Combined Notice of Filings #1, 3434-3435 [2019-02005]
Download as PDF
3434
Federal Register / Vol. 84, No. 29 / Tuesday, February 12, 2019 / Notices
Accession Number: 20190205–5120.
Comments Due: 5 p.m. ET 2/26/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–02002 Filed 2–11–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2137–022;
ER14–2798–014; ER18–494–003; ER14–
2799–014; ER12–164–021; ER15–1873–
011; ER18–1197–003; ER10–2131–022;
ER10–2138–022; ER10–2139–002;
ER10–2140–022; ER10–2141–022;
ER14–2187–016; ER11–4044–022;
ER11–4046–021; ER18–491–003; ER18–
492–003; ER10–2127–019; ER10–2125–
021; ER18–1470–003; ER15–1041–011;
ER15–2205–011; ER10–2133–021;
ER10–2124–020; ER18–471–005; ER18–
472–005; ER11–3872–022; ER10–2764–
020; ER10–2132–020; ER10–2128–020.
Applicants: Beech Ridge Energy LLC,
Beech Ridge Energy II LLC, Beech Ridge
Energy II Holdings LLC, Beech Ridge
Energy Storage LLC, Bishop Hill Energy
III LLC, Buckeye Wind Energy LLC,
Camilla Solar Energy LLC, Grand Ridge
Energy LLC, Grand Ridge Energy II LLC,
Grand Ridge Energy III LLC, Grand
Ridge Energy IV LLC, Grand Ridge
Energy V LLC, Grand Ridge Energy
Storage LLC, Gratiot County Wind LLC,
Gratiot County Wind II LLC, Hardin
Wind Energy LLC, Hardin Wind Energy
Holdings LLC, Invenergy TN LLC,
VerDate Sep<11>2014
18:30 Feb 11, 2019
Jkt 247001
Judith Gap Energy LLC, Pine River
Wind Energy LLC, Prairie Breeze Wind
Energy II LLC, Prairie Breeze Wind
Energy III LLC, Sheldon Energy LLC,
Spring Canyon Energy LLC, States Edge
Wind I LLC, States Edge Wind I
Holdings LLC, Stony Creek Energy LLC,
Vantage Wind Energy LLC, Willow
Creek Energy LLC, Wolverine Creek
Energy LLC.
Description: Notice of Change in Facts
Under Market-Based Rate Authority of
Beech Ridge Energy LLC, et al.
Filed Date: 2/1/19.
Accession Number: 20190201–5264.
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER14–2707–013;
ER14–1630–007; ER16–1872–003;
ER15–1375–004; ER15–2602–003;
ER10–2720–018; ER11–4428–018;
ER12–1880–017; ER18–2182–002;
ER12–895–016; ER18–1535–002; ER14–
21–005; ER11–4462–032; ER18–772–
001; ER16–2443–001; ER17–1774–001;
ER10–1970–012; ER11–4677–011;
ER10–1972–012; ER17–838–007; ER10–
1973–009; ER10–1951–012; ER10–1974–
020; ER16–2241–006; ER10–1975–022;
ER12–2444–010; ER10–1976–009;
ER10–2641–033; ER16–2506–004;
ER16–2297–006; ER10–1983–012;
ER10–1984–012; ER14–2710–013;
ER15–58–011; ER19–11–001; ER10–
1985–009; ER18–2224–002; ER12–676–
009; ER13–2461–007; ER17–196–001;
ER18–1981–002; ER11–2192–012;
ER16–1913–003; ER16–1440–007;
ER16–2240–007; ER14–2708–014;
ER14–2709–013; ER15–30–011; ER15–
2243–002; ER15–1016–004; ER10–1989–
010; ER19–774–002; ER13–2474–012;
ER10–1991–013; ER17–2270–004;
ER18–2091–001; ER12–1660–011;
ER13–2458–007; ER11–4678–011;
ER10–1994–010; ER17–582–002; ER10–
2078–013; ER16–1293–004; ER16–1277–
005; ER17–583–002; ER18–2032–002;
ER10–1995–011; ER12–631–012; ER18–
807–001.
