Biweekly Notice; Applications and Amendments To Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 6176-6183 [2019-02934]
Download as PDF
6176
Federal Register / Vol. 84, No. 38 / Tuesday, February 26, 2019 / Notices
• Email comments to: UNCChurchRockEIS.resource@nrc.gov
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Ashley Waldron, Office of Nuclear
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–7317; email: Ashley.Waldron@
nrc.gov.
SUPPLEMENTARY INFORMATION: In the FR
on February 8, 2019, in FR Doc. 2019–
01642, on page 2935, in the third
column, under the last paragraph, last
line in Section II, ‘‘Background,’’ correct
‘‘ADAMS Package Accession No.
ML18360A424’’ to read ‘‘ADAMS
Accession No. ML19007A126.’’ The
document is also referenced in the last
line of the Document table in Section
VII, Availability of Documents, correct
‘‘ML18360A424 (Package)’’ to read
‘‘ML19007A126.’’
Dated at Rockville, Maryland, on February
21, 2019.
For the U.S. Nuclear Regulatory
Commission.
Michael F. King,
Director, Division of Fuel Cycle Safety,
Safeguards, and Environmental Review,
Office of Nuclear Material Safety, and
Safeguards.
[FR Doc. 2019–03300 Filed 2–25–19; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2019–0058]
Biweekly Notice; Applications and
Amendments To Facility Operating
Licenses and Combined Licenses
Involving No Significant Hazards
Considerations
such amendment involves no significant
hazards consideration, notwithstanding
the pendency before the Commission of
a request for a hearing from any person.
This biweekly notice includes all
notices of amendments issued, or
proposed to be issued, from January 29,
2019, to February 11, 2019. The last
biweekly notice was published on
February 12, 2019.
DATES: Comments must be filed by
March 28, 2019. A request for a hearing
must be filed by April 29, 2019.
Comments received after this date will
be considered if it is practical to do so,
but the Commission is able to ensure
consideration only for comments
received before this date.
ADDRESSES: You may submit comments
by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID INSERT: NRC–2019–0058.
Address questions about Docket IDs in
Regulations.gov to Krupskaya Castellon;
telephone: 301–287–9221; email:
Krupskaya.Castellon@nrc.gov. For
technical questions, contact the
individual(s) listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Office of
Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, ATTN: Program Management,
Announcements and Editing Staff.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Lynn Ronewicz, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington DC
20555–0001; telephone: 301–415–1927,
email: Lynn.Ronewicz@nrc.gov.
SUPPLEMENTARY INFORMATION:
AGENCY:
I. Obtaining Information and
Submitting Comments
Pursuant to the Atomic
Energy Act of 1954, as amended (the
Act), the U.S. Nuclear Regulatory
Commission (NRC) is publishing this
regular biweekly notice. The Act
requires the Commission to publish
notice of any amendments issued, or
proposed to be issued, and grants the
Commission the authority to issue and
make immediately effective any
amendment to an operating license or
combined license, as applicable, upon a
determination by the Commission that
A. Obtaining Information
Please refer to Docket ID INSERT:
NRC–2019–0058, facility name, unit
number(s), plant docket number,
application date, and subject when
contacting the NRC about the
availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID INSERT: NRC–2019–0058.
• NRC’s Agencywide Documents
Access and Management System
Nuclear Regulatory
Commission.
ACTION: Biweekly notice.
SUMMARY:
VerDate Sep<11>2014
16:24 Feb 25, 2019
Jkt 247001
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced (if it is
available in ADAMS) is provided the
first time that it is mentioned in this
document
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2019–
0058, facility name, unit number(s),
plant docket number, application date,
and subject in your comment
submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Background
Pursuant to Section 189a.(2) of the
Atomic Energy Act of 1954, as amended
(the Act), the U.S. Nuclear Regulatory
Commission (NRC) is publishing this
regular biweekly notice. The Act
requires the Commission to publish
notice of any amendments issued, or
proposed to be issued, and grants the
Commission the authority to issue and
make immediately effective any
amendment to an operating license or
combined license, as applicable, upon a
determination by the Commission that
such amendment involves no significant
hazards consideration, notwithstanding
E:\FR\FM\26FEN1.SGM
26FEN1
Federal Register / Vol. 84, No. 38 / Tuesday, February 26, 2019 / Notices
the pendency before the Commission of
a request for a hearing from any person.
III. Notice of Consideration of Issuance
of Amendments to Facility Operating
Licenses and Combined Licenses and
Proposed No Significant Hazards
Consideration Determination
The Commission has made a
proposed determination that the
following amendment requests involve
no significant hazards consideration.
Under the Commission’s regulations in
§ 50.92 of title 10 of the Code of Federal
Regulations (10 CFR), this means that
operation of the facility in accordance
with the proposed amendment would
not (1) involve a significant increase in
the probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. The basis for this
proposed determination for each
amendment request is shown below.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period if circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example in
derating or shutdown of the facility. If
the Commission takes action prior to the
expiration of either the comment period
or the notice period, it will publish in
the Federal Register a notice of
issuance. If the Commission makes a
final no significant hazards
consideration determination, any
hearing will take place after issuance.
The Commission expects that the need
to take this action will occur very
infrequently.
A. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this notice, any persons
(petitioner) whose interest may be
affected by this action may file a request
VerDate Sep<11>2014
16:24 Feb 25, 2019
Jkt 247001
for a hearing and petition for leave to
intervene (petition) with respect to the
action. Petitions shall be filed in
accordance with the Commission’s
‘‘Agency Rules of Practice and
Procedure’’ in 10 CFR part 2. Interested
persons should consult a current copy
of 10 CFR 2.309. The NRC’s regulations
are accessible electronically from the
NRC Library on the NRC’s website at
https://www.nrc.gov/reading-rm/doccollections/cfr/. Alternatively, a copy of
the regulations is available at the NRC’s
Public Document Room, located at One
White Flint North, Room O1–F21, 11555
Rockville Pike (first floor), Rockville,
Maryland 20852. If a petition is filed,
the Commission or a presiding officer
will rule on the petition and, if
appropriate, a notice of a hearing will be
issued.
As required by 10 CFR 2.309(d) the
petition should specifically explain the
reasons why intervention should be
permitted with particular reference to
the following general requirements for
standing: (1) The name, address, and
telephone number of the petitioner; (2)
the nature of the petitioner’s right under
the Act to be made a party to the
proceeding; (3) the nature and extent of
the petitioner’s property, financial, or
other interest in the proceeding; and (4)
the possible effect of any decision or
order which may be entered in the
proceeding on the petitioner’s interest.
In accordance with 10 CFR 2.309(f),
the petition must also set forth the
specific contentions which the
petitioner seeks to have litigated in the
proceeding. Each contention must
consist of a specific statement of the
issue of law or fact to be raised or
controverted. In addition, the petitioner
must provide a brief explanation of the
bases for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner must also
provide references to the specific
sources and documents on which the
petitioner intends to rely to support its
position on the issue. The petition must
include sufficient information to show
that a genuine dispute exists with the
applicant or licensee on a material issue
of law or fact. Contentions must be
limited to matters within the scope of
the proceeding. The contention must be
one which, if proven, would entitle the
petitioner to relief. A petitioner who
fails to satisfy the requirements at 10
CFR 2.309(f) with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
6177
limitations in the order granting leave to
intervene. Parties have the opportunity
to participate fully in the conduct of the
hearing with respect to resolution of
that party’s admitted contentions,
including the opportunity to present
evidence, consistent with the NRC’s
regulations, policies, and procedures.
Petitions must be filed no later than
60 days from the date of publication of
this notice. Petitions and motions for
leave to file new or amended
contentions that are filed after the
deadline will not be entertained absent
a determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i) through (iii). The petition
must be filed in accordance with the
filing instructions in the ‘‘Electronic
Submissions (E-Filing)’’ section of this
document.
If a hearing is requested, and the
Commission has not made a final
determination on the issue of no
significant hazards consideration, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to
establish when the hearing is held. If the
final determination is that the
amendment request involves no
significant hazards consideration, the
Commission may issue the amendment
and make it immediately effective,
notwithstanding the request for a
hearing. Any hearing would take place
after issuance of the amendment. If the
final determination is that the
amendment request involves a
significant hazards consideration, then
any hearing held would take place
before the issuance of the amendment
unless the Commission finds an
imminent danger to the health or safety
of the public, in which case it will issue
an appropriate order or rule under 10
CFR part 2.
A State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1). The petition
should state the nature and extent of the
petitioner’s interest in the proceeding.
The petition should be submitted to the
Commission no later than 60 days from
the date of publication of this notice.
