City of Loveland; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 10060-10061 [2019-05109]
Download as PDF
10060
Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s website (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Dated: March 11, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–05046 Filed 3–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 28, 2019.
Dated: March 13, 2019.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2019–05112 Filed 3–18–19; 8:45 am]
[Project No. 405–121]
BILLING CODE 6717–01–P
Exelon Generation Company, LLC;
Notice of Petition for Declaratory Order
Take notice that on February 28, 2019,
Exelon Generation Company, LLC
(Exelon or Petitioner), applicant for the
Conowingo Hydroelectric Project No.
405, filed a petition for declaratory
order (petition) pursuant to Rule
207(a)(2) of the Federal Energy
Regulatory Commission’s Rules of
Practice and Procedure, 18 CFR
385.207(a)(2). Exelon requests that the
Commission declare that the Maryland
Department of the Environment has
waived its authority to issue a
certification for the Conowingo Project
under Section 401 of the Clean Water
Act, 33 U.S.C. 1341(a)(1), as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.211, 385.214.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
VerDate Sep<11>2014
17:54 Mar 18, 2019
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2829–010]
City of Loveland; Notice of Application
Accepted for Filing, Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Federal Energy Regulatory
Commission and is available for public
inspection:
a. Application Type: License
Amendment.
b. Project No: 2829–010.
c. Date Filed: March 4, 2019.
d. Applicant: City of Loveland,
Colorado.
e. Name of Project: Loveland
Hydroelectric Project.
f. Location: Big Thompson River, in
Larimer County, Colorado.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
h. Applicant Contact: Kimberly
Fentress, Project Manager, City of
Loveland, Colorado, 200 North Wilson
Street, Building 1, Loveland, CO 80537;
phone (970) 962–3587.
i. FERC Contact: David Rudisail at
(202) 502–6376, or david.rudisail@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: April
12, 2019.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, and comments using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2829–010.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The City of
Loveland has requested to amend its
license to allow filling of underground
pipeline on private land in the Idlewild
Subdivision. The purpose of the
proposed fill is to prevent future
subsidence of the pipe in the vicinity of
homes, roads, and other infrastructure.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
E:\FR\FM\19MRN1.SGM
19MRN1
Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: March 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–05109 Filed 3–18–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:54 Mar 18, 2019
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
March 12, 2019.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–68–000.
Applicants: Windhub Solar B, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Status of Windhub Solar B, LLC.
Filed Date: 3/11/19.
Accession Number: 20190311–5220.
Comments Due: 5 p.m. ET 4/1/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1562–006;
ER10–2488–016; ER12–1931–007 ER10–
2504–008; ER12–610–008; ER12–338–
001.
Applicants: Catalina Solar Lessee,
LLC, Oasis Power Partners, LLC, Pacific
Wind Lessee, LLC, Shiloh Wind Project
2, LLC, Shiloh III Lessee, LLC, Shiloh IV
Lessee, LLC.
Description: Notice of Change in
Status of the EDFR CAISO Sellers.
Filed Date: 3/11/19.
Accession Number: 20190311–5266.
Comments Due: 5 p.m. ET 4/1/19.
Docket Numbers: ER15–2135–001;
ER16–1878–002.
Applicants: Alexander Wind Farm,
LLC, Ringer Hill Wind, LLC.
Description: Notice of Non-Material
Change in Status of Alexander Wind
Farm, LLC, et al.
Filed Date: 3/11/19.
Accession Number: 20190311–5273.
Comments Due: 5 p.m. ET 4/1/19.
Docket Numbers: ER17–256–007;
ER17–242–007; ER17–243–007; ER17–
245–007; ER17–652–007.
Applicants: Darby Power, LLC, Gavin
Power, LLC, Lawrenceburg Power, LLC,
Waterford Power, LLC, Lightstone
Marketing LLC.
Description: Notice of Non-Material
Change in Status of Darby Power, LLC,
et. al.
Filed Date: 3/12/19.
Accession Number: 20190312–5159.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–813–001.
