Lansing Board of Water and Light; Notice of Existing Licensee's Failure To File a Notice of Intent To File a Subsequent License Application, and Soliciting Notices of Intent To File a License Application and Pre-Application Documents, 2210-2211 [2019-01189]

Download as PDF amozie on DSK3GDR082PROD with NOTICES1 2210 Federal Register / Vol. 84, No. 25 / Wednesday, February 6, 2019 / Notices Constellation Energy Commodities Group Maine, LLC, Constellation NewEnergy, Inc., Cow Branch Wind Power, LLC, CR Clearing, LLC, Exelon Generation Company, LLC, Wind Capital Holdings, LLC. Description: Supplement to December 22, 2017 Updated Market Power Analysis for the Southeast Region of the Exelon Southeast Entities. Filed Date: 1/24/19. Accession Number: 20190124–5212. Comments Due: 5 p.m. ET 2/7/19. Docket Numbers: ER17–2386–001. Applicants: Great Bay Solar I, LLC. Description: Report Filing: Refund Report (ER17–2386 and EL18–8) to be effective N/A. Filed Date: 1/28/19. Accession Number: 20190128–5137. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER18–1708–001. Applicants: Copenhagen Wind Farm, LLC. Description: Notice of Non-Material Change in Status of Copenhagen Wind Farm, LLC. Filed Date: 1/24/19. Accession Number: 20190124–5229. Comments Due: 5 p.m. ET 2/14/19. Docket Numbers: ER18–1954–002. Applicants: Gulf Power Company. Description: Compliance filing: Notice of Effective Date & Compliance Filing (NITSA/NOA) ER18–1954 to be effective 1/1/2019. Filed Date: 1/25/19. Accession Number: 20190125–5141. Comments Due: 5 p.m. ET 2/15/19. Docket Numbers: ER18–2352–002. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2019–01–28_Amendment to Real-Time Buybacks of Spinning and Offline Supplemental to be effective 2/14/2019. Filed Date: 1/28/19. Accession Number: 20190128–5041. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–871–000. Applicants: Southwestern Electric Power Company. Description: § 205(d) Rate Filing: SWEPCO–ETEC Contracting Services Agreements (Monitor, Op, Dispatch) to be effective 1/1/2019. Filed Date: 1/25/19. Accession Number: 20190125–5113. Comments Due: 5 p.m. ET 2/15/19. Docket Numbers: ER19–872–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–01–28_SA 1925 ITC MidwestInterstate Power and Light 4th Rev DTIA to be effective 3/30/2019. Filed Date: 1/28/19. VerDate Sep<11>2014 18:09 Feb 05, 2019 Jkt 247001 Accession Number: 20190128–5104. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–873–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX-Lighthouse EC-Golden Spread EC Interconnection Agreement to be effective 1/15/2019. Filed Date: 1/28/19. Accession Number: 20190128–5108. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–874–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, SA No. 5260; Queue No. AD1–060 to be effective 1/2/2019. Filed Date: 1/28/19. Accession Number: 20190128–5119. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–875–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–01–28_Cyber Security Coordination to be effective 3/30/2019. Filed Date: 1/28/19. Accession Number: 20190128–5135. Comments Due: 5 p.m. ET 2/19/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 29, 2019. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10684–000] Lansing Board of Water and Light; Notice of Existing Licensee’s Failure To File a Notice of Intent To File a Subsequent License Application, and Soliciting Notices of Intent To File a License Application and PreApplication Documents The current license for the Lansing Board of Water and Light’s Moores Park Project No. 10684 (Moores Park Project) was issued on January 5, 1994, for a term of 30 years, ending December 31, 2023.1 The 600-kilowatt (kW) project is located on the Grand River in the City of Lansing, in Ingham County, Michigan. The principal project works consist of: (1) A 240-acre reservoir with 2,000acre-feet