Lansing Board of Water and Light; Notice of Existing Licensee's Failure To File a Notice of Intent To File a Subsequent License Application, and Soliciting Notices of Intent To File a License Application and Pre-Application Documents, 2210-2211 [2019-01189]
Download as PDF
amozie on DSK3GDR082PROD with NOTICES1
2210
Federal Register / Vol. 84, No. 25 / Wednesday, February 6, 2019 / Notices
Constellation Energy Commodities
Group Maine, LLC, Constellation
NewEnergy, Inc., Cow Branch Wind
Power, LLC, CR Clearing, LLC, Exelon
Generation Company, LLC, Wind
Capital Holdings, LLC.
Description: Supplement to December
22, 2017 Updated Market Power
Analysis for the Southeast Region of the
Exelon Southeast Entities.
Filed Date: 1/24/19.
Accession Number: 20190124–5212.
Comments Due: 5 p.m. ET 2/7/19.
Docket Numbers: ER17–2386–001.
Applicants: Great Bay Solar I, LLC.
Description: Report Filing: Refund
Report (ER17–2386 and EL18–8) to be
effective N/A.
Filed Date: 1/28/19.
Accession Number: 20190128–5137.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER18–1708–001.
Applicants: Copenhagen Wind Farm,
LLC.
Description: Notice of Non-Material
Change in Status of Copenhagen Wind
Farm, LLC.
Filed Date: 1/24/19.
Accession Number: 20190124–5229.
Comments Due: 5 p.m. ET 2/14/19.
Docket Numbers: ER18–1954–002.
Applicants: Gulf Power Company.
Description: Compliance filing: Notice
of Effective Date & Compliance Filing
(NITSA/NOA) ER18–1954 to be effective
1/1/2019.
Filed Date: 1/25/19.
Accession Number: 20190125–5141.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: ER18–2352–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2019–01–28_Amendment to Real-Time
Buybacks of Spinning and Offline
Supplemental to be effective 2/14/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5041.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–871–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
SWEPCO–ETEC Contracting Services
Agreements (Monitor, Op, Dispatch) to
be effective 1/1/2019.
Filed Date: 1/25/19.
Accession Number: 20190125–5113.
Comments Due: 5 p.m. ET 2/15/19.
Docket Numbers: ER19–872–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–01–28_SA 1925 ITC MidwestInterstate Power and Light 4th Rev DTIA
to be effective 3/30/2019.
Filed Date: 1/28/19.
VerDate Sep<11>2014
18:09 Feb 05, 2019
Jkt 247001
Accession Number: 20190128–5104.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–873–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Lighthouse EC-Golden Spread
EC Interconnection Agreement to be
effective 1/15/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5108.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–874–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 5260; Queue
No. AD1–060 to be effective 1/2/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5119.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–875–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–01–28_Cyber Security
Coordination to be effective 3/30/2019.
Filed Date: 1/28/19.
Accession Number: 20190128–5135.
Comments Due: 5 p.m. ET 2/19/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 29, 2019.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10684–000]
Lansing Board of Water and Light;
Notice of Existing Licensee’s Failure
To File a Notice of Intent To File a
Subsequent License Application, and
Soliciting Notices of Intent To File a
License Application and PreApplication Documents
The current license for the Lansing
Board of Water and Light’s Moores Park
Project No. 10684 (Moores Park Project)
was issued on January 5, 1994, for a
term of 30 years, ending December 31,
2023.1 The 600-kilowatt (kW) project is
located on the Grand River in the City
of Lansing, in Ingham County,
Michigan.
The principal project works consist
of: (1) A 240-acre reservoir with 2,000acre-feet of storage at a normal water
surface elevation of 833.6 feet National
Geodetic Vertical Datum; (2) a 190-footlong, 21-foot-high reinforced concrete
gravity dam divided into a 120-foot-long
flashboard-crested spillway section and
a 70-foot-long, three-bay Taintor-gate
section, each gate measuring 20-footlong by 10-foot-high; (3) a 110-foot-long,
50- to 83-foot-wide, 61-foot-high integral
water-impounding powerhouse
constructed of reinforced concrete and
brick masonry containing one horizontal
axis turbine-generator unit rated at 600
kW; (4) a 200-foot-long, 4,160-volt
underground transmission line
connected to a step-up transformer; and
(5) appurtenant equipment and
facilities.
At least five years before the
expiration of a license for a minor water
power project in which sections 14 and
15 of the Federal Power Act were
waived, the Commission’s regulations
require the licensee to file with the
Commission a notice of intent (NOI) that
contains an unequivocal statement of
the licensee’s intention to file or not to
file an application for a subsequent
license, details on the principal project
works and installed plant capacity, and
other information.2
If such a licensee does not inform the
Commission that it intends to file an
application for, in this case, a
subsequent license for the project, the
licensee may not file an application for
a subsequent license, either individually
or in conjunction with an entity or
[FR Doc. 2019–01168 Filed 2–5–19; 8:45 am]
1 Lansing Board of Water and Light, 66 FERC
62,002 (1994).
