Placer County Water Agency; Notice of Petition for Declaratory Order, 10062-10063 [2019-05108]

Download as PDF 10062 Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices Description: § 205(d) Rate Filing: NPC-Overton-Lincoln Trans Agr R.S. 51 to be effective 5/11/2019. Filed Date: 3/12/19. Accession Number: 20190312–5001. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–1246–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amendment to LGIA—Peak Valley Solar Farm, SA No. 198 to be effective 3/13/2018. Filed Date: 3/12/19. Accession Number: 20190312–5003. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: R19–1247–000. Applicants: American Transmission Systems, Incorporated, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ATSI submits (7) ECSAs, Service Agreement Nos. 5180–5184, 5192 and 5209 to be effective 5/14/2019. Filed Date: 3/12/19. Accession Number: 20190312–5037. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–1248–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–03–12_SA 3262 Southern Hills Wind Energy—MidAmerican GIA (J527) to be effective 2/26/2019. Filed Date: 3/12/19. Accession Number: 20190312–5042. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–1249–000. Applicants: Duke Energy Indiana, LLC. Description: Tariff Cancellation: DEI— Rate Schedule No. 246 Cancellation Filing to be effective 12/12/2018. Filed Date: 3/12/19. Accession Number: 20190312–5058. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–1250–000. Applicants: Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: DECRutherford EMC NITSA (SA No. 369) Amendment to be effective 4/1/2019. Filed Date: 3/12/19. Accession Number: 20190312–5063. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–1252–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: RS 239 BPA Two-Way Operation and Maintenance Agreement Rev 6 to be effective 5/12/2019. Filed Date: 3/12/19. Accession Number: 20190312–5081. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–1253–000. Applicants: Midcontinent Independent System Operator, Inc. VerDate Sep<11>2014 17:54 Mar 18, 2019 Jkt 247001 Description: § 205(d) Rate Filing: 2019–03–12_SA 2997 Palo Alto WindMidAmerican 2nd Rev GIA (J529 J590) to be effective 2/26/2019. Filed Date: 3/12/19. Accession Number: 20190312–5111. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–1261–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: LGIA—Athos Power Plant SA No. 227 to be effective 3/13/2019. Filed Date: 3/12/19. Accession Number: 20190312–5151. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–1262–000. Applicants: Indiana Michigan Power Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: AEPSC submits Interconnection Agreement, SA No. 1263 to be effective 12/3/2018. Filed Date: 3/12/19. Accession Number: 20190312–5158. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER19–1263–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of ISA SA No. 4104; Queue No. U2–045/W4–063 to be effective 3/12/2019. Filed Date: 3/12/19. Accession Number: 20190312–5160. Comments Due: 5 p.m. ET 4/2/19. Take notice that the Commission received the following electric reliability filings. Docket Numbers: RD19–3–000. Applicants: North American Electric Reliability Corporation. Description: Petition of the North American Electric Reliability Corporation for Approval of Proposed Reliability Standard CIP–008–6. Filed Date: 3/7/19. Accession Number: 20190307–5219. Comments Due: 5 p.m. ET 4/11/19. Docket Numbers: RD19–4–000. Applicants: North American Electric Reliability Corporation, Western Electricity Coordinating Council. Description: Joint Petition of the North American Electric Reliability Corporation and Western Electricity Coordinating Council for Approval of Proposed Regional Reliability Standard IRO–006–WECC–3. Filed Date: 3/6/19. Accession Number: 20190306–5262. Comments Due: 5 p.m. ET 4/11/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 12, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–05059 Filed 3–18–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2079–080] Placer County Water Agency; Notice of Petition for Declaratory Order Take notice that on February 22, 2019, Placer County Water Agency (Placer County or Petitioner), applicant for the Middle Fork American Project No. 2079, filed a petition for declaratory order (petition) pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s Rules of Practice and Procedure, 18 CFR 385.207(a)(2). Placer County requests that the Commission declare that the California State Water Resources Control Board has waived its authority to issue a certification for the Middle Fork American Project under Section 401 of the Clean Water Act, 33 U.S.C. 1341(a)(1), as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.211, 385.214. