Notice of Workshop: America's Water Infrastructure Act of 2018, 8702-8703 [2019-04325]
Download as PDF
amozie on DSK9F9SC42PROD with NOTICES
8702
Federal Register / Vol. 84, No. 47 / Monday, March 11, 2019 / Notices
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 3 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
VerDate Sep<11>2014
18:41 Mar 08, 2019
Jkt 247001
Dated: March 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–04331 Filed 3–8–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–1179–000]
AES ES Gilbert, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced Innovative AES ES
Gilbert, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 25,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: March 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–04314 Filed 3–8–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD19–8–000]
Notice of Workshop: America’s Water
Infrastructure Act of 2018
The Federal Energy Regulatory
Commission (FERC or Commission) staff
will hold a workshop on April 4, 2019,
from 1:00 p.m. (EDT) to 4:45 p.m. (EDT)
in the Commission Meeting Room at 888
First Street NE, Washington, DC 20426.
The workshop will be open to the
public, and all interested parties are
invited to attend and participate. The
workshop will be led by Commission
staff, and may be attended by one or
more Commissioners. The workshop
will involve roundtable discussions by
a number of panelists and moderated by
Commission staff.
The purpose of the workshop is to
explore potential opportunities for
development of closed-loop pumped
storage projects at abandoned mine sites
in compliance with section 3004 of the
America’s Water Infrastructure Act of
2018. An agenda for the workshop is
attached to this notice. There will be
time for audience questions and
comments following each agenda
discussion topic.
A free webcast of this event will be
available through www.ferc.gov. Anyone
with internet access who wants to view
this event can do so by navigating to the
Calendar of Events at www.ferc.gov and
locating this event in the Calendar. The
Capitol Connection provides technical
support for webcasts and offers the
option of listening to the workshop via
phone-bridge for a fee. If you have any
questions, visit
www.CapitolConnection.org or call (703)
993–3100.
Those interested in attending the
workshop or viewing the webcast are
encouraged to register at https://
E:\FR\FM\11MRN1.SGM
11MRN1
Federal Register / Vol. 84, No. 47 / Monday, March 11, 2019 / Notices
www.ferc.gov/whats-new/registration/
04-04-19-form.asp.
Commission workshops are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations, please send an email
to accessibility@ferc.gov, call (866) 208–
3372 (toll free) or (202) 208–8659 (TTY),
or send a FAX to (202) 208–2106 with
the required accommodations.
For more information about this
workshop, please contact: Monir
Chowdhury (Technical Information),
Office of Energy Projects, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
(202) 502–6736, monir.chowdhury@
ferc.gov.
Sarah McKinley (Logistical
Information), Office of External Affairs,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426, (202) 502–8368,
sarah.mckinley@ferc.gov.
Dated: March 5, 2019.
Kimberly D. Bose,
Secretary.
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on March 8, 2019.
Dated: February 27, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–04325 Filed 3–8–19; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2019–04326 Filed 3–8–19; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. OR19–18–000]
Federal Energy Regulatory
Commission
amozie on DSK9F9SC42PROD with NOTICES
Notice of Request for Temporary
Waiver: Sequitur Permian, LLC
Combined Notice of Filings
Take notice that on February 15, 2019,
Sequitur Permian, LLC (Sequitur
Permian) filed a petition seeking a
temporary waiver of the tariff filing and
reporting requirements of sections 6 and
20 of the Interstate Commerce Act and
parts 341 and 357 of the Commission’s
regulations. This request pertains to
certain oil pipeline facilities and
associated appurtenances to be operated
by Sequitur Permian within the State of
Texas, as more fully explained in the
petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and 385.214.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
VerDate Sep<11>2014
18:41 Mar 08, 2019
Jkt 247001
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR19–44–000.
Applicants: Enable Oklahoma
Intrastate Transmission, LLC.
Description: Tariff filing per
284.123(b),(e)+(g): Enable Revised Fuel
Percentages April 1, 2019 through
March 31, 2020 to be effective 4/1/2019.
Filed Date: 2/28/19.
Accession Number: 201902285128.
Comments Due: 5 p.m. ET 3/21/19.
284.123(g) Protests Due: 5 p.m. ET 4/
29/19.
Docket Number: PR19–45–000.
Applicants: EnLink LIG, LLC.
Description: Tariff filing per
284.123(b)(2)+(g): Petition for Rate
Approval and Amended Statement of
Operating Conditions to be effective 3/
1/2019.
Filed Date: 3/1/19.
Accession Number: 201903015283.
Comments Due: 5 p.m. ET 3/22/19.