of storage at a normal water surface elevation of 833.6 feet National Geodetic Vertical Datum; (2) a 190-footlong, 21-foot-high reinforced concrete gravity dam divided into a 120-foot-long flashboard-crested spillway section and a 70-foot-long, three-bay Taintor-gate section, each gate measuring 20-footlong by 10-foot-high; (3) a 110-foot-long, 50- to 83-foot-wide, 61-foot-high integral water-impounding powerhouse constructed of reinforced concrete and brick masonry containing one horizontal axis turbine-generator unit rated at 600 kW; (4) a 200-foot-long, 4,160-volt underground transmission line connected to a step-up transformer; and (5) appurtenant equipment and facilities. At least five years before the expiration of a license for a minor water power project in which sections 14 and 15 of the Federal Power Act were waived, the Commission’s regulations require the licensee to file with the Commission a notice of intent (NOI) that contains an unequivocal statement of the licensee’s intention to file or not to file an application for a subsequent license, details on the principal project works and installed plant capacity, and other information.2 If such a licensee does not inform the Commission that it intends to file an application for, in this case, a subsequent license for the project, the licensee may not file an application for a subsequent license, either individually or in conjunction with an entity or [FR Doc. 2019–01168 Filed 2–5–19; 8:45 am] 1 Lansing Board of Water and Light, 66 FERC 62,002 (1994). 2 18 CFR 16.19(b) (2018) (citing 18 CFR 16.6(b) (2018)). BILLING CODE 6717–01–P PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 E:\FR\FM\06FEN1.SGM 06FEN1 Federal Register / Vol. 84, No. 25 / Wednesday, February 6, 2019 / Notices entities that are not currently licensees of the project.3 Because the existing license expires on December 31, 2023, the NOI was due to be filed by the close of business on December 31, 2018. The Lansing Board of Water and Light, the existing licensee for the Moores Park Project, failed to file an NOI for the project by this date.4 Any party interested in filing a license application for the Moores Park Project No. 10684 must first file a NOI 5 and pre-application document (PAD) 6 pursuant to Part 5 of the Commission’s regulations. Although the integrated licensing process (ILP) is the default pre-filing process, section 5.3(b) of the Commission’s regulations allows a potential license applicant to request to use the traditional licensing process or alternative procedures when it files its NOI.7 This notice sets a deadline of 120 days from the date of this notice for interested applicants, other than the existing licensee, to file NOIs, PADs, and requests to use the traditional licensing process or alternative procedures. Applications for a subsequent license from potential applicants must be filed with the Commission at least 24 months prior to the expiration of the existing license.8 Because the existing license expires on December 31, 2023, applications for license for this project must be filed by December 31, 2021.9 Questions concerning this notice should be directed to Lee Emery at (202) 502–8379 or lee.emery@ferc.gov. Dated: January 31, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–01189 Filed 2–5–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: 3 18 CFR 16.24(b) (2018). CFR 16.23(b) (2018). 5 18 CFR 5.5 (2018). 6 18 CFR 5.6 (2018). 7 18 CFR 5.3(b) (2018). 8 18 CFR 16.20 (2018). 9 To the extent an interested applicant files an NOI and PAD and elects or is required to use the Commission’s ILP, a process plan will be issued within 180 days of this notice, which accelerates the steps of the ILP to allow for filing a timely subsequent license application by the December 31, 2021 deadline. amozie on DSK3GDR082PROD with NOTICES1 4 18 VerDate Sep<11>2014 18:09 Feb 05, 2019 Jkt 247001 Docket Numbers: ER11–4507–010. Applicants: Canastota Windpower, LLC. Description: Notice of Non-Material Change in Status of Canastota Windpower, LLC. Filed Date: 1/29/19. Accession Number: 20190129–5250. