Notice of Early Scoping for the Capital Metro Orange Line High Capacity Transit Corridor in Austin, Texas, 6862-6863 [2019-03479]
Download as PDF
khammond on DSKBBV9HB2PROD with NOTICES
6862
Federal Register / Vol. 84, No. 40 / Thursday, February 28, 2019 / Notices
microprocessor-based systems. These
systems utilize programmed logic
equations in lieu of relays or other
mechanical components for control of
both vital and non-vital functions. The
logic does not change once a
microprocessor-based system has been
tested and locking tests are documented
on installation. Conrail proposes to
verify and test signal locking systems
and non-configurable timers controlled
by microprocessor-based equipment by
use of alternative procedures every 4
years after initial baseline testing or
program change as follows:
• Verifying the Cyclic Redundancy
Check/Check Sum/Universal Control
Number of the existing location’s
specific application logic to the
previously-tested version.
• Testing the appropriate
interconnection to the associated
signaling hardware equipment outside
of the processor (switch indication,
track indication, searchlight signal
indication, approach locking (if
external) to verify correct and intended
inputs to and outputs from the
processor are maintained.
• Analyze and compare the results of
the 4-year alternative testing with the
results of the baseline testing performed
at the location and submit the results to
FRA.
A copy of the petition, as well as any
written communications concerning the
petition, is available for review online at
www.regulations.gov and in person at
the Department of Transportation’s
Docket Operations Facility, 1200 New
Jersey Ave. SE, W12–140, Washington,
DC 20590. The Docket Operations
Facility is open from 9 a.m. to 5 p.m.,
Monday through Friday, except Federal
Holidays.
Interested parties are invited to
participate in these proceedings by
submitting written views, data, or
comments. FRA does not anticipate
scheduling a public hearing in
connection with these proceedings since
the facts do not appear to warrant a
hearing. If any interested party desires
an opportunity for oral comment, they
should notify FRA, in writing, before
the end of the comment period and
specify the basis for their request.
All communications concerning these
proceedings should identify the
appropriate docket number and may be
submitted by any of the following
methods:
• Website: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
• Fax: 202–493–2251.
• Mail: Docket Operations Facility,
U.S. Department of Transportation, 1200
VerDate Sep<11>2014
17:52 Feb 27, 2019
Jkt 247001
New Jersey Avenue SE, W12–140,
Washington, DC 20590.
• Hand Delivery: 1200 New Jersey
Avenue SE, Room W12–140,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal Holidays.
Communications received by April
15, 2019 will be considered by FRA
before final action is taken. Comments
received after that date will be
considered as far as practicable.
Anyone can search the electronic
form of any written communications
and comments received into any of our
dockets by the name of the individual
submitting the comment (or signing the
document, if submitted on behalf of an
association, business, labor union, etc.).
In accordance with 5 U.S.C. 553(c), DOT
solicits comments from the public to
better inform its processes. DOT posts
these comments, without edit, including
any personal information the
commenter provides, to
www.regulations.gov, as described in
the system of records notice (DOT/ALL–
14 FDMS), which can be reviewed at
www.dot.gov/privacy. See also https://
www.regulations.gov/#!privacyNotice
for the privacy notice of regulations.gov.
DEPARTMENT OF TRANSPORTATION
project study area, alternatives being
considered, public participation and
outreach methods, relevant
transportation and community impacts
and benefits being considered, potential
environmental impacts, and the
projected capital and operating costs of
the project.
DATES: The public may learn more about
the Orange Line HCT Corridor and
provide comments at an early scoping
meeting scheduled for: Monday, April 8,
2019, 3:00 to 7:00 p.m. Central Time at
Austin Central Library, 710 W Cesar
Chavez St., Austin, TX 78701.
Capital Metro is also providing notice
of this early scoping meeting on Capital
Metro’s website (capmetro.org) and in
the following publications:
• Austin American Statesman
• Community Impact Newspaper
• The Villager Newspaper
• The LaPrensa Newspaper
ADDRESSES: Public comments will be
accepted at the early scoping meeting.
