Environmental Impact Statements; Notice of Availability, 4463-4464 [2019-02454]
Download as PDF
Federal Register / Vol. 84, No. 32 / Friday, February 15, 2019 / Notices
khammond on DSKBBV9HB2PROD with NOTICES
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings
[Docket No. ER19–1009–000]
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Revere Power, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
Filings Instituting Proceedings
Docket Numbers: RP19–639–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2019–02–06 Encana to be effective
2/6/2019.
Filed Date: 2/6/19.
Accession Number: 20190206–5094.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: RP18–1219–001.
Applicants: Northern Natural Gas
Company.
Description: Progress Report and
Petition for Waiver of Commission
Regulations of Northern Natural Gas
Company.
Filed Date: 2/7/19.
Accession Number: 20190207–5038.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: RP19–640–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Feb2019 Negotiated Rates Cleanup
Filing to be effective 3/7/2019.
Filed Date: 2/7/19.
Accession Number: 20190207–5007.
Comments Due: 5 p.m. ET 2/19/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 8, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–02500 Filed 2–14–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
21:24 Feb 14, 2019
Jkt 247001
This is a supplemental notice in the
above-referenced proceeding of Revere
Power, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 4,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link above.
They are also available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
4463
Dated: February 11, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–02504 Filed 2–14–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9043–4]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/
nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 02/04/2019 Through 02/08/2019
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20190006, Draft, HHS, WV,
Acquisition of Site for Development
of a Replacement Underground Safety
Research Program Facility in Mace,
West Virginia, Comment Period Ends:
04/05/2019, Contact: Sam Tarr 770–
488–2408
EIS No. 20190007, Final, USCG, AK,
Polar Security Cutter Acquisition
Program Final Programmatic
Environmental Impact Statement,
Review Period Ends: 03/18/2019,
Contact: Christine Wiegand 202–475–
3742
EIS No. 20190008, Final, USFS, CBP, ID,
Bog Creek Road Project, Review
Period Ends: 04/02/2019, Contact:
Joseph Zidron 949–643–6392
EIS No. 20190009, Final, USFS, ID,
Little Boulder, Review Period Ends:
04/01/2019, Contact: Johanna Kovarik
208–476–8344
EIS No. 20190010, Final, USFS, CO,
Crested Butte Mountain Resort Ski
Area Projects, Review Period Ends:
04/01/2019, Contact: Aaron Drendel
970–641–0471
EIS No. 20190011, Draft, BLM, NV,
Gemfield Mine Project, Comment
Period Ends: 04/10/2019, Contact:
Kevin Hurrell 775–635–4000
EIS No. 20190012, Final Supplement,
GSA, CA, San Ysidro Land Port of
E:\FR\FM\15FEN1.SGM
15FEN1
4464
Federal Register / Vol. 84, No. 32 / Friday, February 15, 2019 / Notices
Entry Improvements Project, Review
Period Ends: 03/18/2019, Contact:
Osmahn Kadri 415–522–3617
EIS No. 20190013, Final, DOE, LA,
ADOPTION—Port Arthur
Liquefaction Project, Texas Connector
Project, and Louisiana Connector
Project, Contact: Brian Lavoie 202–
586–2459
The Department of Energy (DOE) has
adopted the Federal Energy Regulatory
Commission’s Final EIS No. 20190003,
filed 01/31/2019 with the EPA. DOE
was a cooperating agency on this
project. Therefore, recirculation of the
document is not necessary under
Section 1506.3(c) of the CEQ
regulations.
Amended Notices
EIS No. 20180302, Draft Supplement,
NMFS, WA, 10 Salmon and Steelhead
Hatchery Programs in the DuwamishGreen River Basin, Comment Period
Ends: 03/01/2019, Contact: Allyson
Purcell 503–736–4736. Revision to FR
Notice Published 12/07/2018; NOAA
has reopened the comment period to
end on 03/01/2019.
EIS No. 20180303, Draft, BOEM, MA,
Vineyard Wind Offshore Wind Energy
Project, Comment Period Ends: 02/22/
2019, Contact: Michelle Morin 703–
787–1722. Revision to FR Notice
Published 12/07/2018; Extending the
Comment Period from 01/21/2019 to
02/22/2019.
