Placer County Water Agency; Notice of Petition for Declaratory Order, 10062-10063 [2019-05108]
Download as PDF
10062
Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices
Description: § 205(d) Rate Filing:
NPC-Overton-Lincoln Trans Agr R.S. 51
to be effective 5/11/2019.
Filed Date: 3/12/19.
Accession Number: 20190312–5001.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–1246–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amendment to LGIA—Peak Valley Solar
Farm, SA No. 198 to be effective
3/13/2018.
Filed Date: 3/12/19.
Accession Number: 20190312–5003.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: R19–1247–000.
Applicants: American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ATSI submits (7) ECSAs, Service
Agreement Nos. 5180–5184, 5192 and
5209 to be effective 5/14/2019.
Filed Date: 3/12/19.
Accession Number: 20190312–5037.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–1248–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–03–12_SA 3262 Southern Hills
Wind Energy—MidAmerican GIA (J527)
to be effective 2/26/2019.
Filed Date: 3/12/19.
Accession Number: 20190312–5042.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–1249–000.
Applicants: Duke Energy Indiana,
LLC.
Description: Tariff Cancellation: DEI—
Rate Schedule No. 246 Cancellation
Filing to be effective 12/12/2018.
Filed Date: 3/12/19.
Accession Number: 20190312–5058.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–1250–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing: DECRutherford EMC NITSA (SA No. 369)
Amendment to be effective 4/1/2019.
Filed Date: 3/12/19.
Accession Number: 20190312–5063.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–1252–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: RS
239 BPA Two-Way Operation and
Maintenance Agreement Rev 6 to be
effective 5/12/2019.
Filed Date: 3/12/19.
Accession Number: 20190312–5081.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–1253–000.
Applicants: Midcontinent
Independent System Operator, Inc.
VerDate Sep<11>2014
17:54 Mar 18, 2019
Jkt 247001
Description: § 205(d) Rate Filing:
2019–03–12_SA 2997 Palo Alto WindMidAmerican 2nd Rev GIA (J529 J590)
to be effective 2/26/2019.
Filed Date: 3/12/19.
Accession Number: 20190312–5111.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–1261–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
LGIA—Athos Power Plant SA No. 227 to
be effective 3/13/2019.
Filed Date: 3/12/19.
Accession Number: 20190312–5151.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–1262–000.
Applicants: Indiana Michigan Power
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
AEPSC submits Interconnection
Agreement, SA No. 1263 to be effective
12/3/2018.
Filed Date: 3/12/19.
Accession Number: 20190312–5158.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER19–1263–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA SA No.
4104; Queue No. U2–045/W4–063 to be
effective 3/12/2019.
Filed Date: 3/12/19.
Accession Number: 20190312–5160.
Comments Due: 5 p.m. ET 4/2/19.
Take notice that the Commission
received the following electric
reliability filings.
Docket Numbers: RD19–3–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of Proposed
Reliability Standard CIP–008–6.
Filed Date: 3/7/19.
Accession Number: 20190307–5219.
Comments Due: 5 p.m. ET 4/11/19.
Docket Numbers: RD19–4–000.
Applicants: North American Electric
Reliability Corporation, Western
Electricity Coordinating Council.
Description: Joint Petition of the
North American Electric Reliability
Corporation and Western Electricity
Coordinating Council for Approval of
Proposed Regional Reliability Standard
IRO–006–WECC–3.
Filed Date: 3/6/19.
Accession Number: 20190306–5262.
Comments Due: 5 p.m. ET 4/11/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 12, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–05059 Filed 3–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2079–080]
Placer County Water Agency; Notice of
Petition for Declaratory Order
Take notice that on February 22, 2019,
Placer County Water Agency (Placer
County or Petitioner), applicant for the
Middle Fork American Project No. 2079,
filed a petition for declaratory order
(petition) pursuant to Rule 207(a)(2) of
the Federal Energy Regulatory
Commission’s Rules of Practice and
Procedure, 18 CFR 385.207(a)(2). Placer
County requests that the Commission
declare that the California State Water
Resources Control Board has waived its
authority to issue a certification for the
Middle Fork American Project under
Section 401 of the Clean Water Act, 33
U.S.C. 1341(a)(1), as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.211, 385.214.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
E:\FR\FM\19MRN1.SGM
19MRN1
Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 28, 2019.