Applicants: Mammoth Plains Wind
Project, LLC, Manuta Creek Solar, LLC,
Marshall Solar, LLC, McCoy Solar, LLC,
Meyersdale Storage, LLC, Minco Wind,
LLC, Minco Wind II, LLC, Minco Wind
III, LLC, Minco IV & V Interconnection,
LLC, Minco Wind Interconnection
Services, LLC, Montauk Energy Storage
Center, LLC, Mountain View Solar, LLC,
NEPM II, LLC, New Mexico Wind, LLC,
NextEra Blythe Solar Energy Center,
LLC, NextEra Energy Bluff Point, LLC,
NextEra Energy Duane Arnold, LLC,
NextEra Energy Montezuma II Wind,
LLC, NextEra Energy Point Beach, LLC,
NextEra Energy Marketing, LLC,
NextEra Energy Seabrook, LLC, NextEra
Energy Services Massachusetts, LLC,
Northeast Energy Associates, A Limited
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Partnership, Ninnescah Wind Energy,
LLC, North Jersey Energy Associates, A
Limited Partnership, North Sky River
Energy, LLC, Northern Colorado Wind
Energy, LLC, Oleander Power Project,
Limited Partnership, Oliver Wind III,
LLC, Osborn Wind Energy, LLC, Osceola
Windpower, LLC, Osceola Windpower
II, LLC, Palo Duro Wind Energy, LLC,
Palo Duro Wind Interconnection
Services, LLC, Peetz Logan Interconnect,
LLC, Peetz Table Wind Energy, LLC,
Pegasus Wind, LLC, Perrin Ranch Wind,
LLC, Pheasant Run Wind, LLC, Pima
Energy Storage System, LLC, Pinal
Central Energy Center, LLC, Pratt Wind,
LLC, Red Mesa Wind, LLC, River Bend
Solar, LLC, Roswell Solar, LLC, Rush
Springs Wind Energy, LLC, Seiling
Wind, LLC, Seiling Wind II, LLC,
Seiling Wind Interconnection Services,
LLC, Silver State Solar Power South,
LLC, Shafter Solar, LLC, Sky River LLC,
Stanton Clean Energy, LLC, Steele Flats
Wind Project, LLC, Story Wind, LLC,
Stuttgart Solar, LLC, Titan Solar, LLC,
Tuscola Bay Wind, LLC, Tuscola Wind
II, LLC, Vasco Winds, LLC, Wessington
Wind Energy Center, LLC, Westside
Solar, LLC, White Oak Energy LLC,
White Oak Solar, LLC, White Pine Solar,
LLC, Whitney Point Solar, LLC, Wildcat
Ranch Wind Project, LLC, Wilton Wind
II, LLC, Windpower Partners 1993, LLC.
Description: Notice of Non-Material
Change in Status of the NextEra MBR
Sellers (Part 2).
Filed Date: 1/31/19.
Accession Number: 20190131–5384.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–982–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to the OATT, section 234.2 re:
Incremental Capacity Transfer Rights to
be effective 2/5/2019.
Filed Date: 2/4/19.
Accession Number: 20190204–5221.
Comments Due: 5 p.m. ET 2/25/19.
Docket Numbers: ER19–983–000.
Applicants: Ameren Illinois
Company.
Description: Request for Period I
Waiver, et al. of Ameren Illinois
Company.
Filed Date: 2/4/19.
Accession Number: 20190204–5233.
Comments Due: 5 p.m. ET 2/15/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
E:\FR\FM\12FEN1.SGM
12FEN1
Federal Register / Vol. 84, No. 29 / Tuesday, February 12, 2019 / Notices
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–02005 Filed 2–11–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2639–027]
Northern States Power Company;
Notice of Intent to File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 2639–027.
c. Date Filed: November 29, 2018.
d. Submitted By: Northern States
Power Company.
e. Name of Project: Cornell
Hydroelectric Project.
f. Location: On the Lower Chippewa
River in the City of Cornell, Chippewa
County, Wisconsin. The project does not
occupy federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact:
William P. Zawacki, Director of
Regional Generation, Northern States
Power Company—Wisconsin, 1414 W
Hamilton Ave., P.O. Box 8, Eau Claire,
WI 54702; phone: (800) 895–4999;
email: william.p.zawacki@
xcelenergy.com.
i. FERC Contact: Laura Washington at
(202) 502–6072; or email at
Laura.Washington@ferc.gov.
j. Northern States Power Company
filed its request to use the Traditional
Licensing Process on November 29,
2018. Northern States Power Company
provided public notice of its request on
November 29, 2018. In a letter dated
February 5, 2019, the Director of the
Division of Hydropower Licensing
approved Northern States Power
Company’s request to use the
Traditional Licensing Process.
VerDate Sep<11>2014
18:30 Feb 11, 2019
Jkt 247001
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402. We are also initiating
consultation the Wisconsin State
Historic Preservation Officer, as
required by section 106, National
Historical Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Northern States Power Company as the
Commission’s non-federal
representative for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act and section
106 of the National Historic
Preservation Act.
m. Northern States Power Company
filed a Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502- 8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 2639.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by November 30, 2021.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: February 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–02007 Filed 2–11–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
3435
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1215–003.