In addition, comments may be sent
electronically to: orangelinefeedback@
projectconnect.com. Comments may be
mailed to: Capital Metro Project Connect
Office, Orange Line HCT Corridor
Comments, 607 Congress Avenue,
Austin, TX 78701. All comments are
requested by May 24, 2019.
The meeting location is accessible to
persons with disabilities. If translation,
signing services, or other special
accommodations are needed, please
contact Courtney Black at (512) 457–
1244 via email at courtney.black@
capmetro.org.
Federal Transit Administration
FOR FURTHER INFORMATION CONTACT:
Issued in Washington, DC.
Robert C. Lauby,
Associate Administrator for Railroad Safety,
Chief Safety Officer.
[FR Doc. 2019–03451 Filed 2–27–19; 8:45 am]
BILLING CODE 4910–06–P
Notice of Early Scoping for the Capital
Metro Orange Line High Capacity
Transit Corridor in Austin, Texas
Federal Transit Administration
(FTA), DOT.
ACTION: Notice of early scoping meeting.
AGENCY:
The Federal Transit
Administration (FTA) and the Capital
Metropolitan Transportation Authority
(Capital Metro) of Austin, Texas issue
this early scoping notice to advise other
agencies and the public that they intend
to conduct early scoping for the Orange
Line High Capacity Transit (HCT)
Corridor. The Orange Line HCT Corridor
is the 21-mile corridor used for Capital
Metro’s MetroRapid 801 from Tech
Ridge to Southpark Meadows. The
entire 21-mile corridor is being
proposed for HCT dedicated pathways.
This notice invites public input to
ongoing planning efforts for the Orange
Line HCT Corridor by commenting on
the project’s purpose and need, the
SUMMARY:
PO 00000
Frm 00098
Fmt 4703
Sfmt 4703
Terence Plaskon, FTA, phone: (817)
978–0573, email: terence.plaskon@
dot.gov or Joe Clemens, AICP, Capital
Metro, phone: (512) 369–6515, email:
joe.clemens@capmetro.org.
SUPPLEMENTARY INFORMATION: The
Orange Line HCT Corridor is included
in Capital Metro’s Project Connect LongTerm Vision Plan. Project Connect
developed specifically targeted
solutions that address existing service
deficiencies and identified HCT
investments that would add mobility
options for the Central Texas region.
Early scoping for the Orange Line HCT
Corridor builds on previous Project
Connect planning efforts and will
examine potential alternatives to
provide HCT in the Central Texas
region.
The early scoping process is intended
to support the formal National
Environmental Policy Act (NEPA)
scoping process. In addition, early
scoping supports FTA planning
requirements associated with the
E:\FR\FM\28FEN1.SGM
28FEN1
Federal Register / Vol. 84, No. 40 / Thursday, February 28, 2019 / Notices
Capital Investment Grant funding
program. Capital Metro will comply
with all relevant FTA requirements
related to planning and project
development to help analyze and screen
alternatives in preparation for the NEPA
process.
khammond on DSKBBV9HB2PROD with NOTICES
Early Scoping
Early Scoping is an optional early step
in the NEPA process that precedes
formal scoping, which begins when FTA
publishes a notice of intent to prepare
an environmental impact statement
(EIS). FTA encourages the use of early
scoping for major planning activities
that may receive FTA funding to start
the NEPA process during earlier project
planning phases. Early scoping is
intended to generate public and agency
review and comments on the scope of a
planning effort within a defined
transportation corridor, which helps the
agency to determine which alignment
variations should receive more focused
development to streamline the NEPA
process. Early scoping can serve not
only to streamline the NEPA process,
but also to firmly link transportation
planning and NEPA, ensuring that the
public and interested agencies are given
the opportunity to review and provide
comments on the results of planning
activities that can then be used to
inform the NEPA process.
Project Connect Long-Term Vision Plan
Over the last 30 months, Capital
Metro has been conducting the Project
Connect System Plan per general
guidelines of the Federal Planning and
Environmental Linkages (PEL) process.
