Combined Notice of Filings #1, 5999-6000 [2019-03143]

Download as PDF amozie on DSK3GDR082PROD with NOTICES1 Federal Register / Vol. 84, No. 37 / Monday, February 25, 2019 / Notices Refiling and Request for Administrative Cancel to be effective 10/16/2017. Filed Date: 2/19/19. Accession Number: 20190219–5171. Comments Due: 5 p.m. ET 3/12/19. Docket Numbers: ER19–1077–000. Applicants: Wildcat Wind Farm I, LLC. Description: Baseline eTariff Filing: Reactive Power Compensation Filing to be effective 4/20/2019. Filed Date: 2/19/19. Accession Number: 20190219–5182. Comments Due: 5 p.m. ET 3/12/19. Docket Numbers: ER19–1078–000. Applicants: PPA Grand Johanna LLC. Description: § 205(d) Rate Filing: Revised Market Based Rate Tariff Filing to be effective 2/20/2019. Filed Date: 2/19/19. Accession Number: 20190219–5183. Comments Due: 5 p.m. ET 3/12/19. Docket Numbers: ER19–1079–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of WMPA SA No. 4847, Queue No. AB2–084 to be effective 4/2/2019. Filed Date: 2/19/19. Accession Number: 20190219–5184. Comments Due: 5 p.m. ET 3/12/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 19, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–03172 Filed 2–22–19; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 16:22 Feb 22, 2019 Jkt 247001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–1946–011; ER12–1946–012; ER13–2387–005; ER13–2387–006; ER10–1333–011; ER10–1333–012; ER15–190–008; ER15– 190–009; ER17–543–005; ER17–543– 006; ER18–1343–002; ER18–1343–003. Applicants: Duke Energy Beckjord, LLC, Duke Energy Florida, LLC, Duke Energy Commercial Enterprises, Inc., Duke Energy Renewable Services, LLC, Duke Energy SAM, LLC, Carolina Solar Power, LLC. Description: Supplement to November 13, 2018 and December 20, 2018 Notice(s) of Change in Status of the Duke MBR Sellers. Filed Date: 2/15/19. Accession Number: 20190215–5111. Comments Due: 5 p.m. ET 3/8/19. Docket Numbers: ER19–105–002. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Response to Commission’s Jan 15, 2019 Deficiency Letter re: Quadrennial Review to be effective 12/12/2018. Filed Date: 2/14/19. Accession Number: 20190214–5130. Comments Due: 5 p.m. ET 3/7/19. Docket Numbers: ER19–1047–000. Applicants: VESIVEC LLC. Description: Baseline eTariff Filing: MBRA Tariff to be effective 2/15/2019. Filed Date: 2/14/19. Accession Number: 20190214–5094. Comments Due: 5 p.m. ET 3/7/19. Docket Numbers: ER19–1048–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 4355, Queue No. Z2–011/AD1–109 to be effective 5/10/2018. Filed Date: 2/14/19. Accession Number: 20190214–5105. Comments Due: 5 p.m. ET 3/7/19. Docket Numbers: ER19–1049–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, SA No. 5295; Queue No. AB1–137 to be effective 1/18/2019. Filed Date: 2/14/19. Accession Number: 20190214–5106. Comments Due: 5 p.m. ET 3/7/19. Docket Numbers: ER19–1050–000. Applicants: Quantum Pasco Power, LP. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 5999 Description: Tariff Cancellation: Quantum Pasco Notice of Cancellation MBR Tariff to be effective 2/15/2019. Filed Date: 2/14/19. Accession Number: 20190214–5107. Comments Due: 5 p.m. ET 3/7/19. Docket Numbers: ER19–1051–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–02–14_SA 3253 J498 J499 MPFCA (Granger Tap Sycamore) to be effective 1/31/2019. Filed Date: 2/14/19. Accession Number: 20190214–5112. Comments Due: 5 p.m. ET 3/7/19. Docket Numbers: ER19–1052–000. Applicants: ISO New England Inc. Description: ISO New England Inc. submits Fourth Quarter 2018 Capital Budget Report. Filed Date: 2/14/19. Accession Number: 20190214–5095. Comments Due: 5 p.m. ET 3/7/19. Docket Numbers: ER19–1053–000. Applicants: ISO New England Inc. Description: ISO New England Inc. submits Fourth Quarter 2018 Capital Budget Report. Filed Date: 2/14/19. Accession Number: 20190214–5095. Comments Due: 5 p.m. ET 3/7/19. Docket Numbers: ER19–1054–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–02–15_SA 3242 OSER-Hoosier Energy GIA (J759) to be effective 2/1/ 2019. Filed Date: 2/15/19. Accession Number: 20190215–5018. Comments Due: 5 p.m. ET 3/8/19. Docket Numbers: ER19–1055–000. Applicants: Portland General Electric Company. Description: § 205(d) Rate Filing: Attachment N Filing to be effective 4/ 16/2019. Filed Date: 2/15/19. Accession Number: 20190215–5041. Comments Due: 5 p.m. ET 3/8/19. Docket Numbers: ER19–1056–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: GIA & Distribution Serv Agmt Montecito Water District Picay Hydroelectric Plant to be effective 1/17/2019. Filed Date: 2/15/19. Accession Number: 20190215–5077. Comments Due: 5 p.m. ET 3/8/19. Docket Numbers: