Application To Export Electric Energy; TransCanada Energy Sales Ltd., 10485-10486 [2019-05399]
Download as PDF
Federal Register / Vol. 84, No. 55 / Thursday, March 21, 2019 / Notices
DEPARTMENT OF ENERGY
[OE Docket No. EA–467]
Application to Export Electric Energy;
Citigroup Commodities Canada ULC
Office of Electricity,
Department of Energy (DOE).
ACTION: Notice of application.
AGENCY:
Citigroup Commodities
Canada ULC (Applicant or CCCU) has
applied for authorization to transmit
electric energy from the United States to
Canada pursuant to the Federal Power
Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before April 22, 2019.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
to: Office of Electricity, Mail Code: OE–
20, U.S. Department of Energy, 1000
Independence Avenue SW, Washington,
DC 20585–0350. Because of delays in
handling conventional mail, it is
recommended that documents be
transmitted by overnight mail, by
electronic mail to Electricity.Exports@
hq.doe.gov, or by facsimile to 202–586–
8008.
SUPPLEMENTARY INFORMATION: The
Department of Energy (DOE) regulates
exports of electricity from the United
States to a foreign country, pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b) and 7172(f)). Such
exports require authorization under
section 202(e) of the Federal Power Act
(16 U.S.C. 824a(e)).
On March 4, 2019, DOE received an
application from CCCU for
authorization to transmit electric energy
from the United States to Canada as a
power marketer for a five-year term
using existing international
transmission facilities.
In its application, the Applicant states
that it ‘‘does not own or control electric
generation or transmission facilities in
the United States’’ and that it has no
‘‘obligation to serve native load within
a franchised service area.’’ The electric
energy that the Applicant proposes to
export to Canada would be surplus
energy purchased from third parties
such as electric utilities and Federal
power marketing agencies pursuant to
voluntary agreements. The existing
international transmission facilities to
be utilized by the Applicant have
previously been authorized by
Presidential permits issued pursuant to
Executive Order 10485, as amended,
and are appropriate for open access
transmission by third parties.
amozie on DSK9F9SC42PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
18:27 Mar 20, 2019
Jkt 247001
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214). Five (5)
copies of such comments, protests, or
motions to intervene should be sent to
the address provided above on or before
the date listed above.
Comments and other filings
concerning CCCU’s application to
export electric energy to Canada should
be clearly marked with OE Docket No.
EA–467. An additional copy is to be
provided directly to both Jeffrey
Gollomp, Citigroup Energy Inc., 2700
Post Oak Blvd., Suite 400, Houston, TX
77056, and Margaret H. Claybour, Van
Ness Feldman, LLP, 1050 Thomas
Jefferson St. NW, Seventh Floor,
Washington, DC 20007.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after DOE determines
that the proposed action will not have
an adverse impact on the sufficiency of
supply or reliability of the U.S. electric
power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program website at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
Signed in Washington, DC, on March 15,
2019.
Christopher Lawrence,
Management and Program
Analyst,Transmission Permitting and
Technical Assistance,Office of Electricity.
[FR Doc. 2019–05397 Filed 3–20–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–468]
Application To Export Electric Energy;
TransCanada Energy Sales Ltd.
Office of Electricity,
Department of Energy (DOE).
ACTION: Notice of application.
AGENCY:
TransCanada Energy Sales
Ltd. (Applicant or TCES) has applied for
authorization to transmit electric energy
SUMMARY:
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
10485
from the United States to Canada
pursuant to the Federal Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before April 22, 2019.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
to: Office of Electricity, Mail Code: OE–
20, U.S. Department of Energy, 1000
Independence Avenue SW, Washington,
DC 20585–0350. Because of delays in
handling conventional mail, it is
recommended that documents be
transmitted by overnight mail, by
electronic mail to Electricity.Exports@
hq.doe.gov, or by facsimile to 202–586–
8008.
SUPPLEMENTARY INFORMATION: The
Department of Energy (DOE) regulates
exports of electricity from the United
States to a foreign country, pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b) and 7172(f)). Such
exports require authorization under
section 202(e) of the Federal Power Act
(16 U.S.C. 824a(e)).
On March 6, 2019, DOE received an
application from TCES for authorization
to transmit electric energy from the
United States to Canada as a power
marketer for a five-year term using
existing international transmission
facilities. DOE most recently granted
export authorization to TCES on May 6,
2014 for a five-year term, in Order No.