Capital Metro intends to formalize the
PEL process with the initiation of early
scoping for the Orange Line HCT
Corridor, so that the results of the PEL
may be considered during the formal
NEPA environmental review process.
Under this PEL process, Capital Metro
will analyze alternatives that could be
considered in an EIS, if warranted. The
alternatives analysis will document the
project’s purpose and need, analyze a
range of reasonable, feasible, and
prudent alternatives, and identify a
locally preferred alternative (LPA) in
accordance with the Council on
Environmental Quality’s and FTA’s
regulations and guidance for
implementing NEPA (40 CFR 1501.2
through 1501.8 and 23 CFR 771.111,
respectively), which encourages Federal
agencies to initiate NEPA early in their
planning processes.
Early scoping allows the scoping
process to begin as soon as there is
enough information to describe the
proposal so that the public and relevant
agencies can participate effectively. This
VerDate Sep<11>2014
17:52 Feb 27, 2019
Jkt 247001
notice opens early scoping and invites
public and agency involvement with
ongoing planning activities and studies
for the Orange Line HCT Corridor,
including review of the (a) purpose and
need, (b) the proposed alternatives, and
(c) the potential environmental,
transportation, and community impacts
and benefits to consider during the
NEPA process.
Purpose and Need for the Proposed
Project
Capital Metro invites comments on
the following preliminary statement of
the project’s purpose and need: The
purpose of the project is to build a
north-south transit corridor that
provides faster, more reliable travel to,
from, and within Central Austin and the
surrounding region. The purpose is in
response to the following needs in the
corridor:
• Growth affecting all travel modes
and travel times;
• limited ability to increase roadway
width;
• the need to provide better transit
options linking affordable housing and
jobs;
• the need to connect activity centers
and manage future growth with better
transit;
• create a central corridor for a better
regional transit system; and
• ensure inter-operability between the
Orange Line and future corridors.
Potential Alternatives
During the early scoping process, all
reasonable alternatives under
consideration will be evaluated in terms
of their transportation impacts, capital
and operating costs, social, economic,
and environmental impacts, and
technical consideration. Capital Metro
will continue to analyze alternative
transit modes, alignment, and design
options for HCT in the Orange Line
Corridor. Capital Metro will seek to
identify a broad range of alternatives,
consistent with the project’s purpose
and need. The alternatives will include
a No Build Alternative, as well as the
following proposed alternatives:
• Baseline Alternative (MetroRapid 801
with transit speed and reliability
improvements)
• Dedicated Pathways Bus Rapid
Transit (BRT)
• Dedicated Pathways Light Rail Transit
(LRT)
• Dedicated Pathways Autonomous
Rapid Transit (ART)
At the end of the early scoping
process, FTA and Capital Metro
anticipate identifying a preferred mode
and alignment as the LPA for further
PO 00000
Frm 00099
Fmt 4703
Sfmt 4703
6863
evaluation during the formal NEPA
process. If an EIS is warranted, FTA will
publish a Notice of Intent in the Federal
Register and the public and interested
agencies will have the opportunity to
participate in a review and comment
period on the scope of the EIS.
Robert C. Patrick,
Regional Administrator, FTA Region VI.
[FR Doc. 2019–03479 Filed 2–27–19; 8:45 am]
BILLING CODE 4910–57–P
DEPARTMENT OF TRANSPORTATION
Office of the Secretary
[Docket No. DOT–OST–2015–0221]
Agency Information Collection
Activities: Reinstatement of a
Previously Approved Collection of
Information
Office of the Secretary of
Transportation (OST), U.S. Department
of Transportation (DOT).
ACTION: 30-Day notice and request for
comments.
AGENCY:
The Department of
Transportation (DOT) invites public
comments on our intention to request
Office of Management and Budget
(OMB) approval to renew an
information collection (OMB Control
Number 2105–0563) in accordance with
the requirements of the Paperwork
Reduction Act of 1995. The collection is
necessary for administration of the
BUILD Transportation Discretionary
Grants Program. BUILD Transportation
grants support surface transportation
infrastructure projects that have a
significant local or regional impact. A
60-day Federal Register notice was
published on December 28, 2018 (83 FR
67484). Since the publication of the 60day Federal Register notice, no
comments were received to the Docket
(DOT–OST–2015–0221) and therefore
no review of comments was required, so
none was performed by the Department.
