Commission Information Collection Activities (FERC-725k); Comment Request, 10055-10056 [2019-05047]
Download as PDF
Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices
require special accommodations due to
a disability, please contact Menice
Santistevan at least seven days in
advance of the meeting at the telephone
number listed above. Written statements
may be filed with the Committees either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact Menice Santistevan at the
address or telephone number listed
above. Requests must be received five
days prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Menice Santistevan at
the address or phone number listed
above. Minutes and other Board
documents are on the internet at: https://
energy.gov/em/nnmcab/meetingmaterials.
Signed in Washington, DC on March 13,
2019.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2019–05035 Filed 3–18–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC19–9–000]
Commission Information Collection
Activities (FERC–725k); Comment
Request
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Comment request.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is submitting its
information collection FERC–725K
(Mandatory Reliability Standards for the
SERC Region) to the Office of
Management and Budget (OMB) for
review of the information collection
requirements. Any interested person
may file comments directly with OMB
and should address a copy of those
comments to the Commission as
explained below. The Commission
previously published a Notice in the
Federal Register on December 10, 2018
(83 FR 63494), requesting public
SUMMARY:
VerDate Sep<11>2014
17:54 Mar 18, 2019
Jkt 247001
comments. The Commission received no
comments and is making this notation
in its submittal to OMB.
DATES: Comments on the collection of
information are due by April 18, 2019.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0260, should be sent via email to
the Office of Information and Regulatory
Affairs: oira_submission@omb.gov.
Attention: Federal Energy Regulatory
Commission Desk Officer.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC19–9–000, by either of the
following methods:
• eFiling at Commission’s Website:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Title: Mandatory Reliability Standards
for the SERC Region.
OMB Control No.: 1902–0260.
Type of Request: Three-year extension
of the FERC–725K information
collection requirements with no changes
to the current reporting requirements.
Abstract: Section 215 of the Federal
Power Act (FPA) requires a
Commission-certified Electric
Reliability Organization (ERO) to
develop mandatory and enforceable
Reliability Standards, which are subject
to Commission review and approval.
Once approved, the Reliability
Standards may be enforced by NERC,
subject to Commission oversight, or by
the Commission independently.
Reliability Standards that NERC
proposes to the Commission may
include Reliability Standards that are
proposed by a Regional Entity to be
effective in that region. In Order No.
672, the Commission noted that:
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
10055
As a general matter, we will accept the
following two types of regional differences,
provided they are otherwise just, reasonable,
not unduly discriminatory or preferential and
in the public interest, as required under the
statute: (1) A regional difference that is more
stringent than the continent-wide Reliability
Standard, including a regional difference that
addresses matters that the continent-wide
Reliability Standard does not; and (2) a
regional Reliability Standard that is
necessitated by a physical difference in the
Bulk-Power System.
When NERC reviews a regional
Reliability Standard that would be
applicable on an interconnection-wide
basis and that has been proposed by a
Regional Entity organized on an
interconnection-wide basis, NERC must
rebuttably presume that the regional
Reliability Standard is just, reasonable,
not unduly discriminatory or
preferential, and in the public interest.
In turn, the Commission must give ‘‘due
weight’’ to the technical expertise of
NERC and of a Regional Entity
organized on an interconnection-wide
basis.
On April 19, 2007, the Commission
accepted delegation agreements between
NERC and each of the eight Regional
Entities. In the order, the Commission
accepted SERC as a Regional Entity
organized on less than an
interconnection-wide basis. As a
Regional Entity, SERC oversees BulkPower System reliability within the
SERC Region, which covers a
geographic area of approximately
560,000 square miles in a sixteen-state
area in the southeastern and central
United States (all of Missouri, Alabama,
Tennessee, North Carolina, South
Carolina, Georgia, Mississippi, and
portions of Iowa, Illinois, Kentucky,
Virginia, Oklahoma, Arkansas,
Louisiana, Texas and Florida). The
SERC Region is currently geographically
divided into five subregions that are
identified as Southeastern, Central,
VACAR, Delta, and Gateway.
Type of Respondents: Entities
registered with the North American
Electric Reliability Corporation (within
the SERC region).
Estimate of Annual Burden: 1 The
Commission estimates the annual
reporting burden and cost for the
information collection as:
1 ‘‘Burden’’ is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information
collection burden, refer to 5 Code of Federal
Regulations 1320.3.
E:\FR\FM\19MRN1.SGM
19MRN1
10056
Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices
FERC–725K—MANDATORY RELIABILITY STANDARDS FOR THE SERC REGION
Annual
number of
responses per
respondent
Total number
of responses
Average burden hrs. & cost
per response 2
Total annual burden hours &
total annual cost
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
3 21
1
21
8 hrs.; $535.20 ....................
168 hrs.; $11,239.20 ...........
$535.20
3 21
1
21
16 hrs.; $1,070.40 ...............
336 hrs.; $22,478.40 ...........
1,070.40
4 104
1
104
16 hrs.; $1,070.40 ...............
1,664 hrs.; $111,321.60 ......