The petition must be filed in accordance
with the filing instructions in the
‘‘Electronic Submissions (E-Filing)’’
section of this document, and should
meet the requirements for petitions set
forth in this section, except that under
10 CFR 2.309(h)(2) a State, local
governmental body, or Federallyrecognized Indian Tribe, or agency
thereof does not need to address the
E:\FR\FM\26FEN1.SGM
26FEN1
6178
Federal Register / Vol. 84, No. 38 / Tuesday, February 26, 2019 / Notices
standing requirements in 10 CFR
2.309(d) if the facility is located within
its boundaries. Alternatively, a State,
local governmental body, Federallyrecognized Indian Tribe, or agency
thereof may participate as a non-party
under 10 CFR 2.315(c).
If a hearing is granted, any person
who is not a party to the proceeding and
is not affiliated with or represented by
a party may, at the discretion of the
presiding officer, be permitted to make
a limited appearance pursuant to the
provisions of 10 CFR 2.315(a). A person
making a limited appearance may make
an oral or written statement of his or her
position on the issues but may not
otherwise participate in the proceeding.
A limited appearance may be made at
any session of the hearing or at any
prehearing conference, subject to the
limits and conditions as may be
imposed by the presiding officer. Details
regarding the opportunity to make a
limited appearance will be provided by
the presiding officer if such sessions are
scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing and petition for
leave to intervene (petition), any motion
or other document filed in the
proceeding prior to the submission of a
request for hearing or petition to
intervene, and documents filed by
interested governmental entities that
request to participate under 10 CFR
2.315(c), must be filed in accordance
with the NRC’s E-Filing rule (72 FR
49139; August 28, 2007, as amended at
77 FR 46562; August 3, 2012). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Detailed guidance on
making electronic submissions may be
found in the Guidance for Electronic
Submissions to the NRC and on the NRC
website at https://www.nrc.gov/site-help/
e-submittals.html. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to (1) request a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
submissions and access the E-Filing
system for any proceeding in which it
VerDate Sep<11>2014
16:24 Feb 25, 2019
Jkt 247001
is participating; and (2) advise the
Secretary that the participant will be
submitting a petition or other
adjudicatory document (even in
instances in which the participant, or its
counsel or representative, already holds
an NRC-issued digital ID certificate).
Based upon this information, the
Secretary will establish an electronic
docket for the hearing in this proceeding
if the Secretary has not already
established an electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public website at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. Once a participant
has obtained a digital ID certificate and
a docket has been created, the
participant can then submit
adjudicatory documents. Submissions
must be in Portable Document Format
(PDF). Additional guidance on PDF
submissions is available on the NRC’s
public website at https://www.nrc.gov/
site-help/electronic-sub-ref-mat.html. A
filing is considered complete at the time
the document is submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the document on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before adjudicatory
documents are filed so that they can
obtain access to the documents via the
E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC’s Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s public website at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 6 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
documents in paper format. Such filings
must be submitted by: (1) First class
mail addressed to the Office of the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, 11555 Rockville Pike,
Rockville, Maryland 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing adjudicatory
documents in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
adams.nrc.gov/ehd, unless excluded
pursuant to an order of the Commission
or the presiding officer. If you do not
have an NRC-issued digital ID certificate
as described above, click ‘‘Cancel’’
when the link requests certificates and
you will be automatically directed to the
NRC’s electronic hearing dockets where
you will be able to access any publicly
available documents in a particular
hearing docket. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
personal phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. For example, in some
instances, individuals provide home
addresses in order to demonstrate
proximity to a facility or site. With
respect to copyrighted works, except for
limited excerpts that serve the purpose
of the adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
For further details with respect to
these license amendment applications,
see the application for amendment
which is available for public inspection
E:\FR\FM\26FEN1.SGM
26FEN1
Federal Register / Vol. 84, No. 38 / Tuesday, February 26, 2019 / Notices
in ADAMS and at the NRC’s PDR. For
additional direction on accessing
information related to this document,
see the ‘‘Obtaining Information and
Submitting Comments’’ section of this
document.
Duke Energy Progress, LLC, Docket Nos.
50–325 and 50–324, Brunswick Steam
Electric Plant, Units 1 and 2, Brunswick
County, North Carolina
Date of amendment request:
December 14, 2018. A publicly-available
version is in ADAMS under Accession
No. ML18353A951.
Description of amendment request:
The amendments would modify
requirements for repetitive verification
of the status of locked, sealed, or
secured components to allow the
verification to be done by use of
administrative means consistent with
Technical Specifications Task Force
(TSTF) Traveler 269, Revision 2, ‘‘Allow
Administrative Means of Position
Verification for Locked or Sealed
Valves.’’
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change modifies Technical
Specification (TS) 3.6.1.3, ‘‘Primary
Containment Isolation Valves (PCIVs)’’ and
TS 3.6.4.2, ‘‘Secondary Containment
Isolation Dampers (SCIDs).’’ These
specifications require penetration flow paths
with inoperable isolation devices be isolated
and periodically verified to be isolated.
Consistent with TSTF–269–A, Revision 2,
notes are proposed to be added to TS 3.6.1.3,
Required Actions A.2 and C.2, and TS
3.6.4.2, Required Action A.2, to allow
isolation devices that are locked, sealed, or
otherwise secured to be verified using
administrative means.
The proposed change does not affect any
plant equipment, test methods, or plant
operation, and is not an initiator of any
analyzed accident sequence. The inoperable
containment penetrations will continue to be
isolated, and hence perform their isolation
function. Operation in accordance with the
proposed TSs will ensure that all analyzed
accidents will continue to be mitigated as
previously analyzed. Therefore, the proposed
change does not involve a significant
increase in the probability or consequences
of an accident previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
VerDate Sep<11>2014
16:24 Feb 25, 2019
Jkt 247001
The proposed change does not involve a
physical alteration to the plant (i.e., no new
or different type of equipment will be
installed) or a change to the methods
governing normal plant operation.
Furthermore, the change does not alter the
assumptions made in the safety analysis.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed change will not affect
operation of plant equipment or the function
of any equipment assumed in the accident
analysis. Affected containment penetrations
will continue to be isolated as required by
the existing TSs. Therefore, the proposed
change does not involve a significant
reduction in safety margin.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Kathryn B.
Nolan, Deputy General Counsel, Duke
Energy Corporation, 550 South Tryon
Street, Mail Code DEC45A, Charlotte,
NC 28202.
Entergy Operations, Inc., Docket No. 50–
313, Arkansas Nuclear One, Unit 1
(ANO–1), Pope County, Arkansas
Date of amendment request:
December 19, 2018. A publicly-available
version is in ADAMS under Accession
No. ML18353B044.
Description of amendment request:
The amendment would revise the ANO–
1 Technical Specifications (TSs) to
adopt Technical Specifications Task
Force (TSTF) Traveler TSTF–567,
Revision 1, ‘‘Add Containment Sump
TS to Address GSI [Generic Safety
Issue]–191 Issues.’’
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change adds a new
specification to the TS for the reactor
building sump. An existing SR [surveillance
requirement] on the reactor building sump is
moved to the new specification and a
duplicative requirement to perform the SR in
TS 3.5.3 is removed. The new specification
retains the existing requirements on the
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
6179
reactor building sump and the actions to be
taken when the reactor building sump is
inoperable with the exception of adding new
actions to be taken when the reactor building
sump is inoperable due to reactor building
accident generated and transported debris
exceeding the analyzed limits. The new
action provides time to evaluate and correct
the condition instead of requiring an
immediate plant shutdown.
The reactor building sump is not an
initiator of any accident previously
evaluated. The reactor building sump is a
passive component and the proposed change
does not increase the likelihood of the
malfunction. As a result, the probability of an
accident is unaffected by the proposed
change.
The reactor building sump is used to
mitigate accidents previously evaluated by
providing a borated water source for the
Emergency Core Cooling System (ECCS) and
Reactor Building Spray (RBS) System. The
design of the reactor building sump and the
capability of the reactor building sump
assumed in the accident analysis is not
changed. The proposed action requires
implementation of mitigating actions while
the reactor building sump is inoperable and
more frequent monitoring of reactor coolant
leakage to detect any increased potential for
an accident that would require the reactor
building sump. The consequences of an
accident during the proposed action are no
different than the current consequences of an
accident if the reactor building sump is
inoperable.
The proposed change clarifies the SFDP
[Safety Function Determination Program]
when a supported system is made inoperable
by the inoperability of a single TS support
system. The SFDP directs the appropriate use
of TS actions and the proposed change does
not alter the current intent of the TS. The
actions taken when a system is inoperable are
not an assumption in the initiation or
mitigation of any previously evaluated
accident.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change adds a new
specification to the TS for the reactor
building sump. An existing SR on the reactor
building sump is moved to the new
specification and a duplicative requirement
to perform the SR in TS 3.5.3 is removed.