Dated: March 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–05108 Filed 3–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: March 12, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[Docket No. ER19–1241–000]
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization: Sage Solar II LLC
[FR Doc. 2019–05060 Filed 3–18–19; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding of Sage
Solar II LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is April 1,
2019.
VerDate Sep<11>2014
17:54 Mar 18, 2019
Jkt 247001
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10624–026]
French Paper Company; Notice of
Application Tendered for Filing With
The Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 10624–026.
c. Date Filed: February 27, 2019.
d. Applicant: French Paper Company.
e. Name of Project: French Paper
Hydroelectric Project.
f. Location: The French Paper Project
is located on the St. Joseph River in the
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
10063
City of Niles, Michigan. The project
does not occupy federal land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Shane
Fenske, President, French Paper
Company, 100 French Street, Niles, MI
49120; phone (269) 683–1100 or email
at fenske@frenchpaper.com.
i. FERC Contact: Jay Summers, phone:
(202) 502–8764 or email at
jay.summers@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The French Paper Project consists
of the following existing facilities: (1)
An 80 acre reservoir with a storage
capacity of 510 acre-feet at a water
surface elevation of 653.75 feet mean
sea level; (2) a 321-foot-long, 13-foothigh concrete spillway structure, topped
by 2.3-foot-high flashboards; (3) a 100foot-wide, 600-foot-long intake channel;
(4) a 115-foot-wide, 55-foot-long, 56foot-high powerhouse, with an
operating head of 14 feet; (5) trash racks
at the entrance to the intake channel
and at the entrance to the powerhouse;
(6) two vertical shaft propeller turbines
each coupled to a 400-kilowatt (kW)
generator, one vertical shaft propeller
turbine coupled to a 300-kW generator,
and one vertical shaft Francis turbine
coupled to a 200-kW generator, for a
total installed capacity of 1.3 megawatts;
(7) a 6-foot-wide, 220-foot-long
reinforced concrete fish ladder; (8) a
480-volt to 12-kilovolt (kV) transformer
located adjacent to the powerhouse,
which is connected to Indiana Michigan
Power Company’s 3-phase, 12-kV
overhead transmission line; and (9)
appurtenant facilities.
The French Paper Project is operated
in a run-of-river mode with an estimated
annual energy production of
approximately 8,442.8 megawatt hours.
The French Paper Company proposes to
continue to operate the project in a runof-river mode and does not propose any
new construction or modifications to
the project.
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in item h above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
E:\FR\FM\19MRN1.SGM
19MRN1
Agencies
[Federal Register Volume 84, Number 53 (Tuesday, March 19, 2019)]
[Notices]
[Pages 10062-10063]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05108]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2079-080]
Placer County Water Agency; Notice of Petition for Declaratory
Order
Take notice that on February 22, 2019, Placer County Water Agency
(Placer County or Petitioner), applicant for the Middle Fork American
Project No. 2079, filed a petition for declaratory order (petition)
pursuant to Rule 207(a)(2) of the Federal Energy Regulatory
Commission's Rules of Practice and Procedure, 18 CFR 385.207(a)(2).
Placer County requests that the Commission declare that the California
State Water Resources Control Board has waived its authority to issue a
certification for the Middle Fork American Project under Section 401 of
the Clean Water Act, 33 U.S.C. 1341(a)(1), as more fully explained in
the petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure, 18 CFR 385.211, 385.214. Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Petitioner.
The Commission encourages electronic submission of protests and
[[Page 10063]]
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the website that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on March 28, 2019.
Dated: March 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-05108 Filed 3-18-19; 8:45 am]
BILLING CODE 6717-01-P