DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–56–000]
Colorado Interstate Gas Company,
L.L.C.; Notice of Request Under
Blanket Authorization
Take notice that on January 24, 2019,
Colorado Interstate Gas Company, L.L.C.
(CIG), Post Office (P.O.) Box 1087,
Colorado Springs, Colorado 80944, filed
in Docket No. CP19–56–000 a prior
notice request pursuant to sections
157.205, 157.208, and 157.210 of the
Commission’s regulations under the
Natural Gas Act (NGA) to construct and
operate its High Plains Kiowa Lateral
Expansion Project in Weld County,
Colorado in order to allow for
transportation service from a new
natural gas processing plant located in
the Denver-Julesburg (DJ) Basin to an
interconnect with CIG’s High Plains
pipeline system. Specifically, CIG
requests to construct, own, and operate:
(i) The Kiowa Lateral, an approximately
9.2 mile 24-inch-diameter natural gas
pipeline lateral; (ii) the Prairie Hound
Meter Station, a new receipt meter on
the proposed Kiowa Lateral; (iii) the
High Five Lateral, an approximately 0.7
mile 24-inch diameter natural gas
pipeline lateral; and (iv) the High Five
Meter Station, a new meter station at the
terminus of the proposed High Five
Lateral. CIG states the proposed new
facilities would enable CIG to provide
an additional 410,000 dekatherms per
day of firm transportation capacity from
the DJ Basin to CIG’s High Plains and
mainline system. CIG states the project
would cost approximately $26,600,000,
all as more fully set forth in the
application, which is on file with the
Commission and open to public
inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to
Francisco Tarin, Director, Regulatory
Affairs, Colorado Interstate Gas
Company, L.L.C., P.O. Box 1087,
Colorado Springs, Colorado 80944, by
telephone at (719) 667–7517, or by
facsimile at (719) 520–4697; or Mark A.
VerDate Sep<11>2014
18:30 Feb 11, 2019
Jkt 247001
Minich, Assistant General Counsel,
Colorado Interstate Gas Company,
L.L.C., P.O. Box 1087, Colorado Springs,
Colorado 80944, by telephone at (719)
520–4416, or by facsimile at (719) 520–
4898.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: February 4, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–02010 Filed 2–11–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14791–001]
Ochoco Irrigation District; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 14791–001.
c. Date Filed: October 29, 2018.
d. Submitted By: Ochoco Irrigation
District.
e. Name of Project: Bowman Dam
Hydroelectric Project.
f. Location: At the existing Arthur R.
Bowman Dam On the Crooked River, in
Crook County, Oregon. The project
would occupy 5 acres of federal lands
administered by the U.S. Bureau of
Reclamation.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Bruce
Scanlon, Manager, Ochoco Irrigation
District, 1001 NW Deer Street,
Prineville, OR 97754; (541) 447–6449;
email at bruceoid@crestviewcable.com.
i. FERC Contact: Matt Cutlip at (503)
552–2762; or email at matt.cutlip@
ferc.gov.
j. Ochoco Irrigation District filed its
request to use the Traditional Licensing
Process on October 29, 2018. Ochoco
Irrigation Distrct provided public notice
of its request on December 21, 2018. In
a letter dated February 5, 2019, the
Director of the Division of Hydropower
Licensing approved Ochoco Irrigation
District’s request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service under section 7 of
the Endangered Species Act and the
E:\FR\FM\12FEN1.SGM
12FEN1
Federal Register / Vol. 84, No. 29 / Tuesday, February 12, 2019 / Notices
joint agency regulations thereunder at
50 CFR part 402. We are also initiating
consultation with the Oregon State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Ochoco Irrigation District as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Ochoco Irrigation District filed a
Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: February 6, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Amendment—Koch Energy Services,
LLC to be effective 2/1/2019.
Filed Date: 2/4/19.
Accession Number: 20190204–5220.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: RP19–637–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 020419
Negotiated Rates—Mercuria Energy
America, Inc. R–7540–02 to be effective
4/1/2019.
Filed Date: 2/4/19.
