Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utilty Company Status, 3431 [2019-02080]

Download as PDF 3431 Federal Register / Vol. 84, No. 29 / Tuesday, February 12, 2019 / Notices l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–6191. This filing may also be viewed on the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the Docket number P–10172, in the docket number field to access the document. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified deadline date for the particular application. n. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading, the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: February 6, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–02083 Filed 2–11–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utilty Company Status TG High Prairie, LLC ........................................................................................................................................................................... Bridgewater Power Company, L.P ...................................................................................................................................................... Peony Solar LLC ................................................................................................................................................................................. Marengo Energy Storage .................................................................................................................................................................... KCE NY 1, LLC ................................................................................................................................................................................... DG Whitefield LLC .............................................................................................................................................................................. Springfield Power, LLC ....................................................................................................................................................................... Antelope DSR 3, LLC .......................................................................................................................................................................... San Pablo Raceway, LLC ................................................................................................................................................................... Calpine Gilroy Cogen, L.P .................................................................................................................................................................. Solomon Forks Wind Project, LLC ...................................................................................................................................................... LUZ Solar Partners VIII, Ltd ................................................................................................................................................................ LUZ Solar Partners IX, Ltd .................................................................................................................................................................. Ibereolica Solar Moron, S.L.U ............................................................................................................................................................. Take notice that during the month of January 2019, the status of the abovecaptioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a) (2018). Dated: February 6, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–02080 Filed 2–11–19; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 18:30 Feb 11, 2019 Jkt 247001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1107–008. Applicants: Pacific Gas and Electric Company. Description: Notice of Non-Material Change in Status of Pacific Gas and Electric Company. Filed Date: 2/1/19. Accession Number: 20190201–5259. Comments Due: 5 p.m. ET 2/22/19. Docket Numbers: ER14–1818–018. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 EG19–16–000 EG19–17–000 EG19–18–000 EG19–19–000 EG19–20–000 EG19–21–000 EG19–22–000 EG19–23–000 EG19–24–000 EG19–25–000 EG19–26–000 EG19–27–000 EG19–28–000 FC19–1–000 Applicants: Boston Energy Trading and Marketing LLC. Description: Triennial Market Power Analysis for the Southwest Power Pool region of Boston Energy Trading and Marketing LLC. Filed Date: 2/1/19. Accession Number: 20190201–5244. Comments Due: 5 p.m. ET 4/2/19. Docket Numbers: ER15–1883–004; ER10–1836–013; ER10–1841–012; ER10–1843–012; ER10–1844–012; ER10–1845–012; ER10–1846–010; ER10–1849–016; ER10–1851–008; ER10–1852–025; ER10–1855–010; ER10–1857–009; ER10–1887–016; ER10–1890–010; ER10–1897–012; ER10–1899–010; ER10–1905–012; ER10–1907–011; ER10–1915–009; ER10–1918–012; ER10–1920–018; E:\FR\FM\12FEN1.SGM 12FEN1

Agencies

[Federal Register Volume 84, Number 29 (Tuesday, February 12, 2019)]
[Notices]
[Page 3431]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-02080]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator and Foreign 
Utilty Company Status

------------------------------------------------------------------------
 
------------------------------------------------------------------------
TG High Prairie, LLC..........................  EG19-16-000
Bridgewater Power Company, L.P................  EG19-17-000
Peony Solar LLC...............................  EG19-18-000
Marengo Energy Storage........................  EG19-19-000
KCE NY 1, LLC.................................  EG19-20-000
DG Whitefield LLC.............................  EG19-21-000
Springfield Power, LLC........................  EG19-22-000
Antelope DSR 3, LLC...........................  EG19-23-000
San Pablo Raceway, LLC........................  EG19-24-000
Calpine Gilroy Cogen, L.P.....................  EG19-25-000
Solomon Forks Wind Project, LLC...............  EG19-26-000
LUZ Solar Partners VIII, Ltd..................  EG19-27-000
LUZ Solar Partners IX, Ltd....................  EG19-28-000
Ibereolica Solar Moron, S.L.U.................  FC19-1-000
------------------------------------------------------------------------

    Take notice that during the month of January 2019, the status of 
the above-captioned entities as Exempt Wholesale Generators or Foreign 
Utility Companies became effective by operation of the Commission's 
regulations. 18 CFR 366.7(a) (2018).

    Dated: February 6, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-02080 Filed 2-11-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.