Environmental Impact Statements; Notice of Availability, 9519 [2019-04767]

Download as PDF amozie on DSK9F9SC42PROD with NOTICES Federal Register / Vol. 84, No. 51 / Friday, March 15, 2019 / Notices promulgated under CWA section 312 for vessels of the Armed forces if there is significant new information that could reasonably result in a change to the discharge determination or standard. This ICR addresses the information requirements associated with the establishment of an UNDS NDZ for a particular discharge from a vessel of the Armed Forces in addition to the information requirements associated with a request to the EPA and DoD to review a discharge determination or standard. UNDS NDZs for a particular discharge from a vessel of the Armed Forces cannot be requested or established until after the EPA and DoD promulgate vessel discharge performance standards for marine pollution control devices for that particular discharge and DoD promulgates the corresponding regulations governing the design, construction, installation and use of marine pollution control devices for that particular discharge. The information collection activities discussed in this ICR do not require the submission of any confidential information. Form Numbers: None. Respondents/affected entities: States. Respondent’s obligation to respond: The responses to this collection of information are required for a state to obtain a sewage NDZ (CWA section 312(f)) and required to obtain an UNDS NDZ or a review of an UNDS discharge determination or standard (CWA section 312(n)). Estimated number of respondents:13 (total). Frequency of response: One time. Total estimated burden: 914 hours (per year). Burden is defined at 5 CFR 1320.03(b). Total estimated cost: $12,501 (per year), includes $848 annualized capital or operation & maintenance costs. Changes in the Estimates: There is a decrease of 169 hours in the total estimated respondent burden compared with the ICR currently approved by OMB. This estimated decrease is attributable to a downward adjustment in the estimated number of anticipated total actions during the upcoming 3-year period. Courtney Kerwin, Director, Regulatory Support Division. [FR Doc. 2019–04797 Filed 3–14–19; 8:45 am] BILLING CODE 6560–50–P VerDate Sep<11>2014 16:53 Mar 14, 2019 Jkt 247001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9043–8] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information 202– 564–5632 or https://www.epa.gov/nepa/. Weekly receipt of Environmental Impact Statements Filed 03/04/2019 Through 03/08/2019 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https://cdxnod engn.epa.gov/cdx-enepa-public/action/ eis/search. EIS No. 20190023, Final, OSM, NM, San Juan Mine Deep Lease Extension Mining Plan Modification, Review Period Ends: 04/15/2019, Contact: Gretchen Pinkham 303–293–5088 EIS No. 20190024, Final, BR, WA, Kachess Drought Relief Pumping Plant and Keechelus Reservoir-toKachess Reservoir Conveyance Projects Final Environmental Impact Statement, Kittitas and Yakima Counties, Washington, Review Period Ends: 04/15/2019, Contact: Ms. Candace McKinley 509–573–8020 EIS No. 20190025, Draft, USFS, NM, South Sacramento Restoration Project, Comment Period Ends: 04/29/2019, Contact: Peggy Luensmann 575–434– 7200 EIS No. 20190026, Final, FHWA, ND, U.S. Highway 85—I–94 Interchange to Watford City Bypass, Contact: Kevin Brodie 701–221–9467 Under 23 U.S.C. 139(n)(2), FHWA has issued a single document that consists of a final environmental impact statement and record of decision. Therefore, the 30-day wait/review period under NEPA does not apply to this action. EIS No. 20190027, Final, USFWS, CA, South Farallon Islands Invasive House Mouse Eradication Project; Farallon Islands National Wildlife Refuge, California, Review Period Ends: 04/ 15/2019, Contact: Gerry McChesney 510–792–0222, ext. 222 EIS No. 20190028, Final, USFS, ID, Boise & Sawtooth Forest-wide Invasive Plant Species Treatments, Review Period Ends: 04/29/2019, Contact: Michael Haney 208–423– 7530 EIS No. 20190029, Draft, GSA, AZ, Expansion and Modernization of the San Luis I Land Port of Entry, PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 9519 Comment Period Ends: 04/29/2019, Contact: Osmahn Kadri 415–522–3617 EIS No. 20190030, Draft, BLM, AK, Bering Sea—Western Interior Resource Management Plan and Environmental Impact Statement, Comment Period Ends: 06/13/2019, Contact: Jorjena Barringer 907–267– 1246 EIS No. 20190031, Final Supplement, OSM, CO, ADOPTION—Federal Coal Lease Modifications COC–1362 and COC–67232, Contact: Gretchen Pinkham 303–293–5088 The Office of Surface Mining (OSM) has adopted the U.S. Forest Service’s Final Supplemental EIS No. 20170173, filed 09/01/2017 with the Environmental Protection Agency. The OSM was a cooperating agency on this project. Therefore, recirculation of the document is not necessary under Section 1506.3(c) of the CEQ regulations. EIS No. 20190032, Draft, BLM, NV, Burning Man Event Special Recreation Permit Draft Environmental Impact Statement, Comment Period Ends: 04/29/2019, Contact: Mark Hall 775–623–1529 Dated: March 11, 2019. Robert Tomiak, Director, Office of Federal Activities. [FR Doc. 2019–04767 Filed 3–14–19; 8:45 am] BILLING CODE 6560–50–P FEDERAL DEPOSIT INSURANCE CORPORATION FDIC Advisory Committee on Community Banking; Notice of Meeting Federal Deposit Insurance Corporation (FDIC). ACTION: Notice of open meeting. AGENCY: In accordance with the Federal Advisory Committee Act, notice is hereby given of a meeting of the FDIC Advisory Committee on Community Banking, which will be held in Washington, DC. The Advisory Committee will provide advice and recommendations on a broad range of policy issues that have particular impact on small community banks throughout the United States and the local communities they serve, with a focus on rural areas. DATES: Thursday, March 28, 2019, from 9:00 a.m. to 3:00 p.m. ADDRESSES: The meeting will be held in the FDIC Board Room on the sixth floor of the FDIC Building located at 550 17th Street NW, Washington, DC. FOR FURTHER INFORMATION CONTACT: Requests for further information SUMMARY: E:\FR\FM\15MRN1.SGM 15MRN1

