Environmental Impact Statements; Notice of Availability, 4463-4464 [2019-02454]

Download as PDF Federal Register / Vol. 84, No. 32 / Friday, February 15, 2019 / Notices khammond on DSKBBV9HB2PROD with NOTICES FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Combined Notice of Filings [Docket No. ER19–1009–000] Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Revere Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization Filings Instituting Proceedings Docket Numbers: RP19–639–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: Neg Rate 2019–02–06 Encana to be effective 2/6/2019. Filed Date: 2/6/19. Accession Number: 20190206–5094. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: RP18–1219–001. Applicants: Northern Natural Gas Company. Description: Progress Report and Petition for Waiver of Commission Regulations of Northern Natural Gas Company. Filed Date: 2/7/19. Accession Number: 20190207–5038. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: RP19–640–000. Applicants: Algonquin Gas Transmission, LLC. Description: § 4(d) Rate Filing: Feb2019 Negotiated Rates Cleanup Filing to be effective 3/7/2019. Filed Date: 2/7/19. Accession Number: 20190207–5007. Comments Due: 5 p.m. ET 2/19/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 8, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–02500 Filed 2–14–19; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 21:24 Feb 14, 2019 Jkt 247001 This is a supplemental notice in the above-referenced proceeding of Revere Power, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is March 4, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link above. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 4463 Dated: February 11, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–02504 Filed 2–14–19; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9043–4] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information 202– 564–5632 or https://www.epa.gov/ nepa/. Weekly receipt of Environmental Impact Statements Filed 02/04/2019 Through 02/08/2019 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20190006, Draft, HHS, WV, Acquisition of Site for Development of a Replacement Underground Safety Research Program Facility in Mace, West Virginia, Comment Period Ends: 04/05/2019, Contact: Sam Tarr 770– 488–2408 EIS No. 20190007, Final, USCG, AK, Polar Security Cutter Acquisition Program Final Programmatic Environmental Impact Statement, Review Period Ends: 03/18/2019, Contact: Christine Wiegand 202–475– 3742 EIS No. 20190008, Final, USFS, CBP, ID, Bog Creek Road Project, Review Period Ends: 04/02/2019, Contact: Joseph Zidron 949–643–6392 EIS No. 20190009, Final, USFS, ID, Little Boulder, Review Period Ends: 04/01/2019, Contact: Johanna Kovarik 208–476–8344 EIS No. 20190010, Final, USFS, CO, Crested Butte Mountain Resort Ski Area Projects, Review Period Ends: 04/01/2019, Contact: Aaron Drendel 970–641–0471 EIS No. 20190011, Draft, BLM, NV, Gemfield Mine Project, Comment Period Ends: 04/10/2019, Contact: Kevin Hurrell 775–635–4000 EIS No. 20190012, Final Supplement, GSA, CA, San Ysidro Land Port of E:\FR\FM\15FEN1.SGM 15FEN1 4464 Federal Register / Vol. 84, No. 32 / Friday, February 15, 2019 / Notices Entry Improvements Project, Review Period Ends: 03/18/2019, Contact: Osmahn Kadri 415–522–3617 EIS No. 20190013, Final, DOE, LA, ADOPTION—Port Arthur Liquefaction Project, Texas Connector Project, and Louisiana Connector Project, Contact: Brian Lavoie 202– 586–2459 The Department of Energy (DOE) has adopted the Federal Energy Regulatory Commission’s Final EIS No. 20190003, filed 01/31/2019 with the EPA. DOE was a cooperating agency on this project. Therefore, recirculation of the document is not necessary under Section 1506.3(c) of the CEQ regulations. Amended Notices EIS No. 20180302, Draft Supplement, NMFS, WA, 10 Salmon and Steelhead Hatchery Programs in the DuwamishGreen River Basin, Comment Period Ends: 03/01/2019, Contact: Allyson Purcell 503–736–4736. Revision to FR Notice Published 12/07/2018; NOAA has reopened the comment period to end on 03/01/2019. EIS No. 20180303, Draft, BOEM, MA, Vineyard Wind Offshore Wind Energy Project, Comment Period Ends: 02/22/ 2019, Contact: Michelle Morin 703– 787–1722. Revision to FR Notice Published 12/07/2018; Extending the Comment Period from 01/21/2019 to 02/22/2019. EIS No. 20180328, Draft, CTDOH, CT, Resilient Bridgeport, Comment Period Ends: 03/18/2019, Contact: Rebecca French 860–270–8231. Revision to FR Notice Published 02/01/2109; Correction Lead Agency from HUD to CTDOH. Dated: February 12, 2019. Robert Tomiak, Director, Office of Federal Activities. [FR Doc. 2019–02454 Filed 2–14–19; 8:45 am] BILLING CODE 6560–50–P FEDERAL COMMUNICATIONS COMMISSION Federal Advisory Committee