The new specification retains the existing
requirements on the reactor building sump
and the actions to be taken when the reactor
building sump is inoperable with the
exception of adding new actions to be taken
when the reactor building sump is inoperable
due to reactor building accident generated
and transported debris exceeding the
analyzed limits. The new action provides
time to evaluate and correct the condition
instead of requiring an immediate plant
shutdown.
The proposed change does not alter the
design or design function of the reactor
E:\FR\FM\26FEN1.SGM
26FEN1
6180
Federal Register / Vol. 84, No. 38 / Tuesday, February 26, 2019 / Notices
building sump or the plant. No new systems
are installed or removed as part of the
proposed change. The reactor building sump
is a passive component and cannot initiate a
malfunction or accident. No new credible
accident is created that is not encompassed
by the existing accident analyses that assume
the function of the reactor building sump.
The proposed change clarifies the SFDP
when a supported system is made inoperable
by the inoperability of a single TS support
system. The SFDP directs the appropriate use
of TS actions and the proposed change does
not alter the current intent of the TS. The
proposed change to the Safety Function
Determination Program will not result in any
change to the design or design function of the
reactor building sump or a method of
operation of the plant.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed change adds a new
specification to the TS for the reactor
building sump. An existing SR on the reactor
building sump is moved to the new
specification and a duplicative requirement
to perform the SR in TS 3.5.3 is removed.
The new specification retains the existing
requirements on the reactor building sump
and the actions to be taken when the reactor
building sump is inoperable with the
exception of adding new actions to be taken
when the reactor building sump is inoperable
due to reactor building accident generated
and transported debris exceeding the
analyzed limits. The new action provides
time to evaluate and correct the condition
instead of requiring an immediate plant
shutdown.
The proposed change does not affect the
controlling values of parameters used to
avoid exceeding regulatory or licensing
limits. No Safety Limits are affected by the
proposed change. The proposed change does
not affect any assumptions in the accident
analyses that demonstrate compliance with
regulatory and licensing requirements.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Anna Vinson
Jones, Senior Counsel, Entergy Services,
Inc., 101 Constitution Avenue NW,
Suite 200 East, L–ENT–WDC,
Washington, DC 20001.
NRC Branch Chief: Robert J.
Pascarelli.
VerDate Sep<11>2014
16:24 Feb 25, 2019
Jkt 247001
Susquehanna Nuclear, LLC, Docket Nos.
50–387 and 50–388, Susquehanna
Steam Electric Station, Units 1 and 2,
Luzerne County, Pennsylvania
Date of amendment request: January
9, 2019. A publicly-available version is
in ADAMS under Accession No.
ML19009A431.
Description of amendment request:
The amendments would temporarily
change Technical Specification (TS) TS
3.7.1, ‘‘Residual Heat Removal Service
Water (RHRSW) System and the
Ultimate Heat Sink (UHS),’’ and TS
3.7.2, ‘‘Emergency Service Water (ESW)
System,’’ to allow one division of the
ESW and RHRSW systems to be
inoperable for a total of 14 days to
address piping degradation. The
amendments would also remove the
Table of Contents (TOC) from the TSs
and place it under licensee control.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change is to permit a
temporary extension to existing TS
Completion Times to allow for ESW system
piping replacement. The division of the ESW
and RHRSW systems that are not being
worked on will remain fully OPERABLE
during the 14 day Completion Time.
Although it would not be able to be restored
to a fully OPERABLE status, the impacted
division of ESW and RHRSW will be capable
of being restored to perform its safety
function within the limiting 72 hour
Completion Time. The ESW and RHRSW
systems and their supported equipment
function as accident mitigators. Removing
one division from service for a limited period
of time does not affect any accident initiator
and, therefore, cannot change the probability
of an accident. The proposed changes and the
ESW repair evolution have been evaluated to
assess their impact on the systems affected
and ensure design basis safety functions are
preserved. There is a slight increase in risk
associated with having the ESW and RHRSW
systems and their supported systems out of
service for longer than currently allowed by
the SSES [Susquehanna] TS. However,
Susquehanna will maintain the nonimpacted division of ESW and RHRSW fully
OPERABLE throughout the repair evolution
and will protect required equipment in
accordance with its protected equipment
program. The non-impacted division is
capable of serving 100 percent of the heat
loads for both the online and outage units
during an accident. As such, there is no
impact on consequence mitigation for any
transient or accident.
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
Additionally, Susquehanna proposes an
administrative change to remove the TOC
from the TS and place it under licensee
control. This has no impact on the design or
operation of the plant and cannot impact the
probability of an accident in any way.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change is to permit a
temporary extension to existing TS
Completion Times to allow for ESW system
piping replacement. The change does not
involve a physical alteration of the plant (i.e.,
no different equipment will be installed) or
a change in the methods governing normal
plant operations. The proposed change does
not alter assumptions made in the safety
analysis. During the replacement evolution,
one division of the ESW and RHRSW systems
will not be capable of performing their safety
function. However, the other division of ESW
and RHRSW are capable of providing the
necessary cooling in the event of an accident.
Furthermore, the ability to perform the safety
function for the impacted division can
always be recovered within the existing TS
Completion Times and the systems will be
fully restored to OPERABLE status following
the pipe replacement. The proposed change
does not introduce new failure mechanisms,
malfunctions, or accident initiators not
considered in the design and licensing basis.
Additionally, Susquehanna proposes an
administrative change to remove the TOC
from the TS and place it under licensee
control. This has no impact on the design or
operation of the plant and cannot create a
new or different kind of accident.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed change is to permit a
temporary extension to existing TS
Completion Times to allow for ESW system
piping replacement. The proposed change
does not alter the manner in which safety
limits, limiting safety settings, or limiting
conditions for operation are determined. The
safety analysis assumptions and acceptance
criteria are not affected by this change. The
change will ultimately result in an increase
in a margin of safety due to installation of the
new piping.
Additionally, Susquehanna proposes an
administrative change to remove the TOC
from the TS and place it under licensee
control. This has no impact on the design or
operation of the plant and cannot impact any
safety margins.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
E:\FR\FM\26FEN1.SGM
26FEN1
Federal Register / Vol. 84, No. 38 / Tuesday, February 26, 2019 / Notices
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Damon D. Obie,
Associate General Counsel, Talen
Energy Supply, LLC, 835 Hamilton St.,
Suite 150, Allentown, PA 18101.
NRC Branch Chief: James G. Danna.
IV. Notice of Issuance of Amendments
to Facility Operating Licenses and
Combined Licenses
During the period since publication of
the last biweekly notice, the
Commission has issued the following
amendments. The Commission has
determined for each of these
amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR chapter I, which are set forth in
the license amendment.
A notice of consideration of issuance
of amendment to facility operating
license or combined license, as
applicable, proposed no significant
hazards consideration determination,
and opportunity for a hearing in
connection with these actions, was
published in the Federal Register as
indicated.
Unless otherwise indicated, the
Commission has determined that these
amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments. If the Commission has
prepared an environmental assessment
under the special circumstances
provision in 10 CFR 51.22(b) and has
made a determination based on that
assessment, it is so indicated.
For further details with respect to the
action see (1) the applications for
amendment, (2) the amendment, and (3)
the Commission’s related letter, Safety
Evaluation and/or Environmental
Assessment as indicated. All of these
items can be accessed as described in
the ‘‘Obtaining Information and
Submitting Comments’’ section of this
document.
VerDate Sep<11>2014
16:24 Feb 25, 2019
Jkt 247001
Indiana Michigan Power Company,
Docket Nos. 50–315 and 50–316, Donald
C. Cook Nuclear Plant, Unit Nos. 1 and
2, Berrien County, Michigan
Date of amendment request:
September 5, 2018.
Brief description of amendments: The
amendments revised the Donald C. Cook
Nuclear Plant, Unit Nos. 1 and 2,
Technical Specification 5.5.15, ‘‘Battery
Monitoring and Maintenance Program,’’
to align with the latest Institute of
Electrical and Electronics Engineers
(IEEE) Standard (Std.) for maintenance
and testing of the safety-related
batteries. Specifically, the amendments
replaced all the references of the IEEE
Std. 450–1995, ‘‘IEEE Recommended
Practice for Maintenance, Testing, and
Replacement of Vented Lead-Acid
Batteries for Stationary Applications,’’
with the updated IEEE Std. 450–2010, as
endorsed, with certain regulatory
positions, in Regulatory Guide 1.129,
Revision 3, ‘‘Seismic Design
Classification.’’
