Combined Notice of Filings, 9326-9327 [2019-04673]
Download as PDF
9326
Federal Register / Vol. 84, No. 50 / Thursday, March 14, 2019 / Notices
inspection and reproduction at the
address in paragraph h.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. With this notice, we are soliciting
comments on the PAD and
Commission’s staff Scoping Document 1
(SD1), as well as study requests. All
comments on the PAD and SD1, and
study requests should be sent to the
address above in paragraph h. In
addition, all comments on the PAD and
SD1, study requests, requests for
cooperating agency status, and all
communications to and from
Commission staff related to the merits of
the potential application must be filed
with the Commission.
The Commission strongly encourages
electronic filing. Please file all
documents using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2514–186.
All filings with the Commission must
bear the appropriate heading:
‘‘Comments on Pre-Application
Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by May 7, 2019.
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, this
meeting will satisfy the NEPA scoping
requirements, irrespective of whether an
EA or EIS is issued by the Commission.
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
VerDate Sep<11>2014
17:22 Mar 13, 2019
Jkt 247001
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and location of
these meetings are as follows:
Evening Scoping Meeting
Date and Time: Wednesday, April 10,
2019 at 7:00 p.m.
Location: Hampton Inn-Galax, 205
Cranberry Road, Galax, VA 24333,
Phone: (276) 238–4605.
Daytime Scoping Meeting
Date and Time: Thursday, April 11,
2019 at 9:00 a.m.
Location: Hampton Inn-Galax, 205
Cranberry Road, Galax, VA 24333,
Phone: (276) 238–4605.
SD1, which outlines the subject areas
to be addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
The applicant and Commission staff
will conduct an environmental site
review of the project on Wednesday,
April 10, 2019 at 10:00 a.m. All
participants should meet at Byllesby
Dam located at the intersection of
Byllesby Road and the New River Trail
near Ivanhoe, VA 24350; thereafter
participants should be prepared to drive
or carpool to other locations within the
project boundary. To attend the
environmental site review, please RSVP
via email to Elizabeth B. Parcell at
ebparcell@aep.com. Persons not
providing an RSVP by April 3, 2019,
will not be allowed on the
environmental site review.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public record of the project.
Dated: March 8, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–04743 Filed 3–13–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP19–103–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: Abbreviated Application
of Columbia Gas Transmission, LLC for
Authorization to Abandon Exchange
Service under Rate Schedule X–130.
Filed Date: 3/1/19.
Accession Number: 20190301–5263.
Comments Due: 5 p.m. ET 3/13/19.
Docket Numbers: CP19–104–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Abbreviated Application
for Authorization to Abandon Exchange
Service (Rate Schedule X–128) of Texas
Eastern Transmission, LP.
Filed Date: 3/1/19.
Accession Number: 20190301–5354.
Comments Due: 5 p.m. ET 3/13/19.
Docket Number: PR19–46–000.
Applicants: The Brooklyn Union Gas
Company.
E:\FR\FM\14MRN1.SGM
14MRN1
Federal Register / Vol. 84, No. 50 / Thursday, March 14, 2019 / Notices
Description: Tariff filing per
284.123(b),(e)/: REVISED STATEMENT
OF OPERATING CONDITIONS to be
effective 5/1/2019.
Filed Date: 3/4/19.
Accession Number: 201903045129.
Comments/Protests Due: 5 p.m. ET
3/25/19.
Docket Number: PR19–47–000.
Applicants: KeySpan Gas East
Corporation.
Description: Tariff filing per
284.123(b),(e)/: REVISED STATEMENT
OF OPERATING CONDITIONS to be
effective 5/1/2019.
Filed Date: 3/4/19.
Accession Number: 201903045151.
Comments/Protests Due: 5 p.m. ET
3/25/19.
Docket Numbers: RP19–809–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: PAL
NRA–NJR Energy Deal 951952 eff
3–7–19 to be effective 3/7/2019.
Filed Date: 3/6/19.
Accession Number: 20190306–5135.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: RP19–810–000.
Applicants: Tallgrass Interstate Gas
Transmission, L, Trailblazer Pipeline
Company LLC, Rockies Express Pipeline
LLC.
Description: Request for Temporary
Waiver and Extension of Time to
Implement Certain NAESB Order No.
587–Y Standards of the Tallgrass
Pipelines under RP19–810, et al.
Filed Date: 3/6/19.
Accession Number: 20190306–5145.
Comments Due: 5 p.m. ET 3/13/19.
Docket Numbers: RP19–811–000.
Applicants: Tallgrass Interstate Gas
Transmission, L, Trailblazer Pipeline
Company LLC, Rockies Express Pipeline
LLC.
Description: Request for Temporary
Waiver and Extension of Time to
Implement Certain NAESB Order No.
587–Y Standards of the Tallgrass
Pipelines under RP19–810, et al.
Filed Date: 3/6/19.
Accession Number: 20190306–5145.
Comments Due: 5 p.m. ET 3/13/19.
Docket Numbers: RP19–812–000.
Applicants: Tallgrass Interstate Gas
Transmission, L, Trailblazer Pipeline
Company LLC, Rockies Express Pipeline
LLC.
Description: Request for Temporary
Waiver and Extension of Time to
Implement Certain NAESB Order No.