2 18 CFR 16.19(b) (2018) (citing 18 CFR 16.6(b)
(2018)).
BILLING CODE 6717–01–P
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
E:\FR\FM\06FEN1.SGM
06FEN1
Federal Register / Vol. 84, No. 25 / Wednesday, February 6, 2019 / Notices
entities that are not currently licensees
of the project.3
Because the existing license expires
on December 31, 2023, the NOI was due
to be filed by the close of business on
December 31, 2018. The Lansing Board
of Water and Light, the existing licensee
for the Moores Park Project, failed to file
an NOI for the project by this date.4
Any party interested in filing a license
application for the Moores Park Project
No. 10684 must first file a NOI 5 and
pre-application document (PAD) 6
pursuant to Part 5 of the Commission’s
regulations. Although the integrated
licensing process (ILP) is the default
pre-filing process, section 5.3(b) of the
Commission’s regulations allows a
potential license applicant to request to
use the traditional licensing process or
alternative procedures when it files its
NOI.7
This notice sets a deadline of 120
days from the date of this notice for
interested applicants, other than the
existing licensee, to file NOIs, PADs,
and requests to use the traditional
licensing process or alternative
procedures.
Applications for a subsequent license
from potential applicants must be filed
with the Commission at least 24 months
prior to the expiration of the existing
license.8 Because the existing license
expires on December 31, 2023,
applications for license for this project
must be filed by December 31, 2021.9
Questions concerning this notice
should be directed to Lee Emery at (202)
502–8379 or lee.emery@ferc.gov.
Dated: January 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–01189 Filed 2–5–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
3 18
CFR 16.24(b) (2018).
CFR 16.23(b) (2018).
5 18 CFR 5.5 (2018).
6 18 CFR 5.6 (2018).
7 18 CFR 5.3(b) (2018).
8 18 CFR 16.20 (2018).
9 To the extent an interested applicant files an
NOI and PAD and elects or is required to use the
Commission’s ILP, a process plan will be issued
within 180 days of this notice, which accelerates
the steps of the ILP to allow for filing a timely
subsequent license application by the December 31,
2021 deadline.
amozie on DSK3GDR082PROD with NOTICES1
4 18
VerDate Sep<11>2014
18:09 Feb 05, 2019
Jkt 247001
Docket Numbers: ER11–4507–010.
Applicants: Canastota Windpower,
LLC.
Description: Notice of Non-Material
Change in Status of Canastota
Windpower, LLC.
Filed Date: 1/29/19.
Accession Number: 20190129–5250.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER14–1421–001.
Applicants: Diamond State
Generation Partners, LLC.
Description: Compliance filing:
Informational Filing Pursuant to
Schedule 2 of the PJM OATT & Request
for Waiver to be effective N/A.
Filed Date: 1/29/19.
Accession Number: 20190129–5186.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER18–1934–001.
Applicants: Alabama Power
Company.
Description: Compliance filing: OATT
Compliance Filing (Relating to Sale of
Gulf Power) to be effective 1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130–5084.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER18–1938–001.
Applicants: Alabama Power
Company.
Description: Compliance filing:
Transmission Facility Cost Allocation
Tariff Compliance Filing to be effective
1/1/2019.
Filed Date: 1/30/19.
Accession Number: 20190130–5085.
Comments Due: 5 p.m. ET 2/20/19.
Docket Numbers: ER19–256–002.
Applicants: Wisconsin Power and
Light Company.
Description: Tariff Amendment:
Amendment to WPL Wholesale Formula
Rate Application to be effective 12/31/
2018.
Filed Date: 1/29/19.
Accession Number: 20190129–5209.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–257–002.
Applicants: Interstate Power and
Light Company.
Description: Tariff Amendment:
Amendment to IPL Wholesale Formula
Rate Application to be effective 12/31/
2018.
Filed Date: 1/29/19.
Accession Number: 20190129–5212.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–361–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
International Transmission Company,
Michigan Electric Transmission
Company, LLC, ITC Midwest LLC.
Description: Report Filing: 2019–01–
29_Refund Report for ITC Companies re
Transco Adder (EL18–140) to be
effective N/A.
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
2211
Filed Date: 1/29/19.
Accession Number: 20190129–5163.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–541–001.
Applicants: ITC Midwest LLC.
Description: Tariff Amendment:
Amendment to Filing of JUA with JoCarroll Energy to be effective 2/11/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5201.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–846–000.
Applicants: Antelope DSR 3, LLC.
Description: Supplement to January
22, 2019 Antelope DSR 3, LLC tariff
filing.
Filed Date: 1/29/19.
Accession Number: 20190129–5239.
Comments Due: 5 p.m. ET 2/12/19.
Docket Numbers: ER19–847–000.
Applicants: San Pablo Raceway, LLC.
Description: Supplement to January
22, 2019 San Pablo Raceway, LLC tariff
filing.
Filed Date: 1/29/19.
Accession Number: 20190129–5243.
Comments Due: 5 p.m. ET 2/12/19.