Date of issuance: February 5, 2019.
Effective date: As of the date of
issuance and shall be implemented
within 90 days of issuance.
Amendment Nos.: 343 (Unit No. 1)
and 325 (Unit No. 2). A publiclyavailable version is in ADAMS under
Accession No. ML18346A358;
documents related to these amendments
are listed in the Safety Evaluation
enclosed with the amendments.
Facility Operating License Nos. DPR–
58 and DPR–74: The amendments
revised the Renewed Facility Operating
Licenses and Technical Specifications.
Date of initial notice in Federal
Register: November 6, 2018 (83 FR
55574).
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated February 5,
2019.
No significant hazards consideration
comments received: No.
Southern Nuclear Operating Company,
Docket Nos. 52–025 and 52–026, Vogtle
Electric Generating Plant, Units 3 and 4,
Burke County, Georgia
Date of amendment request: July 20,
2018, as supplemented by letter dated
December 3, 2018.
Brief description of amendments: The
amendments consisted of changes to
Combined License Appendix A,
Technical Specifications (TSs), and
revised operability requirements for the
Engineered Safety Feature Actuation
System Spent Fuel Pool Level—Low 2
and In-Containment Refueling Water
Storage Tank Wide Range Level—Low
instrumentation functions for Refueling
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
6181
Cavity and Spent Fuel Pool Cooling
System (SFS) Isolation. Additional
changes added TS operability
requirements for the SFS containment
isolation valves in MODES 5 and 6.
Date of issuance: January 15, 2019.
Effective date: As of the date of
issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 150 (Unit 3) and
149 (Unit 4). A publicly-available
version is in ADAMS under Package
Accession No. ML18351A189;
documents related to these amendments
are listed in the Safety Evaluation
enclosed with the amendments.
Facility Combined License Nos. NPF–
91 and NPF–92: The amendments
revised the facility Combined Licenses.
Date of initial notice in Federal
Register: September 11, 2018 (83 FR
45986). The supplement dated
December 3, 2018, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the NRC staff’s
original proposed no significant hazards
consideration determination.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated January 15,
2019.
No significant hazards consideration
comments received: No.
Southern Nuclear Operating Company,
Docket Nos. 52–025 and 52–026, Vogtle
Electric Generating Plant, Units 3 and 4,
Burke County, Georgia
Date of amendment request: August
10, 2018.
Brief description of amendments: The
amendments consisted of changes to
Combined License Appendix A,
Technical Specifications (TSs), and
revised TS Limiting Condition for
Operation (LCO) 3.1.8, ‘‘Physics Tests
Exception—Mode 2,’’ to include
Function 4 as one of the LCO 3.3.1,
‘‘Reactor Trip System (RTS)
Instrumentation,’’ functions where the
number of required channels may be
reduced to three during the performance
of physics tests. Additionally, LCO
3.8.3, ‘‘Inverters—Operating,’’ was
revised to make an editorial
nomenclature change from ‘‘constant
voltage source transformer’’ to ‘‘voltage
regulating transformer.’’
Date of issuance: January 30, 2019.
Effective date: As of the date of
issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 153 (Unit 3) and
152 (Unit 4). A publicly-available
version is in ADAMS under Package
Accession No. ML18354B207;
documents related to these amendments
E:\FR\FM\26FEN1.SGM
26FEN1
6182
Federal Register / Vol. 84, No. 38 / Tuesday, February 26, 2019 / Notices
are listed in the Safety Evaluation
enclosed with the amendments.
Facility Combined Licenses Nos. NPF–
91 and NPF–92: The amendments
revised the facility Combined Licenses.
Date of initial notice in Federal
Register: September 25, 2018 (83 FR
48467).
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated January 30,
2019.
No significant hazards consideration
comments received: No.
Tennessee Valley Authority, Docket
Nos. 50–390 and 50–391, Watts Bar
Nuclear Plant, Units 1 and 2 (Watts
Bar), Rhea County, Tennessee
Date of amendment request: January
5, 2018.
Brief description of amendments: The
amendments revised Technical
Specification (TS) 3.6.3, ‘‘Containment
Isolation Valves,’’ and Surveillance
Requirement 3.6.3.5 to change the
frequency in accordance with the Watts
Bar Containment Leakage Rate Testing
Program, which is described in TS
5.7.2.19. The changes allow leak rate
testing of the containment purge system
containment isolation valves to be
performed at least once every 30
months, as prescribed in Regulatory
Guide 1.163, ‘‘Performance-Based
Containment Leak-Test Program.’’
Date of issuance: January 28, 2019.
Effective date: As of the date of
issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 123 (Unit 1) and 24
(Unit 2). A publicly-available version is
in ADAMS under Accession No.
ML18327A005; documents related to
these amendments are listed in the
Safety Evaluation enclosed with the
amendments.
Facility Operating License Nos. NPF–
90 and NPF–96: The amendments
revised the Facility Operating Licenses
and TSs.
Date of initial notice in Federal
Register: March 13, 2018 (83 FR
10924).
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated January 28,
2019.
No significant hazards consideration
comments received: No.
VerDate Sep<11>2014
16:24 Feb 25, 2019
Jkt 247001
V. Notice of Issuance of Amendments to
Facility Operating Licenses and
Combined Licenses and Final
Determination of No Significant
Hazards Consideration and
Opportunity for a Hearing (Exigent
Public Announcement or Emergency
Circumstances)
During the period since publication of
the last biweekly notice, the
Commission has issued the following
amendments. The Commission has
determined for each of these
amendments that the application for the
amendment complies with the
standards and requirements of the
Atomic Energy Act of 1954, as amended
(the Act), and the Commission’s rules
and regulations. The Commission has
made appropriate findings as required
by the Act and the Commission’s rules
and regulations in 10 CFR chapter I,
which are set forth in the license
amendment.
Because of exigent or emergency
circumstances associated with the date
the amendment was needed, there was
not time for the Commission to publish,
for public comment before issuance, its
usual notice of consideration of
issuance of amendment, proposed no
significant hazards consideration
determination, and opportunity for a
hearing.
For exigent circumstances, the
Commission has either issued a Federal
Register notice providing opportunity
for public comment or has used local
media to provide notice to the public in
the area surrounding a licensee’s facility
of the licensee’s application and of the
Commission’s proposed determination
of no significant hazards consideration.
The Commission has provided a
reasonable opportunity for the public to
comment, using its best efforts to make
available to the public means of
communication for the public to
respond quickly, and in the case of
telephone comments, the comments
have been recorded or transcribed as
appropriate and the licensee has been
informed of the public comments.
In circumstances where failure to act
in a timely way would have resulted, for
example, in derating or shutdown of a
nuclear power plant or in prevention of
either resumption of operation or of
increase in power output up to the
plant’s licensed power level, the
Commission may not have had an
opportunity to provide for public
comment on its no significant hazards
consideration determination. In such
case, the license amendment has been
issued without opportunity for
comment. If there has been some time
for public comment but less than 30
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
days, the Commission may provide an
opportunity for public comment. If
comments have been requested, it is so
stated. In either event, the State has
been consulted by telephone whenever
possible.
Under its regulations, the Commission
may issue and make an amendment
immediately effective, notwithstanding
the pendency before it of a request for
a hearing from any person, in advance
of the holding and completion of any
required hearing, where it has
determined that no significant hazards
consideration is involved.
The Commission has applied the
standards of 10 CFR 50.92 and has made
a final determination that the
amendment involves no significant
hazards consideration. The basis for this
determination is contained in the
documents related to this action.
Accordingly, the amendments have
been issued and made effective as
indicated.
Unless otherwise indicated, the
Commission has determined that these
amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments. If the Commission has
prepared an environmental assessment
under the special circumstances
provision in 10 CFR 51.12(b) and has
made a determination based on that
assessment, it is so indicated.
For further details with respect to the
action see (1) The application for
amendment, (2) the amendment to
Facility Operating License or Combined
License, as applicable, and (3) the
Commission’s related letter, Safety
Evaluation and/or Environmental
Assessment, as indicated. All of these
items can be accessed as described in
the ‘‘Obtaining Information and
Submitting Comments’’ section of this
document.
Northern States Power Company—
Minnesota, Docket No. 50–306, Prairie
Island Nuclear Generating Plant, Unit 2,
Goodhue County, Minnesota
Date of amendment request: January
29, 2019.
Description of amendment: The
amendment revised Technical
Specification 3.8.1, Condition E, to
allow a one-time extension to the
completion time for two diesel
generators out of service.