1,070.40
4 104
1
104
4 hrs.; $267.60 ....................
416 hrs.; $27,830.40 ...........
267.60
........................
........................
125
..............................................
2,584 hrs.; $172,869.60 ......
2,943.60
PCs: Design and Document Automatic UFLS Program.
PCs: Provide Documentation and
Data to SERC.
GOs: Provide Documentation and
Data to SERC.
GOs: Record Retention ................
Total .......................................
Number of
respondents
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: March 11, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–05047 Filed 3–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2814–025]
Great Falls Hydroelectric Company;
Notice of Application Tendered for
Filing With The Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
2 The estimated hourly cost (salary plus benefits)
provided in this section is based on the salary
figures (https://www.bls.gov/oes/current/naics2_
22.htm) and benefits (https://www.bls.gov/
news.release/ecec.nr0.htm) for May 2017 posted by
the Bureau of Labor Statistics for the Utilities
sector. The hourly estimates for salary plus benefits
are $66.90/hour based on the Engineering career
(Occupation Code: 17–2071).
3 Both figures for PC respondents are not to be
totaled. They represent the same set of respondents.
4 Both figures for GO respondents are not to be
totaled. They represent the same set of respondents.
VerDate Sep<11>2014
19:27 Mar 18, 2019
Jkt 247001
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2814–025.
c. Date Filed: February 28, 2019.
d. Applicant: Great Falls
Hydroelectric Company and the City of
Paterson, New Jersey, as co-licensees.
e. Name of Project: Great Falls
Hydroelectric Project.
f. Location: On the Passaic River, near
the City of Paterson, Passaic County,
New Jersey. The project does not occupy
federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825 (r).
h. Applicant Contact: Mr. Robert
Gates, Senior Vice President of
Operations, Eagle Creek Renewable
Energy, 65 Madison Avenue, Suite 500,
Morristown, NJ 07960; (973) 998–8400;
email—bob.gates@eaglecreekre.com
and/or Ben-David Seligman, 2nd
Assistant Corp. Counsel, City of
Paterson, 155 Market Street, Paterson,
NJ; (973) 321–1366; email—bseligman@
patersonnj.gov.
i. FERC Contact: Christopher Millard
at (202) 502–8256; or email at
christopher.millard@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: April 29, 2019.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2814–025.
m. This application is not ready for
environmental analysis at this time.
n. The existing project works consist
of: (1) The Society for the Establishment
of Useful Manufactures dam, an
overflow granite stone gravity structure
about 315 feet long, with a maximum
height of 15 feet and having a crest
elevation of 114.6 feet mean sea level
(msl); (2) a reservoir with a surface area
of 202 acres and a storage capacity of
1,415 acre-feet at elevation 114.6 feet
msl; (3) a forebay inlet structure; (4) a
headgate control structure containing
three trashracks and three steel gates; (5)
three penstocks, each 8.5 feet in
diameter and approximately 55 feet
long; (6) a powerhouse containing three
turbine-generator units with a total rated
capacity of 10.95 megawatts; (7) a 37foot-long 4.16-kilovolt (kV)
underground transmission line
connecting the powerhouse to a 4.16/
26.4-kV step-up transformer which in
turn is connected to a 26.4-kV
E:\FR\FM\19MRN1.SGM
19MRN1
Agencies
[Federal Register Volume 84, Number 53 (Tuesday, March 19, 2019)]
[Notices]
[Pages 10055-10056]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-05047]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. IC19-9-000]
Commission Information Collection Activities (FERC-725k); Comment
Request
AGENCY: Federal Energy Regulatory Commission, Department of Energy.
ACTION: Comment request.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of the Paperwork Reduction
Act of 1995, the Federal Energy Regulatory Commission (Commission or
FERC) is submitting its information collection FERC-725K (Mandatory
Reliability Standards for the SERC Region) to the Office of Management
and Budget (OMB) for review of the information collection requirements.
Any interested person may file comments directly with OMB and should
address a copy of those comments to the Commission as explained below.
The Commission previously published a Notice in the Federal Register on
December 10, 2018 (83 FR 63494), requesting public comments. The
Commission received no comments and is making this notation in its
submittal to OMB.
DATES: Comments on the collection of information are due by April 18,
2019.
ADDRESSES: Comments filed with OMB, identified by the OMB Control No.
1902-0260, should be sent via email to the Office of Information and
Regulatory Affairs: oira_submission@omb.gov. Attention: Federal Energy
Regulatory Commission Desk Officer.
A copy of the comments should also be sent to the Commission, in
Docket No. IC19-9-000, by either of the following methods:
eFiling at Commission's Website: https://www.ferc.gov/docs-filing/efiling.asp.
Mail/Hand Delivery/Courier: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE,
Washington, DC 20426.
Instructions: All submissions must be formatted and filed in
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676
(toll-free), or (202) 502-8659 for TTY.
Docket: Users interested in receiving automatic notification of
activity in this docket or in viewing/downloading comments and
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at
DataClearance@FERC.gov, by telephone at (202) 502-8663, and by fax at
(202) 273-0873.
