 4/9/19. Docket Numbers: ER19–1376–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–03–19_SA 3272 100 Mvar PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 11081 Switched Cap Bank at Montezuma 345 kV MPFCA to be effective 3/20/2019. Filed Date: 3/19/19. Accession Number: 20190319–5072. Comments Due: 5 p.m. ET 4/9/19. Docket Numbers: ER19–1377–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Wilsonville Solar (Douglas Solar) LGIA Filing to be effective 3/8/2019. Filed Date: 3/19/19. Accession Number: 20190319–5078. Comments Due: 5 p.m. ET 4/9/19. Docket Numbers: ER19–1378–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–03–19_SA 3274 1x50 Mvar Cap Bank at Midport 161 kV MPFCA to be effective 3/20/2019. Filed Date: 3/19/19. Accession Number: 20190319–5086. Comments Due: 5 p.m. ET 4/9/19. Docket Numbers: ER19–1379–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–03–19_SA 3275 J438 POI Add 25 Mvar Cap Bank MPFCA to be effective 3/20/2019. Filed Date: 3/19/19. Accession Number: 20190319–5112. Comments Due: 5 p.m. ET 4/9/19. Docket Numbers: ER19–1380–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: LGIA Luz Solar Partners LTD., VI, CAISO & SCE—Kramer Junction 6 Project to be effective 2/21/2019. Filed Date: 3/19/19. Accession Number: 20190319–5124. Comments Due: 5 p.m. ET 4/9/19. Docket Numbers: ER19–1381–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: LGIA Luz Solar Partners LTD., VII, CAISO & SCE—Kramer Junction 7 Project to be effective 3/2/2019. Filed Date: 3/19/19. Accession Number: 20190319–5130. Comments Due: 5 p.m. ET 4/9/19. Docket Numbers: ER19–1382–000. Applicants: FirstEnergy Solutions Corp. Description: Compliance filing: MBR Compliance Filing [ER18–809; ER18– 810] to be effective 6/1/2018. Filed Date: 3/19/19. Accession Number: 20190319–5131. Comments Due: 5 p.m. ET 4/9/19. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES19–19–000. E:\FR\FM\25MRN1.SGM 25MRN1 11082 Federal Register / Vol. 84, No. 57 / Monday, March 25, 2019 / Notices Applicants: Southwest Power Pool, Inc. Description: Application under Section 204 of the Federal Power Act for Authorization to Issue Securities of Southwest Power Pool, Inc. Filed Date: 3/19/19. Accession Number: 20190319–5105. Comments Due: 5 p.m. ET 4/9/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 19, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–05628 Filed 3–22–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM98–1–000] Public Notice: Records Governing Offthe-Record Communications This constitutes notice, in accordance with 18 CFR 385.2201(b), of the receipt of prohibited and exempt off-the-record communications. Order No. 607 (64 FR 51222, September 22, 1999) requires Commission decisional employees, who make or receive a prohibited or exempt off-the-record communication relevant to the merits of a contested proceeding, to deliver to the Secretary of the Commission, a copy of the communication, if written, or a summary of the substance of any oral communication. Prohibited communications are included in a public, non-decisional file associated with, but not a part of, the decisional record of the proceeding. Unless the Commission determines that the prohibited communication and any responses thereto should become a part of the decisional record, the prohibited off-the-record communication will not be considered by the Commission in reaching its decision. Parties to a proceeding may seek the opportunity to respond to any facts or contentions made in a prohibited off-the-record communication, and may request that Docket No. File date Prohibited: CP17–101–000 ..................................................................................................... Exempt: P–13318–003 ....................................................................................................... Dated: March 19, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–05630 Filed 3–22–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14960–000] Renewable Energy Aggregators; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 10, 2019, Renewable Energy Aggregators filed an application VerDate Sep<11>2014 16:47 Mar 22, 2019 Jkt 247001 the Commission place the prohibited communication and responses thereto in the decisional record. The Commission will grant such a request only when it determines that fairness so requires. Any person identified below as having made a prohibited off-the-record communication shall serve the document on all parties listed on the official service list for the applicable proceeding in accordance with Rule 2010, 18 CFR 385.2010. Exempt off-the-record communications are included in the decisional record of the proceeding, unless the communication was with a cooperating agency as described by 40 CFR 1501.6, made under 18 CFR 385.2201(e) (1) (v). The following is a list of off-therecord communications recently received by the Secretary of the Commission. The communications listed are grouped by docket numbers in ascending order. These filings are available for electronic review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https:// www.ferc.gov using the eLibrary link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202)502–8659. 3/12/19 Larson Design Group. 3/12/19 Advisory Council on Historic Preservation. for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Big Rock Pumped Storage Hydro Project to be located in Big Rock in Buchanan County, Virginia. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new upper reservoir with a surface area of 27 acres and a storage capacity of 404.97 acre-feet at a surface elevation of approximately 1,883 feet above mean sea level (msl) created PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 Presenter or requester through construction of a new rollercompacted concrete or rock-fill dam; (2) a new lower reservoir with a surface area of 9.13 acres and a storage capacity of 547.76 acre-feet at a surface elevation of 1,241 feet msl; (3) a new 2,053-footlong, 4-foot-diameter penstock connecting the upper and lower reservoirs; (4) a new 150-foot-long, 50foot-wide, 25-foot-high powerhouse containing as many as two turbinegenerator units with a total rated capacity of 20 megawatts; (5) a new transmission line connecting the powerhouse to a nearby electric grid interconnection point with options to evaluate multiple grid interconnection locations; and (6) appurtenant facilities. The proposed project would have an annual generation of 86,449.37 megawatt-hours. E:\FR\FM\25MRN1.SGM 25MRN1