Date of issuance: January 29, 2019.
Effective date: January 29, 2019.
Amendment No: 213. A publiclyavailable version is in ADAMS under
Accession No. ML19029A094;
E:\FR\FM\26FEN1.SGM
26FEN1
Federal Register / Vol. 84, No. 38 / Tuesday, February 26, 2019 / Notices
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–60: The amendment revised
the Renewed Facility Operating License
and Technical Specifications.
Public comments requested as to
proposed no significant hazards
consideration: No.
The Commission’s related evaluation
of the amendment, finding of emergency
circumstances, State consultation, and
final no significant hazards
consideration determination are
contained in a Safety Evaluation dated
January 29, 2019.
Attorney for licensee: Peter M. Glass,
Assistant General Counsel, Xcel Energy
Services, Inc., 414 Nicollet Mall,
Minneapolis, MN 55401.
NRC Branch Chief: David J. Wrona.
Dated at Rockville, Maryland, this 15th day
of February, 2019.
For the Nuclear Regulatory Commission.
Craig G. Erlanger,
Director, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2019–02934 Filed 2–25–19; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2019–0001]
Sunshine Act Meetings
Weeks of February 25,
March 4, 11, 18, 25, April 1, 2019.
TIME AND DATE:
Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
PLACE:
STATUS:
Public and Closed.
MATTERS TO BE CONSIDERED:
Week of February 18, 2019
There are no meetings scheduled for
the week of February 18, 2019.
Week of February 25, 2019—Tentative
There are no meetings scheduled for
the week of February 25, 2019.
Week of March 4, 2019—Tentative
Tuesday, March 5, 2019
10:00 a.m. Briefing on NRC
International Activities (Closed—
Ex. 1 & 9)
Week of March 11, 2019—Tentative
There are no meetings scheduled for
the week of March 11, 2019.
VerDate Sep<11>2014
16:24 Feb 25, 2019
Jkt 247001
Week of March 18, 2019—Tentative
Wednesday, March 20, 2019
10:00 a.m. Meeting with the
Organization of Agreement States
and the Conference of Radiation
Control Program Directors (Public),
(Contact: Paul Michalak: 301–415–
5804)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
Week of March 25, 2019—Tentative
Thursday, March 28, 2019
9:00 a.m. Transformation at the NRC:
Innovation (Public Meeting),
(Contact: June Cai: 301–415–1771)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
6183
Dated at Rockville, Maryland, this 21st day
of February, 2019.
For the Nuclear Regulatory Commission.
Denise L. McGovern,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2019–03337 Filed 2–22–19; 11:15 am]
BILLING CODE 7590–01–P
POSTAL SERVICE
Temporary Emergency Committee of
the Board of Governors; Sunshine Act
Meeting
Week of April 1, 2019—Tentative
Monday, March 4,
2019, at 9:30 a.m.
PLACE: Washington, DC.
STATUS: Closed.
MATTERS TO BE CONSIDERED:
Thursday, April 4, 2019
Monday, March 4, 2019, at 9:30 a.m.
10:00 a.m. Meeting with the Advisory
Committee on the Medical Uses of
Isotopes (Public Meeting), (Contact:
Kellee Jamerson: 301–415–7408)
Additional Information: The meeting
scheduled on March 28, 2019 at 9:00
a.m., Transformation at the NRC:
Innovation, was postponed from the
originally scheduled date of January 31,
2019.
CONTACT PERSON FOR MORE INFORMATION:
For more information or to verify the
status of meetings, contact Denise
McGovern at 301–415–0681 or via email
at Denise.McGovern@nrc.gov. The
schedule for Commission meetings is
subject to change on short notice.
The NRC Commission Meeting
Schedule can be found on the internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.,
Braille, large print), please notify
Kimberly Meyer-Chambers, NRC
Disability Program Manager, at 301–
287–0739, by videophone at 240–428–
3217, or by email at Kimberly.MeyerChambers@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
Members of the public may request to
receive this information electronically.
If you would like to be added to the
distribution, please contact the Nuclear
Regulatory Commission, Office of the
Secretary, Washington, DC 20555, (301–
415–1969), or by email at
Wendy.Moore@nrc.gov.
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
DATES AND TIMES:
1. Strategic Items.
2. Administrative Matters.
GENERAL COUNSEL CERTIFICATION: The
General Counsel of the United States
Postal Service has certified that the
meeting may be closed under the
Government in the Sunshine Act.
CONTACT PERSON FOR MORE INFORMATION:
Michael J. Elston, Acting Secretary of
the Board, U.S. Postal Service, 475
L’Enfant Plaza SW, Washington, DC
20260–1000. Telephone: (202) 268–
4800.
Michael J. Elston,
Acting Secretary.
[FR Doc. 2019–03460 Filed 2–22–19; 4:15 pm]
BILLING CODE 7710–12–P
SECURITIES AND EXCHANGE
COMMISSION
[Investment Company Act Release No.
33379; 812–14881]
Monteagle Funds and Nashville Capital
Corporation
February 21, 2019.
Securities and Exchange
Commission (‘‘Commission’’).
ACTION: Notice.
AGENCY:
Notice of an application under section
6(c) of the Investment Company Act of
1940 (‘‘Act’’) for an exemption from
section 15(a) of the Act and rule 18f–2
under the Act, as well as from certain
disclosure requirements in rule 20a–1
under the Act, Item 19(a)(3) of Form N–
1A, Items 22(c)(1)(ii), 22(c)(1)(iii),
22(c)(8) and 22(c)(9) of Schedule 14A
under the Securities Exchange Act of
1934, and sections 6–07(2)(a), (b), and
(c) of Regulation S–X (‘‘Disclosure
Requirements’’). The requested
E:\FR\FM\26FEN1.SGM
26FEN1
Agencies
[Federal Register Volume 84, Number 38 (Tuesday, February 26, 2019)]
[Notices]
[Pages 6176-6183]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-02934]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2019-0058]
Biweekly Notice; Applications and Amendments To Facility
Operating Licenses and Combined Licenses Involving No Significant
Hazards Considerations
AGENCY: Nuclear Regulatory Commission.
ACTION: Biweekly notice.
-----------------------------------------------------------------------
SUMMARY: Pursuant to the Atomic Energy Act of 1954, as amended (the
Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this
regular biweekly notice. The Act requires the Commission to publish
notice of any amendments issued, or proposed to be issued, and grants
the Commission the authority to issue and make immediately effective
any amendment to an operating license or combined license, as
applicable, upon a determination by the Commission that such amendment
involves no significant hazards consideration, notwithstanding the
pendency before the Commission of a request for a hearing from any
person.
This biweekly notice includes all notices of amendments issued, or
proposed to be issued, from January 29, 2019, to February 11, 2019. The
last biweekly notice was published on February 12, 2019.
DATES: Comments must be filed by March 28, 2019. A request for a
hearing must be filed by April 29, 2019. Comments received after this
date will be considered if it is practical to do so, but the Commission
is able to ensure consideration only for comments received before this
date.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID INSERT: NRC-2019-0058.
Address questions about Docket IDs in Regulations.gov to Krupskaya
Castellon; telephone: 301-287-9221; email: Krupskaya.Castellon@nrc.gov.
For technical questions, contact the individual(s) listed in the FOR
FURTHER INFORMATION CONTACT section of this document.
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Lynn Ronewicz, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC
20555-0001; telephone: 301-415-1927, email: Lynn.Ronewicz@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID INSERT: NRC-2019-0058, facility name,
unit number(s), plant docket number, application date, and subject when
contacting the NRC about the availability of information for this
action. You may obtain publicly-available information related to this
action by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID INSERT: NRC-2019-0058.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to pdr.resource@nrc.gov. The ADAMS accession number for each
document referenced (if it is available in ADAMS) is provided the first
time that it is mentioned in this document
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2019-0058, facility name, unit
number(s), plant docket number, application date, and subject in your
comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Background
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is
publishing this regular biweekly notice. The Act requires the
Commission to publish notice of any amendments issued, or proposed to
be issued, and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves no significant hazards consideration,
notwithstanding
[[Page 6177]]
the pendency before the Commission of a request for a hearing from any
person.
