Combined Notice of Filings #1, 7356-7357 [2019-03740]
Download as PDF
7356
Federal Register / Vol. 84, No. 42 / Monday, March 4, 2019 / Notices
Milestone
Target date
Filing comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions .......................
Commission issues EA ...............................................................................................................................................................
Comments on EA ........................................................................................................................................................................
Filing modified terms and conditions ..........................................................................................................................................
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file, no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: February 22, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–03763 Filed 3–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–60–000.
Applicants: NedPower Mount Storm
LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of NedPower
Mount Storm, LLC.
Filed Date: 2/22/19.
Accession Number: 20190222–5195.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: EC19–61–000.
Applicants: Apple Blossom Wind,
LLC, Black Oak Wind, LLC, Cedar Creek
II, LLC, Flat Ridge 2 Wind Energy LLC,
Fowler Ridge II Wind Farm LLC,
Mehoopany Wind Energy LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Apple
Blossom Wind, LLC, et al.
Filed Date: 2/22/19.
Accession Number: 20190222–5200.
Comments Due: 5 p.m. ET 3/15/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–2342–003.
Applicants: GridLiance Heartland
LLC.
VerDate Sep<11>2014
17:33 Mar 01, 2019
Jkt 247001
Description: Compliance filing:
GridLiance Heartland LLC—ER18–2342
Compliance Filing to be effective N/A.
Filed Date: 2/22/19.
Accession Number: 20190222–5157.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1102–000.
Applicants: NextEra Energy
Transmission West, LLC.
Description: § 205(d) Rate Filing:
Revised Formula Rate Implementation
Protocols to be effective 4/24/2019.
Filed Date: 2/22/19.
Accession Number: 20190222–5102.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1103–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–02–22 Attachment X revisions for
Hybrid Interconnection to be effective
4/24/2019.
Filed Date: 2/22/19.
Accession Number: 20190222–5122.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1104–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA/SA No.
3986, Queue No. W3–099 to be effective
9/10/2018.
Filed Date: 2/22/19.
Accession Number: 20190222–5126.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1105–000.
Applicants: Central Maine Power
Company.
Description: § 205(d) Rate Filing:
Schedule 20A Service Agreements with
Brookfield Energy Marketing LP (85
MW) to be effective 1/1/2020.
Filed Date: 2/22/19.
Accession Number: 20190222–5132.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1106–000.
Applicants: The United Illuminating
Company.
Description: § 205(d) Rate Filing:
Schedule 20A Service Agreements with
Brookfield Energy Marketing LP (1 MW)
to be effective 1/1/2020.
Filed Date: 2/22/19.
Accession Number: 20190222–5133.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1107–000.
Applicants: The United Illuminating
Company.
Description: § 205(d) Rate Filing:
Schedule 20A Service Agreements with
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
April 2019.
October 2019.
November 2019.
January 2020.
Brookfield Energy Marketing LP (32
MW) to be effective 9/1/2020.
Filed Date: 2/22/19.
Accession Number: 20190222–5134.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1108–000.
Applicants: Citigroup Commodities
Canada ULC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 5/1/2019.
Filed Date: 2/22/19.
Accession Number: 20190222–5158.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1109–000.
Applicants: Windhub Solar A, LLC.
Description: Baseline eTariff Filing:
Certificate of Concurrence to CoTenancy and Shared Facilities
Agreement to be effective 2/25/2019.
Filed Date: 2/25/19.
Accession Number: 20190225–5000.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1110–000.
Applicants: Windhub Solar B, LLC.
Description: Baseline eTariff Filing:
Certificate of Concurrence to CoTenancy and Shared Facilities
Agreement to be effective 2/25/2019.
Filed Date: 2/25/19.
Accession Number: 20190225–5001.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1111–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3481
AEP and AECI Attachment AO to be
effective 5/1/2019.
Filed Date: 2/25/19.
Accession Number: 20190225–5016.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1112–000.
Applicants: Flat Ridge 2 Wind Energy
LLC, Fowler Ridge II Wind Farm LLC,
Southwestern Electric Power Company,
Indiana Michigan Power Company,
Ohio Power Company.
