Combined Notice of Filings #2, 7352-7353 [2019-03738]
Download as PDF
7352
Federal Register / Vol. 84, No. 42 / Monday, March 4, 2019 / Notices
Accession Number: 20190222–5098.
Comments Due: 5 p.m. ET 3/15/19.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–62–000.
Applicants: Brickyard Hills Project,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Brickyard Hills
Project, LLC.
Filed Date: 2/21/19.
Accession Number: 20190221–5262.
Comments Due: 5 p.m. ET 3/14/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–632–008;
ER14–2140 008; ER14–2141 008; ER14–
2465 009; ER14–2466 009; ER14–2939
006; ER15–1952 006; ER15–2728 008;
ER15–634 008.
Applicants: CID Solar, LLC,
Cottonwood Solar, LLC, RE Camelot
LLC, RE Columbia Two LLC, Pavant
Solar LLC, Imperial Valley Solar
Company (IVSC) 2, LLC, Maricopa West
Solar PV, LLC, Mulberry Farm, LLC,
Selmer Farm, LLC.
Description: Notice of Non-material
Change in Status of the Dominion
Companies.
Filed Date: 2/21/19.
Accession Number: 20190221–5307.
Comments Due: 5 p.m. ET 3/14/19.
Docket Numbers: ER19–709–001.
Applicants: Entergy Louisiana, LLC.
Description: Tariff Amendment:
Entergy OpCos Reactive Power Update
to be effective 1/1/2019.
Filed Date: 2/22/19.
Accession Number: 20190222–5087.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–714–001.
Applicants: Tucson Electric Power
Company.
Description: Tariff Amendment:
Request for Deferral of Commission
Action to be effective 12/31/9998.
Filed Date: 2/22/19.
Accession Number: 20190222–5038.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1097–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: Notice of cancellation of
Connection Agreement of Northern
States Power Company, a Minnesota
corporation.
Filed Date: 2/21/19.
Accession Number: 20190221–5291.
Comments Due: 5 p.m. ET 3/14/19.
Docket Numbers: ER19–1098–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–02–22_SA 3252 MRES-Deuel
VerDate Sep<11>2014
17:33 Mar 01, 2019
Jkt 247001
Harvest Wind Energy FCA (J526) to be
effective 2/12/2019.
Filed Date: 2/22/19.
Accession Number: 20190222–5012.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1099–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA, SA 3610; Queue No. AD1–
114 to be effective 1/23/2019.
Filed Date: 2/22/19.
Accession Number: 20190222–5036.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1100–000.
Applicants: SEPV Mojave West, LLC.
Description: Baseline eTariff Filing:
SFA to be effective 2/23/2019.
Filed Date: 2/22/19.
Accession Number: 20190222–5073.
Comments Due: 5 p.m. ET 3/15/19.
Docket Numbers: ER19–1101–000.
Applicants: Ontario Power Generation
Energy Trading, Inc.
Description: § 205(d) Rate Filing:
OPGET Market-Based Rate Tariff Filing
to be effective 2/23/2019.
Filed Date: 2/22/19.
Accession Number: 20190222–5093.
Comments Due: 5 p.m. ET 3/15/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
revenue requirement filing for reactive
supply and voltage control service for
its Alsey 6 Peaking Power Facility,
under Midcontinent Independent
Transmission System Operator Inc.
Tariff Schedule 2.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 15, 2019.
Dated: February 25, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–03758 Filed 3–1–19; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2019–03737 Filed 3–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
[Docket No. EL19–48–000]
Notice of Filing: Prairie Power, Inc.
Take notice that on February 22, 2019,
Prairie Power, Inc. filed a proposed
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–716–001.
Applicants: PacifiCorp.
E:\FR\FM\04MRN1.SGM
04MRN1
Federal Register / Vol. 84, No. 42 / Monday, March 4, 2019 / Notices
Description: Tariff Amendment: ESM
Construction Agreement—Milford
(update) to be effective 12/20/2018.
Filed Date: 2/25/19.
Accession Number: 20190225–5090.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–749–001.
Applicants: PacifiCorp.
Description: Tariff Amendment: ESM
Construction Agreement—Sigurd
(update) to be effective 12/20/2018.
Filed Date: 2/25/19.
Accession Number: 20190225–5088.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1115–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Maverick County WC&ID No.1
Interconnection Agreement 1st Amd &
Restated to be effective 2/1/2019.
Filed Date: 2/25/19.
Accession Number: 20190225–5065.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1116–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 5284; Queue
No. AD2–027 to be effective 1/26/2019.
Filed Date: 2/25/19.
Accession Number: 20190225–5071.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1117–000.
Applicants: Mirabito Power & Gas,
LLC.
Description: Baseline eTariff Filing:
MPG_MBR initial_tariff to be effective
3/1/2019.
Filed Date: 2/25/19.
Accession Number: 20190225–5073.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1118–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–02–25_SA 3246 Certificate of
Concurrence Entergy-Southern TIA to
be effective 1/1/2019.
Filed Date: 2/25/19.
Accession Number: 20190225–5085.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1119–000.
Applicants: Wheelabrator Ridge
Energy Inc.
Description: Tariff Cancellation:
Notice of Cancellation to be effective
2/26/2019.
Filed Date: 2/25/19.
