Combined Notice of Filings #1, 11081-11082 [2019-05628]
Download as PDF
Federal Register / Vol. 84, No. 57 / Monday, March 25, 2019 / Notices
Total Estimated Number of Annual
Burden Hours: 1,110.
Abstract: In October 2015, the
Institute for Community Inclusion (ICI),
UMass Boston received a five-year
cooperative agreement from the Office
of Postsecondary Education to serve as
the National Coordinating Center (NCC)
for colleges and universities
implementing inclusive higher
education programs for students with
intellectual disabilities, including 25
newly-funded model demonstration
projects aimed at creating inclusive
comprehensive transition and
postsecondary programs for students
with intellectual disabilities known as
Transition and Postsecondary Programs
for Students with Intellectual
Disabilities (TPSIDs).
To reduce respondent burden, the
NCC has streamlined and simplified the
previously approved evaluation system
for the TPSID programs. The NCC will
enhance the collection and analyses of
longitudinal follow up data from the
new 25 TPSID model programs via an
already developed and previously OMB
approved evaluation system for the
TPSID programs. The revised data
collection system is part of an
evaluation effort. The system will
collect program data at the institutions
from TPSID program staff via an online,
secure data management system.
Dated: March 20, 2019.
Stephanie Valentine,
PRA Clearance Coordinator, Information
Collection Clearance Program, Information
Management Branch, Office of the Chief
Information Officer.
[FR Doc. 2019–05638 Filed 3–22–19; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–68–000.
Applicants: Clearway Energy Group
LLC, Clearway Energy, Inc.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Clearway Energy
Group LLC, et al.
Filed Date: 3/18/19.
Accession Number: 20190318–5118.
Comments Due: 5 p.m. ET 4/8/19.
Take notice that the Commission
received the following electric rate
filings:
VerDate Sep<11>2014
16:47 Mar 22, 2019
Jkt 247001
Docket Numbers: ER10–2794–028;
ER12–1825–026; ER14–2672–013.
Applicants: EDF Trading North
America, LLC, EDF Energy Services,
LLC, EDF Industrial Power Services
(CA), LLC.
Description: Notice of Non-Material
Change in Status of the EDF Sellers.
Filed Date: 3/18/19.
Accession Number: 20190318–5124.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: ER19–1371–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
and FKEC Amendments to Rate
Schedule FERC No. 322 to be effective
1/1/2018.
Filed Date: 3/18/19.
Accession Number: 20190318–5103.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: ER19–1372–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
and LCEC Amendments to Rate
Schedule FERC No. 317 to be effective
1/1/2018.
Filed Date: 3/18/19.
Accession Number: 20190318–5109.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: ER19–1373–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–03–19_SA 3269 Flying Cow
Wind—Otter Tail GIA (J493) to be
effective 3/5/2019.
Filed Date: 3/19/19.
Accession Number: 20190319–5035.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19–1374–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–03–19_SA 3271 BondurantMontezuma 345kV Structure
Replacement MPFCA to be effective
3/20/2019.
Filed Date: 3/19/19.
Accession Number: 20190319–5065.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19–1375–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–03–19_SA 3273 150 Mvar Cap
Bank at Blackhawk 345kV MPFCA to be
effective 3/20/2019.
Filed Date: 3/19/19.
Accession Number: 20190319–5070.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19–1376–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–03–19_SA 3272 100 Mvar
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
11081
Switched Cap Bank at Montezuma 345
kV MPFCA to be effective 3/20/2019.
Filed Date: 3/19/19.
Accession Number: 20190319–5072.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19–1377–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Wilsonville Solar (Douglas Solar) LGIA
Filing to be effective 3/8/2019.
Filed Date: 3/19/19.
Accession Number: 20190319–5078.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19–1378–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–03–19_SA 3274 1x50 Mvar Cap
Bank at Midport 161 kV MPFCA to be
effective 3/20/2019.
Filed Date: 3/19/19.
Accession Number: 20190319–5086.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19–1379–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–03–19_SA 3275 J438 POI Add 25
Mvar Cap Bank MPFCA to be effective
3/20/2019.
Filed Date: 3/19/19.
Accession Number: 20190319–5112.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19–1380–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
LGIA Luz Solar Partners LTD., VI,
CAISO & SCE—Kramer Junction 6
Project to be effective 2/21/2019.
Filed Date: 3/19/19.
Accession Number: 20190319–5124.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19–1381–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
LGIA Luz Solar Partners LTD., VII,
CAISO & SCE—Kramer Junction 7
Project to be effective 3/2/2019.
Filed Date: 3/19/19.
Accession Number: 20190319–5130.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19–1382–000.
Applicants: FirstEnergy Solutions
Corp.
Description: Compliance filing: MBR
Compliance Filing [ER18–809; ER18–
810] to be effective 6/1/2018.
Filed Date: 3/19/19.
Accession Number: 20190319–5131.
Comments Due: 5 p.m. ET 4/9/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–19–000.
E:\FR\FM\25MRN1.SGM
25MRN1
11082
Federal Register / Vol. 84, No. 57 / Monday, March 25, 2019 / Notices
Applicants: Southwest Power Pool,
Inc.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Southwest Power Pool, Inc.
Filed Date: 3/19/19.
Accession Number: 20190319–5105.
Comments Due: 5 p.m. ET 4/9/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–05628 Filed 3–22–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Public Notice: Records Governing Offthe-Record Communications
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
be considered by the Commission in
reaching its decision. Parties to a
proceeding may seek the opportunity to
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
Docket No.
File date
Prohibited:
CP17–101–000 .....................................................................................................
Exempt:
P–13318–003 .......................................................................................................
