Renewable Energy Aggregators; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 9328 [2019-04745]
Download as PDF
9328
Federal Register / Vol. 84, No. 50 / Thursday, March 14, 2019 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14961–000]
Renewable Energy Aggregators;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 10, 2019, Renewable
Energy Aggregators, filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Eastern Industries Pumped
Storage Hydroelectric Project to be
located in Lehigh County, Pennsylvania.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 62 acres and a
storage capacity of 929.9 acre-feet at a
surface elevation of approximately 1,343
feet above mean sea level (msl) created
through construction of a new rollercompacted concrete or rock-filled dam;
(2) a new lower reservoir with a surface
area of 22.3 acres and a total storage
capacity of 1,337.9 acre-feet at a surface
elevation of 1,057 feet msl; (3) a new
834-foot-long, 48-inch-diameter
penstock connecting the upper and
lower reservoirs; (4) a new 150-footlong, 50-foot-wide powerhouse
containing one turbine-generator unit
with a total rated capacity of 20
megawatts; (5) a new transmission line
connecting the powerhouse to a nearby
electric grid interconnection point with
options to evaluate multiple grid
interconnection locations; and (6)
appurtenant facilities. The proposed
project would have an annual
generation of 88,434 megawatt-hours.
Applicant Contact: Adam Rousselle II,
Renewable Energy Aggregators, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: 215–485–1708.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
VerDate Sep<11>2014
17:22 Mar 13, 2019
Jkt 247001
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14961–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14961) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: Tariff Amendment: Fuel
Filing 2019—Amendment to be effective
4/1/2019.
Filed Date: 3/5/19.
Accession Number: 20190305–5102.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: RP19–805–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate PAL Agreement—Twin
Eagle Resource Management, LLC to be
effective 3/6/2019.
Filed Date: 3/5/19.
Accession Number: 20190305–5105.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: RP19–806–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement-Eco-Energy
to be effective 4/1/2019.
Filed Date: 3/6/19.
Accession Number: 20190306–5000.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: RP19–807–000.
Applicants: Natural Gas Pipeline
Company of America.
Dated: March 8, 2019.
Description: § 4(d) Rate Filing:
Kimberly D. Bose,
Negotiated Rate Agreement-Sempra Gas
Secretary.
& Power to be effective 4/1/2019.
[FR Doc. 2019–04745 Filed 3–13–19; 8:45 am]
Filed Date: 3/6/19.
BILLING CODE 6717–01–P
Accession Number: 20190306–5001.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: RP19–808–000.
DEPARTMENT OF ENERGY
Applicants: Natural Gas Pipeline
Company of America.
Federal Energy Regulatory
Commission
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement-Union
Combined Notice of Filings
Electric to be effective 4/1/2019.
Filed Date: 3/6/19.
Take notice that the Commission has
Accession Number: 20190306–5002.
received the following Natural Gas
Comments Due: 5 p.m. ET 3/18/19.
Pipeline Rate and Refund Report filings:
The filings are accessible in the
Filings Instituting Proceedings
Commission’s eLibrary system by
Docket Numbers: RP19–803–000.
clicking on the links or querying the
Applicants: Guardian Pipeline, L.L.C. docket number.
Description: § 4(d) Rate Filing:
Any person desiring to intervene or
Negotiated Rate PAL Agreements—
protest in any of the above proceedings
MIECO, Twin Eagle, Citadel, & Updates
must file in accordance with Rules 211
to be effective 3/4/2019.
and 214 of the Commission’s
Filed Date: 3/4/19.
Regulations (18 CFR 385.211 and
Accession Number: 20190304–5157.
385.214) on or before 5 p.m. Eastern
Comments Due: 5 p.m. ET 3/18/19.
time on the specified comment date.
Docket Numbers: RP19–804–000.
Protests may be considered, but
Applicants: UGI Sunbury, LLC.
intervention is necessary to become a
Description: § 4(d) Rate Filing: Annual party to the proceeding.
Retainage Adjustment Filing to be
eFiling is encouraged. More detailed
effective 4/1/2019.
information relating to filing
Filed Date: 3/4/19.
requirements, interventions, protests,
Accession Number: 20190304–5160.
service, and qualifying facilities filings
Comments Due: 5 p.m. ET 3/18/19.
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
Docket Numbers: RP19–801–001.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 84, Number 50 (Thursday, March 14, 2019)]
[Notices]
[Page 9328]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-04745]
[[Page 9328]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14961-000]
Renewable Energy Aggregators; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 10, 2019, Renewable Energy Aggregators, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Eastern Industries Pumped Storage Hydroelectric Project to be located
in Lehigh County, Pennsylvania. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The proposed project would consist of the following: (1) A new
upper reservoir with a surface area of 62 acres and a storage capacity
of 929.9 acre-feet at a surface elevation of approximately 1,343 feet
above mean sea level (msl) created through construction of a new
roller-compacted concrete or rock-filled dam; (2) a new lower reservoir
with a surface area of 22.3 acres and a total storage capacity of
1,337.9 acre-feet at a surface elevation of 1,057 feet msl; (3) a new
834-foot-long, 48-inch-diameter penstock connecting the upper and lower
reservoirs; (4) a new 150-foot-long, 50-foot-wide powerhouse containing
one turbine-generator unit with a total rated capacity of 20 megawatts;
(5) a new transmission line connecting the powerhouse to a nearby
electric grid interconnection point with options to evaluate multiple
grid interconnection locations; and (6) appurtenant facilities. The
proposed project would have an annual generation of 88,434 megawatt-
hours.
Applicant Contact: Adam Rousselle II, Renewable Energy Aggregators,
5710 Oak Crest Drive, Doylestown, PA 18902; phone: 215-485-1708.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14961-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14961) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: March 8, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-04745 Filed 3-13-19; 8:45 am]