Natural Gas Pipeline Company of America LLC; Notice of Application, 2844-2845 [2019-01654]

Download as PDF amozie on DSK3GDR082PROD with NOTICES1 2844 Federal Register / Vol. 84, No. 27 / Friday, February 8, 2019 / Notices Filed Date: 1/31/19. Accession Number: 20190131–5225. Comments Due: 5 p.m. ET 2/21/19. Docket Numbers: ER19–945–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to Att Q. re FTR Mark to Auction Credit Revisions to be effective 4/4/2019. Filed Date: 1/31/19. Accession Number: 20190131–5236. Comments Due: 5 p.m. ET 2/21/19. Docket Numbers: ER19–946–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3127R1 Montana-Dakota Utilities Co. NITSA and NOA to be effective 4/1/2019. Filed Date: 1/31/19. Accession Number: 20190131–5239. Comments Due: 5 p.m. ET 2/21/19. Docket Numbers: ER19–947–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Exelon Generation GISA Filing to be effective 1/1/2019. Filed Date: 1/31/19. Accession Number: 20190131–5244. Comments Due: 5 p.m. ET 2/21/19. Docket Numbers: ER19–948–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Shell Energy North America GISA Filing to be effective 1/1/2019. Filed Date: 1/31/19. Accession Number: 20190131–5245. Comments Due: 5 p.m. ET 2/21/19. Docket Numbers: ER19–949–000. Applicants: Westar Energy, Inc. Description: § 205(d) Rate Filing: Revisions, Full Requirements Electric Service Agreements to be effective 4/1/2019. Filed Date: 1/31/19. Accession Number: 20190131–5246. Comments Due: 5 p.m. ET 2/21/19. Docket Numbers: ER19–950–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: SCPSA Interchange Contract Amendment Filing (To Remove Gulf) to be effective 1/1/2019. Filed Date: 1/31/19. Accession Number: 20190131–5248. Comments Due: 5 p.m. ET 2/21/19. Docket Numbers: ER19–951–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2019–01–31 Commitment Cost Enhancements & Reliability Services Clarification to be effective 4/1/2019. VerDate Sep<11>2014 17:18 Feb 07, 2019 Jkt 247001 Filed Date: 1/31/19. Accession Number: 20190131–5249. Comments Due: 5 p.m. ET 2/21/19. Docket Numbers: ER19–952–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Raven Solar LGIA Amendments Filing (to Remove Gulf) to be effective 1/1/2019. Filed Date: 1/31/19. Accession Number: 20190131–5279. Comments Due: 5 p.m. ET 2/21/19. Docket Numbers: ER19–953–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended LGIA Solar Star California XIX, LLC True-Up SA No. 110 to be effective 4/3/2019. Filed Date: 2/1/19. Accession Number: 20190201–5071. Comments Due: 5 p.m. ET 2/22/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Issued: February 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–01652 Filed 2–7–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–52–000] Natural Gas Pipeline Company of America LLC; Notice of Application Take notice that on January 18, 2019, Natural Gas Pipeline Company of America LLC (Natural), 3250 Lacey Road, Downers Grove, IL 60615, filed in Docket No. CP19–52–000 an application pursuant to section 7(c) of the Natural Gas Act (NGA) and Part 157 of the PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 Commission’s regulations for authorization to construct, install, modify, operate, and maintain a new 16.84 mile 30-inch pipeline extension which will be located in Ward, Reeves and Pecos Counties, Texas, as well as a new bidirectional interconnect, including two 10-inch meter runs and a 30-inch tap located in Pecos County, Texas. Natural states that the proposed facilities will enable it to provide 500,000 dekatherms per day (Dth/d) of incremental firm transportation capacity southbound on Natural’s existing Lockridge Pipeline and the proposed pipeline extension to the new bidirectional interconnect with TransPecos Pipeline, LLC at the Waha Hub. Natural estimates the cost of the project to be $51,611,669, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Bruce H. Newsome, Vice President, Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, Suite 700, Downers Grove, IL 60515, by telephone at (630)725–3070, or by email at bruce_ newsome@kindermorgan.com. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. E:\FR\FM\08FEN1.SGM 08FEN1 amozie on DSK3GDR082PROD with NOTICES1 Federal Register / Vol. 84, No. 27 / Friday, February 8, 2019 / Notices There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 3 copies of filings made with the Commission and must provide a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. As of the February 27, 2018 date of the Commission’s order in Docket No. CP16–4–001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new Natural Gas Act section 3 or section VerDate Sep<11>2014 17:18 Feb 07, 2019 Jkt 247001 7 proceeding.1 Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-oftime, the movant is required to ‘‘show good cause why the time limitation should be waived,’’ and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission’s Rules and Regulations.2 The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5 p.m. Eastern Time on February 22, 2019. Issued: February 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–01654 Filed 2–7–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1484–018; ER13–1069–007; ER12–2381–004. Applicants: Shell Energy North America (US), L.P., MP2 Energy LLC, MP2 Energy NE LLC. Description: Notice of Non-Material Change in Status of Shell Energy North America (US), L.P., et al. Filed Date: 1/31/19. Accession Number: 20190131–5308. Comments Due: 5 p.m. ET 2/21/19. Docket Numbers: ER17–2341–001. Applicants: CA Flats Solar 130, LLC. Description: Compliance filing: Notice of Change in Category Status to be effective 6/19/2018. Filed Date: 2/1/19. Accession Number: 20190201–5126. Comments Due: 5 p.m. ET 2/22/19. Docket Numbers: ER19–954–000. Applicants: Alta Wind VIII, LLC. Description: § 205(d) Rate Filing: Amendment to Market Base Rate Tariff to be effective 10/16/2017. Filed Date: 2/1/19. Accession Number: 20190201–5087. 1 Tennessee Gas Pipeline Company, L.L.C., 162 FERC ¶ 61,167 at ¶ 50 (2018). 2 18 CFR 385.214(d)(1). PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 2845 Comments Due: 5 p.m. ET 2/22/19. Docket Numbers: ER19–955–000. Applicants: Brookfield Energy Marketing Inc. Description: § 205(d) Rate Filing: Amendment to Market Base Rate Tariff to be effective 10/16/2017. Filed Date: 2/1/19. Accession Number: 20190201–5088. Comments Due: 5 p.m. ET 2/22/19. Docket Numbers: ER19–956–000. Applicants: ITC Midwest LLC, Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–02–01_ITCM Attachment O Filing for Intangible Plant to be effective 1/1/ 2020. Filed Date: 2/1/19. Accession Number: 20190201–5089. Comments Due: 5 p.m. ET 2/22/19. Docket Numbers: ER19–957–000. Applicants: Brookfield Energy Marketing LP. Description: § 205(d) Rate Filing: Amendment to Market Base Rate Tariff to be effective 10/16/2017. Filed Date: 2/1/19. Accession Number: 20190201–5090. Comments Due: 5 p.m. ET 2/22/19. Docket Numbers: ER19–958–000. Applicants: Brookfield Energy Marketing US LLC. Description: § 205(d) Rate Filing: Amendment to Market Base Rate Tariff to be effective 10/16/2017. Filed Date: 2/1/19. Accession Number: 20190201–5092. Comments Due: 5 p.m. ET 2/22/19. Docket Numbers: ER19–959–000. Applicants: Mesa Wind Power Corporation. Description: § 205(d) Rate Filing: Amendment to Market Base Rate Tariff to be effective 10/16/2017. Filed Date: 2/1/19. Accession Number: 20190201–5094. Comments Due: 5 p.m. ET 2/22/19. Docket Numbers: ER19–960–000. Applicants: Windstar Energy, LLC. Description: § 205(d) Rate Filing: Amendment to Market Base Rate Tariff to be effective 10/16/2017. Filed Date: 2/1/19. Accession Number: 20190201–5096. Comments Due: 5 p.m. ET 2/22/19. Docket Numbers: ER19–961–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended LGIA Solar Star California XX, LLC True-Up SA No. 111 to be effective 4/3/2019. Filed Date: 2/1/19. Accession Number: 20190201–5097. Comments Due: 5 p.m. ET 2/22/19. Docket Numbers: ER19–962–000. E:\FR\FM\08FEN1.SGM 08FEN1