284.123(g) Protests Due: 5 p.m. ET 4/
30/19.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
8703
Docket Numbers: RP18–1126–002.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: Compliance filing
Compliance Filing to Update Suspended
Tariff Records in Docket No. RP18–1126
to be effective 3/1/2019.
Filed Date: 2/28/19.
Accession Number: 20190228–5276.
Comments Due: 5 p.m. ET 3/12/19.
Docket Numbers: RP19–700–001.
Applicants: Natural Gas Pipeline
Company of America.
Description: Tariff Amendment:
Corrected Negotiated Rate Agreement
Filing-Macquarie Energy LLC to be
effective 4/1/2019.
Filed Date: 2/28/19.
Accession Number: 20190228–5203.
Comments Due: 5 p.m. ET 3/12/19.
Docket Numbers: RP19–746–001.
Applicants: Columbia Gas
Transmission, LLC.
Description: Tariff Amendment: TCO
Neg Rate and NC Agreement Clean-Up
(Part 2) to be effective 4/1/2019.
Filed Date: 2/28/19.
Accession Number: 20190228–5250.
Comments Due: 5 p.m. ET 3/12/19.
Docket Numbers: RP19–757–000.
Applicants: Panhandle Eastern Pipe
Line Company, LP.
Description: § 4(d) Rate Filing: Fuel
Filing on 3–1–19 to be effective 4/1/
2019.
Filed Date: 3/1/19.
Accession Number: 20190301–5006.
Comments Due: 5 p.m. ET 3/13/19.
Docket Numbers: RP19–758–000.
Applicants: Trunkline Gas Company,
LLC.
Description: § 4(d) Rate Filing: Fuel
Filing on 3–1–19 to be effective 4/1/
2019.
Filed Date: 3/1/19.
Accession Number: 20190301–5007.
Comments Due: 5 p.m. ET 3/13/19.
Docket Numbers: RP19–759–000.
Applicants: Southwest Gas Storage
Company.
Description: § 4(d) Rate Filing: Fuel
Filing on 3–1–19 to be effective 4/1/
2019.
Filed Date: 3/1/19.
Accession Number: 20190301–5008.
Comments Due: 5 p.m. ET 3/13/19.
Docket Numbers: RP19–760–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: § 4(d) Rate Filing: Fuel
Filing on 3–1–19 to be effective 4/1/
2019.
Filed Date: 3/1/19.
Accession Number: 20190301–5009.
Comments Due: 5 p.m. ET 3/13/19.
Docket Numbers: RP19–761–000.
Applicants: Rover Pipeline LLC.
E:\FR\FM\11MRN1.SGM
11MRN1
Agencies
[Federal Register Volume 84, Number 47 (Monday, March 11, 2019)]
[Notices]
[Pages 8702-8703]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-04325]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD19-8-000]
Notice of Workshop: America's Water Infrastructure Act of 2018
The Federal Energy Regulatory Commission (FERC or Commission) staff
will hold a workshop on April 4, 2019, from 1:00 p.m. (EDT) to 4:45
p.m. (EDT) in the Commission Meeting Room at 888 First Street NE,
Washington, DC 20426. The workshop will be open to the public, and all
interested parties are invited to attend and participate. The workshop
will be led by Commission staff, and may be attended by one or more
Commissioners. The workshop will involve roundtable discussions by a
number of panelists and moderated by Commission staff.
The purpose of the workshop is to explore potential opportunities
for development of closed-loop pumped storage projects at abandoned
mine sites in compliance with section 3004 of the America's Water
Infrastructure Act of 2018. An agenda for the workshop is attached to
this notice. There will be time for audience questions and comments
following each agenda discussion topic.
A free webcast of this event will be available through
www.ferc.gov. Anyone with internet access who wants to view this event
can do so by navigating to the Calendar of Events at www.ferc.gov and
locating this event in the Calendar. The Capitol Connection provides
technical support for webcasts and offers the option of listening to
the workshop via phone-bridge for a fee. If you have any questions,
visit www.CapitolConnection.org or call (703) 993-3100.
Those interested in attending the workshop or viewing the webcast
are encouraged to register at https://
[[Page 8703]]
www.ferc.gov/whats-new/registration/04-04-19-form.asp.
Commission workshops are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an email to accessibility@ferc.gov, call (866) 208-3372 (toll
free) or (202) 208-8659 (TTY), or send a FAX to (202) 208-2106 with the
required accommodations.
For more information about this workshop, please contact: Monir
Chowdhury (Technical Information), Office of Energy Projects, Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426, (202) 502-6736, monir.chowdhury@ferc.gov.
Sarah McKinley (Logistical Information), Office of External
Affairs, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426, (202) 502-8368, sarah.mckinley@ferc.gov.
Dated: March 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-04325 Filed 3-8-19; 8:45 am]
BILLING CODE 6717-01-P