III. Notice of Consideration of Issuance of Amendments to Facility
Operating Licenses and Combined Licenses and Proposed No Significant
Hazards Consideration Determination
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in Sec. 50.92 of title 10 of the Code of
Federal Regulations (10 CFR), this means that operation of the facility
in accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period if circumstances change during the 30-day comment
period such that failure to act in a timely way would result, for
example in derating or shutdown of the facility. If the Commission
takes action prior to the expiration of either the comment period or
the notice period, it will publish in the Federal Register a notice of
issuance. If the Commission makes a final no significant hazards
consideration determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and petition for leave to intervene
(petition) with respect to the action. Petitions shall be filed in
accordance with the Commission's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested persons should consult a
current copy of 10 CFR 2.309. The NRC's regulations are accessible
electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a copy of
the regulations is available at the NRC's Public Document Room, located
at One White Flint North, Room O1-F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852. If a petition is filed, the
Commission or a presiding officer will rule on the petition and, if
appropriate, a notice of a hearing will be issued.
As required by 10 CFR 2.309(d) the petition should specifically
explain the reasons why intervention should be permitted with
particular reference to the following general requirements for
standing: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
petitioner's property, financial, or other interest in the proceeding;
and (4) the possible effect of any decision or order which may be
entered in the proceeding on the petitioner's interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions which the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise statement of the alleged facts or
expert opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to the specific sources and
documents on which the petitioner intends to rely to support its
position on the issue. The petition must include sufficient information
to show that a genuine dispute exists with the applicant or licensee on
a material issue of law or fact. Contentions must be limited to matters
within the scope of the proceeding. The contention must be one which,
if proven, would entitle the petitioner to relief. A petitioner who
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Petitions and motions for leave to file new
or amended contentions that are filed after the deadline will not be
entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in
accordance with the filing instructions in the ``Electronic Submissions
(E-Filing)'' section of this document.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to establish when the hearing is held. If the final determination is
that the amendment request involves no significant hazards
consideration, the Commission may issue the amendment and make it
immediately effective, notwithstanding the request for a hearing. Any
hearing would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, then any hearing held would take place before
the issuance of the amendment unless the Commission finds an imminent
danger to the health or safety of the public, in which case it will
issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission no later
than 60 days from the date of publication of this notice. The petition
must be filed in accordance with the filing instructions in the
``Electronic Submissions (E-Filing)'' section of this document, and
should meet the requirements for petitions set forth in this section,
except that under 10 CFR 2.309(h)(2) a State, local governmental body,
or Federally-recognized Indian Tribe, or agency thereof does not need
to address the
[[Page 6178]]
standing requirements in 10 CFR 2.309(d) if the facility is located
within its boundaries. Alternatively, a State, local governmental body,
Federally-recognized Indian Tribe, or agency thereof may participate as
a non-party under 10 CFR 2.315(c).
If a hearing is granted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing and petition for leave to intervene (petition), any
motion or other document filed in the proceeding prior to the
submission of a request for hearing or petition to intervene, and
documents filed by interested governmental entities that request to
participate under 10 CFR 2.315(c), must be filed in accordance with the
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR
46562; August 3, 2012). The E-Filing process requires participants to
submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Detailed
guidance on making electronic submissions may be found in the Guidance
for Electronic Submissions to the NRC and on the NRC website at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit
paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a
digital ID certificate and a docket has been created, the participant
can then submit adjudicatory documents. Submissions must be in Portable
Document Format (PDF). Additional guidance on PDF submissions is
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the
time the document is submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
document on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before adjudicatory documents are
filed so that they can obtain access to the documents via the E-Filing
system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public website at https://www.nrc.gov/site-help/e-submittals.html, by
email to MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing adjudicatory documents in this
manner are responsible for serving the document on all other
participants. Filing is considered complete by first-class mail as of
the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
Commission or the presiding officer. If you do not have an NRC-issued
digital ID certificate as described above, click ``Cancel'' when the
link requests certificates and you will be automatically directed to
the NRC's electronic hearing dockets where you will be able to access
any publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy information,
such as social security numbers, home addresses, or personal phone
numbers in their filings, unless an NRC regulation or other law
requires submission of such information. For example, in some
instances, individuals provide home addresses in order to demonstrate
proximity to a facility or site. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the adjudicatory
filings and would constitute a Fair Use application, participants are
requested not to include copyrighted materials in their submission.
For further details with respect to these license amendment
applications, see the application for amendment which is available for
public inspection
[[Page 6179]]
in ADAMS and at the NRC's PDR. For additional direction on accessing
information related to this document, see the ``Obtaining Information
and Submitting Comments'' section of this document.
Duke Energy Progress, LLC, Docket Nos. 50-325 and 50-324, Brunswick
Steam Electric Plant, Units 1 and 2, Brunswick County, North Carolina
Date of amendment request: December 14, 2018. A publicly-available
version is in ADAMS under Accession No. ML18353A951.
Description of amendment request: The amendments would modify
requirements for repetitive verification of the status of locked,
sealed, or secured components to allow the verification to be done by
use of administrative means consistent with Technical Specifications
Task Force (TSTF) Traveler 269, Revision 2, ``Allow Administrative
Means of Position Verification for Locked or Sealed Valves.''
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change modifies Technical Specification (TS)
3.6.1.3, ``Primary Containment Isolation Valves (PCIVs)'' and TS
3.6.4.2, ``Secondary Containment Isolation Dampers (SCIDs).'' These
specifications require penetration flow paths with inoperable
isolation devices be isolated and periodically verified to be
isolated. Consistent with TSTF-269-A, Revision 2, notes are proposed
to be added to TS 3.6.1.3, Required Actions A.2 and C.2, and TS
3.6.4.2, Required Action A.2, to allow isolation devices that are
locked, sealed, or otherwise secured to be verified using
administrative means.
The proposed change does not affect any plant equipment, test
methods, or plant operation, and is not an initiator of any analyzed
accident sequence. The inoperable containment penetrations will
continue to be isolated, and hence perform their isolation function.
Operation in accordance with the proposed TSs will ensure that all
analyzed accidents will continue to be mitigated as previously
analyzed. Therefore, the proposed change does not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change does not involve a physical alteration to
the plant (i.e., no new or different type of equipment will be
installed) or a change to the methods governing normal plant
operation. Furthermore, the change does not alter the assumptions
made in the safety analysis. Therefore, the proposed change does not
create the possibility of a new or different kind of accident from
any accident previously evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed change will not affect operation of plant equipment
or the function of any equipment assumed in the accident analysis.
Affected containment penetrations will continue to be isolated as
required by the existing TSs. Therefore, the proposed change does
not involve a significant reduction in safety margin.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Kathryn B. Nolan, Deputy General Counsel,
Duke Energy Corporation, 550 South Tryon Street, Mail Code DEC45A,
Charlotte, NC 28202.
Entergy Operations, Inc., Docket No. 50-313, Arkansas Nuclear One, Unit
1 (ANO-1), Pope County, Arkansas
Date of amendment request: December 19, 2018. A publicly-available
version is in ADAMS under Accession No. ML18353B044.
Description of amendment request: The amendment would revise the
ANO-1 Technical Specifications (TSs) to adopt Technical Specifications
Task Force (TSTF) Traveler TSTF-567, Revision 1, ``Add Containment Sump
TS to Address GSI [Generic Safety Issue]-191 Issues.''
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change adds a new specification to the TS for the
reactor building sump. An existing SR [surveillance requirement] on
the reactor building sump is moved to the new specification and a
duplicative requirement to perform the SR in TS 3.5.3 is removed.
The new specification retains the existing requirements on the
reactor building sump and the actions to be taken when the reactor
building sump is inoperable with the exception of adding new actions
to be taken when the reactor building sump is inoperable due to
reactor building accident generated and transported debris exceeding
the analyzed limits. The new action provides time to evaluate and
correct the condition instead of requiring an immediate plant
shutdown.
The reactor building sump is not an initiator of any accident
previously evaluated. The reactor building sump is a passive
component and the proposed change does not increase the likelihood
of the malfunction. As a result, the probability of an accident is
unaffected by the proposed change.
The reactor building sump is used to mitigate accidents
previously evaluated by providing a borated water source for the
Emergency Core Cooling System (ECCS) and Reactor Building Spray
(RBS) System. The design of the reactor building sump and the
capability of the reactor building sump assumed in the accident
analysis is not changed. The proposed action requires implementation
of mitigating actions while the reactor building sump is inoperable
and more frequent monitoring of reactor coolant leakage to detect
any increased potential for an accident that would require the
reactor building sump. The consequences of an accident during the
proposed action are no different than the current consequences of an
accident if the reactor building sump is inoperable.