Accession Number: 20190225–5091.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1120–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Second Revised ISA No. 3064, Queue
No. W4–009/X4–005/AD1–113 to be
effective 1/26/2019.
VerDate Sep<11>2014
17:33 Mar 01, 2019
Jkt 247001
Filed Date: 2/25/19.
Accession Number: 20190225–5102.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1121–000.
Applicants: Wabash Valley Power
Association, Inc., Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–02–25_Rate Schedule 52_AMMO–
ATXI–WVPA JPZ Revenue Allocation
Agreement to be effective 6/1/2019.
Filed Date: 2/25/19.
Accession Number: 20190225–5104.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19–1122–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Wabash Valley Power Association, Inc.
Description: § 205(d) Rate Filing:
2019–02–25_Revisions to Schs 7, 8, and
9 to add ATXI and WVPA to Zone 3B
to be effective 6/1/2019.
Filed Date: 2/25/19.
Accession Number: 20190225–5105.
Comments Due: 5 p.m. ET 3/18/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 25, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–03738 Filed 3–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD19–13–000]
Notice of Technical Conference;
Reliability Technical Conference
Take notice that the Federal Energy
Regulatory Commission (Commission)
will hold a Technical Conference on
Thursday, June 27, 2019, from 9:00 a.m.
to 5:00 p.m. This Commissioner-led
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
7353
conference will be held in the
Commission Meeting Room at the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. The purpose of the conference is
to discuss policy issues related to the
reliability of the Bulk-Power System.
The Commission will issue an agenda at
a later date in a supplemental notice.
The conference will be open for the
public to attend. There is no fee for
attendance. However, members of the
public are encouraged to preregister
online at: https://www.ferc.gov/whatsnew/registration/06-27-19-form.asp.
Those wishing to be considered for
participation in panel discussions
should submit nominations no later
than close of business on March 15,
2019 online at: https://www.ferc.gov/
whats-new/registration/06-27-19speaker-form.asp.
Information on this event will be
posted on the Calendar of Events on the
Commission’s website, https://
www.ferc.gov, prior to the event. The
conference will also be webcast and
transcribed. Anyone with internet
access who desires to listen to this event
can do so by navigating to the Calendar
of Events at https://www.ferc.gov and
locating this event in the Calendar. The
event will contain a link to the webcast.
The Capitol Connection provides
technical support for webcasts and
offers the option of listening to the
meeting via phone-bridge for a fee. If
you have any questions, visit https://
www.CapitolConnection.org or call (703)
993–3100. Transcripts of the technical
conference will be available for a fee
from Ace-Federal Reporters, Inc. at (202)
347–3700.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1 (866) 208–3372 (voice)
or (202) 502–8659 (TTY), or send a fax
to (202) 208–2106 with the required
accommodations.
For more information about this
technical conference, please contact
Lodie White (202) 502–8453,
Lodie.White@ferc.gov. For information
related to logistics, please contact Sarah
McKinley at (202) 502–8368,
Sarah.Mckinley@ferc.gov.
Dated: February 25, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–03764 Filed 3–1–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 84, Number 42 (Monday, March 4, 2019)]
[Notices]
[Pages 7352-7353]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-03738]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-716-001.
Applicants: PacifiCorp.
[[Page 7353]]
Description: Tariff Amendment: ESM Construction Agreement--Milford
(update) to be effective 12/20/2018.
Filed Date: 2/25/19.
Accession Number: 20190225-5090.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-749-001.
Applicants: PacifiCorp.
Description: Tariff Amendment: ESM Construction Agreement--Sigurd
(update) to be effective 12/20/2018.
Filed Date: 2/25/19.
Accession Number: 20190225-5088.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1115-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-Maverick County WC&ID
No.1 Interconnection Agreement 1st Amd & Restated to be effective 2/1/
2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5065.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1116-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, SA No. 5284;
Queue No. AD2-027 to be effective 1/26/2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5071.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1117-000.
Applicants: Mirabito Power & Gas, LLC.
Description: Baseline eTariff Filing: MPG_MBR initial_tariff to be
effective 3/1/2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5073.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1118-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-02-25_SA 3246
Certificate of Concurrence Entergy-Southern TIA to be effective 1/1/
2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5085.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1119-000.
Applicants: Wheelabrator Ridge Energy Inc.
Description: Tariff Cancellation: Notice of Cancellation to be
effective 2/26/2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5091.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1120-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Second Revised ISA No. 3064,
Queue No. W4-009/X4-005/AD1-113 to be effective 1/26/2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5102.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1121-000.
Applicants: Wabash Valley Power Association, Inc., Midcontinent
Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-02-25_Rate Schedule
52_AMMO-ATXI-WVPA JPZ Revenue Allocation Agreement to be effective 6/1/
2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5104.
Comments Due: 5 p.m. ET 3/18/19.
Docket Numbers: ER19-1122-000.
Applicants: Midcontinent Independent System Operator, Inc., Wabash
Valley Power Association, Inc.
Description: Sec. 205(d) Rate Filing: 2019-02-25_Revisions to Schs
7, 8, and 9 to add ATXI and WVPA to Zone 3B to be effective 6/1/2019.
Filed Date: 2/25/19.
Accession Number: 20190225-5105.
Comments Due: 5 p.m. ET 3/18/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 25, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-03738 Filed 3-1-19; 8:45 am]
BILLING CODE 6717-01-P