DATES: Written comments should be
submitted by: April 1, 2019.
ADDRESSES: To ensure that you do not
duplicate your docket submissions,
please submit them by only one of the
following means:
• Federal eRulemaking Portal: Go to
https://www.regulations.gov and follow
the online instructions for submitting
comments.
• Mail: Docket Management Facility,
U.S. Department of Transportation, 1200
New Jersey Ave. SE, West Building
Ground Floor, Room W12–140,
Washington, DC 20590–0001.
SUMMARY:
E:\FR\FM\28FEN1.SGM
28FEN1
Agencies
[Federal Register Volume 84, Number 40 (Thursday, February 28, 2019)]
[Notices]
[Pages 6862-6863]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-03479]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Transit Administration
Notice of Early Scoping for the Capital Metro Orange Line High
Capacity Transit Corridor in Austin, Texas
AGENCY: Federal Transit Administration (FTA), DOT.
ACTION: Notice of early scoping meeting.
-----------------------------------------------------------------------
SUMMARY: The Federal Transit Administration (FTA) and the Capital
Metropolitan Transportation Authority (Capital Metro) of Austin, Texas
issue this early scoping notice to advise other agencies and the public
that they intend to conduct early scoping for the Orange Line High
Capacity Transit (HCT) Corridor. The Orange Line HCT Corridor is the
21-mile corridor used for Capital Metro's MetroRapid 801 from Tech
Ridge to Southpark Meadows. The entire 21-mile corridor is being
proposed for HCT dedicated pathways.
This notice invites public input to ongoing planning efforts for
the Orange Line HCT Corridor by commenting on the project's purpose and
need, the project study area, alternatives being considered, public
participation and outreach methods, relevant transportation and
community impacts and benefits being considered, potential
environmental impacts, and the projected capital and operating costs of
the project.
DATES: The public may learn more about the Orange Line HCT Corridor and
provide comments at an early scoping meeting scheduled for: Monday,
April 8, 2019, 3:00 to 7:00 p.m. Central Time at Austin Central
Library, 710 W Cesar Chavez St., Austin, TX 78701.
Capital Metro is also providing notice of this early scoping
meeting on Capital Metro's website (capmetro.org) and in the following
publications:
Austin American Statesman
Community Impact Newspaper
The Villager Newspaper
The LaPrensa Newspaper
ADDRESSES: Public comments will be accepted at the early scoping
meeting. In addition, comments may be sent electronically to:
orangelinefeedback@projectconnect.com. Comments may be mailed to:
Capital Metro Project Connect Office, Orange Line HCT Corridor
Comments, 607 Congress Avenue, Austin, TX 78701. All comments are
requested by May 24, 2019.
The meeting location is accessible to persons with disabilities. If
translation, signing services, or other special accommodations are
needed, please contact Courtney Black at (512) 457-1244 via email at
capmetro.org">courtney.black@capmetro.org.
FOR FURTHER INFORMATION CONTACT: Terence Plaskon, FTA, phone: (817)
978-0573, email: terence.plaskon@dot.gov or Joe Clemens, AICP, Capital
Metro, phone: (512) 369-6515, email: capmetro.org">joe.clemens@capmetro.org.
SUPPLEMENTARY INFORMATION: The Orange Line HCT Corridor is included in
Capital Metro's Project Connect Long-Term Vision Plan. Project Connect
developed specifically targeted solutions that address existing service
deficiencies and identified HCT investments that would add mobility
options for the Central Texas region. Early scoping for the Orange Line
HCT Corridor builds on previous Project Connect planning efforts and
will examine potential alternatives to provide HCT in the Central Texas
region.
The early scoping process is intended to support the formal
National Environmental Policy Act (NEPA) scoping process. In addition,
early scoping supports FTA planning requirements associated with the
[[Page 6863]]
Capital Investment Grant funding program. Capital Metro will comply
with all relevant FTA requirements related to planning and project
development to help analyze and screen alternatives in preparation for
the NEPA process.