ER19–1057–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Revisions to Appendix A to the US DOE Berkeley Site Office IA LLNL (SA 63) to be effective 4/16/2019. E:\FR\FM\25FEN1.SGM 25FEN1 6000 Federal Register / Vol. 84, No. 37 / Monday, February 25, 2019 / Notices Filed Date: 2/15/19. Accession Number: 20190215–5078. Comments Due: 5 p.m. ET 3/8/19. Docket Numbers: ER19–1058–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–02–15 Revisions to Attachment FF–4 and VV to add City of Henderson, KY to be effective 4/17/2019. Filed Date: 2/15/19. Accession Number: 20190215–5091. Comments Due: 5 p.m. ET 3/8/19. Docket Numbers: ER19–1059–000. Applicants: Northern Iowa Windpower, LLC. Description: § 205(d) Rate Filing: Revised Tariff, Notice of Category 1 Seller Cntr & Status Change, ER10–1529 to be effective 2/16/2019. Filed Date: 2/15/19. Accession Number: 20190215–5118. Comments Due: 5 p.m. ET 3/8/19. amozie on DSK3GDR082PROD with NOTICES1 Docket Numbers: ER19–1060–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of WMPA SA No. 4093, Queue No. Y2–055 to be effective 1/8/2019. Filed Date: 2/15/19. Accession Number: 20190215–5137. Comments Due: 5 p.m. ET 3/8/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 15, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–03143 Filed 2–22–19; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 16:22 Feb 22, 2019 Jkt 247001 Dated: February 15, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2019–03145 Filed 2–22–19; 8:45 am] BILLING CODE 6717–01–P [Project No. 4644–015] Stevens & Thompson Paper Company, Inc., GR Catalyst Two, LLC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests DEPARTMENT OF ENERGY On January 7, 2019, Stevens & Thompson Paper Company, Inc. (transferor) and GR Catalyst Two, LLC (transferee) filed an application for the transfer of license of the Dahowa Project No. 4644. The project is located on the Batten Kill River in Washington County, New York. The applicants seek Commission approval to transfer the license for the Dahowa Project from the transferor to the transferee. Applicants Contact: For transferor: Stevens & Thompson Paper Company, Inc., Attn: Emory L. Waldrip II, President, 27711 Marina Pointe Drive, Bonita Springs, Florida 34134, Email: emoryw@earthlink.net. For transferee: GR Catalyst Two, LLC, c/o Gravity Renewables, Inc., Attn: Mark J. Boumansour, COO, 1401 Walnut Street, Suite 420, Boulder, Colorado 80302, Email: mark@ gravityrenewables.com. FERC Contact: Anumzziatta Purchiaroni, (202) 502–6191, Anumzziatta.purchiaroni@ferc.gov. Deadline for filing comments, motions to intervene, and protests: 30 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–4644–015. PennEast Pipeline Company, LLC; Notice of Application for Amendment PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. CP19–78–000] Take notice that on February 1, 2019 PennEast Pipeline Company, LLC, One Meridian Boulevard, Suite 2C01, Wyomissing, PA 19610, filed an application under section 7(c) of the Natural Gas Act (NGA) and Part 157 of the Commission’s regulations to amend the certificate of public convenience and necessity and related authorizations issued by the Commission on January 19, 2018 in Docket No. CP15–558–000 (January 19 Order).1 In this application, PennEast has proposed a series of changes to the Project route approved as conditioned in the Certificate Order, all as more fully set forth in the application which is on file with the Commission and open to public inspection. PennEast states that the proposed changes to the Project route address agency and landowner requests, and reduce environmental and landowner impacts. The proposed modifications include realignments and an adjustment in Luzerne, Carbon, Monroe, and Northampton Counties, in Pennsylvania. Among other route changes, PennEast proposes a realignment of the project route to implement an alternate crossing of the Appalachian Trail to be collocated with an existing easement. The other modifications include two (2) minor route realignments and one (1) workspace adjustment. Except for the realignment of the Appalachian Trail crossing, PennEast states that all other realignments and adjustment are within 0.25 mile of the existing Project route approved in the January 19 Order. Questions regarding this filing may be directed Jeffrey D. England, Project Manager PennEast Pipeline Company, LLC, One Meridian Boulevard, Suite 2C01, Wyomissing, PA 19610; Phone: (610) 373–7999, Email: jengland@ ugies.com. This filing is available for review at the Commission’s Washington, DC 1 PennEast Pipeline Company, LLC, 162 FERC ¶ 61,053 (2018), order on reh’g 164 FERC ¶ 16,098 (2018). E:\FR\FM\25FEN1.SGM 25FEN1

