Natural Gas Pipeline Company of America LLC; Notice of Application, 2844-2845 [2019-01654]
Download as PDF
amozie on DSK3GDR082PROD with NOTICES1
2844
Federal Register / Vol. 84, No. 27 / Friday, February 8, 2019 / Notices
Filed Date: 1/31/19.
Accession Number: 20190131–5225.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–945–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to Att Q. re FTR Mark to
Auction Credit Revisions to be effective
4/4/2019.
Filed Date: 1/31/19.
Accession Number: 20190131–5236.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–946–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3127R1 Montana-Dakota Utilities Co.
NITSA and NOA to be effective
4/1/2019.
Filed Date: 1/31/19.
Accession Number: 20190131–5239.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–947–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Exelon Generation GISA Filing to be
effective 1/1/2019.
Filed Date: 1/31/19.
Accession Number: 20190131–5244.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–948–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Shell Energy North America GISA Filing
to be effective 1/1/2019.
Filed Date: 1/31/19.
Accession Number: 20190131–5245.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–949–000.
Applicants: Westar Energy, Inc.
Description: § 205(d) Rate Filing:
Revisions, Full Requirements Electric
Service Agreements to be effective
4/1/2019.
Filed Date: 1/31/19.
Accession Number: 20190131–5246.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–950–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
SCPSA Interchange Contract
Amendment Filing (To Remove Gulf) to
be effective 1/1/2019.
Filed Date: 1/31/19.
Accession Number: 20190131–5248.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–951–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–01–31 Commitment Cost
Enhancements & Reliability Services
Clarification to be effective 4/1/2019.
VerDate Sep<11>2014
17:18 Feb 07, 2019
Jkt 247001
Filed Date: 1/31/19.
Accession Number: 20190131–5249.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–952–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Raven Solar LGIA Amendments Filing
(to Remove Gulf) to be effective
1/1/2019.
Filed Date: 1/31/19.
Accession Number: 20190131–5279.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER19–953–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended LGIA Solar Star California
XIX, LLC True-Up SA No. 110 to be
effective 4/3/2019.
Filed Date: 2/1/19.
Accession Number: 20190201–5071.
Comments Due: 5 p.m. ET 2/22/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Issued: February 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–01652 Filed 2–7–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–52–000]
Natural Gas Pipeline Company of
America LLC; Notice of Application
Take notice that on January 18, 2019,
Natural Gas Pipeline Company of
America LLC (Natural), 3250 Lacey
Road, Downers Grove, IL 60615, filed in
Docket No. CP19–52–000 an application
pursuant to section 7(c) of the Natural
Gas Act (NGA) and Part 157 of the
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Commission’s regulations for
authorization to construct, install,
modify, operate, and maintain a new
16.84 mile 30-inch pipeline extension
which will be located in Ward, Reeves
and Pecos Counties, Texas, as well as a
new bidirectional interconnect,
including two 10-inch meter runs and a
30-inch tap located in Pecos County,
Texas. Natural states that the proposed
facilities will enable it to provide
500,000 dekatherms per day (Dth/d) of
incremental firm transportation capacity
southbound on Natural’s existing
Lockridge Pipeline and the proposed
pipeline extension to the new
bidirectional interconnect with TransPecos Pipeline, LLC at the Waha Hub.
Natural estimates the cost of the project
to be $51,611,669, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Bruce
H. Newsome, Vice President, Natural
Gas Pipeline Company of America LLC,
3250 Lacey Road, Suite 700, Downers
Grove, IL 60515, by telephone at
(630)725–3070, or by email at bruce_
newsome@kindermorgan.com.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
E:\FR\FM\08FEN1.SGM
08FEN1
amozie on DSK3GDR082PROD with NOTICES1
Federal Register / Vol. 84, No. 27 / Friday, February 8, 2019 / Notices
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made with the
Commission and must provide a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new Natural Gas Act section 3 or section
VerDate Sep<11>2014
17:18 Feb 07, 2019
Jkt 247001
7 proceeding.1 Persons desiring to
become a party to a certificate
proceeding are to intervene in a timely
manner. If seeking to intervene out-oftime, the movant is required to ‘‘show
good cause why the time limitation
should be waived,’’ and should provide
justification by reference to factors set
forth in Rule 214(d)(1) of the
Commission’s Rules and Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5 p.m. Eastern Time
on February 22, 2019.
Issued: February 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–01654 Filed 2–7–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1484–018;
ER13–1069–007; ER12–2381–004.
Applicants: Shell Energy North
America (US), L.P., MP2 Energy LLC,
MP2 Energy NE LLC.
Description: Notice of Non-Material
Change in Status of Shell Energy North
America (US), L.P., et al.
Filed Date: 1/31/19.
Accession Number: 20190131–5308.
Comments Due: 5 p.m. ET 2/21/19.
Docket Numbers: ER17–2341–001.
Applicants: CA Flats Solar 130, LLC.
Description: Compliance filing: Notice
of Change in Category Status to be
effective 6/19/2018.