Act; Broadband Deployment Advisory Committee, GN 17–83 Federal Communications Commission. ACTION: Notice of renewal of the Broadband Deployment Advisory Committee’s charter. khammond on DSKBBV9HB2PROD with NOTICES AGENCY: The Federal Communications Commission (Commission) hereby announces that the charter of the Broadband Deployment Advisory SUMMARY: VerDate Sep<11>2014 19:41 Feb 14, 2019 Jkt 247001 Committee (hereinafter Committee) has been renewed pursuant to the Federal Advisory Committee Act (FACA). FOR FURTHER INFORMATION CONTACT: Paul D’Ari, Designated Federal Officer, Federal Communications Commission, Wireline Competition Bureau, (202) 418–1550, or email: Paul.DAri@fcc.gov. SUPPLEMENTARY INFORMATION: On February 4, 2019, the General Services Administration approved renewal of the charter of the Committee pursuant to provisions of the FACA. The Commission intends to renew the charter on or before March 1, 2019 and provide the Committee with authorization to operate for two years from the effective date. The Committee provides recommendations to the Commission on how to accelerate the deployment of high-speed internet access, or ‘‘broadband,’’ by reducing and/or removing regulatory barriers to infrastructure investment and strengthening existing broadband networks in communities across the country. This Committee provides an effective means for stakeholders with interests in this area to exchange ideas and develop recommendations to the Commission on broadband deployment, which will in turn enhance the Commission’s ability to carry out its statutory responsibility to encourage broadband deployment to all Americans. Issues to be considered by the Committee may include, but are not limited to, measures to prepare for, respond to, and recover from disasters that impact broadband networks; new ways of encouraging deployment of high-speed broadband infrastructure and services to low-income communities; and other ways to accelerate deployment of broadband infrastructure to all Americans and to close the digital divide. The Committee is organized under, and operates in accordance with, the provisions of the FACA. The Committee will be solely advisory in nature. Consistent with FACA and its requirements, each meeting of the Committee will be open to the public unless otherwise noticed. A notice of each meeting will be published in the Federal Register at least fifteen (15) days in advance of the meeting. Records will be maintained of each meeting and made available for public inspection. All activities of the Committee will be conducted in an open, transparent, and accessible manner. The Committee shall terminate on March 1, 2021, or earlier upon the completion of its work as determined by the Chairman, unless its PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 charter is renewed prior to the termination date. During the Committee’s second term, it is anticipated that the Committee will meet in Washington, DC for at least three (3) one-day meetings. The first meeting date and agenda topics will be described in a Public Notice issued and published in the Federal Register at least fifteen (15) days prior to the first meeting date. In addition, as needed, working groups or subcommittees (ad hoc or steering) will be established to facilitate the Committee’s work between meetings of the full Committee. All meetings, including those of working groups and subcommittees, will be fully accessible to individuals with disabilities. Federal Communications Commission. Pamela Arluk, Chief, Competition Policy Division, Wireline Competition Bureau. [FR Doc. 2019–02567 Filed 2–14–19; 8:45 am] BILLING CODE 6712–01–P FEDERAL COMMUNICATIONS COMMISSION Radio Broadcasting Services; AM or FM Proposals To Change The Community of License Federal Communications Commission. ACTION: Notice. AGENCY: The agency must receive comments on or before April 16, 2019. ADDRESSES: Federal Communications Commission, 445 12th Street SW, Washington, DC 20554. FOR FURTHER INFORMATION CONTACT: Rolanda F. Smith, 202–418–2054. SUPPLEMENTARY INFORMATION: The following applicants filed AM or FM proposals to change the community of license: WE HAVE THIS HOPE CHRISTIAN RADIO, INC., Fac. ID No. 175404, KOLJ–FM, Channel 216C1, From WARROAD, MN, To WANNASKA, MN, BPED– 20190108AAG; CENTRO FAMILIAR CRISTIANO, Fac. ID No. 164149, KLSY(FM), Channel 229C0, From MONTESANO, WA, To BELFAIR, WA, BPH–20181108AAQ; CHISHOLM TRAIL COMMUNICATIONS LLC, Fac. ID No. 165950, KOME–FM, Channel 238C3, From MERIDIAN, TX, To TOLAR, TX, BPH–20181228AAD; THE CROMWELL GROUP, INC. OF ILLINOIS, Fac. ID No. 65572, WMCI(FM), Channel 267B1, From NEOGA, IL, To MATTOON, IL, BPH– 20181109ACC; CITICASTERS LICENSES, INC., AS DEBTOR IN DATES: E:\FR\FM\15FEN1.SGM 15FEN1