Description: Request for
Authorization to Make Affiliate
Transactions of Flat Ridge 2 Wind
Energy LLC, et al.
Filed Date: 2/22/19.
Accession Number: 20190222–5194.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1113–000.
Applicants: Southwestern Public
Service Company.
Description: § 205(d) Rate Filing:
SPS–GSEC–LYNGR–IA-Thunderhead708–0.0.0 to be effective 4/27/2019.
E:\FR\FM\04MRN1.SGM
04MRN1
Federal Register / Vol. 84, No. 42 / Monday, March 4, 2019 / Notices
Filed Date: 2/25/19.
Accession Number: 20190225–5050.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1114–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1910R15 Southwestern Public Service
Company NITSA NOA to be effective
2/1/2019.
Filed Date: 2/25/19.
Accession Number: 20190225–5051.
Comments Due: 5 p.m. ET 3/18/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 25, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–03740 Filed 3–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Public Meetings Soliciting Comments
on the Draft Environmental Impact
Statement for the Don Pedro and La
Grange Projects
Turlock Irrigation District
Modesto Irrigation District
Project No. 2299–082.
Project No. 14581–002.
On February 11, 2019, the
Commission issued a Notice of
Availability of the Draft Environmental
Impact Statement for the Don Pedro and
La Grange Projects. The draft EIS
documents the views of governmental
agencies, non-governmental
organizations, affected Indian tribes, the
public, the license applicants, and
Commission staff. All written comments
must be filed by April 12, 2019, and
should reference Project No. 2299–082
and Project No. 14581–002. More
information on filing comments can be
VerDate Sep<11>2014
17:33 Mar 01, 2019
Jkt 247001
found in the letter at the front of the
draft EIS or on the Commission’s
website at https://www.ferc.gov/docsfiling/efiling.asp. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed.
In addition to or in lieu of sending
written comments, you are invited to
attend public meetings that will be held
to receive comments on the draft EIS.
The daytime meeting will focus on
resource agency, Indian tribes, and nongovernmental organization comments,
while the evening meeting is primarily
for receiving input from the public. All
interested individuals and entities are
invited to attend one or both of the
public meetings. The time and location
of the meetings are as follows:
Date: Tuesday, March 26, 2019.
Time: Daytime meeting—1–4 p.m.
Pacific Daylight Time evening
meeting—7–9 p.m. Pacific Daylight
Time.
Place: Double Tree Hotel.
Address: 1150 Ninth Street, Modesto,
CA 95354.
At this meeting, resource agency
personnel and other interested persons
will have the opportunity to provide
oral and written comments and
recommendations regarding the draft
EIS. The meeting will be recorded by a
court reporter, and all statements (verbal
and written) will become part of the
Commission’s public record for the
project. This meeting is posted on the
Commission’s calendar located at https://
www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
For further information, contact Jim
Hastreiter at (503) 552–2760 or at
james.hastreiter@ferc.gov.
Dated: February 25, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–03759 Filed 3–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL19–47–000]
Notice of Complaint: Independent
Market Monitor for PJM v. PJM
Interconnection, LLC
Take notice that on February 21, 2019,
pursuant to Rule 206 of the Federal
Energy Regulatory Commission’s
(Commission) Rules and Practice and
Procedure, 18 CFR 385.206 (2018),
Monitoring Analytics, LLC, acting in its
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
7357
capacity as the Independent Market
Monitor for PJM (Complainant) filed a
formal complaint against PJM
Interconnection, L.L.C. (Respondent)
requesting that the Commission direct
Respondent to revise the expected
number of Performance Assessment
Intervals (PAI) used to set the default
Market Seller Offer Cap in Reliability
Pricing Model (RPM) auctions to a level
consistent with a reasonable and
supportable expectation of PAI, as more
fully explained in the complaint.
The Complainant states that copies of
the complaint were served on
representatives of the Respondent.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 13, 2019.
Dated: February 25, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–03766 Filed 3–1–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 84, Number 42 (Monday, March 4, 2019)]
[Notices]
[Pages 7356-7357]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-03740]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-60-000.