Applicants: Broken Bow Wind II,
LLC.
Description: Tariff Amendment:
Amendment to Pending Tariff Filing to
be effective 1/16/2019.
Filed Date: 3/12/19.
Accession Number: 20190312–5099.
Comments Due: 5 p.m. ET 4/2/19.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
10061
Docket Numbers: ER19–924–001.
Applicants: Arizona Public Service
Company.
Description: Tariff Amendment: Rate
Schedule No. 274, WestConnect
Planning Participation Agreement to be
effective 12/31/2018.
Filed Date: 3/12/19.
Accession Number: 20190312–5075.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–1043–001.
Applicants: Idaho Power Company.
Description: Tariff Amendment:
Amendment to Schedule 12 Update
Regarding Real Power Losses for
Dynamic Transfer to be effective
4/15/2019.
Filed Date: 3/12/19.
Accession Number: 20190312–5055.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–1208–000.
Applicants: Renewable Energy
Aggregators, Inc.
Description: Request for Waiver of
Renewable Energy Aggregators, Inc.
Filed Date: 3/6/19.
Accession Number: 20190306–5237.
Comments Due: 5 p.m. ET 3/21/19.
Docket Numbers: ER19–1240–000.
Applicants: Sage Solar I LLC.
Description: Baseline eTariff Filing:
Sage Solar I LLC MBR to be effective
5/1/2019.
Filed Date: 3/11/19.
Accession Number: 20190311–5197,
20190311–5268.
Comments Due: 5 p.m. ET 4/1/19.
Docket Numbers: ER19–1241–000.
Applicants: Sage Solar II LLC.
Description: Baseline eTariff Filing:
Sage Solar II LLC MBR to be effective
5/1/2019.
Filed Date: 3/11/19.
Accession Number: 20190311–5205,
20190311–5268.
Comments Due: 5 p.m. ET 4/1/19.
Docket Numbers: ER19–1242–000.
Applicants: Sage Solar III LLC.
Description: Baseline eTariff Filing:
Sage Solar III LLC MBR to be effective
5/1/2019.
Filed Date: 3/11/19.
Accession Number: 20190311–5215,
20190311–5268.
Comments Due: 5 p.m. ET 4/1/19.
Docket Numbers: ER19–1243–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised Service Agreement No. 3471;
Queue No. AE1–036 to be effective
2/8/2019.
Filed Date: 3/11/19.
Accession Number: 20190311–5219.
Comments Due: 5 p.m. ET 4/1/19.
Docket Numbers: ER19–1245–000.
Applicants: Nevada Power Company.
E:\FR\FM\19MRN1.SGM
19MRN1
Agencies
[Federal Register Volume 84, Number 53 (Tuesday, March 19, 2019)]
[Notices]
[Pages 10060-10061]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05109]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2829-010]
City of Loveland; Notice of Application Accepted for Filing,
Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Federal Energy Regulatory Commission and is available
for public inspection:
a. Application Type: License Amendment.
b. Project No: 2829-010.
c. Date Filed: March 4, 2019.
d. Applicant: City of Loveland, Colorado.
e. Name of Project: Loveland Hydroelectric Project.
f. Location: Big Thompson River, in Larimer County, Colorado.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Kimberly Fentress, Project Manager, City of
Loveland, Colorado, 200 North Wilson Street, Building 1, Loveland, CO
80537; phone (970) 962-3587.
i. FERC Contact: David Rudisail at (202) 502-6376, or
david.rudisail@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: April 12, 2019.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, and comments using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-2829-010. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The City of Loveland has requested to
amend its license to allow filling of underground pipeline on private
land in the Idlewild Subdivision. The purpose of the proposed fill is
to prevent future subsidence of the pipe in the vicinity of homes,
roads, and other infrastructure.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502-8371. This filing may also be viewed on
the Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the
[[Page 10061]]
document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above. Agencies may obtain
copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: March 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-05109 Filed 3-18-19; 8:45 am]
BILLING CODE 6717-01-P