ANR Pipeline Company; Notice of Request Under Blanket Authorization, 9319-9320 [2019-04746]
Download as PDF
Federal Register / Vol. 84, No. 50 / Thursday, March 14, 2019 / Notices
9319
FERC–556—CERTIFICATION OF QUALIFYING FACILITY STATUS FOR A SMALL POWER PRODUCTION OR COGENERATION
FACILITY
Facility type
Filing type
Cogeneration Facility > 1 MW 6.
Cogeneration Facility > 1 MW.
Small Power Production Facility
> 1 MW.
Small Power Production Facility
> 1 MW.
Cogeneration and
Small Power
Production Facility ≤ 1 MW
(Self-Certification) 7.
Total ............
Number of
respondents
Annual
number of
responses per
respondent
Total
number of
responses
Average
burden hours
& cost per
response 5
Total
annual burden
hours & total
annual cost
(rounded)
Cost per
respondent
($) (rounded)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
Self-certification ..
63
1.25
78.75
1.5 hrs; $118.5
Application for
FERC certification.
Self-certification ..
1
1.25
1.25
50 hrs; $3,950
2,698
1.25
3,372.5
1.5 hrs; $118.5
5,058.75 hrs;
$399,641.
Application for
FERC certification.
Self-certification ..
0
1.25
0
50 hrs; $3,950
0 hrs; $0 .............
692
1.25
865
1.5 hrs; $118.5
1,297.5 hrs;
$102,503.
............................
3,454
........................
4,317.5
........................
6,536.875 hrs;
$516,413.13.
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: March 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–04678 Filed 3–13–19; 8:45 am]
BILLING CODE 6717–01–P
5 The Commission staff believes that industry is
similarly situated in terms of wages and benefits.
Therefore, cost estimates are based on FERC’s 2018
average annual wage (and benefits) for a full-time
employee of $164,820 (or $79.00/hour).
6 MW = megawatt.
7 Not required to file.
VerDate Sep<11>2014
118.125 hrs;
$9,332.
62.5 hrs; $4,938
20:21 Mar 13, 2019
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–102–000]
ANR Pipeline Company; Notice of
Request Under Blanket Authorization
Take notice that on February 27, 2019,
ANR Pipeline Company (ANR), 700
Louisiana Street, Houston, Texas
77002–2700, filed in Docket No. CP19–
102–000 a prior notice request pursuant
to sections 157.205, 157.208, and
157.216 of the Commission’s regulations
under the Natural Gas Act (NGA) and
ANR’s blanket certificate issued in
Docket No. CP82–480–000. ANR
proposes to replace segments of its
existing 22-inch mainline (Line 301),
24-inch loop line (Line 1–301), and 30inch loop line (Line 2–301), all located
in Kane County, Illinois. Due to
residential housing and recreational
development along discrete sections of
the pipelines, ANR is required, pursuant
to Part 192 of the U.S. Department of
Transportation regulations, to either
upgrade the pipe or lower the Maximum
Allowable Operating Pressure in those
sections by June 30, 2019, all as more
fully set forth in the request which is on
file with the Commission and open to
public inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
$148
4,938
148
0
148
........................
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Linda
Farquhar, Manager, Project
Determinations & Regulatory
Administration, ANR Pipeline
Company, 700 Louisiana Street, Suite
700, Houston, Texas, 77002–2700, at
(832) 320–5685 or fax (832) 320–6685 or
linda_farquhar@transcanada.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
E:\FR\FM\14MRN1.SGM
14MRN1
9320
Federal Register / Vol. 84, No. 50 / Thursday, March 14, 2019 / Notices
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: March 8, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–04746 Filed 3–13–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:22 Mar 13, 2019
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14963–000]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications: Renewable Energy
Aggregators
On January 10, 2019, Renewable
Energy Aggregators, filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Wrightstown Pumped Storage
Hydroelectric Project to be located in
Bucks County, Pennsylvania. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 46.4 acres and a
storage capacity of 695.9 acre-feet at a
surface elevation of approximately 228
feet above mean sea level (msl) created
through construction of a new rollercompacted concrete or rock-filled dam;
(2) a new lower reservoir with a surface
area of 12.6 acres and a total storage
capacity of 755.9 acre-feet at a surface
elevation of ¥149 feet msl; (3) a new
1,100-foot-long, 48-inch-diameter
penstock connecting the upper and
lower reservoirs; (4) a new 150-footlong, 50-foot-wide powerhouse
containing one turbine-generator unit
with a total rated capacity of 20
megawatts; (5) a new transmission line
connecting the powerhouse to a nearby
electric grid interconnection point with
options to evaluate multiple grid
interconnection locations; and (6)
appurtenant facilities. The proposed
project would have an annual
generation of 87,241 megawatt-hours.
Applicant Contact: Adam Rousselle II,
Renewable Energy Aggregators, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: 215–485–1708.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14963–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14963) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 8, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–04742 Filed 3–13–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–106–001;
ER17–2364–003; ER10–2719–033;
ER16–2462–008; ER14–2500–009;
ER14–2498–009; ER10–3099–021.
Applicants: Birdsboro Power LLC, St.
Joseph Energy Center, LLC, East Coast
Power Linden Holding, L.L.C., Oregon
Clean Energy, LLC, Newark Energy
Center, LLC, EIF Newark, LLC, RC Cape
May Holdings, LLC.
Description: Notice of Non-Material
Change in Status of Birdsboro Power
LLC, et al.
Filed Date: 3/7/19.
Accession Number: 20190307–5113.
Comments Due: 5 p.m. ET 3/28/19.
Docket Numbers: ER19–289–002;
ER10–1827–007; ER10–1533–019;
ER18–2264–002; ER10–2791–0016;
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 84, Number 50 (Thursday, March 14, 2019)]
[Notices]
[Pages 9319-9320]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-04746]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-102-000]
ANR Pipeline Company; Notice of Request Under Blanket
Authorization
Take notice that on February 27, 2019, ANR Pipeline Company (ANR),
700 Louisiana Street, Houston, Texas 77002-2700, filed in Docket No.
CP19-102-000 a prior notice request pursuant to sections 157.205,
157.208, and 157.216 of the Commission's regulations under the Natural
Gas Act (NGA) and ANR's blanket certificate issued in Docket No. CP82-
480-000. ANR proposes to replace segments of its existing 22-inch
mainline (Line 301), 24-inch loop line (Line 1-301), and 30-inch loop
line (Line 2-301), all located in Kane County, Illinois. Due to
residential housing and recreational development along discrete
sections of the pipelines, ANR is required, pursuant to Part 192 of the
U.S. Department of Transportation regulations, to either upgrade the
pipe or lower the Maximum Allowable Operating Pressure in those
sections by June 30, 2019, all as more fully set forth in the request
which is on file with the Commission and open to public inspection.
The filing is available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's website web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this application should be directed to
Linda Farquhar, Manager, Project Determinations & Regulatory
Administration, ANR Pipeline Company, 700 Louisiana Street, Suite 700,
Houston, Texas, 77002-2700, at (832) 320-5685 or fax (832) 320-6685 or
linda_farquhar@transcanada.com.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
[[Page 9320]]
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of filed documents on all other parties. However, the non-party
commenters will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 3 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: March 8, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-04746 Filed 3-13-19; 8:45 am]
BILLING CODE 6717-01-P