Agencies

[Federal Register Volume 84, Number 51 (Friday, March 15, 2019)]
[Notices]
[Page 9519]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-04767]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9043-8]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information 202-564-5632 or https://www.epa.gov/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 03/04/2019 Through 03/08/2019
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.

EIS No. 20190023, Final, OSM, NM, San Juan Mine Deep Lease Extension 
Mining Plan Modification, Review Period Ends: 04/15/2019, Contact: 
Gretchen Pinkham 303-293-5088
EIS No. 20190024, Final, BR, WA, Kachess Drought Relief Pumping Plant 
and Keechelus Reservoir-to-Kachess Reservoir Conveyance Projects Final 
Environmental Impact Statement, Kittitas and Yakima Counties, 
Washington, Review Period Ends: 04/15/2019, Contact: Ms. Candace 
McKinley 509-573-8020
EIS No. 20190025, Draft, USFS, NM, South Sacramento Restoration 
Project, Comment Period Ends: 04/29/2019, Contact: Peggy Luensmann 575-
434-7200
EIS No. 20190026, Final, FHWA, ND, U.S. Highway 85--I-94 Interchange to 
Watford City Bypass, Contact: Kevin Brodie 701-221-9467 Under 23 U.S.C. 
139(n)(2), FHWA has issued a single document that consists of a final 
environmental impact statement and record of decision. Therefore, the 
30-day wait/review period under NEPA does not apply to this action.
EIS No. 20190027, Final, USFWS, CA, South Farallon Islands Invasive 
House Mouse Eradication Project; Farallon Islands National Wildlife 
Refuge, California, Review Period Ends: 04/15/2019, Contact: Gerry 
McChesney 510-792-0222, ext. 222
EIS No. 20190028, Final, USFS, ID, Boise & Sawtooth Forest-wide 
Invasive Plant Species Treatments, Review Period Ends: 04/29/2019, 
Contact: Michael Haney 208-423-7530
EIS No. 20190029, Draft, GSA, AZ, Expansion and Modernization of the 
San Luis I Land Port of Entry, Comment Period Ends: 04/29/2019, 
Contact: Osmahn Kadri 415-522-3617
EIS No. 20190030, Draft, BLM, AK, Bering Sea--Western Interior Resource 
Management Plan and Environmental Impact Statement, Comment Period 
Ends: 06/13/2019, Contact: Jorjena Barringer 907-267-1246
EIS No. 20190031, Final Supplement, OSM, CO, ADOPTION--Federal Coal 
Lease Modifications COC-1362 and COC-67232, Contact: Gretchen Pinkham 
303-293-5088 The Office of Surface Mining (OSM) has adopted the U.S. 
Forest Service's Final Supplemental EIS No. 20170173, filed 09/01/2017 
with the Environmental Protection Agency. The OSM was a cooperating 
agency on this project. Therefore, recirculation of the document is not 
necessary under Section 1506.3(c) of the CEQ regulations.
EIS No. 20190032, Draft, BLM, NV, Burning Man Event Special Recreation 
Permit Draft Environmental Impact Statement, Comment Period Ends: 04/
29/2019, Contact: Mark Hall 775-623-1529

    Dated: March 11, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019-04767 Filed 3-14-19; 8:45 am]
 BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.