Applicants: Radford’s Run Wind
Farm, LLC.
Description: Report Filing: Refund
Report Filing to be effective N/A.
Filed Date: 2/6/19.
Accession Number: 20190206–5022.
Comments Due: 5 p.m. ET 2/27/19.
Docket Numbers: ER19–460–001.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Amended Order No. 841 Compliance
Filing to be effective 12/1/2019.
Filed Date: 2/6/19.
Accession Number: 20190206–5087.
Comments Due: 5 p.m. ET 2/27/19.
Docket Numbers: ER19–517–001.
Applicants: Interstate Power and
Light Company.
Description: Tariff Amendment:
Amendment Market Based Rate Tariff to
be effective 2/5/2019.
Filed Date: 2/5/19.
Accession Number: 20190205–5122.
Comments Due: 5 p.m. ET 2/26/19.
Docket Numbers: ER19–519–001.
Applicants: Wisconsin Power and
Light Company.
Description: Tariff Amendment:
Market Based Rate Tariff to be effective
2/5/2019.
Filed Date: 2/5/19.
Accession Number: 20190205–5123.
Comments Due: 5 p.m. ET 2/26/19.
Docket Numbers: ER19–991–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–02–06_SA 3233 OTP–MDU–
Dakota Range III GIA (J488) to be
effective 1/23/2019.
Filed Date: 2/6/19.
Accession Number: 20190206–5037.
Comments Due: 5 p.m. ET 2/27/19.
Docket Numbers: ER19–992–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3391
Municipal Energy Agency of Nebraska
PTP Cancellation to be effective 1/1/
2019.
Filed Date: 2/6/19.
Accession Number: 20190206–5043.
Comments Due: 5 p.m. ET 2/27/19.
Docket Numbers: ER19–993–000.
Applicants: PJM Interconnection,
L.L.C.
E:\FR\FM\12FEN1.SGM
12FEN1
Agencies
[Federal Register Volume 84, Number 29 (Tuesday, February 12, 2019)]
[Notices]
[Pages 3434-3435]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-02005]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2137-022; ER14-2798-014; ER18-494-003; ER14-
2799-014; ER12-164-021; ER15-1873-011; ER18-1197-003; ER10-2131-022;
ER10-2138-022; ER10-2139-002; ER10-2140-022; ER10-2141-022; ER14-2187-
016; ER11-4044-022; ER11-4046-021; ER18-491-003; ER18-492-003; ER10-
2127-019; ER10-2125-021; ER18-1470-003; ER15-1041-011; ER15-2205-011;
ER10-2133-021; ER10-2124-020; ER18-471-005; ER18-472-005; ER11-3872-
022; ER10-2764-020; ER10-2132-020; ER10-2128-020.
Applicants: Beech Ridge Energy LLC, Beech Ridge Energy II LLC,
Beech Ridge Energy II Holdings LLC, Beech Ridge Energy Storage LLC,
Bishop Hill Energy III LLC, Buckeye Wind Energy LLC, Camilla Solar
Energy LLC, Grand Ridge Energy LLC, Grand Ridge Energy II LLC, Grand
Ridge Energy III LLC, Grand Ridge Energy IV LLC, Grand Ridge Energy V
LLC, Grand Ridge Energy Storage LLC, Gratiot County Wind LLC, Gratiot
County Wind II LLC, Hardin Wind Energy LLC, Hardin Wind Energy Holdings
LLC, Invenergy TN LLC, Judith Gap Energy LLC, Pine River Wind Energy
LLC, Prairie Breeze Wind Energy II LLC, Prairie Breeze Wind Energy III
LLC, Sheldon Energy LLC, Spring Canyon Energy LLC, States Edge Wind I
LLC, States Edge Wind I Holdings LLC, Stony Creek Energy LLC, Vantage
Wind Energy LLC, Willow Creek Energy LLC, Wolverine Creek Energy LLC.
Description: Notice of Change in Facts Under Market-Based Rate
Authority of Beech Ridge Energy LLC, et al.
Filed Date: 2/1/19.
Accession Number: 20190201-5264.