Filed Date: 2/1/19.
Accession Number: 20190201–5126.
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER19–954–000.
Applicants: Alta Wind VIII, LLC.
Description: § 205(d) Rate Filing:
Amendment to Market Base Rate Tariff
to be effective 10/16/2017.
Filed Date: 2/1/19.
Accession Number: 20190201–5087.
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC ¶ 61,167 at ¶ 50 (2018).
2 18 CFR 385.214(d)(1).
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
2845
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER19–955–000.
Applicants: Brookfield Energy
Marketing Inc.
Description: § 205(d) Rate Filing:
Amendment to Market Base Rate Tariff
to be effective 10/16/2017.
Filed Date: 2/1/19.
Accession Number: 20190201–5088.
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER19–956–000.
Applicants: ITC Midwest LLC,
Midcontinent Independent System
Operator, Inc.
Description: § 205(d) Rate Filing:
2019–02–01_ITCM Attachment O Filing
for Intangible Plant to be effective 1/1/
2020.
Filed Date: 2/1/19.
Accession Number: 20190201–5089.
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER19–957–000.
Applicants: Brookfield Energy
Marketing LP.
Description: § 205(d) Rate Filing:
Amendment to Market Base Rate Tariff
to be effective 10/16/2017.
Filed Date: 2/1/19.
Accession Number: 20190201–5090.
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER19–958–000.
Applicants: Brookfield Energy
Marketing US LLC.
Description: § 205(d) Rate Filing:
Amendment to Market Base Rate Tariff
to be effective 10/16/2017.
Filed Date: 2/1/19.
Accession Number: 20190201–5092.
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER19–959–000.
Applicants: Mesa Wind Power
Corporation.
Description: § 205(d) Rate Filing:
Amendment to Market Base Rate Tariff
to be effective 10/16/2017.
Filed Date: 2/1/19.
Accession Number: 20190201–5094.
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER19–960–000.
Applicants: Windstar Energy, LLC.
Description: § 205(d) Rate Filing:
Amendment to Market Base Rate Tariff
to be effective 10/16/2017.
Filed Date: 2/1/19.
Accession Number: 20190201–5096.
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER19–961–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended LGIA Solar Star California
XX, LLC True-Up SA No. 111 to be
effective 4/3/2019.
Filed Date: 2/1/19.
Accession Number: 20190201–5097.
Comments Due: 5 p.m. ET 2/22/19.
Docket Numbers: ER19–962–000.
E:\FR\FM\08FEN1.SGM
08FEN1
Agencies
[Federal Register Volume 84, Number 27 (Friday, February 8, 2019)]
[Notices]
[Pages 2844-2845]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-01654]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-52-000]
Natural Gas Pipeline Company of America LLC; Notice of
Application
Take notice that on January 18, 2019, Natural Gas Pipeline Company
of America LLC (Natural), 3250 Lacey Road, Downers Grove, IL 60615,
filed in Docket No. CP19-52-000 an application pursuant to section 7(c)
of the Natural Gas Act (NGA) and Part 157 of the Commission's
regulations for authorization to construct, install, modify, operate,
and maintain a new 16.84 mile 30-inch pipeline extension which will be
located in Ward, Reeves and Pecos Counties, Texas, as well as a new
bidirectional interconnect, including two 10-inch meter runs and a 30-
inch tap located in Pecos County, Texas. Natural states that the
proposed facilities will enable it to provide 500,000 dekatherms per
day (Dth/d) of incremental firm transportation capacity southbound on
Natural's existing Lockridge Pipeline and the proposed pipeline
extension to the new bidirectional interconnect with Trans-Pecos
Pipeline, LLC at the Waha Hub. Natural estimates the cost of the
project to be $51,611,669, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection.
The filing is available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's website web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this application should be directed to
Bruce H. Newsome, Vice President, Natural Gas Pipeline Company of
America LLC, 3250 Lacey Road, Suite 700, Downers Grove, IL 60515, by
telephone at (630)725-3070, or by email at
bruce_newsome@kindermorgan.com.
Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9),
within 90 days of this Notice, the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
[[Page 2845]]
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 3 copies of filings made with the Commission and must provide a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commentors will not be required to serve
copies of filed documents on all other parties. However, the non-party
commentors will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
As of the February 27, 2018 date of the Commission's order in
Docket No. CP16-4-001, the Commission will apply its revised practice
concerning out-of-time motions to intervene in any new Natural Gas Act
section 3 or section 7 proceeding.\1\ Persons desiring to become a
party to a certificate proceeding are to intervene in a timely manner.
If seeking to intervene out-of-time, the movant is required to ``show
good cause why the time limitation should be waived,'' and should
provide justification by reference to factors set forth in Rule
214(d)(1) of the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------
\1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC ] 61,167 at
] 50 (2018).
\2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 3 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Comment Date: 5 p.m. Eastern Time on February 22, 2019.
Issued: February 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-01654 Filed 2-7-19; 8:45 am]
BILLING CODE 6717-01-P