Notice of Authorization for Continued Project Operation: Goodyear Lake Hydro, LLC, 8709-8710 [2019-04317]

Download as PDF Federal Register / Vol. 84, No. 47 / Monday, March 11, 2019 / Notices Additional Information Additional information about the projects are available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on General Search and enter the docket number(s) in the Docket Number field, excluding the last three digits (i.e., PF17–10 for the FM100 Project; PF19– 1 for the Leidy South Project). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. Public sessions or site visits will be posted on the Commission’s calendar located at www.ferc.gov/EventCalendar/ EventsList.aspx along with other related information. Dated: March 5, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–04318 Filed 3–8–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2388–000] amozie on DSK9F9SC42PROD with NOTICES Notice of Authorization for Continued Project Operation: City of Holyoke Gas and Electric Department On August 31, 2016, City of Holyoke Gas and Electric Department, licensee for the Holyoke No. 3 Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Holyoke No. 3 Hydroelectric Project is located between the first and second canals adjacent to the Connecticut River, in the City of Holyoke in Hampton County, Massachusetts. The license for Project No. 2388 was issued for a period ending February 20, 2019. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. VerDate Sep<11>2014 18:41 Mar 08, 2019 Jkt 247001 If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2388 is issued to the licensee for a period effective February 21, 2019 through February 20, 2020, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before February 20, 2020, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee, City of Holyoke Gas and Electric Department, Inc., is authorized to continue operation of the Holyoke No. 3 Hydroelectric Project until such time as the Commission acts on its application for a subsequent license. Dated: March 5, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–04316 Filed 3–8–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2788–000] Notice of Authorization for Continued Project Operation: Goodyear Lake Hydro, LLC On February 27, 2017, Goodyear Lake Hydro, LLC, licensee for the Colliersville Hydroelectric Project, filed an Application for a New License PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 8709 pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Colliersville Hydroelectric Project is located on the North Branch of the Susquehanna River, in the Town of Milford, Otsego County, New York. The license for Project No. 2788 was issued for a period ending February 28, 2019. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2788 is issued to the licensee for a period effective March 1, 2019 through February 28, 2020, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before February 28, 2020, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee, Goodyear Lake Hydro, LLC., is authorized to continue operation of the Colliersville Hydroelectric Project until such time as the Commission acts on its application for a subsequent license. E:\FR\FM\11MRN1.SGM 11MRN1 8710 Federal Register / Vol. 84, No. 47 / Monday, March 11, 2019 / Notices Dated: March 5, 2019. Kimberly D. Bose, Secretary. Description: § 205(d) Rate Filing: Amendment to 5 WMPAs; SA No. 3147, 3318, 3524, 4083, 3094 re: Marina to GRSP to be effective 10/11/2011. Filed Date: 3/5/19. Accession Number: 20190305–5153. Comments Due: 5 p.m. ET 3/26/19. [FR Doc. 2019–04317 Filed 3–8–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission amozie on DSK9F9SC42PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–64–000. Applicants: Canal 3 Generating LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Canal 3 Generating LLC. Filed Date: 3/5/19. Accession Number: 20190305–5197. Comments Due: 5 p.m. ET 3/26/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–2030–001. Applicants: Southwest Power Pool, Inc. Description: Compliance filing: Request for Deferral of Effective Date— Revisions to RNU Rounding Process to be effective N/A. Filed Date: 3/5/19. Accession Number: 20190305–5198. Comments Due: 5 p.m. ET 3/26/19. Docket Numbers: ER19–836–001. Applicants: El Paso Electric Company. Description: Tariff Amendment: Service Agreement No. 315, EDF PTP to be effective 5/18/2019. Filed Date: 3/5/19. Accession Number: 20190305–5133. Comments Due: 5 p.m. ET 3/26/19. Docket Numbers: ER19–1188–000. Applicants: RC Cape May Holdings, LLC. Description: Tariff Cancellation: Notice of Cancellation of Reliability Must-Run Agreement to be effective 5/1/2019. Filed Date: 3/5/19. Accession Number: 20190305–5129. Comments Due: 5 p.m. ET 3/26/19. Docket Numbers: ER19–1189–000. Applicants: RC Cape May Holdings, LLC. Description: Tariff Cancellation: RC Cape May Notice of Cancellation MBR Tariff to be effective 5/1/2019. Filed Date: 3/5/19. Accession Number: 20190305–5132. Comments Due: 5 p.m. ET 3/26/19. Docket Numbers: ER19–1190–000. Applicants: PJM Interconnection, L.L.C. VerDate Sep<11>2014 18:41 Mar 08, 2019 Jkt 247001 Docket Numbers: ER19–1191–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Brother Solar LGIA Filing to be effective 2/21/2019. Filed Date: 3/5/19. Accession Number: 20190305–5155. Comments Due: 5 p.m. ET 3/26/19. Docket Numbers: ER19–1193–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Kruger Energy North Sumter Solar LGIA Filing to be effective 2/25/2019. Filed Date: 3/5/19. Accession Number: 20190305–5157. Comments Due: 5 p.m. ET 3/26/19. Docket Numbers: ER19–1194–000. Applicants: Canal 3 Generating LLC. Description: Baseline eTariff Filing: Baseline New to be effective 3/6/2019. Filed Date: 3/5/19. Accession Number: 20190305–5191. Comments Due: 5 p.m. ET 3/26/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 5, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–04329 Filed 3–8–19; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–65–000. Applicants: Imperial Valley Solar, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of Imperial Valley Solar, LLC. Filed Date: 3/4/19. Accession Number: 20190304–5169. Comments Due: 5 p.m. ET 3/25/19. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–63–000. Applicants: AES ES Gilbert, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of AES ES Gilbert, LLC. Filed Date: 3/4/19. Accession Number: 20190304–5207. Comments Due: 5 p.m. ET 3/25/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1338–003. Applicants: Southern Indiana Gas and Electric Company. Description: Notice of Change in Status of Southern Indiana Gas and Electric Company. Filed Date: 3/4/19. Accession Number: 20190304–5198. Comments Due: 5 p.m. ET 3/25/19. Docket Numbers: ER10–1437–009. Applicants: Tampa Electric Company. Description: Notice of Change in Status of Tampa Electric Company. Filed Date: 3/4/19. Accession Number: 20190304–5203. Comments Due: 5 p.m. ET 3/25/19. Docket Numbers: ER10–2732–016; ER10–2733–016; ER10–2734–016; ER10–2736–016; ER10–2737–016; ER10–2741–016; ER10–2749–016; ER10–2752–016; ER12–2492–012; ER12–2493–012; ER12–2494–012; ER12–2495–012; ER12–2496–012; ER16–2455–006; ER16–2456–006; ER16–2457–006; ER16–2458–006; ER16–2459–006; ER18–1404–002. Applicants: Emera Energy U.S. Subsidiary No. 1, Inc, Emera Energy U.S. Subsidiary No. 2, Inc., Emera Energy Services Subsidiary No. 1 LLC, Emera Energy Services Subsidiary No. 2 LLC, Emera Energy Services Subsidiary No. 3 LLC, Emera Energy Services E:\FR\FM\11MRN1.SGM 11MRN1