Agencies

[Federal Register Volume 84, Number 32 (Friday, February 15, 2019)]
[Notices]
[Pages 4463-4464]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-02454]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9043-4]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information 202-564-5632 or https://www.epa.gov/ nepa/.

Weekly receipt of Environmental Impact Statements
Filed 02/04/2019 Through 02/08/2019
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.

EIS No. 20190006, Draft, HHS, WV, Acquisition of Site for Development 
of a Replacement Underground Safety Research Program Facility in Mace, 
West Virginia, Comment Period Ends: 04/05/2019, Contact: Sam Tarr 770-
488-2408
EIS No. 20190007, Final, USCG, AK, Polar Security Cutter Acquisition 
Program Final Programmatic Environmental Impact Statement, Review 
Period Ends: 03/18/2019, Contact: Christine Wiegand 202-475-3742
EIS No. 20190008, Final, USFS, CBP, ID, Bog Creek Road Project, Review 
Period Ends: 04/02/2019, Contact: Joseph Zidron 949-643-6392
EIS No. 20190009, Final, USFS, ID, Little Boulder, Review Period Ends: 
04/01/2019, Contact: Johanna Kovarik 208-476-8344
EIS No. 20190010, Final, USFS, CO, Crested Butte Mountain Resort Ski 
Area Projects, Review Period Ends: 04/01/2019, Contact: Aaron Drendel 
970-641-0471
EIS No. 20190011, Draft, BLM, NV, Gemfield Mine Project, Comment Period 
Ends: 04/10/2019, Contact: Kevin Hurrell 775-635-4000
EIS No. 20190012, Final Supplement, GSA, CA, San Ysidro Land Port of

[[Page 4464]]

Entry Improvements Project, Review Period Ends: 03/18/2019, Contact: 
Osmahn Kadri 415-522-3617
EIS No. 20190013, Final, DOE, LA, ADOPTION--Port Arthur Liquefaction 
Project, Texas Connector Project, and Louisiana Connector Project, 
Contact: Brian Lavoie 202-586-2459

    The Department of Energy (DOE) has adopted the Federal Energy 
Regulatory Commission's Final EIS No. 20190003, filed 01/31/2019 with 
the EPA. DOE was a cooperating agency on this project. Therefore, 
recirculation of the document is not necessary under Section 1506.3(c) 
of the CEQ regulations.

Amended Notices

EIS No. 20180302, Draft Supplement, NMFS, WA, 10 Salmon and Steelhead 
Hatchery Programs in the Duwamish-Green River Basin, Comment Period 
Ends: 03/01/2019, Contact: Allyson Purcell 503-736-4736. Revision to FR 
Notice Published 12/07/2018; NOAA has reopened the comment period to 
end on 03/01/2019.
EIS No. 20180303, Draft, BOEM, MA, Vineyard Wind Offshore Wind Energy 
Project, Comment Period Ends: 02/22/2019, Contact: Michelle Morin 703-
787-1722. Revision to FR Notice Published 12/07/2018; Extending the 
Comment Period from 01/21/2019 to 02/22/2019.
EIS No. 20180328, Draft, CTDOH, CT, Resilient Bridgeport, Comment 
Period Ends: 03/18/2019, Contact: Rebecca French 860-270-8231. Revision 
to FR Notice Published 02/01/2109; Correction Lead Agency from HUD to 
CTDOH.

    Dated: February 12, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019-02454 Filed 2-14-19; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.