Crystal Lake Wind Energy II, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 4801 [2019-02636]

Download as PDF Federal Register / Vol. 84, No. 33 / Tuesday, February 19, 2019 / Notices Online service, please email FERC OnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: February 12, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [Docket No. ER19–1003–000] tkelley on DSKBCP9HB2PROD with NOTICES Crystal Lake Wind Energy II, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization [FR Doc. 2019–02636 Filed 2–15–19; 8:45 am] BILLING CODE 6717–01–P This is a supplemental notice in the above-referenced proceeding of Crystal Lake Wind Energy II, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is March 4, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC VerDate Sep<11>2014 17:46 Feb 15, 2019 Jkt 247001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–54–000 Applicants: FPL Energy New York, LLC, FPL ENERGY ROCKAWAY PEAKING FACILITIES, LLC, Bayswater Peaking Facility, LLC, Jamaica Bay Peaking Facility, LLC, MPH Rockaway Peakers, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of FPL Energy New York, LLC, et al. Filed Date: 2/8/19. Accession Number: 20190208–5181. Comments Due: 5 p.m. ET 3/1/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–3285–002; ER10–3181 003;ER17–177 001. Applicants: UGI Utilities Inc., UGI Development Company, UGI Energy Services, LLC. Description: Errata to October 31, 2018 Notice of Non-Material Change in Status of the UGI MBR Companies. Filed Date: 2/11/19. Accession Number: 20190211–5197. Comments Due: 5 p.m. ET 3/4/19. Docket Numbers: ER11–2774–003. Applicants: Virginia Electric and Power Company, Dominion Energy Generation Marketing, Inc., Dominion Energy Nuclear Connecticut, Inc., NedPower Mount Storm, LLC, Fowler Ridge Wind Farm LLC, Dominion Bridgeport Fuel Cell, LLC, South Carolina Electric & Gas Company. Description: Notice of Non-Material Change in Status of Dominion Resources Services, Inc., on behalf of Virginia Electric and Power Company, et al. Filed Date: 2/8/19. Accession Number: 20190208–5175. Comments Due: 5 p.m. ET 3/1/19. Docket Numbers: ER12–203–003. Applicants: Virginia Electric and Power Company, Dominion Energy PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 4801 Generation Marketing, Inc., Dominion Energy Nuclear Connecticut, Inc., NedPower Mount Storm, LLC, Fowler Ridge Wind Farm LLC, Dominion Bridgeport Fuel Cell, LLC, South Carolina Electric & Gas Company. Description: Notice of Non-Material Change in Status of Dominion Resources Services, Inc., on behalf of Virginia Electric and Power Company, et al. Filed Date: 2/8/19. Accession Number: 20190208–5174. Comments Due: 5 p.m. ET 3/1/19. Docket Numbers: ER19–1030–000. Applicants: Masspower, LLC. Description: § 205(d) Rate Filing: Notice of succession to be effective 2/ 12/2019. Filed Date: 2/11/19. Accession Number: 20190211–5158. Comments Due: 5 p.m. ET 3/4/19. Docket Numbers: ER19–1031–000. Applicants: South Shore Energy, LLC, Dairyland Power Cooperative. Description: Request for Expedited One-Time Limited Waiver of South Shore Energy, LLC, et al. Filed Date: 2/8/19. Accession Number: 20190208–5160. Comments Due: 5 p.m. ET 3/1/19. Docket Numbers: ER19–1032–000. Applicants: Central Maine Power Company. Description: Notice of Cancellation of Tariff Schedule W–1 of Central Maine Power Company. Filed Date: 2/8/19. Accession Number: 20190208–5163. Comments Due: 5 p.m. ET 3/1/19. Docket Numbers: ER19–1033–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–02–12_SA 1710 Certificate of Concurrence AEP-Duke Energy IA to be effective 12/12/2018. Filed Date: 2/12/19. Accession Number: 20190212–5029. Comments Due: 5 p.m. ET 3/5/19. Docket Numbers: ER19–1034–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–02–12_Termination of SA 3101 GIA and SA 3102 MPFCA to be effective 3/3/2019. Filed Date: 2/12/19. Accession Number: 20190212–5031. Comments Due: 5 p.m. ET 3/5/19. Docket Numbers: ER19–1035–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–02–12_SA 3045 Ida Grove-MEC 1st Rev GIA (J412) to be effective 1/29/ 2019. Filed Date: 2/12/19. E:\FR\FM\19FEN1.SGM 19FEN1

Agencies

[Federal Register Volume 84, Number 33 (Tuesday, February 19, 2019)]
[Notices]
[Page 4801]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-02636]



[[Page 4801]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER19-1003-000]


Crystal Lake Wind Energy II, LLC; Supplemental Notice That 
Initial Market-Based Rate Filing Includes Request for Blanket Section 
204 Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Crystal Lake Wind Energy II, LLC's application for market-based rate 
authority, with an accompanying rate tariff, noting that such 
application includes a request for blanket authorization, under 18 CFR 
part 34, of future issuances of securities and assumptions of 
liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street, NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is March 4, 2019.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: February 12, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-02636 Filed 2-15-19; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.