Agencies

[Federal Register Volume 84, Number 47 (Monday, March 11, 2019)]
[Notices]
[Pages 8709-8710]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-04317]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2788-000]


Notice of Authorization for Continued Project Operation: Goodyear 
Lake Hydro, LLC

    On February 27, 2017, Goodyear Lake Hydro, LLC, licensee for the 
Colliersville Hydroelectric Project, filed an Application for a New 
License pursuant to the Federal Power Act (FPA) and the Commission's 
regulations thereunder. The Colliersville Hydroelectric Project is 
located on the North Branch of the Susquehanna River, in the Town of 
Milford, Otsego County, New York.
    The license for Project No. 2788 was issued for a period ending 
February 28, 2019. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2788 is issued to 
the licensee for a period effective March 1, 2019 through February 28, 
2020, or until the issuance of a new license for the project or other 
disposition under the FPA, whichever comes first. If issuance of a new 
license (or other disposition) does not take place on or before 
February 28, 2020, notice is hereby given that, pursuant to 18 CFR 
16.18(c), an annual license under section 15(a)(1) of the FPA is 
renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise.
    If the project is not subject to section 15 of the FPA, notice is 
hereby given that the licensee, Goodyear Lake Hydro, LLC., is 
authorized to continue operation of the Colliersville Hydroelectric 
Project until such time as the Commission acts on its application for a 
subsequent license.


[[Page 8710]]


    Dated: March 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-04317 Filed 3-8-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.