Dated: March 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–05630 Filed 3–22–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14960–000]
Renewable Energy Aggregators;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 10, 2019, Renewable
Energy Aggregators filed an application
VerDate Sep<11>2014
16:47 Mar 22, 2019
Jkt 247001
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record
communication shall serve the
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e) (1) (v).
The following is a list of off-therecord communications recently
received by the Secretary of the
Commission. The communications
listed are grouped by docket numbers in
ascending order. These filings are
available for electronic review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website at https://
www.ferc.gov using the eLibrary link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
for TTY, contact (202)502–8659.
3/12/19
Larson Design Group.
3/12/19
Advisory Council on Historic Preservation.
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Big Rock Pumped Storage Hydro Project
to be located in Big Rock in Buchanan
County, Virginia. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 27 acres and a
storage capacity of 404.97 acre-feet at a
surface elevation of approximately 1,883
feet above mean sea level (msl) created
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Presenter or requester
through construction of a new rollercompacted concrete or rock-fill dam; (2)
a new lower reservoir with a surface
area of 9.13 acres and a storage capacity
of 547.76 acre-feet at a surface elevation
of 1,241 feet msl; (3) a new 2,053-footlong, 4-foot-diameter penstock
connecting the upper and lower
reservoirs; (4) a new 150-foot-long, 50foot-wide, 25-foot-high powerhouse
containing as many as two turbinegenerator units with a total rated
capacity of 20 megawatts; (5) a new
transmission line connecting the
powerhouse to a nearby electric grid
interconnection point with options to
evaluate multiple grid interconnection
locations; and (6) appurtenant facilities.
The proposed project would have an
annual generation of 86,449.37
megawatt-hours.
E:\FR\FM\25MRN1.SGM
25MRN1
Agencies
[Federal Register Volume 84, Number 57 (Monday, March 25, 2019)]
[Notices]
[Pages 11081-11082]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05628]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-68-000.
Applicants: Clearway Energy Group LLC, Clearway Energy, Inc.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of Clearway Energy Group LLC, et al.
Filed Date: 3/18/19.
Accession Number: 20190318-5118.
Comments Due: 5 p.m. ET 4/8/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2794-028; ER12-1825-026; ER14-2672-013.
Applicants: EDF Trading North America, LLC, EDF Energy Services,
LLC, EDF Industrial Power Services (CA), LLC.
Description: Notice of Non-Material Change in Status of the EDF
Sellers.
Filed Date: 3/18/19.
Accession Number: 20190318-5124.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: ER19-1371-000.
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: FPL and FKEC Amendments to
Rate Schedule FERC No. 322 to be effective 1/1/2018.
Filed Date: 3/18/19.
Accession Number: 20190318-5103.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: ER19-1372-000.
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: FPL and LCEC Amendments to
Rate Schedule FERC No. 317 to be effective 1/1/2018.
Filed Date: 3/18/19.
Accession Number: 20190318-5109.
Comments Due: 5 p.m. ET 4/8/19.
Docket Numbers: ER19-1373-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-03-19_SA 3269 Flying
Cow Wind--Otter Tail GIA (J493) to be effective 3/5/2019.
Filed Date: 3/19/19.
Accession Number: 20190319-5035.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19-1374-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-03-19_SA 3271
Bondurant-Montezuma 345kV Structure Replacement MPFCA to be effective
3/20/2019.
Filed Date: 3/19/19.
Accession Number: 20190319-5065.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19-1375-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-03-19_SA 3273 150 Mvar
Cap Bank at Blackhawk 345kV MPFCA to be effective 3/20/2019.
Filed Date: 3/19/19.
Accession Number: 20190319-5070.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19-1376-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-03-19_SA 3272 100 Mvar
Switched Cap Bank at Montezuma 345 kV MPFCA to be effective 3/20/2019.
Filed Date: 3/19/19.
Accession Number: 20190319-5072.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19-1377-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Wilsonville Solar (Douglas
Solar) LGIA Filing to be effective 3/8/2019.
Filed Date: 3/19/19.
Accession Number: 20190319-5078.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19-1378-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-03-19_SA 3274 1x50 Mvar
Cap Bank at Midport 161 kV MPFCA to be effective 3/20/2019.
Filed Date: 3/19/19.
Accession Number: 20190319-5086.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19-1379-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-03-19_SA 3275 J438 POI
Add 25 Mvar Cap Bank MPFCA to be effective 3/20/2019.
Filed Date: 3/19/19.
Accession Number: 20190319-5112.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19-1380-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: LGIA Luz Solar Partners
LTD., VI, CAISO & SCE--Kramer Junction 6 Project to be effective 2/21/
2019.
Filed Date: 3/19/19.
Accession Number: 20190319-5124.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19-1381-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: LGIA Luz Solar Partners
LTD., VII, CAISO & SCE--Kramer Junction 7 Project to be effective 3/2/
2019.
Filed Date: 3/19/19.
Accession Number: 20190319-5130.
Comments Due: 5 p.m. ET 4/9/19.
Docket Numbers: ER19-1382-000.
Applicants: FirstEnergy Solutions Corp.
Description: Compliance filing: MBR Compliance Filing [ER18-809;
ER18-810] to be effective 6/1/2018.
Filed Date: 3/19/19.
Accession Number: 20190319-5131.
Comments Due: 5 p.m. ET 4/9/19.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES19-19-000.
[[Page 11082]]
Applicants: Southwest Power Pool, Inc.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of Southwest Power Pool, Inc.
Filed Date: 3/19/19.
Accession Number: 20190319-5105.
Comments Due: 5 p.m. ET 4/9/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-05628 Filed 3-22-19; 8:45 am]
BILLING CODE 6717-01-P