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER14-2707-013; ER14-1630-007; ER16-1872-003; ER15-
1375-004; ER15-2602-003; ER10-2720-018; ER11-4428-018; ER12-1880-017;
ER18-2182-002; ER12-895-016; ER18-1535-002; ER14-21-005; ER11-4462-032;
ER18-772-001; ER16-2443-001; ER17-1774-001; ER10-1970-012; ER11-4677-
011; ER10-1972-012; ER17-838-007; ER10-1973-009; ER10-1951-012; ER10-
1974-020; ER16-2241-006; ER10-1975-022; ER12-2444-010; ER10-1976-009;
ER10-2641-033; ER16-2506-004; ER16-2297-006; ER10-1983-012; ER10-1984-
012; ER14-2710-013; ER15-58-011; ER19-11-001; ER10-1985-009; ER18-2224-
002; ER12-676-009; ER13-2461-007; ER17-196-001; ER18-1981-002; ER11-
2192-012; ER16-1913-003; ER16-1440-007; ER16-2240-007; ER14-2708-014;
ER14-2709-013; ER15-30-011; ER15-2243-002; ER15-1016-004; ER10-1989-
010; ER19-774-002; ER13-2474-012; ER10-1991-013; ER17-2270-004; ER18-
2091-001; ER12-1660-011; ER13-2458-007; ER11-4678-011; ER10-1994-010;
ER17-582-002; ER10-2078-013; ER16-1293-004; ER16-1277-005; ER17-583-
002; ER18-2032-002; ER10-1995-011; ER12-631-012; ER18-807-001.
Applicants: Mammoth Plains Wind Project, LLC, Manuta Creek Solar,
LLC, Marshall Solar, LLC, McCoy Solar, LLC, Meyersdale Storage, LLC,
Minco Wind, LLC, Minco Wind II, LLC, Minco Wind III, LLC, Minco IV & V
Interconnection, LLC, Minco Wind Interconnection Services, LLC, Montauk
Energy Storage Center, LLC, Mountain View Solar, LLC, NEPM II, LLC, New
Mexico Wind, LLC, NextEra Blythe Solar Energy Center, LLC, NextEra
Energy Bluff Point, LLC, NextEra Energy Duane Arnold, LLC, NextEra
Energy Montezuma II Wind, LLC, NextEra Energy Point Beach, LLC, NextEra
Energy Marketing, LLC, NextEra Energy Seabrook, LLC, NextEra Energy
Services Massachusetts, LLC, Northeast Energy Associates, A Limited
Partnership, Ninnescah Wind Energy, LLC, North Jersey Energy
Associates, A Limited Partnership, North Sky River Energy, LLC,
Northern Colorado Wind Energy, LLC, Oleander Power Project, Limited
Partnership, Oliver Wind III, LLC, Osborn Wind Energy, LLC, Osceola
Windpower, LLC, Osceola Windpower II, LLC, Palo Duro Wind Energy, LLC,
Palo Duro Wind Interconnection Services, LLC, Peetz Logan Interconnect,
LLC, Peetz Table Wind Energy, LLC, Pegasus Wind, LLC, Perrin Ranch
Wind, LLC, Pheasant Run Wind, LLC, Pima Energy Storage System, LLC,
Pinal Central Energy Center, LLC, Pratt Wind, LLC, Red Mesa Wind, LLC,
River Bend Solar, LLC, Roswell Solar, LLC, Rush Springs Wind Energy,
LLC, Seiling Wind, LLC, Seiling Wind II, LLC, Seiling Wind
Interconnection Services, LLC, Silver State Solar Power South, LLC,
Shafter Solar, LLC, Sky River LLC, Stanton Clean Energy, LLC, Steele
Flats Wind Project, LLC, Story Wind, LLC, Stuttgart Solar, LLC, Titan
Solar, LLC, Tuscola Bay Wind, LLC, Tuscola Wind II, LLC, Vasco Winds,
LLC, Wessington Wind Energy Center, LLC, Westside Solar, LLC, White Oak
Energy LLC, White Oak Solar, LLC, White Pine Solar, LLC, Whitney Point
Solar, LLC, Wildcat Ranch Wind Project, LLC, Wilton Wind II, LLC,
Windpower Partners 1993, LLC.
Description: Notice of Non-Material Change in Status of the NextEra
MBR Sellers (Part 2).
Filed Date: 1/31/19.
Accession Number: 20190131-5384.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19-982-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to the OATT,
section 234.2 re: Incremental Capacity Transfer Rights to be effective
2/5/2019.
Filed Date: 2/4/19.
Accession Number: 20190204-5221.
Comments Due: 5 p.m. ET 2/25/19.
Docket Numbers: ER19-983-000.
Applicants: Ameren Illinois Company.
Description: Request for Period I Waiver, et al. of Ameren Illinois
Company.
Filed Date: 2/4/19.
Accession Number: 20190204-5233.
Comments Due: 5 p.m. ET 2/15/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and
[[Page 3435]]
385.214) on or before 5:00 p.m. Eastern time on the specified comment
date. Protests may be considered, but intervention is necessary to
become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-02005 Filed 2-11-19; 8:45 am]
BILLING CODE 6717-01-P