Agencies

[Federal Register Volume 84, Number 57 (Monday, March 25, 2019)]
[Notices]
[Pages 11081-11082]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05628]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-68-000.
    Applicants: Clearway Energy Group LLC, Clearway Energy, Inc.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of Clearway Energy Group LLC, et al.
    Filed Date: 3/18/19.
    Accession Number: 20190318-5118.
    Comments Due: 5 p.m. ET 4/8/19.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2794-028; ER12-1825-026; ER14-2672-013.
    Applicants: EDF Trading North America, LLC, EDF Energy Services, 
LLC, EDF Industrial Power Services (CA), LLC.
    Description: Notice of Non-Material Change in Status of the EDF 
Sellers.
    Filed Date: 3/18/19.
    Accession Number: 20190318-5124.
    Comments Due: 5 p.m. ET 4/8/19.

    Docket Numbers: ER19-1371-000.
    Applicants: Florida Power & Light Company.
    Description: Sec.  205(d) Rate Filing: FPL and FKEC Amendments to 
Rate Schedule FERC No. 322 to be effective 1/1/2018.
    Filed Date: 3/18/19.
    Accession Number: 20190318-5103.
    Comments Due: 5 p.m. ET 4/8/19.

    Docket Numbers: ER19-1372-000.
    Applicants: Florida Power & Light Company.
    Description: Sec.  205(d) Rate Filing: FPL and LCEC Amendments to 
Rate Schedule FERC No. 317 to be effective 1/1/2018.
    Filed Date: 3/18/19.
    Accession Number: 20190318-5109.
    Comments Due: 5 p.m. ET 4/8/19.

    Docket Numbers: ER19-1373-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-03-19_SA 3269 Flying 
Cow Wind--Otter Tail GIA (J493) to be effective 3/5/2019.
    Filed Date: 3/19/19.
    Accession Number: 20190319-5035.
    Comments Due: 5 p.m. ET 4/9/19.

    Docket Numbers: ER19-1374-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-03-19_SA 3271 
Bondurant-Montezuma 345kV Structure Replacement MPFCA to be effective 
3/20/2019.
    Filed Date: 3/19/19.
    Accession Number: 20190319-5065.
    Comments Due: 5 p.m. ET 4/9/19.

    Docket Numbers: ER19-1375-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-03-19_SA 3273 150 Mvar 
Cap Bank at Blackhawk 345kV MPFCA to be effective 3/20/2019.
    Filed Date: 3/19/19.
    Accession Number: 20190319-5070.
    Comments Due: 5 p.m. ET 4/9/19.

    Docket Numbers: ER19-1376-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-03-19_SA 3272 100 Mvar 
Switched Cap Bank at Montezuma 345 kV MPFCA to be effective 3/20/2019.
    Filed Date: 3/19/19.
    Accession Number: 20190319-5072.
    Comments Due: 5 p.m. ET 4/9/19.

    Docket Numbers: ER19-1377-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: Wilsonville Solar (Douglas 
Solar) LGIA Filing to be effective 3/8/2019.
    Filed Date: 3/19/19.
    Accession Number: 20190319-5078.
    Comments Due: 5 p.m. ET 4/9/19.

    Docket Numbers: ER19-1378-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-03-19_SA 3274 1x50 Mvar 
Cap Bank at Midport 161 kV MPFCA to be effective 3/20/2019.
    Filed Date: 3/19/19.
    Accession Number: 20190319-5086.
    Comments Due: 5 p.m. ET 4/9/19.

    Docket Numbers: ER19-1379-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-03-19_SA 3275 J438 POI 
Add 25 Mvar Cap Bank MPFCA to be effective 3/20/2019.
    Filed Date: 3/19/19.
    Accession Number: 20190319-5112.
    Comments Due: 5 p.m. ET 4/9/19.

    Docket Numbers: ER19-1380-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: LGIA Luz Solar Partners 
LTD., VI, CAISO & SCE--Kramer Junction 6 Project to be effective 2/21/
2019.
    Filed Date: 3/19/19.
    Accession Number: 20190319-5124.
    Comments Due: 5 p.m. ET 4/9/19.

    Docket Numbers: ER19-1381-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: LGIA Luz Solar Partners 
LTD., VII, CAISO & SCE--Kramer Junction 7 Project to be effective 3/2/
2019.
    Filed Date: 3/19/19.
    Accession Number: 20190319-5130.
    Comments Due: 5 p.m. ET 4/9/19.

    Docket Numbers: ER19-1382-000.
    Applicants: FirstEnergy Solutions Corp.
    Description: Compliance filing: MBR Compliance Filing [ER18-809; 
ER18-810] to be effective 6/1/2018.
    Filed Date: 3/19/19.
    Accession Number: 20190319-5131.
    Comments Due: 5 p.m. ET 4/9/19.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES19-19-000.

[[Page 11082]]

    Applicants: Southwest Power Pool, Inc.
    Description: Application under Section 204 of the Federal Power Act 
for Authorization to Issue Securities of Southwest Power Pool, Inc.
    Filed Date: 3/19/19.
    Accession Number: 20190319-5105.
    Comments Due: 5 p.m. ET 4/9/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-05628 Filed 3-22-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.