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER14–1421–001. Applicants: Diamond State Generation Partners, LLC. Description: Compliance filing: Informational Filing Pursuant to Schedule 2 of the PJM OATT & Request for Waiver to be effective N/A. Filed Date: 1/29/19. Accession Number: 20190129–5186. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER18–1934–001. Applicants: Alabama Power Company. Description: Compliance filing: OATT Compliance Filing (Relating to Sale of Gulf Power) to be effective 1/1/2019. Filed Date: 1/30/19. Accession Number: 20190130–5084. Comments Due: 5 p.m. ET 2/20/19. Docket Numbers: ER18–1938–001. Applicants: Alabama Power Company. Description: Compliance filing: Transmission Facility Cost Allocation Tariff Compliance Filing to be effective 1/1/2019. Filed Date: 1/30/19. Accession Number: 20190130–5085. Comments Due: 5 p.m. ET 2/20/19. Docket Numbers: ER19–256–002. Applicants: Wisconsin Power and Light Company. Description: Tariff Amendment: Amendment to WPL Wholesale Formula Rate Application to be effective 12/31/ 2018. Filed Date: 1/29/19. Accession Number: 20190129–5209. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–257–002. Applicants: Interstate Power and Light Company. Description: Tariff Amendment: Amendment to IPL Wholesale Formula Rate Application to be effective 12/31/ 2018. Filed Date: 1/29/19. Accession Number: 20190129–5212. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–361–000. Applicants: Midcontinent Independent System Operator, Inc., International Transmission Company, Michigan Electric Transmission Company, LLC, ITC Midwest LLC. Description: Report Filing: 2019–01– 29_Refund Report for ITC Companies re Transco Adder (EL18–140) to be effective N/A. PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 2211 Filed Date: 1/29/19. Accession Number: 20190129–5163. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–541–001. Applicants: ITC Midwest LLC. Description: Tariff Amendment: Amendment to Filing of JUA with JoCarroll Energy to be effective 2/11/2019. Filed Date: 1/29/19. Accession Number: 20190129–5201. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–846–000. Applicants: Antelope DSR 3, LLC. Description: Supplement to January 22, 2019 Antelope DSR 3, LLC tariff filing. Filed Date: 1/29/19. Accession Number: 20190129–5239. Comments Due: 5 p.m. ET 2/12/19. Docket Numbers: ER19–847–000. Applicants: San Pablo Raceway, LLC. Description: Supplement to January 22, 2019 San Pablo Raceway, LLC tariff filing. Filed Date: 1/29/19. Accession Number: 20190129–5243. Comments Due: 5 p.m. ET 2/12/19. Docket Numbers: ER19–884–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: DECSoCo Amended and Restated Interconnection Contract Filing to be effective 1/1/2019. Filed Date: 1/29/19. Accession Number: 20190129–5137. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–886–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: DEFSoCo Amended and Restated Interconnection Contract Filing to be effective 1/1/2019. Filed Date: 1/29/19. Accession Number: 20190129–5139. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–887–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Filing of Interchange Contract Amendments (to remove Gulf) to be effective 1/1/2019. Filed Date: 1/29/19. Accession Number: 20190129–5141. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–888–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Filing of NITSA Amendments (to remove Gulf) to be effective 1/1/2019. Filed Date: 1/29/19. Accession Number: 20190129–5143. Comments Due: 5 p.m. ET 2/19/19. Docket Numbers: ER19–889–000. E:\FR\FM\06FEN1.SGM 06FEN1

