Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utilty Company Status, 3431 [2019-02080]
Download as PDF
3431
Federal Register / Vol. 84, No. 29 / Tuesday, February 12, 2019 / Notices
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–6191. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the Docket number
P–10172, in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
deadline date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: February 6, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–02083 Filed 2–11–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator and Foreign
Utilty Company Status
TG High Prairie, LLC ...........................................................................................................................................................................
Bridgewater Power Company, L.P ......................................................................................................................................................
Peony Solar LLC .................................................................................................................................................................................
Marengo Energy Storage ....................................................................................................................................................................
KCE NY 1, LLC ...................................................................................................................................................................................
DG Whitefield LLC ..............................................................................................................................................................................
Springfield Power, LLC .......................................................................................................................................................................
Antelope DSR 3, LLC ..........................................................................................................................................................................
San Pablo Raceway, LLC ...................................................................................................................................................................
Calpine Gilroy Cogen, L.P ..................................................................................................................................................................
Solomon Forks Wind Project, LLC ......................................................................................................................................................
LUZ Solar Partners VIII, Ltd ................................................................................................................................................................
LUZ Solar Partners IX, Ltd ..................................................................................................................................................................
Ibereolica Solar Moron, S.L.U .............................................................................................................................................................
Take notice that during the month of
January 2019, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a) (2018).
Dated: February 6, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–02080 Filed 2–11–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:30 Feb 11, 2019
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1107–008.
Applicants: Pacific Gas and Electric
Company.
Description: Notice of Non-Material
Change in Status of Pacific Gas and
Electric Company.
Filed Date: 2/1/19.
Accession Number: 20190201–5259.
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER14–1818–018.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
EG19–16–000
EG19–17–000
EG19–18–000
EG19–19–000
EG19–20–000
EG19–21–000
EG19–22–000
EG19–23–000
EG19–24–000
EG19–25–000
EG19–26–000
EG19–27–000
EG19–28–000
FC19–1–000
Applicants: Boston Energy Trading
and Marketing LLC.
Description: Triennial Market Power
Analysis for the Southwest Power Pool
region of Boston Energy Trading and
Marketing LLC.
Filed Date: 2/1/19.
Accession Number: 20190201–5244.
Comments Due: 5 p.m. ET 4/2/19.
Docket Numbers: ER15–1883–004;
ER10–1836–013; ER10–1841–012;
ER10–1843–012; ER10–1844–012;
ER10–1845–012; ER10–1846–010;
ER10–1849–016; ER10–1851–008;
ER10–1852–025; ER10–1855–010;
ER10–1857–009; ER10–1887–016;
ER10–1890–010; ER10–1897–012;
ER10–1899–010; ER10–1905–012;
ER10–1907–011; ER10–1915–009;
ER10–1918–012; ER10–1920–018;
E:\FR\FM\12FEN1.SGM
12FEN1
Agencies
[Federal Register Volume 84, Number 29 (Tuesday, February 12, 2019)]
[Notices]
[Page 3431]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-02080]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator and Foreign
Utilty Company Status
------------------------------------------------------------------------
------------------------------------------------------------------------
TG High Prairie, LLC.......................... EG19-16-000
Bridgewater Power Company, L.P................ EG19-17-000
Peony Solar LLC............................... EG19-18-000
Marengo Energy Storage........................ EG19-19-000
KCE NY 1, LLC................................. EG19-20-000
DG Whitefield LLC............................. EG19-21-000
Springfield Power, LLC........................ EG19-22-000
Antelope DSR 3, LLC........................... EG19-23-000
San Pablo Raceway, LLC........................ EG19-24-000
Calpine Gilroy Cogen, L.P..................... EG19-25-000
Solomon Forks Wind Project, LLC............... EG19-26-000
LUZ Solar Partners VIII, Ltd.................. EG19-27-000
LUZ Solar Partners IX, Ltd.................... EG19-28-000
Ibereolica Solar Moron, S.L.U................. FC19-1-000
------------------------------------------------------------------------
Take notice that during the month of January 2019, the status of
the above-captioned entities as Exempt Wholesale Generators or Foreign
Utility Companies became effective by operation of the Commission's
regulations. 18 CFR 366.7(a) (2018).
Dated: February 6, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-02080 Filed 2-11-19; 8:45 am]
BILLING CODE 6717-01-P