Agencies

[Federal Register Volume 84, Number 27 (Friday, February 8, 2019)]
[Notices]
[Pages 2844-2845]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-01654]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP19-52-000]


Natural Gas Pipeline Company of America LLC; Notice of 
Application

    Take notice that on January 18, 2019, Natural Gas Pipeline Company 
of America LLC (Natural), 3250 Lacey Road, Downers Grove, IL 60615, 
filed in Docket No. CP19-52-000 an application pursuant to section 7(c) 
of the Natural Gas Act (NGA) and Part 157 of the Commission's 
regulations for authorization to construct, install, modify, operate, 
and maintain a new 16.84 mile 30-inch pipeline extension which will be 
located in Ward, Reeves and Pecos Counties, Texas, as well as a new 
bidirectional interconnect, including two 10-inch meter runs and a 30-
inch tap located in Pecos County, Texas. Natural states that the 
proposed facilities will enable it to provide 500,000 dekatherms per 
day (Dth/d) of incremental firm transportation capacity southbound on 
Natural's existing Lockridge Pipeline and the proposed pipeline 
extension to the new bidirectional interconnect with Trans-Pecos 
Pipeline, LLC at the Waha Hub. Natural estimates the cost of the 
project to be $51,611,669, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection.
    The filing is available for review at the Commission in the Public 
Reference Room or may be viewed on the Commission's website web at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Bruce H. Newsome, Vice President, Natural Gas Pipeline Company of 
America LLC, 3250 Lacey Road, Suite 700, Downers Grove, IL 60515, by 
telephone at (630)725-3070, or by email at 
bruce_newsome@kindermorgan.com.
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.

[[Page 2845]]

    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 3 copies of filings made with the Commission and must provide a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list and will be 
notified of any meetings associated with the Commission's environmental 
review process. Environmental commentors will not be required to serve 
copies of filed documents on all other parties. However, the non-party 
commentors will not receive copies of all documents filed by other 
parties or issued by the Commission and will not have the right to seek 
court review of the Commission's final order.
    As of the February 27, 2018 date of the Commission's order in 
Docket No. CP16-4-001, the Commission will apply its revised practice 
concerning out-of-time motions to intervene in any new Natural Gas Act 
section 3 or section 7 proceeding.\1\ Persons desiring to become a 
party to a certificate proceeding are to intervene in a timely manner. 
If seeking to intervene out-of-time, the movant is required to ``show 
good cause why the time limitation should be waived,'' and should 
provide justification by reference to factors set forth in Rule 
214(d)(1) of the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------

    \1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC ] 61,167 at 
] 50 (2018).
    \2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 3 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: 5 p.m. Eastern Time on February 22, 2019.

    Issued: February 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-01654 Filed 2-7-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.