Accession Number: 20190204–5095.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: RP19–638–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Correction to CCRM 2019 Rates to be
effective 2/1/2019.
Filed Date: 2/4/19.
Accession Number: 20190204–5193.
Comments Due: 5 p.m. ET 2/19/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
[FR Doc. 2019–02085 Filed 2–11–19; 8:45 am]
Dated: February 5, 2019.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2019–02009 Filed 2–11–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19–592–001.
Applicants: Midwestern Gas
Transmission Company.
Description: Tariff Amendment:
Negotiated Rate PAL Agreement
VerDate Sep<11>2014
18:30 Feb 11, 2019
Jkt 247001
[Project No. 4881–028]
Barber Dam Hydroelectric Project;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
3427
b. Project No.: 4881–028.
c. Date Filed: November 29, 2018.
d. Submitted By: Fulcrum, LLC and
Ada County, Idaho (co-licensees).
e. Name of Project: Barber Dam
Hydroelectric Project.
f. Location: On the Boise River, in Ada
County, Idaho. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Kevin
Webb, Hydro Licensing Manager, Enel
Green Power North America, Inc., 100
Brickstone Square, Suite 300, Andover,
MA 01810; (978) 935–6039; email at
Kevin.Webb@enel.com.
i. FERC Contact: Matt Cutlip at (503)
552–2762; or email at matt.cutlip@
ferc.gov.
j. The co-licensees filed their request
to use the Traditional Licensing Process
on November 29, 2018. The co-licensees
provided public notice of their request
on December 13, 2018. In a letter dated
February 5, 2019, the Director of the
Division of Hydropower Licensing
approved the co-licensees’ request to
use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and National
Marine Fisheries Service under section
7 of the Endangered Species Act and the
joint agency regulations thereunder at
50 CFR part 402; and National Marine
Fisheries Service under section 305(b)
of the Magnuson-Stevens Fishery
Conservation and Management Act and
implementing regulations at 50 CFR
600.920. We are also initiating
consultation with the Idaho State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
the co-licensees as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act;
and consultation pursuant to section
106 of the National Historic
Preservation Act.
m. The co-licensees filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
E:\FR\FM\12FEN1.SGM
12FEN1
Agencies
[Federal Register Volume 84, Number 29 (Tuesday, February 12, 2019)]
[Notices]
[Pages 3426-3427]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-02085]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14791-001]
Ochoco Irrigation District; Notice of Intent To File License
Application, Filing of Pre-Application Document, Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 14791-001.
c. Date Filed: October 29, 2018.
d. Submitted By: Ochoco Irrigation District.
e. Name of Project: Bowman Dam Hydroelectric Project.
f. Location: At the existing Arthur R. Bowman Dam On the Crooked
River, in Crook County, Oregon. The project would occupy 5 acres of
federal lands administered by the U.S. Bureau of Reclamation.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Bruce Scanlon, Manager, Ochoco
Irrigation District, 1001 NW Deer Street, Prineville, OR 97754; (541)
447-6449; email at bruceoid@crestviewcable.com.
i. FERC Contact: Matt Cutlip at (503) 552-2762; or email at
matt.cutlip@ferc.gov.
j. Ochoco Irrigation District filed its request to use the
Traditional Licensing Process on October 29, 2018. Ochoco Irrigation
Distrct provided public notice of its request on December 21, 2018. In
a letter dated February 5, 2019, the Director of the Division of
Hydropower Licensing approved Ochoco Irrigation District's request to
use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service under section 7 of the Endangered
Species Act and the
[[Page 3427]]
joint agency regulations thereunder at 50 CFR part 402. We are also
initiating consultation with the Oregon State Historic Preservation
Officer, as required by section 106, National Historic Preservation
Act, and the implementing regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Ochoco Irrigation District
as the Commission's non-federal representative for carrying out
informal consultation pursuant to section 7 of the Endangered Species
Act; and consultation pursuant to section 106 of the National Historic
Preservation Act.
m. Ochoco Irrigation District filed a Pre-Application Document
(PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: February 6, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-02085 Filed 2-11-19; 8:45 am]
BILLING CODE 6717-01-P