Agencies

[Federal Register Volume 84, Number 37 (Monday, February 25, 2019)]
[Notices]
[Pages 5999-6000]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-03143]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER12-1946-011; ER12-1946-012; ER13-2387-005; ER13-
2387-006; ER10-1333-011; ER10-1333-012; ER15-190-008; ER15-190-009; 
ER17-543-005; ER17-543-006; ER18-1343-002; ER18-1343-003.
    Applicants: Duke Energy Beckjord, LLC, Duke Energy Florida, LLC, 
Duke Energy Commercial Enterprises, Inc., Duke Energy Renewable 
Services, LLC, Duke Energy SAM, LLC, Carolina Solar Power, LLC.
    Description: Supplement to November 13, 2018 and December 20, 2018 
Notice(s) of Change in Status of the Duke MBR Sellers.
    Filed Date: 2/15/19.
    Accession Number: 20190215-5111.
    Comments Due: 5 p.m. ET 3/8/19.

    Docket Numbers: ER19-105-002.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Response to Commission's Jan 15, 
2019 Deficiency Letter re: Quadrennial Review to be effective 12/12/
2018.
    Filed Date: 2/14/19.
    Accession Number: 20190214-5130.
    Comments Due: 5 p.m. ET 3/7/19.

    Docket Numbers: ER19-1047-000.
    Applicants: VESIVEC LLC.
    Description: Baseline eTariff Filing: MBRA Tariff to be effective 
2/15/2019.
    Filed Date: 2/14/19.
    Accession Number: 20190214-5094.
    Comments Due: 5 p.m. ET 3/7/19.

    Docket Numbers: ER19-1048-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to ISA, Service 
Agreement No. 4355, Queue No. Z2-011/AD1-109 to be effective 5/10/2018.
    Filed Date: 2/14/19.
    Accession Number: 20190214-5105.
    Comments Due: 5 p.m. ET 3/7/19.