EIS No. 20180328, Draft, CTDOH, CT,
Resilient Bridgeport, Comment Period
Ends: 03/18/2019, Contact: Rebecca
French 860–270–8231. Revision to FR
Notice Published 02/01/2109;
Correction Lead Agency from HUD to
CTDOH.
Dated: February 12, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019–02454 Filed 2–14–19; 8:45 am]
BILLING CODE 6560–50–P
FEDERAL COMMUNICATIONS
COMMISSION
Federal Advisory Committee Act;
Broadband Deployment Advisory
Committee, GN 17–83
Federal Communications
Commission.
ACTION: Notice of renewal of the
Broadband Deployment Advisory
Committee’s charter.
khammond on DSKBBV9HB2PROD with NOTICES
AGENCY:
The Federal Communications
Commission (Commission) hereby
announces that the charter of the
Broadband Deployment Advisory
SUMMARY:
VerDate Sep<11>2014
19:41 Feb 14, 2019
Jkt 247001
Committee (hereinafter Committee) has
been renewed pursuant to the Federal
Advisory Committee Act (FACA).
FOR FURTHER INFORMATION CONTACT: Paul
D’Ari, Designated Federal Officer,
Federal Communications Commission,
Wireline Competition Bureau, (202)
418–1550, or email: Paul.DAri@fcc.gov.
SUPPLEMENTARY INFORMATION: On
February 4, 2019, the General Services
Administration approved renewal of the
charter of the Committee pursuant to
provisions of the FACA. The
Commission intends to renew the
charter on or before March 1, 2019 and
provide the Committee with
authorization to operate for two years
from the effective date.
The Committee provides
recommendations to the Commission on
how to accelerate the deployment of
high-speed internet access, or
‘‘broadband,’’ by reducing and/or
removing regulatory barriers to
infrastructure investment and
strengthening existing broadband
networks in communities across the
country. This Committee provides an
effective means for stakeholders with
interests in this area to exchange ideas
and develop recommendations to the
Commission on broadband deployment,
which will in turn enhance the
Commission’s ability to carry out its
statutory responsibility to encourage
broadband deployment to all
Americans.
Issues to be considered by the
Committee may include, but are not
limited to, measures to prepare for,
respond to, and recover from disasters
that impact broadband networks; new
ways of encouraging deployment of
high-speed broadband infrastructure
and services to low-income
communities; and other ways to
accelerate deployment of broadband
infrastructure to all Americans and to
close the digital divide.
The Committee is organized under,
and operates in accordance with, the
provisions of the FACA. The Committee
will be solely advisory in nature.
Consistent with FACA and its
requirements, each meeting of the
Committee will be open to the public
unless otherwise noticed. A notice of
each meeting will be published in the
Federal Register at least fifteen (15)
days in advance of the meeting. Records
will be maintained of each meeting and
made available for public inspection.
All activities of the Committee will be
conducted in an open, transparent, and
accessible manner. The Committee shall
terminate on March 1, 2021, or earlier
upon the completion of its work as
determined by the Chairman, unless its
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
charter is renewed prior to the
termination date.
During the Committee’s second term,
it is anticipated that the Committee will
meet in Washington, DC for at least
three (3) one-day meetings. The first
meeting date and agenda topics will be
described in a Public Notice issued and
published in the Federal Register at
least fifteen (15) days prior to the first
meeting date. In addition, as needed,
working groups or subcommittees (ad
hoc or steering) will be established to
facilitate the Committee’s work between
meetings of the full Committee. All
meetings, including those of working
groups and subcommittees, will be fully
accessible to individuals with
disabilities.
Federal Communications Commission.
Pamela Arluk,
Chief, Competition Policy Division, Wireline
Competition Bureau.
[FR Doc. 2019–02567 Filed 2–14–19; 8:45 am]
BILLING CODE 6712–01–P
FEDERAL COMMUNICATIONS
COMMISSION
Radio Broadcasting Services; AM or
FM Proposals To Change The
Community of License
Federal Communications
Commission.
ACTION: Notice.
AGENCY:
The agency must receive
comments on or before April 16, 2019.
ADDRESSES: Federal Communications
Commission, 445 12th Street SW,
Washington, DC 20554.
FOR FURTHER INFORMATION CONTACT:
Rolanda F. Smith, 202–418–2054.
SUPPLEMENTARY INFORMATION: The
following applicants filed AM or FM
proposals to change the community of
license: WE HAVE THIS HOPE
CHRISTIAN RADIO, INC., Fac. ID No.