The proposed change clarifies the SFDP [Safety Function
Determination Program] when a supported system is made inoperable by
the inoperability of a single TS support system. The SFDP directs
the appropriate use of TS actions and the proposed change does not
alter the current intent of the TS. The actions taken when a system
is inoperable are not an assumption in the initiation or mitigation
of any previously evaluated accident.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed change adds a new specification to the TS for the
reactor building sump. An existing SR on the reactor building sump
is moved to the new specification and a duplicative requirement to
perform the SR in TS 3.5.3 is removed. The new specification retains
the existing requirements on the reactor building sump and the
actions to be taken when the reactor building sump is inoperable
with the exception of adding new actions to be taken when the
reactor building sump is inoperable due to reactor building accident
generated and transported debris exceeding the analyzed limits. The
new action provides time to evaluate and correct the condition
instead of requiring an immediate plant shutdown.
The proposed change does not alter the design or design function
of the reactor
[[Page 6180]]
building sump or the plant. No new systems are installed or removed
as part of the proposed change. The reactor building sump is a
passive component and cannot initiate a malfunction or accident. No
new credible accident is created that is not encompassed by the
existing accident analyses that assume the function of the reactor
building sump.
The proposed change clarifies the SFDP when a supported system
is made inoperable by the inoperability of a single TS support
system. The SFDP directs the appropriate use of TS actions and the
proposed change does not alter the current intent of the TS. The
proposed change to the Safety Function Determination Program will
not result in any change to the design or design function of the
reactor building sump or a method of operation of the plant.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed change adds a new specification to the TS for the
reactor building sump. An existing SR on the reactor building sump
is moved to the new specification and a duplicative requirement to
perform the SR in TS 3.5.3 is removed. The new specification retains
the existing requirements on the reactor building sump and the
actions to be taken when the reactor building sump is inoperable
with the exception of adding new actions to be taken when the
reactor building sump is inoperable due to reactor building accident
generated and transported debris exceeding the analyzed limits. The
new action provides time to evaluate and correct the condition
instead of requiring an immediate plant shutdown.
The proposed change does not affect the controlling values of
parameters used to avoid exceeding regulatory or licensing limits.
No Safety Limits are affected by the proposed change. The proposed
change does not affect any assumptions in the accident analyses that
demonstrate compliance with regulatory and licensing requirements.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Anna Vinson Jones, Senior Counsel, Entergy
Services, Inc., 101 Constitution Avenue NW, Suite 200 East, L-ENT-WDC,
Washington, DC 20001.
NRC Branch Chief: Robert J. Pascarelli.
Susquehanna Nuclear, LLC, Docket Nos. 50-387 and 50-388, Susquehanna
Steam Electric Station, Units 1 and 2, Luzerne County, Pennsylvania
Date of amendment request: January 9, 2019. A publicly-available
version is in ADAMS under Accession No. ML19009A431.
Description of amendment request: The amendments would temporarily
change Technical Specification (TS) TS 3.7.1, ``Residual Heat Removal
Service Water (RHRSW) System and the Ultimate Heat Sink (UHS),'' and TS
3.7.2, ``Emergency Service Water (ESW) System,'' to allow one division
of the ESW and RHRSW systems to be inoperable for a total of 14 days to
address piping degradation. The amendments would also remove the Table
of Contents (TOC) from the TSs and place it under licensee control.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change is to permit a temporary extension to
existing TS Completion Times to allow for ESW system piping
replacement. The division of the ESW and RHRSW systems that are not
being worked on will remain fully OPERABLE during the 14 day
Completion Time. Although it would not be able to be restored to a
fully OPERABLE status, the impacted division of ESW and RHRSW will
be capable of being restored to perform its safety function within
the limiting 72 hour Completion Time. The ESW and RHRSW systems and
their supported equipment function as accident mitigators. Removing
one division from service for a limited period of time does not
affect any accident initiator and, therefore, cannot change the
probability of an accident. The proposed changes and the ESW repair
evolution have been evaluated to assess their impact on the systems
affected and ensure design basis safety functions are preserved.
There is a slight increase in risk associated with having the ESW
and RHRSW systems and their supported systems out of service for
longer than currently allowed by the SSES [Susquehanna] TS. However,
Susquehanna will maintain the non-impacted division of ESW and RHRSW
fully OPERABLE throughout the repair evolution and will protect
required equipment in accordance with its protected equipment
program. The non-impacted division is capable of serving 100 percent
of the heat loads for both the online and outage units during an
accident. As such, there is no impact on consequence mitigation for
any transient or accident.
Additionally, Susquehanna proposes an administrative change to
remove the TOC from the TS and place it under licensee control. This
has no impact on the design or operation of the plant and cannot
impact the probability of an accident in any way.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change is to permit a temporary extension to
existing TS Completion Times to allow for ESW system piping
replacement. The change does not involve a physical alteration of
the plant (i.e., no different equipment will be installed) or a
change in the methods governing normal plant operations. The
proposed change does not alter assumptions made in the safety
analysis. During the replacement evolution, one division of the ESW
and RHRSW systems will not be capable of performing their safety
function. However, the other division of ESW and RHRSW are capable
of providing the necessary cooling in the event of an accident.
Furthermore, the ability to perform the safety function for the
impacted division can always be recovered within the existing TS
Completion Times and the systems will be fully restored to OPERABLE
status following the pipe replacement. The proposed change does not
introduce new failure mechanisms, malfunctions, or accident
initiators not considered in the design and licensing basis.
Additionally, Susquehanna proposes an administrative change to
remove the TOC from the TS and place it under licensee control. This
has no impact on the design or operation of the plant and cannot
create a new or different kind of accident.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed change is to permit a temporary extension to
existing TS Completion Times to allow for ESW system piping
replacement. The proposed change does not alter the manner in which
safety limits, limiting safety settings, or limiting conditions for
operation are determined. The safety analysis assumptions and
acceptance criteria are not affected by this change. The change will
ultimately result in an increase in a margin of safety due to
installation of the new piping.
Additionally, Susquehanna proposes an administrative change to
remove the TOC from the TS and place it under licensee control. This
has no impact on the design or operation of the plant and cannot
impact any safety margins.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this
[[Page 6181]]
review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Damon D. Obie, Associate General Counsel,
Talen Energy Supply, LLC, 835 Hamilton St., Suite 150, Allentown, PA
18101.
NRC Branch Chief: James G. Danna.
IV. Notice of Issuance of Amendments to Facility Operating Licenses and
Combined Licenses
During the period since publication of the last biweekly notice,
the Commission has issued the following amendments. The Commission has
determined for each of these amendments that the application complies
with the standards and requirements of the Atomic Energy Act of 1954,
as amended (the Act), and the Commission's rules and regulations. The
Commission has made appropriate findings as required by the Act and the
Commission's rules and regulations in 10 CFR chapter I, which are set
forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or combined license, as applicable, proposed no
significant hazards consideration determination, and opportunity for a
hearing in connection with these actions, was published in the Federal
Register as indicated.
Unless otherwise indicated, the Commission has determined that
these amendments satisfy the criteria for categorical exclusion in
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be
prepared for these amendments. If the Commission has prepared an
environmental assessment under the special circumstances provision in
10 CFR 51.22(b) and has made a determination based on that assessment,
it is so indicated.
For further details with respect to the action see (1) the
applications for amendment, (2) the amendment, and (3) the Commission's
related letter, Safety Evaluation and/or Environmental Assessment as
indicated. All of these items can be accessed as described in the
``Obtaining Information and Submitting Comments'' section of this
document.
Indiana Michigan Power Company, Docket Nos. 50-315 and 50-316, Donald
C. Cook Nuclear Plant, Unit Nos. 1 and 2, Berrien County, Michigan
Date of amendment request: September 5, 2018.
Brief description of amendments: The amendments revised the Donald
C. Cook Nuclear Plant, Unit Nos. 1 and 2, Technical Specification
5.5.15, ``Battery Monitoring and Maintenance Program,'' to align with
the latest Institute of Electrical and Electronics Engineers (IEEE)
Standard (Std.) for maintenance and testing of the safety-related
batteries. Specifically, the amendments replaced all the references of
the IEEE Std. 450-1995, ``IEEE Recommended Practice for Maintenance,
Testing, and Replacement of Vented Lead-Acid Batteries for Stationary
Applications,'' with the updated IEEE Std. 450-2010, as endorsed, with
certain regulatory positions, in Regulatory Guide 1.129, Revision 3,
``Seismic Design Classification.''
Date of issuance: February 5, 2019.
Effective date: As of the date of issuance and shall be implemented
within 90 days of issuance.
Amendment Nos.: 343 (Unit No. 1) and 325 (Unit No. 2). A publicly-
available version is in ADAMS under Accession No. ML18346A358;
documents related to these amendments are listed in the Safety
Evaluation enclosed with the amendments.
Facility Operating License Nos. DPR-58 and DPR-74: The amendments
revised the Renewed Facility Operating Licenses and Technical
Specifications.