Early Scoping
Early Scoping is an optional early step in the NEPA process that
precedes formal scoping, which begins when FTA publishes a notice of
intent to prepare an environmental impact statement (EIS). FTA
encourages the use of early scoping for major planning activities that
may receive FTA funding to start the NEPA process during earlier
project planning phases. Early scoping is intended to generate public
and agency review and comments on the scope of a planning effort within
a defined transportation corridor, which helps the agency to determine
which alignment variations should receive more focused development to
streamline the NEPA process. Early scoping can serve not only to
streamline the NEPA process, but also to firmly link transportation
planning and NEPA, ensuring that the public and interested agencies are
given the opportunity to review and provide comments on the results of
planning activities that can then be used to inform the NEPA process.
Project Connect Long-Term Vision Plan
Over the last 30 months, Capital Metro has been conducting the
Project Connect System Plan per general guidelines of the Federal
Planning and Environmental Linkages (PEL) process. Capital Metro
intends to formalize the PEL process with the initiation of early
scoping for the Orange Line HCT Corridor, so that the results of the
PEL may be considered during the formal NEPA environmental review
process.
Under this PEL process, Capital Metro will analyze alternatives
that could be considered in an EIS, if warranted. The alternatives
analysis will document the project's purpose and need, analyze a range
of reasonable, feasible, and prudent alternatives, and identify a
locally preferred alternative (LPA) in accordance with the Council on
Environmental Quality's and FTA's regulations and guidance for
implementing NEPA (40 CFR 1501.2 through 1501.8 and 23 CFR 771.111,
respectively), which encourages Federal agencies to initiate NEPA early
in their planning processes.
Early scoping allows the scoping process to begin as soon as there
is enough information to describe the proposal so that the public and
relevant agencies can participate effectively. This notice opens early
scoping and invites public and agency involvement with ongoing planning
activities and studies for the Orange Line HCT Corridor, including
review of the (a) purpose and need, (b) the proposed alternatives, and
(c) the potential environmental, transportation, and community impacts
and benefits to consider during the NEPA process.
Purpose and Need for the Proposed Project
Capital Metro invites comments on the following preliminary
statement of the project's purpose and need: The purpose of the project
is to build a north-south transit corridor that provides faster, more
reliable travel to, from, and within Central Austin and the surrounding
region. The purpose is in response to the following needs in the
corridor:
Growth affecting all travel modes and travel times;
limited ability to increase roadway width;
the need to provide better transit options linking
affordable housing and jobs;
the need to connect activity centers and manage future
growth with better transit;
create a central corridor for a better regional transit
system; and
ensure inter-operability between the Orange Line and
future corridors.
Potential Alternatives
During the early scoping process, all reasonable alternatives under
consideration will be evaluated in terms of their transportation
impacts, capital and operating costs, social, economic, and
environmental impacts, and technical consideration. Capital Metro will
continue to analyze alternative transit modes, alignment, and design
options for HCT in the Orange Line Corridor. Capital Metro will seek to
identify a broad range of alternatives, consistent with the project's
purpose and need. The alternatives will include a No Build Alternative,
as well as the following proposed alternatives:
Baseline Alternative (MetroRapid 801 with transit speed and
reliability improvements)
Dedicated Pathways Bus Rapid Transit (BRT)
Dedicated Pathways Light Rail Transit (LRT)
Dedicated Pathways Autonomous Rapid Transit (ART)
At the end of the early scoping process, FTA and Capital Metro
anticipate identifying a preferred mode and alignment as the LPA for
further evaluation during the formal NEPA process. If an EIS is
warranted, FTA will publish a Notice of Intent in the Federal Register
and the public and interested agencies will have the opportunity to
participate in a review and comment period on the scope of the EIS.
Robert C. Patrick,
Regional Administrator, FTA Region VI.
[FR Doc. 2019-03479 Filed 2-27-19; 8:45 am]
BILLING CODE 4910-57-P