EA–98–M. That Order authorized
electricity exports by TCES and certain
other members of WSPP Inc., which the
Order described as ‘‘a non-profit
organization with approximately 300
electric utility members.’’ In its present
application, TCES requests
authorization effective by May 6, 2019,
to prevent lapse in its current
authorization under Order No. EA–98–
M, which expires on that date.
In its application, the Applicant states
that it ‘‘does not own or control any
generation, transmission, or distribution
facilities within the United States and
does not have a franchised electric
power service area.’’ The electric energy
that the Applicant proposes to export to
Canada would be surplus energy
purchased from third parties such as
electric utilities and Federal power
marketing agencies pursuant to
voluntary agreements. The existing
international transmission facilities to
be utilized by the Applicant have
previously been authorized by
Presidential permits issued pursuant to
Executive Order 10485, as amended,
and are appropriate for open access
transmission by third parties.
E:\FR\FM\21MRN1.SGM
21MRN1
10486
Federal Register / Vol. 84, No. 55 / Thursday, March 21, 2019 / Notices
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214). Five (5)
copies of such comments, protests, or
motions to intervene should be sent to
the address provided above on or before
the date listed above.
Comments and other filings
concerning TCES’s application to export
electric energy to Canada should be
clearly marked with OE Docket No. EA–
468. An additional copy is to be
provided directly to both David Farmer,
TransCanada, 450–1 Street SW, Calgary,
AB T2P 5H1, and Arnold B. Podgorsky,
Podgorsky PLLC, 2101 L Street NW,
Suite 800, Washington, DC 20037.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after DOE determines
that the proposed action will not have
an adverse impact on the sufficiency of
supply or reliability of the U.S. electric
power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program website at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
Signed in Washington, DC, on March 15,
2019.
Christopher Lawrence,
Management and Program
Analyst,Transmission Permitting and
Technical Assistance,Office of Electricity.
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME:
March 21, 2019, 10:00
a.m.
Room 2C, 888 First Street NE,
Washington, DC 20426.
PLACE:
STATUS:
Open.
Agenda.
* Note—Items listed on the agenda
may be deleted without further notice.
MATTERS TO BE CONSIDERED:
CONTACT PERSON FOR MORE INFORMATION:
[FR Doc. 2019–05399 Filed 3–20–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
The following notice of meeting is
published pursuant to section 3(a) of the
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
website at https://ferc.capitol
connection.org/ using the eLibrary link,
or may be examined in the
Commission’s Public Reference Room.
1053RD MEETING—OPEN MEETING
[March 21, 2019, 10:00 a.m.]
Item No.
Docket No.
Company
Administrative
A–1 .........
A–2 .........
AD19–1–000 ..........................................
AD19–2–000 ..........................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Electric
amozie on DSK9F9SC42PROD with NOTICES
E–1 .........
E–2 .........
E–3 .........
E–4 .........
E–5 .........
E–6 .........
E–7 .........
E–8 .........
E–9 .........
E–10 .......
E–11 .......
E–12 .......
E–13 .......
E–14 .......
E–15 .......
E–16 .......
E–17 .......
E–18 .......
E–19
E–20
E–21
E–22
.......
.......
.......
.......
VerDate Sep<11>2014
PL19–3–000 ...........................................
PL19–4–000 ...........................................
Omitted ...................................................
TX19–1–000 ...........................................
EC19–36–000 ........................................
EC98–2–001, ER18–2162–000 .............
ES19–5–000 ..........................................
ER19–654–000, EL18–79–000 ..............
ER16–120–007 ......................................
ER18–2397–000, ER18–2397–001 .......
ER18–2401–000, ER18–2401–001 .......
ER18–2318–000, ER18–2318–001 .......
ER18–829–001 ......................................
ER09–548–000 ......................................
ER17–1553–002 ....................................
ER18–2428–001 ....................................
EL18–104–001 .......................................
EL14–9–002 ...........................................
EL14–18–002 .........................................
QF11–424–006 ......................................
Omitted ...................................................
Omitted ...................................................
EL19–6–000 ...........................................
EL19–17–000 .........................................
18:27 Mar 20, 2019
Jkt 247001
PO 00000
Inquiry Regarding the Commission’s Electric Transmission Incentives Policy.
Inquiry Regarding the Commission’s Policy for Determining Return on Equity.
Mountain Breeze Wind, LLC.
NextEra Energy Transmission, LLC and Trans Bay Cable LLC.
Louisville Gas and Electric Company; Kentucky Utilities Company.
Cube Yadkin Transmission LLC.
Cheyenne Light, Fuel and Power Company.
New York Independent System Operator, Inc.
Midcontinent Independent System Operator, Inc.