Docket Numbers: ER19–884–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing: DECSoCo Amended and Restated
Interconnection Contract Filing to be
effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5137.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–886–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing: DEFSoCo Amended and Restated
Interconnection Contract Filing to be
effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5139.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–887–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Filing of Interchange Contract
Amendments (to remove Gulf) to be
effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5141.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–888–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Filing of NITSA Amendments (to
remove Gulf) to be effective 1/1/2019.
Filed Date: 1/29/19.
Accession Number: 20190129–5143.
Comments Due: 5 p.m. ET 2/19/19.
Docket Numbers: ER19–889–000.
E:\FR\FM\06FEN1.SGM
06FEN1
Agencies
[Federal Register Volume 84, Number 25 (Wednesday, February 6, 2019)]
[Notices]
[Pages 2210-2211]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-01189]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10684-000]
Lansing Board of Water and Light; Notice of Existing Licensee's
Failure To File a Notice of Intent To File a Subsequent License
Application, and Soliciting Notices of Intent To File a License
Application and Pre-Application Documents
The current license for the Lansing Board of Water and Light's
Moores Park Project No. 10684 (Moores Park Project) was issued on
January 5, 1994, for a term of 30 years, ending December 31, 2023.\1\
The 600-kilowatt (kW) project is located on the Grand River in the City
of Lansing, in Ingham County, Michigan.
---------------------------------------------------------------------------
\1\ Lansing Board of Water and Light, 66 FERC 62,002 (1994).
---------------------------------------------------------------------------
The principal project works consist of: (1) A 240-acre reservoir
with 2,000-acre-feet of storage at a normal water surface elevation of
833.6 feet National Geodetic Vertical Datum; (2) a 190-foot-long, 21-
foot-high reinforced concrete gravity dam divided into a 120-foot-long
flashboard-crested spillway section and a 70-foot-long, three-bay
Taintor-gate section, each gate measuring 20-foot-long by 10-foot-high;
(3) a 110-foot-long, 50- to 83-foot-wide, 61-foot-high integral water-
impounding powerhouse constructed of reinforced concrete and brick
masonry containing one horizontal axis turbine-generator unit rated at
600 kW; (4) a 200-foot-long, 4,160-volt underground transmission line
connected to a step-up transformer; and (5) appurtenant equipment and
facilities.
At least five years before the expiration of a license for a minor
water power project in which sections 14 and 15 of the Federal Power
Act were waived, the Commission's regulations require the licensee to
file with the Commission a notice of intent (NOI) that contains an
unequivocal statement of the licensee's intention to file or not to
file an application for a subsequent license, details on the principal
project works and installed plant capacity, and other information.\2\
---------------------------------------------------------------------------
\2\ 18 CFR 16.19(b) (2018) (citing 18 CFR 16.6(b) (2018)).
---------------------------------------------------------------------------
If such a licensee does not inform the Commission that it intends
to file an application for, in this case, a subsequent license for the
project, the licensee may not file an application for a subsequent
license, either individually or in conjunction with an entity or
[[Page 2211]]
entities that are not currently licensees of the project.\3\
---------------------------------------------------------------------------
\3\ 18 CFR 16.24(b) (2018).
---------------------------------------------------------------------------
Because the existing license expires on December 31, 2023, the NOI
was due to be filed by the close of business on December 31, 2018. The
Lansing Board of Water and Light, the existing licensee for the Moores
Park Project, failed to file an NOI for the project by this date.\4\
---------------------------------------------------------------------------
\4\ 18 CFR 16.23(b) (2018).
---------------------------------------------------------------------------
Any party interested in filing a license application for the Moores
Park Project No. 10684 must first file a NOI \5\ and pre-application
document (PAD) \6\ pursuant to Part 5 of the Commission's regulations.
Although the integrated licensing process (ILP) is the default pre-
filing process, section 5.3(b) of the Commission's regulations allows a
potential license applicant to request to use the traditional licensing
process or alternative procedures when it files its NOI.\7\
---------------------------------------------------------------------------
\5\ 18 CFR 5.5 (2018).
\6\ 18 CFR 5.6 (2018).
\7\ 18 CFR 5.3(b) (2018).
---------------------------------------------------------------------------
This notice sets a deadline of 120 days from the date of this
notice for interested applicants, other than the existing licensee, to
file NOIs, PADs, and requests to use the traditional licensing process
or alternative procedures.
Applications for a subsequent license from potential applicants
must be filed with the Commission at least 24 months prior to the
expiration of the existing license.\8\ Because the existing license
expires on December 31, 2023, applications for license for this project
must be filed by December 31, 2021.\9\
---------------------------------------------------------------------------
\8\ 18 CFR 16.20 (2018).
\9\ To the extent an interested applicant files an NOI and PAD
and elects or is required to use the Commission's ILP, a process
plan will be issued within 180 days of this notice, which
accelerates the steps of the ILP to allow for filing a timely
subsequent license application by the December 31, 2021 deadline.
---------------------------------------------------------------------------
Questions concerning this notice should be directed to Lee Emery at
(202) 502-8379 or lee.emery@ferc.gov.
Dated: January 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-01189 Filed 2-5-19; 8:45 am]
BILLING CODE 6717-01-P