587–Y Standards of the Tallgrass
Pipelines under RP19–810, et al.
Filed Date: 3/6/19.
VerDate Sep<11>2014
17:22 Mar 13, 2019
Jkt 247001
Accession Number: 20190306–5145.
Comments Due: 5 p.m. ET 3/13/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–04673 Filed 3–13–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2544–049]
Hydro Technology Systems, Inc.;
Notice of Intent to File License
Application, Filing of Pre-Application
Document, Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice Approving
the Use of the Traditional Licensing
Process.
b. Project No.: 2544–049.
c. Date Filed: December 31, 2018.
d. Submitted By: Hydro Technology
Systems, Inc.
e. Name of Project: Meyers Falls
Hydroelectric Project.
f. Location: On the Colville River near
the city of Kettle Falls, in Stevens
County, Washington. The project does
not occupy federal lands.
g. Filed Pursuant to: 18 CFR part 5 of
the Commission’s Regulations.
h. Applicant Contact: Mr. Benjamin
Hendrickson, Hydro Technology
System, Inc., P.O. Box 245, Kettle Falls,
WA 99141, (509) 993–7629.
i. FERC Contact: Maryam Zavareh at
(202) 502–8474 or email at
Maryam.zavareh@ferc.gov.
j. Hydro Technology Systems, Inc.
filed its request to use the Traditional
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
9327
Licensing Process on December 31,
2018. Hydro Technology Systems, Inc.
provided public notice of its request on
February 1, 2019. In a letter dated
March 7, 2019, the Director of the
Division of Hydropower Licensing
approved Hydro Technology Systems,
Inc.’s request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402. We are also initiating
consultation with the Washington State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. Hydro Technology Systems, Inc.
filed a Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
n. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 2544.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by December 01, 2020.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: March 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–04681 Filed 3–13–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 84, Number 50 (Thursday, March 14, 2019)]
[Notices]
[Pages 9326-9327]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-04673]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP19-103-000.
Applicants: Columbia Gas Transmission, LLC.
Description: Abbreviated Application of Columbia Gas Transmission,
LLC for Authorization to Abandon Exchange Service under Rate Schedule
X-130.
Filed Date: 3/1/19.
Accession Number: 20190301-5263.
Comments Due: 5 p.m. ET 3/13/19.
Docket Numbers: CP19-104-000.
Applicants: Texas Eastern Transmission, LP.
Description: Abbreviated Application for Authorization to Abandon
Exchange Service (Rate Schedule X-128) of Texas Eastern Transmission,
LP.
Filed Date: 3/1/19.
Accession Number: 20190301-5354.
Comments Due: 5 p.m. ET 3/13/19.
Docket Number: PR19-46-000.
Applicants: The Brooklyn Union Gas Company.
[[Page 9327]]
Description: Tariff filing per 284.123(b),(e)/: REVISED STATEMENT
OF OPERATING CONDITIONS to be effective 5/1/2019.
Filed Date: 3/4/19.
Accession Number: 201903045129.
Comments/Protests Due: 5 p.m. ET 3/25/19.
Docket Number: PR19-47-000.
Applicants: KeySpan Gas East Corporation.
Description: Tariff filing per 284.123(b),(e)/: REVISED STATEMENT
OF OPERATING CONDITIONS to be effective 5/1/2019.
Filed Date: 3/4/19.
Accession Number: 201903045151.
Comments/Protests Due: 5 p.m. ET 3/25/19.
Docket Numbers: RP19-809-000.
Applicants: Texas Eastern Transmission, LP.
Description: Sec. 4(d) Rate Filing: PAL NRA-NJR Energy Deal 951952
eff 3-7-19 to be effective 3/7/2019.
Filed Date: 3/6/19.
Accession Number: 20190306-5135.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: RP19-810-000.
Applicants: Tallgrass Interstate Gas Transmission, L, Trailblazer
Pipeline Company LLC, Rockies Express Pipeline LLC.
Description: Request for Temporary Waiver and Extension of Time to
Implement Certain NAESB Order No. 587-Y Standards of the Tallgrass
Pipelines under RP19-810, et al.
Filed Date: 3/6/19.
Accession Number: 20190306-5145.
Comments Due: 5 p.m. ET 3/13/19.
Docket Numbers: RP19-811-000.
Applicants: Tallgrass Interstate Gas Transmission, L, Trailblazer
Pipeline Company LLC, Rockies Express Pipeline LLC.
Description: Request for Temporary Waiver and Extension of Time to
Implement Certain NAESB Order No. 587-Y Standards of the Tallgrass
Pipelines under RP19-810, et al.
Filed Date: 3/6/19.
Accession Number: 20190306-5145.
Comments Due: 5 p.m. ET 3/13/19.
Docket Numbers: RP19-812-000.
Applicants: Tallgrass Interstate Gas Transmission, L, Trailblazer
Pipeline Company LLC, Rockies Express Pipeline LLC.
Description: Request for Temporary Waiver and Extension of Time to
Implement Certain NAESB Order No. 587-Y Standards of the Tallgrass
Pipelines under RP19-810, et al.
Filed Date: 3/6/19.
Accession Number: 20190306-5145.
Comments Due: 5 p.m. ET 3/13/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-04673 Filed 3-13-19; 8:45 am]
BILLING CODE 6717-01-P