City of Loveland; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 10060-10061 [2019-05109]

Download as PDF 10060 Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s website (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Dated: March 11, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–05046 Filed 3–18–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on March 28, 2019. Dated: March 13, 2019. Kimberly D. Bose, Secretary. Federal Energy Regulatory Commission [FR Doc. 2019–05112 Filed 3–18–19; 8:45 am] [Project No. 405–121] BILLING CODE 6717–01–P Exelon Generation Company, LLC; Notice of Petition for Declaratory Order Take notice that on February 28, 2019, Exelon Generation Company, LLC (Exelon or Petitioner), applicant for the Conowingo Hydroelectric Project No. 405, filed a petition for declaratory order (petition) pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s Rules of Practice and Procedure, 18 CFR 385.207(a)(2). Exelon requests that the Commission declare that the Maryland Department of the Environment has waived its authority to issue a certification for the Conowingo Project under Section 401 of the Clean Water Act, 33 U.S.C. 1341(a)(1), as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.211, 385.214. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to VerDate Sep<11>2014 17:54 Mar 18, 2019 Jkt 247001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2829–010] City of Loveland; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Federal Energy Regulatory Commission and is available for public inspection: a. Application Type: License Amendment. b. Project No: 2829–010. c. Date Filed: March 4, 2019. d. Applicant: City of Loveland, Colorado. e. Name of Project: Loveland Hydroelectric Project. f. Location: Big Thompson River, in Larimer County, Colorado. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 h. Applicant Contact: Kimberly Fentress, Project Manager, City of Loveland, Colorado, 200 North Wilson Street, Building 1, Loveland, CO 80537; phone (970) 962–3587. i. FERC Contact: David Rudisail at (202) 502–6376, or david.rudisail@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: April 12, 2019. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, and comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2829–010. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The City of Loveland has requested to amend its license to allow filling of underground pipeline on private land in the Idlewild Subdivision. The purpose of the proposed fill is to prevent future subsidence of the pipe in the vicinity of homes, roads, and other infrastructure. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the E:\FR\FM\19MRN1.SGM 19MRN1 Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: March 13, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–05109 Filed 3–18–19; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:54 Mar 18, 2019 Jkt 247001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 March 12, 2019. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–68–000. Applicants: Windhub Solar B, LLC. Description: Notice of SelfCertification of Exempt Wholesale Status of Windhub Solar B, LLC. Filed Date: 3/11/19. Accession Number: 20190311–5220. Comments Due: 5 p.m. ET 4/1/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER13–1562–006; ER10–2488–016; ER12–1931–007 ER10– 2504–008; ER12–610–008; ER12–338– 001. Applicants: Catalina Solar Lessee, LLC, Oasis Power Partners, LLC, Pacific Wind Lessee, LLC, Shiloh Wind Project 2, LLC, Shiloh III Lessee, LLC, Shiloh IV Lessee, LLC. Description: Notice of Change in Status of the EDFR CAISO Sellers. Filed Date: 3/11/19. Accession Number: 20190311–5266. Comments Due: 5 p.m. ET 4/1/19. Docket Numbers: ER15–2135–001; ER16–1878–002. Applicants: Alexander Wind Farm, LLC, Ringer Hill Wind, LLC. Description: Notice of Non-Material Change in Status of Alexander Wind Farm, LLC, et al. Filed Date: 3/11/19. Accession Number: 20190311–5273. Comments Due: 5 p.m. ET 4/1/19. Docket Numbers: ER17–256–007; ER17–242–007; ER17–243–007; ER17– 245–007; ER17–652–007. Applicants: Darby Power, LLC, Gavin Power, LLC, Lawrenceburg Power, LLC, Waterford Power, LLC, Lightstone Marketing LLC. Description: Notice of Non-Material Change in Status of Darby Power, LLC, et. al. Filed Date: 3/12/19. Accession Number: 20190312–5159. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–813–001. Applicants: Broken Bow Wind II, LLC. Description: Tariff Amendment: Amendment to Pending Tariff Filing to be effective 1/16/2019. Filed Date: 3/12/19. Accession Number: 20190312–5099. Comments Due: 5 p.m. ET 4/2/19. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 10061 Docket Numbers: ER19–924–001. Applicants: Arizona Public Service Company. Description: Tariff Amendment: Rate Schedule No. 274, WestConnect Planning Participation Agreement to be effective 12/31/2018. Filed Date: 3/12/19. Accession Number: 20190312–5075. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–1043–001. Applicants: Idaho Power Company. Description: Tariff Amendment: Amendment to Schedule 12 Update Regarding Real Power Losses for Dynamic Transfer to be effective 4/15/2019. Filed Date: 3/12/19. Accession Number: 20190312–5055. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–1208–000. Applicants: Renewable Energy Aggregators, Inc. Description: Request for Waiver of Renewable Energy Aggregators, Inc. Filed Date: 3/6/19. Accession Number: 20190306–5237. Comments Due: 5 p.m. ET 3/21/19. Docket Numbers: ER19–1240–000. Applicants: Sage Solar I LLC. Description: Baseline eTariff Filing: Sage Solar I LLC MBR to be effective 5/1/2019. Filed Date: 3/11/19. Accession Number: 20190311–5197, 20190311–5268. Comments Due: 5 p.m. ET 4/1/19. Docket Numbers: ER19–1241–000. Applicants: Sage Solar II LLC. Description: Baseline eTariff Filing: Sage Solar II LLC MBR to be effective 5/1/2019. Filed Date: 3/11/19. Accession Number: 20190311–5205, 20190311–5268. Comments Due: 5 p.m. ET 4/1/19. Docket Numbers: ER19–1242–000. Applicants: Sage Solar III LLC. Description: Baseline eTariff Filing: Sage Solar III LLC MBR to be effective 5/1/2019. Filed Date: 3/11/19. Accession Number: 20190311–5215, 20190311–5268. Comments Due: 5 p.m. ET 4/1/19. Docket Numbers: ER19–1243–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised Service Agreement No. 3471; Queue No. AE1–036 to be effective 2/8/2019. Filed Date: 3/11/19. Accession Number: 20190311–5219. Comments Due: 5 p.m. ET 4/1/19. Docket Numbers: ER19–1245–000. Applicants: Nevada Power Company. E:\FR\FM\19MRN1.SGM 19MRN1

Agencies

[Federal Register Volume 84, Number 53 (Tuesday, March 19, 2019)]
[Notices]
[Pages 10060-10061]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05109]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2829-010]


City of Loveland; Notice of Application Accepted for Filing, 
Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Federal Energy Regulatory Commission and is available 
for public inspection:
    a. Application Type: License Amendment.
    b. Project No: 2829-010.
    c. Date Filed: March 4, 2019.
    d. Applicant: City of Loveland, Colorado.
    e. Name of Project: Loveland Hydroelectric Project.
    f. Location: Big Thompson River, in Larimer County, Colorado.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Kimberly Fentress, Project Manager, City of 
Loveland, Colorado, 200 North Wilson Street, Building 1, Loveland, CO 
80537; phone (970) 962-3587.
    i. FERC Contact: David Rudisail at (202) 502-6376, or 
david.rudisail@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: April 12, 2019.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, and comments using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-2829-010. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The City of Loveland has requested to 
amend its license to allow filling of underground pipeline on private 
land in the Idlewild Subdivision. The purpose of the proposed fill is 
to prevent future subsidence of the pipe in the vicinity of homes, 
roads, and other infrastructure.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the

[[Page 10061]]

document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item (h) above. Agencies may obtain 
copies of the application directly from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: March 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-05109 Filed 3-18-19; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.