175404, KOLJ–FM, Channel 216C1,
From WARROAD, MN, To
WANNASKA, MN, BPED–
20190108AAG; CENTRO FAMILIAR
CRISTIANO, Fac. ID No. 164149,
KLSY(FM), Channel 229C0, From
MONTESANO, WA, To BELFAIR, WA,
BPH–20181108AAQ; CHISHOLM
TRAIL COMMUNICATIONS LLC, Fac.
ID No. 165950, KOME–FM, Channel
238C3, From MERIDIAN, TX, To
TOLAR, TX, BPH–20181228AAD; THE
CROMWELL GROUP, INC. OF
ILLINOIS, Fac. ID No. 65572,
WMCI(FM), Channel 267B1, From
NEOGA, IL, To MATTOON, IL, BPH–
20181109ACC; CITICASTERS
LICENSES, INC., AS DEBTOR IN
DATES:
E:\FR\FM\15FEN1.SGM
15FEN1
Agencies
[Federal Register Volume 84, Number 32 (Friday, February 15, 2019)]
[Notices]
[Pages 4463-4464]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-02454]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9043-4]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information 202-564-5632 or https://www.epa.gov/ nepa/.
Weekly receipt of Environmental Impact Statements
Filed 02/04/2019 Through 02/08/2019
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20190006, Draft, HHS, WV, Acquisition of Site for Development
of a Replacement Underground Safety Research Program Facility in Mace,
West Virginia, Comment Period Ends: 04/05/2019, Contact: Sam Tarr 770-
488-2408
EIS No. 20190007, Final, USCG, AK, Polar Security Cutter Acquisition
Program Final Programmatic Environmental Impact Statement, Review
Period Ends: 03/18/2019, Contact: Christine Wiegand 202-475-3742
EIS No. 20190008, Final, USFS, CBP, ID, Bog Creek Road Project, Review
Period Ends: 04/02/2019, Contact: Joseph Zidron 949-643-6392
EIS No. 20190009, Final, USFS, ID, Little Boulder, Review Period Ends:
04/01/2019, Contact: Johanna Kovarik 208-476-8344
EIS No. 20190010, Final, USFS, CO, Crested Butte Mountain Resort Ski
Area Projects, Review Period Ends: 04/01/2019, Contact: Aaron Drendel
970-641-0471
EIS No. 20190011, Draft, BLM, NV, Gemfield Mine Project, Comment Period
Ends: 04/10/2019, Contact: Kevin Hurrell 775-635-4000
EIS No. 20190012, Final Supplement, GSA, CA, San Ysidro Land Port of
[[Page 4464]]
Entry Improvements Project, Review Period Ends: 03/18/2019, Contact:
Osmahn Kadri 415-522-3617
EIS No. 20190013, Final, DOE, LA, ADOPTION--Port Arthur Liquefaction
Project, Texas Connector Project, and Louisiana Connector Project,
Contact: Brian Lavoie 202-586-2459
The Department of Energy (DOE) has adopted the Federal Energy
Regulatory Commission's Final EIS No. 20190003, filed 01/31/2019 with
the EPA. DOE was a cooperating agency on this project. Therefore,
recirculation of the document is not necessary under Section 1506.3(c)
of the CEQ regulations.
Amended Notices
EIS No. 20180302, Draft Supplement, NMFS, WA, 10 Salmon and Steelhead
Hatchery Programs in the Duwamish-Green River Basin, Comment Period
Ends: 03/01/2019, Contact: Allyson Purcell 503-736-4736. Revision to FR
Notice Published 12/07/2018; NOAA has reopened the comment period to
end on 03/01/2019.
EIS No. 20180303, Draft, BOEM, MA, Vineyard Wind Offshore Wind Energy
Project, Comment Period Ends: 02/22/2019, Contact: Michelle Morin 703-
787-1722. Revision to FR Notice Published 12/07/2018; Extending the
Comment Period from 01/21/2019 to 02/22/2019.
EIS No. 20180328, Draft, CTDOH, CT, Resilient Bridgeport, Comment
Period Ends: 03/18/2019, Contact: Rebecca French 860-270-8231. Revision
to FR Notice Published 02/01/2109; Correction Lead Agency from HUD to
CTDOH.
Dated: February 12, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019-02454 Filed 2-14-19; 8:45 am]
BILLING CODE 6560-50-P