SUPPLEMENTARY INFORMATION:
Title: Mandatory Reliability Standards for the SERC Region.
OMB Control No.: 1902-0260.
Type of Request: Three-year extension of the FERC-725K information
collection requirements with no changes to the current reporting
requirements.
Abstract: Section 215 of the Federal Power Act (FPA) requires a
Commission-certified Electric Reliability Organization (ERO) to develop
mandatory and enforceable Reliability Standards, which are subject to
Commission review and approval. Once approved, the Reliability
Standards may be enforced by NERC, subject to Commission oversight, or
by the Commission independently.
Reliability Standards that NERC proposes to the Commission may
include Reliability Standards that are proposed by a Regional Entity to
be effective in that region. In Order No. 672, the Commission noted
that:
As a general matter, we will accept the following two types of
regional differences, provided they are otherwise just, reasonable,
not unduly discriminatory or preferential and in the public
interest, as required under the statute: (1) A regional difference
that is more stringent than the continent-wide Reliability Standard,
including a regional difference that addresses matters that the
continent-wide Reliability Standard does not; and (2) a regional
Reliability Standard that is necessitated by a physical difference
in the Bulk-Power System.
When NERC reviews a regional Reliability Standard that would be
applicable on an interconnection-wide basis and that has been proposed
by a Regional Entity organized on an interconnection-wide basis, NERC
must rebuttably presume that the regional Reliability Standard is just,
reasonable, not unduly discriminatory or preferential, and in the
public interest. In turn, the Commission must give ``due weight'' to
the technical expertise of NERC and of a Regional Entity organized on
an interconnection-wide basis.
On April 19, 2007, the Commission accepted delegation agreements
between NERC and each of the eight Regional Entities. In the order, the
Commission accepted SERC as a Regional Entity organized on less than an
interconnection-wide basis. As a Regional Entity, SERC oversees Bulk-
Power System reliability within the SERC Region, which covers a
geographic area of approximately 560,000 square miles in a sixteen-
state area in the southeastern and central United States (all of
Missouri, Alabama, Tennessee, North Carolina, South Carolina, Georgia,
Mississippi, and portions of Iowa, Illinois, Kentucky, Virginia,
Oklahoma, Arkansas, Louisiana, Texas and Florida). The SERC Region is
currently geographically divided into five subregions that are
identified as Southeastern, Central, VACAR, Delta, and Gateway.
Type of Respondents: Entities registered with the North American
Electric Reliability Corporation (within the SERC region).
Estimate of Annual Burden: \1\ The Commission estimates the annual
reporting burden and cost for the information collection as:
---------------------------------------------------------------------------
\1\ ``Burden'' is defined as the total time, effort, or
financial resources expended by persons to generate, maintain,
retain, or disclose or provide information to or for a Federal
agency. For further explanation of what is included in the
information collection burden, refer to 5 Code of Federal
Regulations 1320.3.
[[Page 10056]]
FERC-725K--Mandatory Reliability Standards for the SERC Region
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Annual number
Number of of responses Total number Average burden hrs. & cost per response Total annual burden hours & total annual Cost per
respondents per respondent of responses \2\ cost respondent ($)
(1) (2) (1) * (2) = (4)....................................... (3) * (4) = (5)........................... (5) / (1)
(3)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PCs: Design and Document Automatic UFLS \3\ 21 1 21 8 hrs.; $535.20........................... 168 hrs.; $11,239.20...................... $535.20
Program.
PCs: Provide Documentation and Data to \3\ 21 1 21 16 hrs.; $1,070.40........................ 336 hrs.; $22,478.40...................... 1,070.40
SERC.
GOs: Provide Documentation and Data to \4\ 104 1 104 16 hrs.; $1,070.40........................ 1,664 hrs.; $111,321.60................... 1,070.40
SERC.
GOs: Record Retention................... \4\ 104 1 104 4 hrs.; $267.60........................... 416 hrs.; $27,830.40...................... 267.60
rrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
Total............................... .............. .............. 125 .......................................... 2,584 hrs.; $172,869.60................... 2,943.60
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Comments: Comments are invited on: (1) Whether the collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden and
cost of the collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information collection; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use of automated collection techniques or
other forms of information technology.
---------------------------------------------------------------------------
\2\ The estimated hourly cost (salary plus benefits) provided in
this section is based on the salary figures (https://www.bls.gov/oes/current/naics2_22.htm) and benefits (https://www.bls.gov/news.release/ecec.nr0.htm) for May 2017 posted by the Bureau of
Labor Statistics for the Utilities sector. The hourly estimates for
salary plus benefits are $66.90/hour based on the Engineering career
(Occupation Code: 17-2071).
\3\ Both figures for PC respondents are not to be totaled. They
represent the same set of respondents.
\4\ Both figures for GO respondents are not to be totaled. They
represent the same set of respondents.
Dated: March 11, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-05047 Filed 3-18-19; 8:45 am]
BILLING CODE 6717-01-P