Date of initial notice in Federal Register: November 6, 2018 (83 FR
55574).
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated February 5, 2019.
No significant hazards consideration comments received: No.
Southern Nuclear Operating Company, Docket Nos. 52-025 and 52-026,
Vogtle Electric Generating Plant, Units 3 and 4, Burke County, Georgia
Date of amendment request: July 20, 2018, as supplemented by letter
dated December 3, 2018.
Brief description of amendments: The amendments consisted of
changes to Combined License Appendix A, Technical Specifications (TSs),
and revised operability requirements for the Engineered Safety Feature
Actuation System Spent Fuel Pool Level--Low 2 and In-Containment
Refueling Water Storage Tank Wide Range Level--Low instrumentation
functions for Refueling Cavity and Spent Fuel Pool Cooling System (SFS)
Isolation. Additional changes added TS operability requirements for the
SFS containment isolation valves in MODES 5 and 6.
Date of issuance: January 15, 2019.
Effective date: As of the date of issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 150 (Unit 3) and 149 (Unit 4). A publicly-available
version is in ADAMS under Package Accession No. ML18351A189; documents
related to these amendments are listed in the Safety Evaluation
enclosed with the amendments.
Facility Combined License Nos. NPF-91 and NPF-92: The amendments
revised the facility Combined Licenses.
Date of initial notice in Federal Register: September 11, 2018 (83
FR 45986). The supplement dated December 3, 2018, provided additional
information that clarified the application, did not expand the scope of
the application as originally noticed, and did not change the NRC
staff's original proposed no significant hazards consideration
determination.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated January 15, 2019.
No significant hazards consideration comments received: No.
Southern Nuclear Operating Company, Docket Nos. 52-025 and 52-026,
Vogtle Electric Generating Plant, Units 3 and 4, Burke County, Georgia
Date of amendment request: August 10, 2018.
Brief description of amendments: The amendments consisted of
changes to Combined License Appendix A, Technical Specifications (TSs),
and revised TS Limiting Condition for Operation (LCO) 3.1.8, ``Physics
Tests Exception--Mode 2,'' to include Function 4 as one of the LCO
3.3.1, ``Reactor Trip System (RTS) Instrumentation,'' functions where
the number of required channels may be reduced to three during the
performance of physics tests. Additionally, LCO 3.8.3, ``Inverters--
Operating,'' was revised to make an editorial nomenclature change from
``constant voltage source transformer'' to ``voltage regulating
transformer.''
Date of issuance: January 30, 2019.
Effective date: As of the date of issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 153 (Unit 3) and 152 (Unit 4). A publicly-available
version is in ADAMS under Package Accession No. ML18354B207; documents
related to these amendments
[[Page 6182]]
are listed in the Safety Evaluation enclosed with the amendments.
Facility Combined Licenses Nos. NPF-91 and NPF-92: The amendments
revised the facility Combined Licenses.
Date of initial notice in Federal Register: September 25, 2018 (83
FR 48467).
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated January 30, 2019.
No significant hazards consideration comments received: No.
Tennessee Valley Authority, Docket Nos. 50-390 and 50-391, Watts Bar
Nuclear Plant, Units 1 and 2 (Watts Bar), Rhea County, Tennessee
Date of amendment request: January 5, 2018.
Brief description of amendments: The amendments revised Technical
Specification (TS) 3.6.3, ``Containment Isolation Valves,'' and
Surveillance Requirement 3.6.3.5 to change the frequency in accordance
with the Watts Bar Containment Leakage Rate Testing Program, which is
described in TS 5.7.2.19. The changes allow leak rate testing of the
containment purge system containment isolation valves to be performed
at least once every 30 months, as prescribed in Regulatory Guide 1.163,
``Performance-Based Containment Leak-Test Program.''
Date of issuance: January 28, 2019.
Effective date: As of the date of issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 123 (Unit 1) and 24 (Unit 2). A publicly-available
version is in ADAMS under Accession No. ML18327A005; documents related
to these amendments are listed in the Safety Evaluation enclosed with
the amendments.
Facility Operating License Nos. NPF-90 and NPF-96: The amendments
revised the Facility Operating Licenses and TSs.
Date of initial notice in Federal Register: March 13, 2018 (83 FR
10924).
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated January 28, 2019.
No significant hazards consideration comments received: No.
V. Notice of Issuance of Amendments to Facility Operating Licenses and
Combined Licenses and Final Determination of No Significant Hazards
Consideration and Opportunity for a Hearing (Exigent Public
Announcement or Emergency Circumstances)
During the period since publication of the last biweekly notice,
the Commission has issued the following amendments. The Commission has
determined for each of these amendments that the application for the
amendment complies with the standards and requirements of the Atomic
Energy Act of 1954, as amended (the Act), and the Commission's rules
and regulations. The Commission has made appropriate findings as
required by the Act and the Commission's rules and regulations in 10
CFR chapter I, which are set forth in the license amendment.
Because of exigent or emergency circumstances associated with the
date the amendment was needed, there was not time for the Commission to
publish, for public comment before issuance, its usual notice of
consideration of issuance of amendment, proposed no significant hazards
consideration determination, and opportunity for a hearing.
For exigent circumstances, the Commission has either issued a
Federal Register notice providing opportunity for public comment or has
used local media to provide notice to the public in the area
surrounding a licensee's facility of the licensee's application and of
the Commission's proposed determination of no significant hazards
consideration. The Commission has provided a reasonable opportunity for
the public to comment, using its best efforts to make available to the
public means of communication for the public to respond quickly, and in
the case of telephone comments, the comments have been recorded or
transcribed as appropriate and the licensee has been informed of the
public comments.
In circumstances where failure to act in a timely way would have
resulted, for example, in derating or shutdown of a nuclear power plant
or in prevention of either resumption of operation or of increase in
power output up to the plant's licensed power level, the Commission may
not have had an opportunity to provide for public comment on its no
significant hazards consideration determination. In such case, the
license amendment has been issued without opportunity for comment. If
there has been some time for public comment but less than 30 days, the
Commission may provide an opportunity for public comment. If comments
have been requested, it is so stated. In either event, the State has
been consulted by telephone whenever possible.
Under its regulations, the Commission may issue and make an
amendment immediately effective, notwithstanding the pendency before it
of a request for a hearing from any person, in advance of the holding
and completion of any required hearing, where it has determined that no
significant hazards consideration is involved.
The Commission has applied the standards of 10 CFR 50.92 and has
made a final determination that the amendment involves no significant
hazards consideration. The basis for this determination is contained in
the documents related to this action. Accordingly, the amendments have
been issued and made effective as indicated.
Unless otherwise indicated, the Commission has determined that
these amendments satisfy the criteria for categorical exclusion in
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be
prepared for these amendments. If the Commission has prepared an
environmental assessment under the special circumstances provision in
10 CFR 51.12(b) and has made a determination based on that assessment,
it is so indicated.
For further details with respect to the action see (1) The
application for amendment, (2) the amendment to Facility Operating
License or Combined License, as applicable, and (3) the Commission's
related letter, Safety Evaluation and/or Environmental Assessment, as
indicated. All of these items can be accessed as described in the
``Obtaining Information and Submitting Comments'' section of this
document.
Northern States Power Company--Minnesota, Docket No. 50-306, Prairie
Island Nuclear Generating Plant, Unit 2, Goodhue County, Minnesota
Date of amendment request: January 29, 2019.
Description of amendment: The amendment revised Technical
Specification 3.8.1, Condition E, to allow a one-time extension to the
completion time for two diesel generators out of service.
Date of issuance: January 29, 2019.
Effective date: January 29, 2019.
Amendment No: 213. A publicly-available version is in ADAMS under
Accession No. ML19029A094;
[[Page 6183]]
documents related to this amendment are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License No. DPR-60: The amendment
revised the Renewed Facility Operating License and Technical
Specifications.
Public comments requested as to proposed no significant hazards
consideration: No.
The Commission's related evaluation of the amendment, finding of
emergency circumstances, State consultation, and final no significant
hazards consideration determination are contained in a Safety
Evaluation dated January 29, 2019.
Attorney for licensee: Peter M. Glass, Assistant General Counsel,
Xcel Energy Services, Inc., 414 Nicollet Mall, Minneapolis, MN 55401.
NRC Branch Chief: David J. Wrona.
Dated at Rockville, Maryland, this 15th day of February, 2019.
For the Nuclear Regulatory Commission.
Craig G. Erlanger,
Director, Division of Operating Reactor Licensing, Office of Nuclear
Reactor Regulation.
[FR Doc. 2019-02934 Filed 2-25-19; 8:45 am]
BILLING CODE 7590-01-P