Federal Register / Vol. 84, No. 31 / Thursday, February 14, 2019 / Notices
SUPPLEMENTARY INFORMATION:
Title; Associated Form; and OMB
Number: Emergency Mass Notification
System (EMNS); OMB Control Number
0701–XXXX.
Needs and Uses: The Emergency Mass
Notification System is an Air Force
enterprise-wide system that employs
commercial software to send notices to
the AF population through desktop,
mobile application, telephone, text
messaging alerts, and Giant Voice
systems at Main Operating Bases (MOB).
This system provides individuals with
near-real time notifications sent directly
from the AF/MAJCOM/Installation
command posts.
This single AF enterprise solution
will provide lifesaving and mission
protective measures within the AF. The
system shall have the capability of
delivering reliable and secure
emergency threat notifications to all
personnel at all AF locations on a 24
hour/7 day a week basis.
EMNS is designated as a National
Security System (NSS). EMNS must be
maintained as a high integrity, high
availability capability vital to
operational readiness. The absence of
such a system could result in immediate
and sustained loss of mission
effectiveness.
Affected Public: Individuals and
households.
Annual Burden Hours: 16,667.
Number of Respondents: 1,000,000.
Responses per Respondent: 1.
Annual Responses: 1,000,000.
Average Burden per Response: 1
minute.
Frequency: On Occasion.
Dated: February 11, 2019.
Shelly E. Finke,
Alternate OSD Federal Register, Liaison
Officer, Department of Defense.
[FR Doc. 2019–02351 Filed 2–13–19; 8:45 am]
BILLING CODE 5001–05–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6440–009]
Lakeport Hydroelectric One, LLC;
Notice of Comment Period Extension
On December 19, 2018, Lakeport
Hydroelectric One, LLC held a public
meeting and site visit in support of the
re-licensing process for the Lakeport
Hydroelectric Project No. 6440.
Pursuant to 18 CFR 16.8(b)(5),
participants must file comments within
60 days of the public meeting. Due to
the funding lapse at certain federal
VerDate Sep<11>2014
17:54 Feb 13, 2019
Jkt 247001
agencies between December 22, 2018
and January 25, 2019, the Commission
is extending the comment period to
March 25, 2019.
Dated: February 8, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–02342 Filed 2–13–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–58–000]
Florida Gas Transmission Company,
LLC; Notice of Request Under Blanket
Authorization
Take notice that on January 29, 2019,
Florida Gas Transmission Company,
LLC (FGT), 1300 Main Street, Houston,
Texas 77002, filed a prior notice
application pursuant to sections
157.205, 157.208, 157.210 and 157.211
of the Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act (NGA), and
FGT’s blanket certificate issued in
Docket No. CP82–553–000.1 FGT
requests authorization to construct/
modify, install, own, maintain and
operate, certain natural gas pipeline
facilities (including lateral looping) and
appurtenant facilities in Volusia
County, Florida; and to install back
pressure regulation and appurtenant
facilities on the existing FGT East Leg
mainlines in Orange County, Florida, in
support of the proposed Sanford Project
(Project).
This Project will enable FGT to
increase firm transportation service
hourly flow rights to the Florida Power
& Light (FPL) Sanford power generation
plant in Volusia County, Florida, from
15.7 MMMBtu/hr to 17.2 MMMBtu/hr,
all as more fully set forth in the request
which is on file with the Commission
and open to public inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Blair
Lichtenwalter, Senior Director of
Certificates, Florida Gas Transmission
Company, LLC, 1300 Main Street,
1 Florida Gas Transmission Company, 21 FERC
¶ 62,236 (1982).
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
4053
Houston, Texas 77002, or call (713)
989–2605, or FAX (713) 989–1205, or
email: Blair.Lichtenwalter@
energyttrnsfer.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
E:\FR\FM\14FEN1.SGM
14FEN1
Agencies
[Federal Register Volume 84, Number 31 (Thursday, February 14, 2019)]
[Notices]
[Page 4053]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-02342]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6440-009]
Lakeport Hydroelectric One, LLC; Notice of Comment Period
Extension
On December 19, 2018, Lakeport Hydroelectric One, LLC held a public
meeting and site visit in support of the re-licensing process for the
Lakeport Hydroelectric Project No. 6440. Pursuant to 18 CFR 16.8(b)(5),
participants must file comments within 60 days of the public meeting.
Due to the funding lapse at certain federal agencies between December
22, 2018 and January 25, 2019, the Commission is extending the comment
period to March 25, 2019.
Dated: February 8, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-02342 Filed 2-13-19; 8:45 am]