PJM Interconnection, L.L.C.
Southwest Power Pool, Inc.
Wisconsin Electric Power Company.
ITC Great Plains, LLC.
Duke Energy Progress, LLC.
Public Service Company of Colorado.
NorthWestern Corporation.
Gregory and Beverly Swecker v. Midland Power Cooperative.
Gregory and Beverly Swecker v. Midland Power Cooperative and Central Iowa Power
Cooperative.
Gregory and Beverly Swecker.
City of Alexandria, Louisiana v. Cleco Power LLC.
Kansas Electric Power Cooperative, Inc. v. Westar Energy, Inc.
Frm 00011
Fmt 4703
Sfmt 4703
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 84, Number 55 (Thursday, March 21, 2019)]
[Notices]
[Pages 10485-10486]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05399]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-468]
Application To Export Electric Energy; TransCanada Energy Sales
Ltd.
AGENCY: Office of Electricity, Department of Energy (DOE).
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: TransCanada Energy Sales Ltd. (Applicant or TCES) has applied
for authorization to transmit electric energy from the United States to
Canada pursuant to the Federal Power Act.
DATES: Comments, protests, or motions to intervene must be submitted on
or before April 22, 2019.
ADDRESSES: Comments, protests, motions to intervene, or requests for
more information should be addressed to: Office of Electricity, Mail
Code: OE-20, U.S. Department of Energy, 1000 Independence Avenue SW,
Washington, DC 20585-0350. Because of delays in handling conventional
mail, it is recommended that documents be transmitted by overnight
mail, by electronic mail to Electricity.Exports@hq.doe.gov, or by
facsimile to 202-586-8008.
SUPPLEMENTARY INFORMATION: The Department of Energy (DOE) regulates
exports of electricity from the United States to a foreign country,
pursuant to sections 301(b) and 402(f) of the Department of Energy
Organization Act (42 U.S.C. 7151(b) and 7172(f)). Such exports require
authorization under section 202(e) of the Federal Power Act (16 U.S.C.
824a(e)).
On March 6, 2019, DOE received an application from TCES for
authorization to transmit electric energy from the United States to
Canada as a power marketer for a five-year term using existing
international transmission facilities. DOE most recently granted export
authorization to TCES on May 6, 2014 for a five-year term, in Order No.
EA-98-M. That Order authorized electricity exports by TCES and certain
other members of WSPP Inc., which the Order described as ``a non-profit
organization with approximately 300 electric utility members.'' In its
present application, TCES requests authorization effective by May 6,
2019, to prevent lapse in its current authorization under Order No. EA-
98-M, which expires on that date.
In its application, the Applicant states that it ``does not own or
control any generation, transmission, or distribution facilities within
the United States and does not have a franchised electric power service
area.'' The electric energy that the Applicant proposes to export to
Canada would be surplus energy purchased from third parties such as
electric utilities and Federal power marketing agencies pursuant to
voluntary agreements. The existing international transmission
facilities to be utilized by the Applicant have previously been
authorized by Presidential permits issued pursuant to Executive Order
10485, as amended, and are appropriate for open access transmission by
third parties.
[[Page 10486]]
Procedural Matters: Any person desiring to be heard in this
proceeding should file a comment or protest to the application at the
address provided above. Protests should be filed in accordance with
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of
Practice and Procedure (18 CFR 385.211). Any person desiring to become
a party to this proceeding should file a motion to intervene at the
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five
(5) copies of such comments, protests, or motions to intervene should
be sent to the address provided above on or before the date listed
above.
Comments and other filings concerning TCES's application to export
electric energy to Canada should be clearly marked with OE Docket No.
EA-468. An additional copy is to be provided directly to both David
Farmer, TransCanada, 450-1 Street SW, Calgary, AB T2P 5H1, and Arnold
B. Podgorsky, Podgorsky PLLC, 2101 L Street NW, Suite 800, Washington,
DC 20037.
A final decision will be made on this application after the
environmental impacts have been evaluated pursuant to DOE's National
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and
after DOE determines that the proposed action will not have an adverse
impact on the sufficiency of supply or reliability of the U.S. electric
power supply system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above, by
accessing the program website at https://energy.gov/node/11845, or by
emailing Angela Troy at Angela.Troy@hq.doe.gov.
Signed in Washington, DC, on March 15, 2019.
Christopher Lawrence,
Management and Program Analyst,Transmission Permitting and Technical
Assistance,Office of Electricity.
[FR Doc. 2019-05399 Filed 3-20-19; 8:45 am]