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and E:\FR\FM\19MRN1.SGM 19MRN1 Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on March 28, 2019. Dated: March 13, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–05108 Filed 3–18–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: March 12, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [Docket No. ER19–1241–000] Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: Sage Solar II LLC [FR Doc. 2019–05060 Filed 3–18–19; 8:45 am] BILLING CODE 6717–01–P This is a supplemental notice in the above-referenced proceeding of Sage Solar II LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is April 1, 2019. VerDate Sep<11>2014 17:54 Mar 18, 2019 Jkt 247001 The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10624–026] French Paper Company; Notice of Application Tendered for Filing With The Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 10624–026. c. Date Filed: February 27, 2019. d. Applicant: French Paper Company. e. Name of Project: French Paper Hydroelectric Project. f. Location: The French Paper Project is located on the St. Joseph River in the PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 10063 City of Niles, Michigan. The project does not occupy federal land. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Mr. Shane Fenske, President, French Paper Company, 100 French Street, Niles, MI 49120; phone (269) 683–1100 or email at fenske@frenchpaper.com. i. FERC Contact: Jay Summers, phone: (202) 502–8764 or email at jay.summers@ferc.gov. j. This application is not ready for environmental analysis at this time. k. The French Paper Project consists of the following existing facilities: (1) An 80 acre reservoir with a storage capacity of 510 acre-feet at a water surface elevation of 653.75 feet mean sea level; (2) a 321-foot-long, 13-foothigh concrete spillway structure, topped by 2.3-foot-high flashboards; (3) a 100foot-wide, 600-foot-long intake channel; (4) a 115-foot-wide, 55-foot-long, 56foot-high powerhouse, with an operating head of 14 feet; (5) trash racks at the entrance to the intake channel and at the entrance to the powerhouse; (6) two vertical shaft propeller turbines each coupled to a 400-kilowatt (kW) generator, one vertical shaft propeller turbine coupled to a 300-kW generator, and one vertical shaft Francis turbine coupled to a 200-kW generator, for a total installed capacity of 1.3 megawatts; (7) a 6-foot-wide, 220-foot-long reinforced concrete fish ladder; (8) a 480-volt to 12-kilovolt (kV) transformer located adjacent to the powerhouse, which is connected to Indiana Michigan Power Company’s 3-phase, 12-kV overhead transmission line; and (9) appurtenant facilities. The French Paper Project is operated in a run-of-river mode with an estimated annual energy production of approximately 8,442.8 megawatt hours. The French Paper Company proposes to continue to operate the project in a runof-river mode and does not propose any new construction or modifications to the project. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in item h above. m. You may also register online at https://www.ferc.gov/docs-filing/ E:\FR\FM\19MRN1.SGM 19MRN1

Agencies

[Federal Register Volume 84, Number 53 (Tuesday, March 19, 2019)]
[Notices]
[Pages 10062-10063]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05108]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2079-080]


Placer County Water Agency; Notice of Petition for Declaratory 
Order

    Take notice that on February 22, 2019, Placer County Water Agency 
(Placer County or Petitioner), applicant for the Middle Fork American 
Project No. 2079, filed a petition for declaratory order (petition) 
pursuant to Rule 207(a)(2) of the Federal Energy Regulatory 
Commission's Rules of Practice and Procedure, 18 CFR 385.207(a)(2). 
Placer County requests that the Commission declare that the California 
State Water Resources Control Board has waived its authority to issue a 
certification for the Middle Fork American Project under Section 401 of 
the Clean Water Act, 33 U.S.C. 1341(a)(1), as more fully explained in 
the petition.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure, 18 CFR 385.211, 385.214. Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Petitioner.
    The Commission encourages electronic submission of protests and

[[Page 10063]]

interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the website that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on March 28, 2019.

    Dated: March 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-05108 Filed 3-18-19; 8:45 am]
BILLING CODE 6717-01-P