Combined Notice of Filings #1, 4461-4462 [2019-02499]
Download as PDF
Federal Register / Vol. 84, No. 32 / Friday, February 15, 2019 / Notices
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 4,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link above.
They are also available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 11, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–02503 Filed 2–14–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKBBV9HB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–55–000.
Applicants: Long Ridge Energy
Generation LLC.
Description: Self-Certification of EG of
Long Ridge Energy Generation LLC.
Filed Date: 2/8/19.
Accession Number: 20190208–5135.
Comments Due: 5 p.m. ET 3/1/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1481–002.
VerDate Sep<11>2014
19:41 Feb 14, 2019
Jkt 247001
Applicants: Duke Energy Florida,
LLC.
Description: Compliance filing: DEF
Interchange Compliance Filing to be
effective 1/1/2019.
Filed Date: 2/11/19.
Accession Number: 20190211–5117.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19–356–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Deficiency Response—Require All VERs
to Register and Convert to DVERs to be
effective 1/16/2019.
Filed Date: 2/11/19.
Accession Number: 20190211–5098.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19–601–001.
Applicants: AEP Energy Partners, Inc.
Description: Tariff Amendment: MBR
Tariff, FERC Electric Tariff for Market
Bases Sales to be effective 3/1/2019.
Filed Date: 2/11/19.
Accession Number: 20190211–5000.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–606–001.
Applicants: AEP Generation
Resources Inc.
Description: Tariff Amendment: MBR
Tariff, FERC Electric Tariff For MarketBased Sales to be effective 3/1/2019.
Filed Date: 2/11/19.
Accession Number: 20190211–5002.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–936–001.
Applicants: New England Power Pool
Participants Committee.
Description: Tariff Amendment: Feb
2019 Membership Filing (Corrected) to
be effective 1/1/2019.
Filed Date: 2/8/19.
Accession Number: 20190208–5150.
Comments Due: 5 p.m. ET 3/1/19.
Docket Numbers: ER19–1021–000.
Applicants: Appalachian Power
Company.
Description: § 205(d) Rate Filing:
OATT—Revise Attachment K, AEP
Texas Inc. Rate Update to be effective
12/31/9998.
Filed Date: 2/8/19.
Accession Number: 20190208–5114.
Comments Due: 5 p.m. ET 3/1/19.
Docket Numbers: ER19–1022–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised WMPA Service Agreement No.
2033; Queue No. N07 to be effective 1/
12/2019.
Filed Date: 2/8/19.
Accession Number: 20190208–5125.
Comments Due: 5 p.m. ET 3/1/19.
Docket Numbers: ER19–1023–000.
Applicants: Spruance Operating
Services, LLC.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
4461
Description: Baseline eTariff Filing:
MBR Application to be effective 3/25/
2019.
Filed Date: 2/8/19.
Accession Number: 20190208–5136.
Comments Due: 5 p.m. ET 3/1/19.
Docket Numbers: ER19–1024–000.
Applicants: AEP Generation
Resources Inc.
Description: § 205(d) Rate Filing: MBR
Tariff, FERC Electric Tariff For MarketBased Sales to be effective 3/1/2019.
Filed Date: 2/8/19.
Accession Number: 20190208–5151.
Comments Due: 5 p.m. ET 3/1/19.
Docket Numbers: ER19–1025–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–02–11_SA 3239 Kossuth WindMidAmerican GIA (J534) to be effective
1/28/2019.
Filed Date: 2/11/19.
Accession Number: 20190211–5060.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19–1026–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–02–11_SA 3238 EDF RenewablesMidAmerican FCA (J495) to be effective
1/28/2019.
Filed Date: 2/11/19.
Accession Number: 20190211–5069.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19–1027–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–02–11_SA 2988 MidAmericanMidAmerican 2nd Rev GIA (J500) to be
effective 1/28/2019.
Filed Date: 2/11/19.
Accession Number: 20190211–5073.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19–1028–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1534R9 Kansas Municipal Energy
Agency NITSA NOA to be effective 2/
1/2019.
Filed Date: 2/11/19.
Accession Number: 20190211–5080.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19–1029–000.
Applicants: Southwestern Public
Service Company.
Description: § 205(d) Rate Filing:
SPS–GSEC–SPEC–T–IA–Yuma–2–707–
0.0.0 to be effective 4/13/2019.
Filed Date: 2/11/19.
Accession Number: 20190211–5094.
Comments Due: 5 p.m. ET 3/4/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
E:\FR\FM\15FEN1.SGM
15FEN1
4462
Federal Register / Vol. 84, No. 32 / Friday, February 15, 2019 / Notices
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 11, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–02499 Filed 2–14–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–987–000]
Dated: February 11, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
khammond on DSKBBV9HB2PROD with NOTICES
Crystal Lake Wind Energy I, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2019–02502 Filed 2–14–19; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding of Crystal
Lake Wind Energy I, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 4,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
VerDate Sep<11>2014
19:41 Feb 14, 2019
Jkt 247001
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link above.
They are also available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR19–36–000.
Applicants: Bay Gas Storage
Company, Ltd.
Description: Tariff filing per
284.123(b),(e)/: Bay Gas Storage Co.,
Ltd. 2019 Annual Adjustment to
Company Use Percentage to be effective
3/1/2019.
Filed Date: 2/6/19.
Accession Number: 201902065085.
Comments/Protests Due: 5 p.m. ET 2/
27/19.
Docket Numbers: RP19–641–000.
Applicants: Dominion Energy Questar
Pipeline, LLC.
Description: § 4(d) Rate Filing: 2019
Cleanup to be effective 3/10/2019.
Filed Date: 2/7/19.
Accession Number: 20190207–5170.
Comments Due: 5 p.m. ET 2/19/19.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Docket Numbers: RP19–642–000.