    Docket Numbers: ER19-1049-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original WMPA, SA No. 5295; 
Queue No. AB1-137 to be effective 1/18/2019.
    Filed Date: 2/14/19.
    Accession Number: 20190214-5106.
    Comments Due: 5 p.m. ET 3/7/19.

    Docket Numbers: ER19-1050-000.
    Applicants: Quantum Pasco Power, LP.
    Description: Tariff Cancellation: Quantum Pasco Notice of 
Cancellation MBR Tariff to be effective 2/15/2019.
    Filed Date: 2/14/19.
    Accession Number: 20190214-5107.
    Comments Due: 5 p.m. ET 3/7/19.

    Docket Numbers: ER19-1051-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-02-14_SA 3253 J498 J499 
MPFCA (Granger Tap Sycamore) to be effective 1/31/2019.
    Filed Date: 2/14/19.
    Accession Number: 20190214-5112.
    Comments Due: 5 p.m. ET 3/7/19.

    Docket Numbers: ER19-1052-000.
    Applicants: ISO New England Inc.
    Description: ISO New England Inc. submits Fourth Quarter 2018 
Capital Budget Report.
    Filed Date: 2/14/19.
    Accession Number: 20190214-5095.
    Comments Due: 5 p.m. ET 3/7/19.

    Docket Numbers: ER19-1053-000.
    Applicants: ISO New England Inc.
    Description: ISO New England Inc. submits Fourth Quarter 2018 
Capital Budget Report.
    Filed Date: 2/14/19.
    Accession Number: 20190214-5095.
    Comments Due: 5 p.m. ET 3/7/19.

    Docket Numbers: ER19-1054-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-02-15_SA 3242 OSER-
Hoosier Energy GIA (J759) to be effective 2/1/2019.
    Filed Date: 2/15/19.
    Accession Number: 20190215-5018.
    Comments Due: 5 p.m. ET 3/8/19.

    Docket Numbers: ER19-1055-000.
    Applicants: Portland General Electric Company.
    Description: Sec.  205(d) Rate Filing: Attachment N Filing to be 
effective 4/16/2019.
    Filed Date: 2/15/19.
    Accession Number: 20190215-5041.
    Comments Due: 5 p.m. ET 3/8/19.

    Docket Numbers: ER19-1056-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: GIA & Distribution Serv Agmt 
Montecito Water District Picay Hydroelectric Plant to be effective 1/
17/2019.
    Filed Date: 2/15/19.
    Accession Number: 20190215-5077.
    Comments Due: 5 p.m. ET 3/8/19.

    Docket Numbers: ER19-1057-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: Revisions to Appendix A to 
the US DOE Berkeley Site Office IA LLNL (SA 63) to be effective 4/16/
2019.

[[Page 6000]]

    Filed Date: 2/15/19.
    Accession Number: 20190215-5078.
    Comments Due: 5 p.m. ET 3/8/19.

    Docket Numbers: ER19-1058-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-02-15 Revisions to 
Attachment FF-4 and VV to add City of Henderson, KY to be effective 4/
17/2019.
    Filed Date: 2/15/19.
    Accession Number: 20190215-5091.
    Comments Due: 5 p.m. ET 3/8/19.

    Docket Numbers: ER19-1059-000.
    Applicants: Northern Iowa Windpower, LLC.
    Description: Sec.  205(d) Rate Filing: Revised Tariff, Notice of 
Category 1 Seller Cntr & Status Change, ER10-1529 to be effective 2/16/
2019.
    Filed Date: 2/15/19.
    Accession Number: 20190215-5118.
    Comments Due: 5 p.m. ET 3/8/19.

    Docket Numbers: ER19-1060-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation of WMPA SA 
No. 4093, Queue No. Y2-055 to be effective 1/8/2019.
    Filed Date: 2/15/19.
    Accession Number: 20190215-5137.
    Comments Due: 5 p.m. ET 3/8/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: February 15, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-03143 Filed 2-22-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.