Agencies

[Federal Register Volume 84, Number 25 (Wednesday, February 6, 2019)]
[Notices]
[Pages 2210-2211]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-01189]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 10684-000]


Lansing Board of Water and Light; Notice of Existing Licensee's 
Failure To File a Notice of Intent To File a Subsequent License 
Application, and Soliciting Notices of Intent To File a License 
Application and Pre-Application Documents

    The current license for the Lansing Board of Water and Light's 
Moores Park Project No. 10684 (Moores Park Project) was issued on 
January 5, 1994, for a term of 30 years, ending December 31, 2023.\1\ 
The 600-kilowatt (kW) project is located on the Grand River in the City 
of Lansing, in Ingham County, Michigan.
---------------------------------------------------------------------------

    \1\ Lansing Board of Water and Light, 66 FERC 62,002 (1994).
---------------------------------------------------------------------------

    The principal project works consist of: (1) A 240-acre reservoir 
with 2,000-acre-feet of storage at a normal water surface elevation of 
833.6 feet National Geodetic Vertical Datum; (2) a 190-foot-long, 21-
foot-high reinforced concrete gravity dam divided into a 120-foot-long 
flashboard-crested spillway section and a 70-foot-long, three-bay 
Taintor-gate section, each gate measuring 20-foot-long by 10-foot-high; 
(3) a 110-foot-long, 50- to 83-foot-wide, 61-foot-high integral water-
impounding powerhouse constructed of reinforced concrete and brick 
masonry containing one horizontal axis turbine-generator unit rated at 
600 kW; (4) a 200-foot-long, 4,160-volt underground transmission line 
connected to a step-up transformer; and (5) appurtenant equipment and 
facilities.
    At least five years before the expiration of a license for a minor 
water power project in which sections 14 and 15 of the Federal Power 
Act were waived, the Commission's regulations require the licensee to 
file with the Commission a notice of intent (NOI) that contains an 
unequivocal statement of the licensee's intention to file or not to 
file an application for a subsequent license, details on the principal 
project works and installed plant capacity, and other information.\2\
---------------------------------------------------------------------------

    \2\ 18 CFR 16.19(b) (2018) (citing 18 CFR 16.6(b) (2018)).
---------------------------------------------------------------------------

    If such a licensee does not inform the Commission that it intends 
to file an application for, in this case, a subsequent license for the 
project, the licensee may not file an application for a subsequent 
license, either individually or in conjunction with an entity or

[[Page 2211]]

entities that are not currently licensees of the project.\3\
---------------------------------------------------------------------------

    \3\ 18 CFR 16.24(b) (2018).
---------------------------------------------------------------------------

    Because the existing license expires on December 31, 2023, the NOI 
was due to be filed by the close of business on December 31, 2018. The 
Lansing Board of Water and Light, the existing licensee for the Moores 
Park Project, failed to file an NOI for the project by this date.\4\
---------------------------------------------------------------------------

    \4\ 18 CFR 16.23(b) (2018).
---------------------------------------------------------------------------

    Any party interested in filing a license application for the Moores 
Park Project No. 10684 must first file a NOI \5\ and pre-application 
document (PAD) \6\ pursuant to Part 5 of the Commission's regulations. 
Although the integrated licensing process (ILP) is the default pre-
filing process, section 5.3(b) of the Commission's regulations allows a 
potential license applicant to request to use the traditional licensing 
process or alternative procedures when it files its NOI.\7\
---------------------------------------------------------------------------

    \5\ 18 CFR 5.5 (2018).
    \6\ 18 CFR 5.6 (2018).
    \7\ 18 CFR 5.3(b) (2018).
---------------------------------------------------------------------------

    This notice sets a deadline of 120 days from the date of this 
notice for interested applicants, other than the existing licensee, to 
file NOIs, PADs, and requests to use the traditional licensing process 
or alternative procedures.
    Applications for a subsequent license from potential applicants 
must be filed with the Commission at least 24 months prior to the 
expiration of the existing license.\8\ Because the existing license 
expires on December 31, 2023, applications for license for this project 
must be filed by December 31, 2021.\9\
---------------------------------------------------------------------------

    \8\ 18 CFR 16.20 (2018).
    \9\ To the extent an interested applicant files an NOI and PAD 
and elects or is required to use the Commission's ILP, a process 
plan will be issued within 180 days of this notice, which 
accelerates the steps of the ILP to allow for filing a timely 
subsequent license application by the December 31, 2021 deadline.
---------------------------------------------------------------------------

    Questions concerning this notice should be directed to Lee Emery at 
(202) 502-8379 or lee.emery@ferc.gov.

    Dated: January 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-01189 Filed 2-5-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.