Applicants: Dominion Energy
Overthrust Pipeline, LLC.
Description: § 4(d) Rate Filing: 2019
Cleanup to be effective 3/10/2019.
Filed Date: 2/7/19.
Accession Number: 20190207–5172.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: RP19–643–000.
Applicants: White River Hub, LLC.
Description: § 4(d) Rate Filing:
Housekeeping to be effective 3/10/2019.
Filed Date: 2/7/19.
Accession Number: 20190207–5173.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: RP19–644–000.
Applicants: Questar Southern Trails
Pipeline Company.
Description: § 4(d) Rate Filing: 2019
Housekeeping to be effective 3/10/2019.
Filed Date: 2/7/19.
Accession Number: 20190207–5174.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: RP19–645–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2019–02–07 BHS (3) to be effective
2/7/2019.
Filed Date: 2/7/19.
Accession Number: 20190207–5175.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: RP19–646–000.
Applicants: Northern Border Pipeline
Company.
Description: § 4(d) Rate Filing:
Correction to NBPL PAL Rate to be
effective 2/1/2019.
Filed Date: 2/8/19.
Accession Number: 20190208–5046.
Comments Due: 5 p.m. ET 2/20/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 11, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–02501 Filed 2–14–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\15FEN1.SGM
15FEN1
Agencies
[Federal Register Volume 84, Number 32 (Friday, February 15, 2019)]
[Notices]
[Pages 4461-4462]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-02499]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-55-000.
Applicants: Long Ridge Energy Generation LLC.
Description: Self-Certification of EG of Long Ridge Energy
Generation LLC.
Filed Date: 2/8/19.
Accession Number: 20190208-5135.
Comments Due: 5 p.m. ET 3/1/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-1481-002.
Applicants: Duke Energy Florida, LLC.
Description: Compliance filing: DEF Interchange Compliance Filing
to be effective 1/1/2019.
Filed Date: 2/11/19.
Accession Number: 20190211-5117.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19-356-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: Deficiency Response--Require All
VERs to Register and Convert to DVERs to be effective 1/16/2019.
Filed Date: 2/11/19.
Accession Number: 20190211-5098.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19-601-001.
Applicants: AEP Energy Partners, Inc.
Description: Tariff Amendment: MBR Tariff, FERC Electric Tariff for
Market Bases Sales to be effective 3/1/2019.
Filed Date: 2/11/19.
Accession Number: 20190211-5000.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19-606-001.
Applicants: AEP Generation Resources Inc.
Description: Tariff Amendment: MBR Tariff, FERC Electric Tariff For
Market-Based Sales to be effective 3/1/2019.
Filed Date: 2/11/19.
Accession Number: 20190211-5002.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19-936-001.
Applicants: New England Power Pool Participants Committee.
Description: Tariff Amendment: Feb 2019 Membership Filing
(Corrected) to be effective 1/1/2019.
Filed Date: 2/8/19.
Accession Number: 20190208-5150.
Comments Due: 5 p.m. ET 3/1/19.
Docket Numbers: ER19-1021-000.
Applicants: Appalachian Power Company.
Description: Sec. 205(d) Rate Filing: OATT--Revise Attachment K,
AEP Texas Inc. Rate Update to be effective 12/31/9998.
Filed Date: 2/8/19.
Accession Number: 20190208-5114.
Comments Due: 5 p.m. ET 3/1/19.
Docket Numbers: ER19-1022-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised WMPA Service
Agreement No. 2033; Queue No. N07 to be effective 1/12/2019.
Filed Date: 2/8/19.
Accession Number: 20190208-5125.
Comments Due: 5 p.m. ET 3/1/19.
Docket Numbers: ER19-1023-000.
Applicants: Spruance Operating Services, LLC.
Description: Baseline eTariff Filing: MBR Application to be
effective 3/25/2019.
Filed Date: 2/8/19.
Accession Number: 20190208-5136.
Comments Due: 5 p.m. ET 3/1/19.
Docket Numbers: ER19-1024-000.
Applicants: AEP Generation Resources Inc.
Description: Sec. 205(d) Rate Filing: MBR Tariff, FERC Electric
Tariff For Market-Based Sales to be effective 3/1/2019.
Filed Date: 2/8/19.
Accession Number: 20190208-5151.
Comments Due: 5 p.m. ET 3/1/19.
Docket Numbers: ER19-1025-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-02-11_SA 3239 Kossuth
Wind-MidAmerican GIA (J534) to be effective 1/28/2019.
Filed Date: 2/11/19.
Accession Number: 20190211-5060.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19-1026-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-02-11_SA 3238 EDF
Renewables-MidAmerican FCA (J495) to be effective 1/28/2019.
Filed Date: 2/11/19.
Accession Number: 20190211-5069.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19-1027-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-02-11_SA 2988
MidAmerican-MidAmerican 2nd Rev GIA (J500) to be effective 1/28/2019.
Filed Date: 2/11/19.
Accession Number: 20190211-5073.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19-1028-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1534R9 Kansas Municipal
Energy Agency NITSA NOA to be effective 2/1/2019.
Filed Date: 2/11/19.
Accession Number: 20190211-5080.
Comments Due: 5 p.m. ET 3/4/19.
Docket Numbers: ER19-1029-000.
Applicants: Southwestern Public Service Company.
Description: Sec. 205(d) Rate Filing: SPS-GSEC-SPEC-T-IA-Yuma-2-
707-0.0.0 to be effective 4/13/2019.
Filed Date: 2/11/19.
Accession Number: 20190211-5094.
Comments Due: 5 p.m. ET 3/4/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
[[Page 4462]]
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 11, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-02499 Filed 2-14-19; 8:45 am]
BILLING CODE 6717-01-P