Applicants: NedPower Mount Storm LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of NedPower Mount Storm, LLC.
Filed Date: 2/22/19.
Accession Number: 20190222-5195.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: EC19-61-000.
Applicants: Apple Blossom Wind, LLC, Black Oak Wind, LLC, Cedar
Creek II, LLC, Flat Ridge 2 Wind Energy LLC, Fowler Ridge II Wind Farm
LLC, Mehoopany Wind Energy LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Apple Blossom Wind, LLC, et al.
Filed Date: 2/22/19.
Accession Number: 20190222-5200.
Comments Due: 5 p.m. ET 3/15/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-2342-003.
Applicants: GridLiance Heartland LLC.
Description: Compliance filing: GridLiance Heartland LLC--ER18-2342
Compliance Filing to be effective N/A.
Filed Date: 2/22/19.
Accession Number: 20190222-5157.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19-1102-000.
Applicants: NextEra Energy Transmission West, LLC.
Description: Sec. 205(d) Rate Filing: Revised Formula Rate
Implementation Protocols to be effective 4/24/2019.
Filed Date: 2/22/19.
Accession Number: 20190222-5102.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19-1103-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-02-22 Attachment X
revisions for Hybrid Interconnection to be effective 4/24/2019.
Filed Date: 2/22/19.
Accession Number: 20190222-5122.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19-1104-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of ISA/SA
No. 3986, Queue No. W3-099 to be effective 9/10/2018.
Filed Date: 2/22/19.
Accession Number: 20190222-5126.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19-1105-000.
Applicants: Central Maine Power Company.
Description: Sec. 205(d) Rate Filing: Schedule 20A Service
Agreements with Brookfield Energy Marketing LP (85 MW) to be effective
1/1/2020.
Filed Date: 2/22/19.
Accession Number: 20190222-5132.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19-1106-000.
Applicants: The United Illuminating Company.
Description: Sec. 205(d) Rate Filing: Schedule 20A Service
Agreements with Brookfield Energy Marketing LP (1 MW) to be effective
1/1/2020.
Filed Date: 2/22/19.
Accession Number: 20190222-5133.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19-1107-000.
Applicants: The United Illuminating Company.
Description: Sec. 205(d) Rate Filing: Schedule 20A Service
Agreements with Brookfield Energy Marketing LP (32 MW) to be effective
9/1/2020.
Filed Date: 2/22/19.
Accession Number: 20190222-5134.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19-1108-000.
Applicants: Citigroup Commodities Canada ULC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 5/1/2019.
Filed Date: 2/22/19.
Accession Number: 20190222-5158.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19-1109-000.
Applicants: Windhub Solar A, LLC.
Description: Baseline eTariff Filing: Certificate of Concurrence to
Co-Tenancy and Shared Facilities Agreement to be effective 2/25/2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5000.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1110-000.
Applicants: Windhub Solar B, LLC.
Description: Baseline eTariff Filing: Certificate of Concurrence to
Co-Tenancy and Shared Facilities Agreement to be effective 2/25/2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5001.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1111-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3481 AEP and AECI Attachment
AO to be effective 5/1/2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5016.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1112-000.
Applicants: Flat Ridge 2 Wind Energy LLC, Fowler Ridge II Wind Farm
LLC, Southwestern Electric Power Company, Indiana Michigan Power
Company, Ohio Power Company.
Description: Request for Authorization to Make Affiliate
Transactions of Flat Ridge 2 Wind Energy LLC, et al.
Filed Date: 2/22/19.
Accession Number: 20190222-5194.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19-1113-000.
Applicants: Southwestern Public Service Company.
Description: Sec. 205(d) Rate Filing: SPS-GSEC-LYNGR-IA-
Thunderhead-708-0.0.0 to be effective 4/27/2019.
[[Page 7357]]
Filed Date: 2/25/19.
Accession Number: 20190225-5050.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1114-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1910R15 Southwestern Public
Service Company NITSA NOA to be effective 2/1/2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5051.
Comments Due: 5 p.m. ET 3/18/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 25, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-03740 Filed 3-1-19; 8:45 am]
BILLING CODE 6717-01-P